We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Tutorial 9 Construction Technology & Methods
Date : 5th September 2019
Q1). Briefly discuss the significant points in deciding on a road alignment
Q2). Write a short note on setting out a road trace Q3). Define the “Formation” and discuss the steps that can be taken to improve the formation Q4). Discuss compaction of earthwork in relation to road construction? Q5). Describe the construction of the sub base and the base course Q6). Write a short note on the common compaction specifications in use Q7). What is meant by the different principles of compaction Q8). What is the significance of the compaction layer thickness. Q9). Describe the process of laying the binder layer and the wearing course Q10). Write a short note on the rolling of the bituminous layers Q11). What are the precautionary measures that must be taken with bituminous mixtures? Q12). Give a definition to a bridge and explain its main structural components Q13). Define and discuss an “Integral Bridge” Q14). Explain the sucker deck principle with relevance to BM diagrams Q15). What are the main advantages of integral bridges Q16). Write a short note on culverts Q17). Briefly discuss causeways and viaducts, Q18). Discuss the use of coffer dams in bridge construction Q19). Describe the use of bearings in bridges Q20). Explain life cycle costs in relation to bridges