Larsen & Toubro LTD., Eccd Project Quality Plan: Daily Progress Report

This daily progress report from Larsen & Toubro Ltd provides information on the ECCD project quality plan for the RMZ Centennial site. It includes a table summarizing planned and actual work completed across various construction activities like excavation, backfilling, and formwork. Material and labor resources used on site are also tracked. The report is distributed to provide a status update on construction schedule and percentage of work completed to stakeholders.

Uploaded by

Mahamadali Desai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
896 views1 page

Larsen & Toubro LTD., Eccd Project Quality Plan: Daily Progress Report

This daily progress report from Larsen & Toubro Ltd provides information on the ECCD project quality plan for the RMZ Centennial site. It includes a table summarizing planned and actual work completed across various construction activities like excavation, backfilling, and formwork. Material and labor resources used on site are also tracked. The report is distributed to provide a status update on construction schedule and percentage of work completed to stakeholders.

Uploaded by

Mahamadali Desai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

LARSEN & TOUBRO LTD.

DAILY PROGRESS REPORT


,ECCD PROJECT QUALITY
QUALITY MANAGEMENT PLAN DATE:

RMZ CENTENNIAL
FORMAT NO. QAF/DPR/20 REV NO.00

Name of Work : Contract Start


    T Employer : Date
    C
    E
    J Contract Completion
    O
    R Contractor :
    P

Dur. in Da ys: Total Elapsed Balance


    E From : To :
    TI Normal D ay Rainy Site C onditions: Slushy Dry
T
    S

ACTIVITY
FOR THE DAY Cum
DESCRIPTION LOCATION UNIT TOTAL QTY PL. NEXT DAY % CO MP
. PLANNED ACHIEVED Achieved
EXCAVATION
BACKFILLING
FORMWORK
PCC
REINFORCEMENT
    S RCC
    S
    E
    R BLOCKWORK
    G
    O BRICKWORK
    R
    PK SSM
    R
    O
    W PLASTER
WATER PROOFING

MAN POW ER MAT E RI L


A CONSUMPTION
RECEIPTS
DESCRIPTION PLANNED ACTUAL DESCRIPTION UNIT
    L FOR DAY TILL DATE FOR D AY TILL D ATE
    A
    IR
    E
    T
    A
    M
    &
    R
    U
    O
    B
    A
    L

TOTAL
Distribution Prepared b y: Construction m anager
    S
    T
    NIN
    A
    R
    T
    S
    N
    O
    C