0% found this document useful (0 votes)
73 views6 pages

Bill of Quantity (Boq) Rekapitulasi Pembangunan Tahap Ii Gedung Rawat Inap Rumah Sakit Umum Daerah Dr. M. Yunus Bengkulu Tahun Anggaran 2019

This document is a bill of quantities (BOQ) for the construction of the second phase of the inpatient building at Dr. M. Yunus General Hospital in Bengkulu Province for the 2019 budget year. It includes 3 sections - preparatory work, architecture work, and mechanical & electrical work. The architecture work section includes items for wall and floor finishes like aluminum rail guards and acrylic signage. The mechanical & electrical section lists the specifications and quantities for air conditioning units to be installed on the upper ground, first, and second floors, including outdoor and indoor units of various capacities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views6 pages

Bill of Quantity (Boq) Rekapitulasi Pembangunan Tahap Ii Gedung Rawat Inap Rumah Sakit Umum Daerah Dr. M. Yunus Bengkulu Tahun Anggaran 2019

This document is a bill of quantities (BOQ) for the construction of the second phase of the inpatient building at Dr. M. Yunus General Hospital in Bengkulu Province for the 2019 budget year. It includes 3 sections - preparatory work, architecture work, and mechanical & electrical work. The architecture work section includes items for wall and floor finishes like aluminum rail guards and acrylic signage. The mechanical & electrical section lists the specifications and quantities for air conditioning units to be installed on the upper ground, first, and second floors, including outdoor and indoor units of various capacities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

REKAPITULASI

BILL OF QUANTITY (BOQ)


PEMBANGUNAN TAHAP II GEDUNG RAWAT INAP
RUMAH SAKIT UMUM DAERAH DR. M. YUNUS BENGKULU
TAHUN ANGGARAN 2019

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

I. PEKERJAAN PERSIAPAN
a. Pekerjaan papan nama proyek ls 1.00 -
b. Penyediaan air kerja ls 1.00 -
c. Penyediaan listrik kerja ls 1.00 -
d. Biaya Administrasi dan Dokumentasi ls 1.00 -
JUMLAH I.PEKERJAAN PERSIAPAN -
II. PEKERJAAN ARSITEKTUR
2.1 PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI
1 Wall guard (Raill guard) Alumunium Extrude profil m¹ 55.85 -
2 Wall guard (Bumper guard) Alumunium Extrude profil m¹ 35.25 -
3 Signage Acrylic Nyala "Instalasi Rawat Inap" Unit 1.00 -
JUMLAH 2,1PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI -

III. PEKERJAAN MEKANIKAL & ELEKTRIKAL


3.1. PEKERJAAN AIR CONDITIONING
a. LANTAI UPPER GROUND
Pekerjaan Unit AC, termasuk dudukan Unit
1 Unit Inverter Air Conditioning Teknologi Variable Refrigrant system
System UG.A, Out Door Unit Kapasitas : 276 000 BTU/h unit 1.00 -
- Indoor Unit IU.UG.A6, Wall Type
kapasitas : 6 000 BTU/h unit 1.00 -
- Indoor Unit IU.UG.A1 s.d A5, A9 s.d A13, Wall type
kapasitas : 16 000 BTU/h unit 10.00 -
- Indoor Unit IU.A14,15, Cassete type
kapasitas : 25 000 BTU/h unit 2.00 -
System UG.B, Out Door Unit Kapasitas : 206 000 BTU/h unit 1.00 -
- Indoor Unit IU.UG.B7, Wall Type
kapasitas : 6 000 BTU/h unit 1.00 -
- Indoor Unit UU.B6,8, Wall Type
kapasitas : 12 000 BTU/h unit 2.00 -
- Indoor Unit IU.B14, Cassete Type
kapasitas : 12 000 BTU/h unit 1.00 -
- Indoor Unit IU.UG.B1 s.d B5 & B9 s.d B12, Wall type
kapasitas : 16 000 BTU/h unit 9.00 -
- Indoor Unit UG.B13,14, Cassete Type
kapasitas : 25 000 BTU/h unit 2.00 -
JUMLAH a.LANTAI UPPER GROUND -

b. LANTAI SATU
Pekerjaan Unit AC, termasuk dudukan Unit
1 Unit Inverter Air Conditioning Teknologi Variable Refrigrant system
System 1A, Out Door Unit Kapasitas : 259 000 BTU/h unit 1.00 -
- Indoor Unit IU.1.A6, Wall Type
kapasitas : 6 000 BTU/h unit 1.00 -
- Indoor Unit IU.B6,8,B14, Wall Type
kapasitas : 12 000 BTU/h unit 2.00 -
- Indoor Unit IU.1.A1 s.d A5, A9 s.d A13, Wall type
kapasitas : 16 000 BTU/h unit 10.00 -
- Indoor Unit IU.1.A15, Cassete type
kapasitas : 25 000 BTU/h unit 2.00 -
System !B, Out Door Unit Kapasitas : 238 000 BTU/h unit 1.00 -
- Indoor Unit IU.1B7, Wall Type
kapasitas : 6 000 BTU/h unit 1.00 -
- Indoor Unit UI,1B6,8, Wall Type
kapasitas : 12 000 BTU/h unit 2.00 -
- Indoor Unit IU.1B1 s.d 1B5 & 1B9 s.d 1B12, Wall type
kapasitas : 16 000 BTU/h unit 9.00 -
- Indoor Unit IU.1B14 s.d 1B15, Wall type
kapasitas : 16 000 BTU/h unit 2.00 -
- Indoor Unit IU,1B15, Cassete Type
kapasitas : 32 000 BTU/h unit 1.00 -
JUMLAH b.LANTAI SATU -

Pek. Non Standar - page 1 of 6


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)

c. LANTAI DUA
Pekerjaan Unit AC, termasuk dudukan Unit
1 Unit Inverter Air Conditioning Teknologi Variable Refrigrant system
System 2A, Out Door Unit Kapasitas : 224 000 BTU/h unit 1.00 -
- Indoor Unit IU.2.A6, Wall Type
kapasitas : 6 000 BTU/h unit 1.00 -
- Indoor Unit IU.2.B6 s.d 2B4, dan 2B7 s.d 2B16, Wall Type
kapasitas : 12 000 BTU/h unit 11.00 -
- Indoor Unit IU.2A5 s.d 2A8, Wall type
kapasitas : 16 000 BTU/h unit 2.00 -
- Indoor Unit IU.2.A15, Cassete type
kapasitas : 25 000 BTU/h unit 1.00 -
System 2B, Out Door Unit Kapasitas : 214 000 BTU/h unit 1.00 -
- Indoor Unit IU.2B7, Wall Type
kapasitas : 6 000 BTU/h unit 1.00 -
- Indoor Unit UI,2.B.1, s.d 2.B 4 & 2.B5 s.d 2B 12, Wall Type
kapasitas : 12 000 BTU/h unit 9.00 -
- Indoor Unit IU.2B.8 s.d 2.B.10,2.B.13 & 2.B.14, Wall type
kapasitas : 16 000 BTU/h unit 4.00 -
- Indoor Unit IU.1B14 s.d 1B15, Wall type
kapasitas : 16 000 BTU/h unit 2.00 -
- Indoor Unit IU,1B15, Cassete Type
kapasitas : 32 000 BTU/h unit 1.00 -
JUMLAH c.LANTAI DUA -
JUMLAH 3.1.PEKERJAAN AIR CONDITIONING -

3.2. PEKERJAAN PENGADAAN DAN ELEVATOR TYPE ROOM LESS


1 Elevator
- Jenis : Hospital Bed Elevator unit 1.00 -
- Kapasitas : 1600 Kg
- Kecepatan : 60 Mpm
- Lintasan : 4/4
Sistem Oprasi : Duplex
- Kelengkapan : ARD
: Inverter
JUMLAH 3.2.PEKERJAAN PENGADAAN DAN ELEVATOR TYPE ROOM LESS -

3.3. PENAMBAHAN DAYA


1 Penambahan Daya 1110 KVA (dari 865 KVA menjadi 1975 KVA)
- Biaya Penyambungan (BP) VA 1,975,000.00 -
- Uang Jaminan Layanan (UJL) VA 1,975,000.00 -
- SLO Unit 1.00 -

JUMLAH 3.3.PENAMBAHAN DAYA -


3.4. PEKERJAAN CIBICLE TM
1 Cubicle Incoming PLN Unit 1.00 -
2 Kabel NYY 1x500 mm m' 80.00 -
3 Out Going Panel + Accesoris Unit 1.00 -
JUMLAH 3.4.PEKERJAAN CIBICLE TM -

3.5. PEKERJAAN PENGADAAN TRAVO 1250 KVA


1 Distribution Transformer
2000 KVA ; 20KV/400-231V;Dyn 5, 50 Hz, ONAN;Totally Oil Filled Type Complete With : unit 1.00 -
- RIS / DGPT 2
- Elatimold plug in bushing
- Merk : UNINDO / STARLIST

JUMLAH 3.5.PEKERJAAN PENGADAAN TRAVO 1250 KVA -


JUMLAH III. PEKERJAAN MEKANIKAL & ELEKTRIKAL -

IV. PEKERJAAN UTILITAS


4.1. PEKERJAAN INSTALASI AIR KOTOR, BEKAS DAN VENT
1 STP. Bioseptic Anaerob+aerob Kap. 40 m3/hari (Package) set 1.00 -
Panel Kontrol
Kabel kontrol
Galian Urugan Tanah dan Buangan
Beton Bertulang
2 Bak Kontrol 400x400x400 mm unit 5.00 -
3 Bak Summpit 3000x3000x1500 mm unit 1.00 -
4 Bak Summpit 2000x2000x1500 mm unit 1.00 -
5 Pompa Sumpit 150 liter/menit (Package) Set 3.00 -
Lengkap dengan:
Pompa 2 unit
Panel Kontrol
Kabel kontrol
WLC Dan Aksesories
Gate Valve
Check Valve
6 Pemipaan:
* Pipa PVC AW Dia. 2.1/2" meter 200.00 -
Dari Summpit Ke Bak Pengedapan Awal
* Pipa PVC AW Dia. 4" meter 300.00 -
Dari Bak Pengedapan Awal Ke Bioseptic
Dari Bioseptic Ke Saluran Drainase
JUMLAH 4.1. PEKERJAAN INSTALASI AIR KOTOR, BEKAS DAN VENT -

Pek. Non Standar - page 2 of 6


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)

4.2. PEKERJAAN INSTALASI HYDRANT


1 Diesel Fire Pump Lengkap panel kontrol standar NFPA20 set 1.00 -
Type Horizontal Split Case
Kapasitas : 500 Us.GPM
Head : 75 meter
2 Electric Pire Pump lenkap panel kontrol standart NFPA20 set 1.00 -
Type Horizontal Split Case
Kapasitas : 500 Us.GPM
Head : 75 meter
3 Jocke Fire Pump lengkap panel kontrol standart NFPA20 set 1.00 -
Type : Vertical Segment
Kapasitas : 25 Us.GPM
Head : 85 meter
4 Presure Tank 1000 liter lengkap dengan aksesories set 1.00 -
5 Pemipaan:
* Pipa BSP SCH 40 Dia. 2" meter 40.00 -
* Pipa BSP SCH 40 Dia. 3" meter 26.00 -
* Pipa BSP SCH 40 Dia. 4" meter 237.00 -
* Pipa BSP SCH 40 Dia. 6" meter 430.00 -
* Pipa BSP SCH 40 Dia. 8" meter 590.00 -
6 Fiiting & Material Bantu 35% Dari Harga Pipa (SNI) lot 1.00 - -
7 Pilar Hydrant 20K Dia. 100 mm Buah 8.00 -
8 Outdoor Hydrant Box Buah 8.00 -
9 Gate Valve 20K Dia. 4" Buah 12.00 -
10 Gate Valve 20K Dia. 6" Buah 4.00 -
11 Siamese Dia. 100 mm Buah 2.00 -
JUMLAH 4.2. PEKERJAAN INSTALASI HYDRANT -

4.3. PEKERJAAN PENERANGAN LUAR / SITE


1 Lampu Penerangan Jalan / PJU, area parkir
Lampu LED 1 x 80 watt Buah 6.00 -
Lampu LED 2 x 80 watt Buah 1.00 -
Tiang lampu oktagonal galvanis tinggi 9 meter unit 7.00 -
2 Lampu Taman Esential 28 watt lengkap tiang tinggi 1200mm unit 13.00 -
3 Instalasi Penerangan PJU
Dari panel LP-PL ke Box lampu kabel NYFGBY 4 x 4mm2 m' 20.00 -
Dari Box lampu ke Terminal setiap lampu kabel NYFGBY x 2,5mm2 m' 100.00 -
4 Instalasi Penerangan Taman
Dari panel LP-PL ke Box lampu kabel NYFGBY 4 x 4mm2 m' 9.00 -
Dari Box lampu ke Terminal setiap lampu kabel NYFGBY x 2,5mm2 m' 232.00 -
5 Matrial bantu Ls 1.00 -
JUMLAH 4.3.PEKERJAAN PENERANGAN LUAR / SITE -
4.4. PEKERJAAN RUANG POMPA
A. PEKERJAAN PERSIAPAN
1 Pembersihan dan Pemerataan Lahan m² 70.50 -
2 Pengukuran dan pemasangan bowplank m' 35.00 -

B PEKERJAAN TANAH DAN PASIR


1 Galian Tanah m³ 22.80 -
2 Urugan Tanah Kembali m³ 11.29 -
3 Tanah Urugan Bawah Lantai m³ 8.72 -
4 Pasir Urug, m³ 7.59 -
5 Lantai Kerja, t = 5 cm m³ 0.20 -
6 Rabat Beton , t = 8 cm m³ 2.16 -

C. PEKERJAAN STRUKTUR
1 Pek. Pondasi Plat Setempat 80 x 80 x 25 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 0.64 -
- Besi U-40 kg 99.43 -
- Begesting m² 2.56 -
2 Pek. Sloof 20/30 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 1.74 -
- Besi U-40 kg 352.71 -
- Begesting m² 17.40 -
3 Pek. Kolom 30/30 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 1.51 -
- Besi U-40 kg 256.48 -
- Begesting m² 20.16 -
4 Pek. Kolom 20/20 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 0.36 -
- Besi U-40 kg 72.62 -
- Begesting m² 7.20 -
4 Pek. Balok Konsul
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 0.10 -
- Besi U-40 kg 26.36 -
- Begesting m² 1.60 -
5 Pek. Balok 20/30 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 1.73 -
- Besi U-40 kg 337.49 -
- Begesting m² 23.04 -
6 Pek. Beton Plat Dak Atap T. 12cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 4.32 -
- Besi U-40 kg 654.28 -
- Begesting m² 31.78 -
7 Pek. Beton Lantai T. 15cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 3.54 -
- Besi U-40 kg 220.15 -

Pek. Non Standar - page 3 of 6


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)

C. PEKERJAAN PASANGAN
1 Aanstamping m³ 3.00 -
2 Pondasi Bt. Belah 1 Pc : 4 Pp m³ 7.88 -
3 Dinding Batu Bata 1 Pc : 4 Pc m² 48.60 -
4 Plasteran 1 Pc : 4 Pp m² 97.20 -
5 Acian dinding dan Kolom m² 97.20 -
6 Memasang dinding Homogeneus tile 60 x 60 cm m² 13.50 -
7 Plasteran Rabat m² 27.00 -
8 Acian Rabat m² 27.00 -
9 Saluran Keliling Bangunan m' 32.00 -
10 Pemasangan Tralis Pintu unit 1.00 -
11 Pemasangan Pintu type A2HM1 unit 1.00 -
12 Jendela Type BVB unit 2.00 -

G. PEKERJAAN INSTALASI LISTRIK


1 Lampu LED 12 W Menempel Di plat Beton bh 2.00 -
2 Saklar Ganda bh 1.00 -
3 Stop Kontak Daya / 1 Phase bh 1.00 -
4 Instalasi Penerangan titik 2.00 -
5 Instalasi Stop Kontak titik 1.00 -

H. PEKERJAAN PENGECATAN
1 Pek. Cat Tembok dan Kolom m² 79.39 -
2 Pek. Cat Beton Expose m² 25.64 -

JUMLAH 4.4. PEKERJAAN RUANG POMPA -


4.5. PEKERJAAN RUANG JAGA / SECURITY
A. PEKERJAAN PERSIAPAN
1 Pembersihan dan Pemerataan Lahan m² 25.00 -
2 Pengukuran dan pemasangan bowplank m' 20.00 -

B PEKERJAAN TANAH DAN PASIR


1 Galian Tanah m³ 5.40 -
2 Urugan Tanah Kembali m³ 2.07 -
3 Tanah Urugan Bawah Lantai m³ 1.22 -
4 Pasir Urug, m³ 1.65 -
5 Lantai Kerja, t = 5 cm m³ 0.41 -
6 Rabat Beton , t = 6 cm m³ 0.75 -

C. PEKERJAAN STRUKTUR
1 Pek. Sloof 15/25 cm
- Beton mutu K 175 ,slump ( 12 + 2) cm m³ 0.42 -
- Besi U-24 kg 19.61 -
- Begesting m² 5.60 -
2 Pek. Kolom20/20 cm
- Beton mutu K 175 ,slump ( 12 + 2) cm m³ 0.32 -
- Besi U-24 kg 29.85 -
- Begesting m² 6.31 -
3 Pek. Kolom13/13 cm
- Beton mutu K 175 ,slump ( 12 + 2) cm m³ 0.13 -
- Besi U-24 kg 26.58 -
- Begesting m² 3.08 -
4 Pek. Balok 13/13 cm
- Beton mutu K 175 ,slump ( 12 + 2) cm m³ 0.24 -
- Besi U-24 kg 45.38 -
- Begesting m² 3.72 -
5 Pek. Ring Balok 15/20 cm
- Beton mutu K 175 ,slump ( 12 + 2) cm m³ 0.29 -
- Besi U-24 kg 38.87 -
- Begesting m² 4.48 -
6 Pek. Meja Beton T. 10 cm
- Beton mutu K 175 ,slump ( 12 + 2) cm m³ 1.67 -
- Besi U-24 kg 99.21 -
- Begesting m² 16.72 -

D. PEKERJAAN PASANGAN
1 Aanstamping m³ 1.08 -
2 Pondasi Bt. Belah 1 Pc : 4 Pp m³ 2.25 -
3 Dinding Batu Bata 1 Pc : 4 Pp m² 21.73 -
4 Plesteran semen instan m² 43.47 -
5 Acian semen instan m² 43.47 -
6 Granit 40 x 40 cm m² 12.82 -
7 Memasang dinding Homogeneus tile 60 x 60 cm m² 8.51 -
8 Plesteran semen instan m² 12.48 -
9 Acian semen instan m² 12.48 -
10 Saluran Keliling Bangunan m' 23.52 -

E. PEKERJAAN PLAPOND
1 Plafond Aluminium Spandrel m² 27.74 -
2 List Plafond alumunium m' 56.00 -
3 ACP PVDF 0.5 mm tebal 4 mm alloy 3003 m² 27.54 -

F. PEKERJAAN ATAP
1 Atap Onduline + Rangka Baja Ringan C 75.75 R.32.45 m² 28.28 -
2 Nok Atas m' 11.16 -
3 List Plank GRC m' 18.88 -

G. PEKERJAAN PENERANGAN
1 Lampu Down Light 10 W bh 5.00 -
2 Saklar ganda 10 A bh 1.00 -
3 Stop kontak daya 10/16 A bh 2.00 -
4 Instalasi Penerangan ttk 5.00 -
5 Instalasi Stop Kontak ttk 2.00 -

Pek. Non Standar - page 4 of 6


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)

I. PEKERJAAN PENGECATAN
1 Cat Dinding Interior m² 21.73 -
2 Cat Kayu m² 4.72 -

-
-

V. PEKERJAAN INFRASTRUKTUR
5.1. PEKERJAAN JALAN, PARKIR, SALURAN DAN PEDESTERIAN
A. PEKERJAAN JALAN DAN PARKIR
1 Pekerjaan Lapisan Asphalt m² 973.81 -
2 Pemadatan Tanah dengan CBR + Test m³ 730.35 -
3 Base Course ф5 - 7 mm T = 25 cm LPA m³ 243.45 -
4 Sub Base ф20 - 30 mm T = 20 cm LPB m³ 194.76 -
5 Pekerjaan Rabat Beton (10cm) m³ 97.38 -
6 Pekerjaan Lapisan Permukaan Beton (20cm) m³ 194.76 -
7 Pekerjaan Kansteen m' 312.36 -
8 Pekerjaan Cat Marka Jalan m' 70.00 -
9 Pekerjaan Car Stopper, Lebar = 1.7 m unit 14.00 -

B. PEKERJAAN SALURAN
1 Saluran U Ditch 30 x 40 cm m' 127.18 -
2 Pemasangan Grill, Lebar = 30 cm m' 34.58 -
3 Plat Beton t = 10 cm m³ 5.09 -

C. PEKERJAAN PEDESTERIAN/TROTOAR
1 Pemadatan tanah m³ 274.73 -
2 Pasir urug, t = 10 cm m³ 27.47 -
3 Pekerjaan Paving Block t=6 cm (Full pavement 20/20 warna) m² 274.73 -
JUMLAH 5.1. PEKERJAAN JALAN, PARKIR, SALURAN DAN PEDESTERIAN -

5.2. PEKERJAAN DINSING PENAHAN TANAH / DPT


A. PEKERJAAN TANAH
1 Pembersihan dan Pemerataan Lahan m² 495.33 -

B. PEKERJAAN DINDING PENAHAN TANAH PASANGAN BATU


1 Galian Tanah m³ 81.89 -
2 Urugan Kembali m³ 9.29 -
3 Pasir Urug, t = 10 cm m³ 13.65 -
4 Pipa Suling PVC Dia. 2" m' 360.00 -
5 Pondasi Batu Belah Campuran 1 PC : 4 PP m³ 58.96 -
6 Dinding Batu Belah Penahan Tanah Campuran 1 PC : 4 PP m³ 247.03 -

C. PEKERJAAN DINDING PENAHAN TANAH PASANGAN BETON


1 Galian Tanah m³ 136.11 -
2 Urugan Kembali m³ 67.97 -
3 Urugan Tanah m³ 392.77 -
4 Pasir Urug, T = 8 cm m³ 11.46 -
5 Lantai Kerja, T = 8 cm m³ 11.46 -
6 Pipa Suling PVC Dia. 2" m' 320.00 -
7 Pek. Pondasi Plat Menerus T. 35 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 45.22 -
- Besi U-40 kg 8,033.90 -
- Begesting m² 51.85 -
8 Pek. Kolom 30 x 40 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 13.41 -
- Besi U-40 kg 2,912.85 -
- Begesting m² 67.05 -
9 Pek. Balok LT 20 x 45
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 2.96 -
- Besi U-40 kg 635.90 -
- Begesting m² 13.17 -
10 Balok RB 20 x 25
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 3.07 -
- Besi U-40 kg 1,180.22 -
- Begesting m² 24.57 -
11 Dinding Penahan Tanah campuran 1 PC : 2 PP : 3 PP
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 73.61 -
- Besi U-40 kg 6,289.85 -
- Begesting m² 411.41 -

D. PEKERJAAN TANGGA RAM BETOM


1 Galian Tanah m³ 14.68 -
2 Urugan Kembali m³ 8.93 -
3 Pasir Urug, T = 8 cm m³ 17.45 -
4 Lantai Kerja, T = 8 cm m³ 17.26 -
5 Pek. Pasangan Besi Siku L 40.40.4 kg 650.64 -
6 Pek. Pasangan Grill Besi m' 10.50 -
7 Pek. Pondasi Plat Setempat 120 x 120 x 25 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 1.25 -
- Besi U-40 kg 265.14 -
- Begesting m² 4.00 -
8 Pek. Kolom 30 x 30 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 0.40 -
- Besi U-40 kg 146.93 -
- Begesting m² 5.28 -
9 Pek. Sloof SL 25 x 40
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 9.56 -
- Besi U-40 kg 2,250.35 -
- Begesting m² 76.46 -

Pek. Non Standar - page 5 of 6


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
10 Pek. Tangga Ram Beton
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 2.54 -
- Besi U-40 kg 229.71 -
- Begesting m² 8.68 -
11 Pek. Ram Beton T. 15 cm
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 21.72 -
- Besi U-40 kg 3,154.60 -
- Begesting m² 10.23 -
12 Pek. Saluran Beton
- Beton Ready Mix K-300, fc' = 24.9 MPa m³ 3.36 -
- Besi U-40 kg 334.28 -
- Begesting m² 23.10 -
JUMLAH 5.2. PEKERJAAN DINSING PENAHAN TANAH / DPT -

5.3. PEKERJAAN LANDSCAPE


1 Pengolahan Dan Penggemburan Tanah Untuk Penanaman Rumput m2 1,778.64 -
2 Penanaman Rumput Gajah Mini Area Taman m2 1,778.64 -
3 Tanaman Bunga btg 350.00 -
4 Tanaman Pohon ketapang T= 1,5 -2 M Diameter batang min.4-8 cm btg 50.00 -
5 Tanaman Pohon Tanjung= 1,5 -2 M Diameter batang min.4-8 cm btg 45.00 -
6 Tanaman Pohon Bungur T= 1,5 -2 M Diameter batang min.4-8 cm btg 50.00 -
7 Tanaman Pohon palem rajaT= 1,5 -2 M Diameter batang min.4-8 cm btg 40.00 -
JUMLAH 5.3. PEKERJAAN LANDSCAPE -
JUMLAH V. PEKERJAAN INFRASTRUKTUR -

Pek. Non Standar - page 6 of 6