0% found this document useful (0 votes)
701 views1 page

Handing Over Form

This production handover form documents the transfer of equipment, drawings, and documentation from engineering to production for a new product. It lists 10 items being handed over including cutters, jigs, patterns, test rigs, approved drawings, bills of materials, validation reports, supplier details, and process flows. The form requires sign off from those handing over and receiving the production transfer.

Uploaded by

daniel_sasikumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
701 views1 page

Handing Over Form

This production handover form documents the transfer of equipment, drawings, and documentation from engineering to production for a new product. It lists 10 items being handed over including cutters, jigs, patterns, test rigs, approved drawings, bills of materials, validation reports, supplier details, and process flows. The form requires sign off from those handing over and receiving the production transfer.

Uploaded by

daniel_sasikumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Production Handing over form

Product Description
Product Code

Following items are handedover to production


Sl.No. Details Handed over to Date
1 Cutters
2 Jigs & Fixtures
3 Patterns & its Locations
4 Test Rigs
5 Customer approved GA Drawings
6 Process Drawings
7 BOM
8 Copy of Validation reports
9 Supplier details
10 Process flow for each item

Issued by Received by

You might also like