This production handover form documents the transfer of equipment, drawings, and documentation from engineering to production for a new product. It lists 10 items being handed over including cutters, jigs, patterns, test rigs, approved drawings, bills of materials, validation reports, supplier details, and process flows. The form requires sign off from those handing over and receiving the production transfer.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
701 views1 page
Handing Over Form
This production handover form documents the transfer of equipment, drawings, and documentation from engineering to production for a new product. It lists 10 items being handed over including cutters, jigs, patterns, test rigs, approved drawings, bills of materials, validation reports, supplier details, and process flows. The form requires sign off from those handing over and receiving the production transfer.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Production Handing over form
Product Description Product Code
Following items are handedover to production
Sl.No. Details Handed over to Date 1 Cutters 2 Jigs & Fixtures 3 Patterns & its Locations 4 Test Rigs 5 Customer approved GA Drawings 6 Process Drawings 7 BOM 8 Copy of Validation reports 9 Supplier details 10 Process flow for each item