SECTION B-B

BENCHING DETAIL

C C

SECTION A-A

A
C C

B
A

SECTION B-B

25Ø BOLT.

THICKNESS AS PER
ROCK LINE

SUPPORT CLASS
SHOTCRETE
B
NUT BEARING PLATE
200X200X10THK.
DETAIL - A

SECTION C-C ROCK BOLTS


(SCALE: 1:15)

POINTS X Y
F0 0.00 0.00
F1 0.00 3.33
F2 0.27 2.29
A F3 -0.27 2.29
F4 1.78 2.16
F5 -1.78 2.16
F6 3.34 -0.01
F7 -3.34 -0.01
F8 0.00 19.20

SECTION B-B Ø32

HEADING DETAIL Ø25


Ø8

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM
CROSS SECTION DETAIL-A1 DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD.
0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE CHECKED APPROVED
D0 DEC 2020 DRAFT SUBMISSION DESIGNED DRAWN
NATIONAL HIGHWAYS OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3
POINTS X Y
E0 3.00 0.00
E1 3.00 3.33
E2 -1.78 2.16
E3 1.78 2.16
E4 -3.09 1.55
E5 3.09 1.55

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM CROSS SECTION PRIMARY -B2 DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD.
0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE CHECKED APPROVED
D0 DEC 2020 DRAFT SUBMISSION DESIGNED DRAWN
NATIONAL HIGHWAYS OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3
B B

C C

B
B

SECTION C-C SECTION A-A

A
C C

SECTION B-B

SECTION D-D POINTS X Y


HEADING DETAIL E0 3.00 0.00
E1 3.00 3.33
E2 -1.78 2.16
E3 1.78 2.16
E4 -3.09 1.55
E5 3.09 1.55
25Ø BOLT.
THICKNESS AS PER

ROCK LINE
SUPPORT CLASS
SHOTCRETE

NUT BEARING PLATE


200X200X10THK.

SECTION E-E DETAIL - A Ø26


BENCHING DETAIL ROCK BOLTS
Ø20
(SCALE: 1:15)
Ø8

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM CROSS SECTION PRIMARY -B2 DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD. 0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE
D0 DEC 2020 DESIGNED DRAWN CHECKED APPROVED
DRAFT SUBMISSION OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
NATIONAL HIGHWAYS
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3
A

POINTS X Y
E0 0.00 0.00
E1 0.00 3.33
E2 -1.78 2.16
E3 1.78 2.16
E4 -3.09 1.55
E5 3.09 1.55
E6 -5.10 2.89
E7 5.10 2.89
E8 0.00 18.79
E9 -4.24 -0.46
E10 4.24 -0.46

B B

C C C C

A
B B
SECTION B-B
SECTION A-A
SECTION C-C

Ø32

Ø25

Ø8

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM CROSS SECTION PRIMARY -C1A DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD. 0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE
D0 DEC 2020 DESIGNED DRAWN CHECKED APPROVED
DRAFT SUBMISSION OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
NATIONAL HIGHWAYS
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3
BOLT PLATE FOR SN BOLTS
(GROUTED)
(SCALE: 1:10)

25Ø BOLT.

THICKNESS AS PER
ROCK LINE

SUPPORT CLASS
SHOTCRETE
SECTION B-B NUT BEARING PLATE
BENCHING DETAIL 200X200X10THK.
DETAIL - A
ROCK BOLTS

SECTION E-E
HEADING DETAIL

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM
DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD. 0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE
D0 DEC 2020 DESIGNED DRAWN CHECKED APPROVED
DRAFT SUBMISSION OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
NATIONAL HIGHWAYS
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3