A job safety analysis (JSA) is a procedure which helps integrate accepted safety and health principles and
practices into a particular task or job operation. In a JSA, potential hazards are identified for each step of the
task and controls recommended for the safest way to do the job.
A Take 5 risk assessment can be used instead of a JSA when the work activity involves a simple task with a
limited number of low risk hazards and there is good understanding about how the hazards should be
controlled to ensure the task is completed safely. For example doing a visual inspection of a worksite, or
closing off a valve, or investigating a tripped switch.
Developing a JSA
The person leading the work is responsible for developing the JSA. This is typically the:
One method of doing a JSA is to have a group of experienced workers complete the analysis through
discussion. An advantage of this method is that more people are involved in a wider base of experience and
promoting a more ready acceptance of the resulting work procedure. This method is most suitable for
infrequently performed or new jobs; or situations where observation may not be practical.
These three prompt questions will provide you with the basic information needed to build your JSA. Once you
have your JSA framework built, use available guidance to ensure the risk control measured selected are
sufficient to reduce the risk so far as reasonably practicable i.e. standards, best practice guidelines, WSL Key
Requirements and risks assessments. Include diagrams and photos where needed.
Step 1: Select job to be analysed. When writing the description of the works, clearly define the activities for
which the JSA applies. Complex jobs, or jobs that last several weeks, it’s often more effective to break the job
analysis into specific work packs each with an individual JSA.
Step 2: Record the steps in the task. Examine a specific job by breaking it down into a series of steps or tasks.
This will enable you to discover potential hazards you and the Work Team may encounter. Each job or
operation will consist of a set of steps or tasks. Be sure to list all the steps needed to perform the job. Some
steps may not be performed each time, i.e. setting up the work area, however, if that step is generally part of
the job, it should be listed.
Example:
Step 3: Identify the hazards and assess the risks. A hazard is a potential danger. The purpose of the Job Safety
Analysis is to identify ALL hazards, both those produced by the environment or conditions and those
connected with the work activities. Compiling an accurate and complete list of potential hazards will allow you
to develop the recommended controls to ensure that work proceeds safely.
When we refer to risk in relation to occupational safety and health the most commonly used definition is 'risk
is the likelihood that a person may be harmed or suffers adverse health effects if exposed to a hazard.'
Once you have identified the hazards involved in the task, estimate what realistic severity of harm that may
occur, and the likelihood of that occurring. A risk matrix tool provides a numerical score for the risk
assessment.
1. Identifying the hazard; take into consideration who may be harmed and how that harm may occur
2. Identifying existing controls that will remain active during the work
3. Using the risk matrix determine the LIKELIHOOD and SEVERITY of harm
Example:
IF THE RISK RATING IS IN THE RED (4 or 5) AFTER YOUR PLANNED CONTROLS, WORK CANNOT
PROCEED. The JSA needs to be reviewed by subject matter expert(s).
Permit to Work
Once you have completed the task analysis section you may need to apply for a Permit to Work.
Residual risk
High Medium Low
assessment
(4-5) (3) (1-2)
score
• PI to authorise
permits.
• Site/Asset manager to
Required authorise JSA • PI to authorise permits • PI to authorise
controls • PI must view the site permits
and verify controls
with the PR prior to
work starting.
• Absences from the
• Absences from the job site of job site of 2–4 hours
Supervision
• PR must be at the job 1–2 hours acceptable at the acceptable at the
required by
at all times. PI’s discretion. Must be PI’s discretion. Must
Permit Receiver
contactable at all times. be contactable at all
times.
• PR can be
• PR cannot be • PR can be responsible for
Simultaneous responsible for up
responsible for any one orange-level permit and
permits to three green-level
other permits. one green-level permit.
permits.
Step 5: Follow Control of Work Procedure (appendix B) to obtain Watercare authorisation to proceed with
work. The Person in Charge of the Work is responsible for all aspects of the implementation and adherence to
the JSA.
Make sure that the JSAs are easy to read and understand. Communicate the JSA to all personnel and have the
documents available onsite to read, sign-on and update.
During the work an appropriate level of supervision must be provided to ensure that the controls are
maintained.
Whenever a variation from the JSA occurs, for example a new task, change of risk, unexpected event; the
variation must be clearly identified, hazards identified and risk controls planned. The variation must be
authorised by your Watercare Representative before work can continue.
Use the Permit to Work Decision Tree to help identify any risks associated with your activities and whether a
permit is required. A Permit to Work is mandatory where a “YES” column has been listed in the PTW column.
Where a Y/N is indicated the Permit Receiver and Permit Issuer must discuss controls to determine if a permit
is required.
The Permit Receiver must fill in the permit forms – obtain PTW forms from your Watercare Representative.
Will it involve live product work including all work either inside or on live wastewater or water pipes
YES
where either product or vapours may still be present?
Will it involve working in a HV room or within 2 metres of HV equipment? (Excludes routine activities
YES
undertaken by WTC trained personnel, with a Watercare approved SOP).
Will it involve working on live equipment, electrical circuits, energised pipes or pressure vehicles? YES
All other isolation of hazardous energy; the Watercare Isolation Procedure applies NO
Confined Space
Work in an enclosed or partially enclose space. Note: The Watercare Confined Space Entry
PTW
Certificate and Confined Space Risk Decision Tree must be completed for ALL Confined
Req?
Space entries.
Is the residual risk score 2 or above on the Confined Space Decision Tree? YES
Is any of the work undertaken in a designated hazardous area that is covered by an approved SOP? Y/N
Will it involve working at a height between 2 metres and 5 metres? Excludes: Under 5 metres when
working from a scaffold erected by a competent person or from a scissor lift, a boom lift or a
YES
permanent ladder where the fall protection is permanently engineered into the plant or
equipment.
Does it involve any non-intrinsically safe activity within a confined space or designated explosive
YES
atmosphere zone?
Will there be any hot work in an operational plant, offices or admin areas? Y/N
Will the hot work be undertaken outdoors, when a fire ban is in place and/or within 3 metres of a
Y/N
structure?
Excavation
PTW
Work involving the removal of soil or rock from a site to form an open face trench, hole or
Req?
cavity.
Will the excavation be deeper than 1.5metres? YES
Is there a risk of atmospheric contamination or build-up of gases or fumes within the excavation? YES
Work Initiated
Watercare Control of Work – Process flow
YES
Risk level
JSA Residual risk high
YES reduced to 3 or NO Approved?
(4-5)? less?
Watercare Representative
Assigns the Work Subject Matter Expert(s) Site / Asset Manager
!
Watercare
Personnel (SME) reviews JSA JSA approval required
NO
ONLY
- Plans / drawings Work obtains 3 or more? - Duty Operator /
-Other relevant confirmation to proceed Process Technician
information from Control (fills in NO (non-metro)
Approved work pack
Work Authority Register) -Networks
lodged with Control
Engineer
Approved? (Networks and
transmission)
Work Pack returned to Person in Charge
of the Work for additional information Watercare Representative Watercare Approver
reviews the work pack authorises work pack
Permit Issue
Permit Issued? YES
Required?
Work Starts