This procedure provided necessary steps to rectify leak by using a tube plugging and seal welding
at both ends of tube for Air Fin Cooler / Heat Exchanger.
3. SPECIFICATION
STS/WPS/(M)/001 P1 TO P1 GTAW
STS/WPS/(M)/004 P8 TO P8 GTAW
4. PROCEDURES
5. ACCEPTANCE CRITERIA
5.1. All plugged tube shall be inspected by visual inspection and final acceptance of leak
rectification can be concluded accordingly to leak test result. However the final decision
regarding acceptance tube plugging work can be solely made by owner justification.
5.2. Acceptance/rejection criteria for all testing shall be as per below:-
5.2.1. Visual inspection and evaluation shall be as per UW-42 of UW-38 ASME VIII Div. 1
5.2.2. Dye Penetration Testing or Magnetic Particle Testing as per ASME VIII Appendix 6 or
Appendix 8
6. WORK FLOW
6.1. Perform leak test to detect any leaking on tube and plug.
6.2. Any tube or plug found leak, mark the tube and plug.
6.3. Plug new tube found leak and perform seal weld or plug found leak. Perform DPT/MPT after
completed welding.
7.1. WPS/PQR
7.2. WQT