Quotation For Interior Works (GROUND FLOOR) S.N Description Size Qty SQR/RFT Rate Amount

This document provides quotations for interior works across multiple floors of a building project. It includes estimates for items like kitchen cabinets, living area furniture, bedroom furnishings, false ceilings, flooring and more. The total estimated cost for all work quoted is 32,00,238 INR. A 2-year warranty is provided on materials and workmanship.

Uploaded by

Arjun Pakanewar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
83% found this document useful (6 votes)
25K views6 pages

Quotation For Interior Works (GROUND FLOOR) S.N Description Size Qty SQR/RFT Rate Amount

This document provides quotations for interior works across multiple floors of a building project. It includes estimates for items like kitchen cabinets, living area furniture, bedroom furnishings, false ceilings, flooring and more. The total estimated cost for all work quoted is 32,00,238 INR. A 2-year warranty is provided on materials and workmanship.

Uploaded by

Arjun Pakanewar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

THAKUR ENGINEERING CONSULTANCY DESIGN PVT.

LTD
(TEC DESIGN)
PEPSICOLA-32, KATHMANDU

Date …………………………………………..

Quotation for interior works(GROUND FLOOR)


S.N Description Size Qty SQR/RFT Rate Amount
L B H
A Living + Kitchen + Dining room
1 TV cabinet 90 96 16 1 60 1800 108000
2 Modular kitchen cabinet with shutter 150 96 36 1 60 2100 126000
3 Dining table structure 36 72 30 1 18 2000 36000
4 Hanging light over dining table set 1 1 5000 5000
5 Shoe cabinet 54 36 16 1 14 1900 25650
6 L-Shape sofa set 7 seater x 2 set
7 Cofee Table 1 7000 7000
8 Design False ceiling 240 151 1 1 250 125 31250
9 Parquetting and Tile 240 151 1 1 250 250 62500
10 wall design -horizentol wooden bands 4 120 4 16 1 2000 32000
11 Lights

B Bed room
1 Design fall ceiling + wooden finishing 138 133 1 127 150 19119
2 King size bed with side table
3 TV unit 124 96 6 1 80 950 76000
4 Wardrobe wall filled 32 96 18 1 20 2400 48000
5 Coushin design with decorative board 124 96 6 1 80 950 76000
6 Parquetting and tile 138 133 1 1 128 250 32000
7 Lights

C Son Room
1 Normal bed & bench
2 Wardrobe wall fixed 54 96 18 1 36 2050 73800
3 Platform for study desk & bookcase 108 36 1 27 800 21600
4 Decorative wall and painting 48 48 1 16 800 12800
5 False ceiling 120 132 1 110 75 8250
6 Parquetting and tile 120 132 1 110 250 27500
7 Lights

D Store
1 wardrobe wall filled 134 96 42 1 90 2400 16000

E Store
1 Granite fitting charge for kitchen 18000
In Words:-Eight Lakh Sixty two thousand four hundred Sixty nine only. Total 8,62,469

Note:- 6 pieces door along with Architect for frame with lock up to 4000 is included with above
mentioned total amount.

Date ……………………………………………..

Quotation for interior works(FIRST FLOOR)


S.N Description Size Qty SQR/RFT Rate Amount
L B H
A Living + bar
1 TV cabinet 72 96 20 1 48 1800 86400
2 L-Shape sofa set 6 seater x 1 set 78000
3 Cofee Table
4 Design False ceiling 180 276 9 1 345 150 51750
5 Parquetting and Tile 180 276 1 345 250 86250
6 Lights
7 Chandliers 1 40000 40000
8 Royal chairs(2 seater 1 set-1 seater 2 set) 25000 100000
9 Bar(inlcuding bar table) 105 96 12 1 70 2100 147000
10 Hanging lights 2 sets 2 7500 15000

B Bed room
1 Design fall ceiling + wooden finishing 120 168 1 140 150 21000
2 King size bed with side table
3 TV unit 60 96 12 1 40 2050 82000
4 Wardrobe wall filled 60 96 14 1 40 2050 82000
5 Parquetting and tile 120 168 1 1 140 250 21000
6 Lights
7 Partition wardrobe 78 96 9 1 52 2050 106600

C Son Room
1 Normal bed & bench
2 Platform for study desk & bookcase 108 36 1 27 800 21600
3 Book case 36 36 12 1 9 2100 18900
4 Decorative wall and painting 48 48 1 16 800 12800
5 False ceiling 96 84 1 56 75 4200
6 Parquetting and tile 96 84 1 56 250 14000
7 Lights

In Words:-Nine Lakh Eighty eight thousand five hundred only. Total 9,88,500

Note:- 3 pieces door along with Architect for frame with lock up to 4000 is included with above
mentioned total amount.
Date …………………………………………….

Quotation for interior works(SECOND FLOOR)


S.N Description Size Qty SQR/RFT Rate Amount
L B H
A Kitchen room
1 Modular kitchen cabinet with shutter 288 96 36 1 192 2050 393600
2 Tile 132 120 1 1 110 300 33000
3 False ceiling 132 120 1 110 80 8800

B Dining room
1 Dining table structure
2 Design False ceiling 120 120 1 1 100 150 15000
3 Chandliers 1 20000 20000
4 Parquetting and Tile 240 151 1 1 250 250 62500
5 vertical wooden post (6 pcs) 4 96 4 6 3 2100 37800
6 Wardrobe filled wall 72 96 14 1 52 2050 106600
7 Lights

In Words:-Six Lakh Seventy -seven thousand three hundred only. Total 6,77,300

Note:- 4 pieces door along with Architect for frame with lock up to 4000 is included with above
mentioned total amount.

Date ……………………………………………..

Quotation for interior works(OTHERS)


S.N Description Size Qty SQR/RFT Rate Amount
L B H
A Pooja room
1 Tile 155 150 23250
2 Light
3 Wardrobe 60 96 24 1 40 2100 84000

B Staircase
1 Parquetting and Tile 716 250 179000
2 Scorting 440 200 88000
3 Hookah 110 1700 187000

In Words:-Five LakhSixty one thousand two hundred fifty only. Total 561250

Guaranty & Warranty :- 2 years from the date of handover.


Material Specification:- A grade Duro 19mm thick board for foundation with inner part
colour Formica laminated.18 mm thick marine ply for shutter with marino brand colour formica
finished as per design & 6 mm ply for back pannel with one side laminated.

Fittings & Hardware:-


Steel auto hinges for door,steel finished handle up to 300 per piece,heavy drawer channel,
stainless steel basket for kitchen & others.

Terms & Condition


1 The payment have to be made as per the below details.
50% of total in advance once the work is confirmed.
30% of total on middle of works
20% after the completion of work.

Works are to be completed by us and to be billed accordingly.


1 Civil works, Electric Works, Plumbing, and any other sort that is not mentioned above.
2 We trust that the above quotation is to your satisfaction and in the meanwhile, it may be noted that
the cost may vary with the changes in the plan design and in any changes in the listed items

Failure of the above terms might lead to delays in work.


1 Any changes made in the contract will be accommodated accordingly.
2 The Project period will be 75 days from the day of Start the project.
3 The project might be delayed on unseen circumstances due to Political Situation, Natural Disaster.

Agreed and Accepted, Thanking You,


S.N
A
1
2
3
B
1
2
3
4
5
6
7
C
1
2
3
D
1
2
3
4
5
6
7
8
9
E
1
2
3

4
5
6
7
8
9
10
F
1
2