R12 DRAINAGE BELOW GROUND
FLEXIBLE COUPLINGS –
Polysewer pipe work is supplied plain ended and/or with a single integral socket; all
fittings are supplied with integral sockets, with the following flexible methods of
jointing on site available
150mm – 300mm Ø EPDM ring seals to EN 681 Part 1
LAYING PIPELINES
Pipe bed and surround material shall consist of natural and/or recycled coarse
aggregate complying with BS EN 13242. Refer to Engineering Drawing xxxxxxx
Backfilling in accordance with the Building Regulations, BS EN 752, Sewers for
Adoption, CESWI, MCHW, Volume 3 and will only be carried out after the works have
been inspected and approved.
Mechanical compaction will not be employed until 600mm of cover has been placed
to protect the pipes from the effects of this equipment. Heavy mechanical plant will
not be allowed to run over the pipeline until all the backfill has been consolidated.
Where the pipe run detailed on the engineer’s drawings is shallower than the
manufacturers recommended minimum for the expected load conditions, concrete
protection will be required as detailed on the Engineers drawings. Consideration
should also be given to any further requirements of the approving and/or adopting
organisation
JOINTING PIPELINES
Polysewer pipe work is supplied plain ended and/or with a single integral socket, all
fittings are supplied with integral sockets, with the following flexible methods of
jointing on site available
150mm – 300mm Ø EPDM ring seals to EN 681 Part 1
The Installer will provide apparatus for the off-loading and handling of fabricated
modular chambers in accordance with manufacturer’s requirements /
recommendations and good practice. Where practicable, chambers shall incorporate
lifting lugs for ease of handling, and any manholes suffering damage resulting from
any means, will be immediately rejected from the site. Making good of damaged
chambers will not be permitted
Connect glass 'U' tube gauge to drain plug in length of drain under test.
Pump air into test section 100mm water gauge for pipelines or where gullies and/or
ground floor appliances are connected, of slightly more than 50mm water gauge.
Allow five minutes for stabilisation of air temperature.
Without further pumping, the head of water should not fall by more than 25mm in a
period of five minutes for a 100mm water gauge test pressure, and 12mm for a
50mm water gauge test pressure.
CONTACT:
Polypipe Civils
Charnwood Business Park
North Road
Loughborough
Leicestershire
LE11 1SP
Email: [email protected]