Extended Assignment May 2020 Semester
Extended Assignment May 2020 Semester
INSTRUCTIONS TO CANDIDATES
1. The Extended Assignment (EA) is an open-book assessment.
Students can refer to online resources, learning materials, textbooks,
and other reading materials to answer the questions posted in the
assessment.
2. Answer ALL questions.
3. The duration to complete the EA is TWENTY-FOUR (24) HOURS.
4. Students are allowed ONE (1) attempt to do the EA successfully where
only ONE (1) duly completed EA submission is permitted. Multiple
submissions are NOT allowed.
5. MAXIMUM file size for your EA submission to be uploaded to ULearn
is 20MB.
6. Please upload your answers in ONE (1) PDF file.
7. Please make sure your answer in the PDF file is clear and readable
and name your file as follows: "your name your ID_EA Answer"
8. Late submission and unclear/unreadable answer will not be accepted.
CERTIFICATION OF ORIGINALITY
that the original work is my own except as specified in the references and
acknowledgements
that the original work contained herein have not been undertaken or done by unspecified
sources or persons.
copying the work of others, or allowing others to copy my work) in completing this Extended
Assignment, I will be given an F grade for the Extended Assignment for this course, and may
be suspended for a period of time or dismissed or any other penalty deemed necessary by the
University.
NAME: ____________
Student ID: __ Program: ______________
2
CEB3013/CDB3022
TABLE Q1a
[10 marks]
3
CEB3013/CDB3022
TABLE Q1b
Parameter Value
Temperature (oC) 25
Based on these parameters, suggest the particle settling velocity of the grit
material. State all appropriate assumptions. Design a suitable sedimentation
process for batch mode treatment of 180 m3 effluent produced in 6 hour plant
operation. The design must state the inlet flow direction and predict the flowrate
as well as the tank dimension by considering 80% effective volume of the tank.
For ease of maintenance, the tank height is set at the average height of
Malaysian men.
[30 marks]
4
CEB3013/CDB3022
2. A 4.1 GW Power Plant is working full capacity but facing problem of air pollution
dispersion around located area for overcast conditions, day or night. The management
decide to redesign stack of the power plant and hire you as an environmental engineer
for modify their power plant’s stack parameter and optimize the height of effective plume
according to the atmospheric conditions. You may make variation of stack parameters,
take possible assumptions and considering new variables of pollute dispersion
conditions. Design new stack with your own assumed parameter using Gaussian
diffusion (dispersion) model for point sources at elevation without reflection and justify
your design for effective stack height.
[40 marks]
5
CEB3013/CDB3022
3. The Perak state government is looking to improve all existing waste disposal sites in the
state to ensure solid waste management activities do not pollute the environment. State
Housing, Local Government, Public Transport, Non-Muslim Affairs and New Villages
Committee chairman said this included using high technology to improve the waste
management system. He said he had visited several countries such as Japan, Taiwan
and China to look at systems which could be adopted in Perak. “Through the visits, we
received a lot of information and ideas in managing solid waste and improving the waste
disposal system. So far, the local authorities in the state have experience in managing
solid waste well, and have their own landfills,“ he said at a press conference after the
swearing-in ceremony of the new Taiping Municipal Council (MPT) president here
today.
ii. Propose practical strategy with justifications to overcome this problem for
sustainable development.
[10 marks]
-END OF EA-