ISGOTT Bunker Checklist: Pre-Arrival: Date and Time: Port and Berth: Receiving Ship: Bunker Facility
ISGOTT Bunker Checklist: Pre-Arrival: Date and Time: Port and Berth: Receiving Ship: Bunker Facility
ISGOTT Bunker Checklist: Pre-Arrival: Date and Time: Port and Berth: Receiving Ship: Bunker Facility
Receiving ship:
Bunker facility:
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Receiving ship:
Bunker facility:
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Receiving ship:
Bunker facility:
Receiving Bunker
Item Check ship facility Remarks
status status
17 Effective communications are established Yes Yes
(21.1.1, 21.4, 24.1.3)
18 Bunker watch is established (12.1.6.4, 21.4, Yes Yes
23.11)
19 Smoking restrictions and designated smoking Yes Yes
areas are established (4.10, 23.10)
20 Naked light restrictions are established (4.10.1, Yes Yes
24.2.1)
21 Safety data sheets are available (1.4.4, 20.1, Yes Yes
21.4)
Volume
Product and Loading Maximum Maximum line
Tonnes (in m3) at loading
grade temperature transfer rate pressure
temperature
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Volume of
Capacity of Free capacity
Product and oil in the Volume (in m3) Final volume
Tank number tank of tank
grade tank before to be loaded (in m3)
(volume in m3) (volume in m3)
bunkering
Receiving Bunker
Item ref Agreement Details
ship initials facility initials
17 Process for starting transfer Initial flow rate:
Transfer stop:
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Receiving ship:
Bunker facility:
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Receiving ship:
Bunker facility:
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Receiving ship:
Bunker facility:
Item
Check Time Time Time Time Time Time Remarks
ref
Initials
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Receiving ship:
Bunker facility:
Item
Check Time Time Time Time Time Time Observation
ref
Initials
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Receiving ship:
Bunker facility:
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Declaration
We the undersigned have checked the items in the applicable parts A to G as marked and signed below:
In accordance with the guidance noted in chapter 24 of ISGOTT, we are satisfied that the entries we have made are
correct to the best of our knowledge and that the receiving ship and bunker facility are in agreement to undertake the
transfer operation.
We have also agreed to carry out the repetitive checks noted in parts H and I of the ISGOTT bunker checklist, which
should occur at intervals of not more than ____ hours for the receiving ship and not more than ____ hours for the
bunker facility.
If, to our knowledge, the status of any item changes, we will immediately inform the other party.
Name Name
Rank Position
Signature Signature
Date Date
Time Time
© ICS/OCIMF 2020
ISGOTT Sixth Edition
Name Name
Rank Position
Signature Signature
Date Date
Time Time
© ICS/OCIMF 2020