Process Flow Chart Description: AM RCS Plant Manager Cast Iron Foundry GM Plant
Process Flow Chart Description: AM RCS Plant Manager Cast Iron Foundry GM Plant
VIP-RCS-01-004
Material receiving from vendor through Receiving of the incoming material is done through receiving document & material
3. challan & material entry in SAP quality certificates report are checked to ensure its quality & quantity.
Placement of material as per FIFO system in Placement of Material in INCOMING & OUTGOING Racks in designated areas.
store at designated areas
4.
Issuance of material through MIR as per FIFO MIR is issued by the shop floor & after receiving the MIR the store issues the material by
6. System Left OUT Path.
7. Collection of Issued Material by shop FIFO The Shop collects the required material after clearance from LEFT OUT Path.
System
8. Dispatch of SKP RCS in Store through Left In The Shop dispatches the prepared SKP RCS to store which is kept in Left IN dispatch area.
Left Out FIFO System
9. Dispatch of SKP RCS to SKP through Left In Left The Store dispatches the prepared SKP RCS to store which is kept in Left OUT dispatch
Out FIFO System area.