05 Checklist C&S RC Work (General)

The document is an inspection checklist for reinforced concrete works and concreting. It contains 17 items to inspect related to formwork, reinforcement bars, placement of concrete, finishing and curing of concrete. The checklist is used to inspect these items before, during and after construction and note their status as acceptable or not acceptable along with any remarks. The inspection is jointly conducted and signed off by representatives from the main contractor and client.

Uploaded by

Aldi mubaroq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
538 views6 pages

05 Checklist C&S RC Work (General)

The document is an inspection checklist for reinforced concrete works and concreting. It contains 17 items to inspect related to formwork, reinforcement bars, placement of concrete, finishing and curing of concrete. The checklist is used to inspect these items before, during and after construction and note their status as acceptable or not acceptable along with any remarks. The inspection is jointly conducted and signed off by representatives from the main contractor and client.

Uploaded by

Aldi mubaroq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

ICL/C&S/RCW

Date
Inspection
Location/ Unit : ……………………………………………………… Gridline/ Area: …………………………………...

Inspection Checklist for RC Works (Concreting)

Pre During Post


No. Item to be Inspect?
Construction (P if acceptable)
FORMWORK, SUPPORT & BRACING
1 Formwork surface in good conditions? Cleanliness?
2 Formwork installled to the correct position & alignment?
3 Formwork properly fixed to size, width and dimension?
4 All gaps properly sealed off to prevent loss of grout?
5 Conduits/openings/sleeves/ embeds checked? Spacing?
6 Formwork supports/bracings properly installed?
REINFORCEMENT BAR & BRC MESH
7 Rebar size/material/grade as per specified specification?
8 Rebar cutting/bending mesurement as per bar schedule?
9 Rebar condition visually acceptable; no excessive rust?
10 Rebar clearances acceptable and no rebar constraint?
11 Rebar properly tied, spacer block installed sufficiently?
PLACEMENT OF CONCRETE
12 Weather condition: acceptable for concreting?
13 Rebar inspected approved for concreting? Cleanliness?
14 Suitable pouring method? Vibrated sufficiently?
CONCRETE FINISHED & CURING
15 Curing: Approved method? Sufficent Curing Time?
16 Concrete Surface: need any concrete repairs?
17 Work area clean from unwanted to allow next activities?

General Comments: ……………………………………………………………………………………………


………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………

Inspected by (Main Contractor): Jointly Inspected by (Client Representative):

………………………………………… ……………………………………………….
Name of Checker: Name of Checker:
Company: Company:
Date: Date:
ICL/C&S/RCW

Date
Inspection
Location/ Unit : ……………………………………………………… Gridline/ Area: …………………………………...

Inspection Checklist for RC Works (Concreting)

Status
No. Item to be Inspect? OK(P) Remarks
NOT(X)

FORMWORK, SUPPORT & BRACING


1 Formwork surface in good conditions? Cleanliness?
2 Formwork installled to the correct position & alignment?
3 Formwork properly fixed to size, width and dimension?
4 All gaps properly sealed off to prevent loss of grout?
5 Conduits/openings/sleeves/ embeds checked? Spacing?
6 Formwork supports/bracings properly installed?
REINFORCEMENT BAR & BRC MESH
7 Rebar size/material/grade as per specified specification?
8 Rebar cutting/bending mesurement as per bar schedule?
9 Rebar condition visually acceptable; no excessive rust?
10 Rebar clearances acceptable and no rebar constraint?
11 Rebar properly tied, spacer block installed sufficiently?
PLACEMENT OF CONCRETE
12 Weather condition: acceptable for concreting?
13 Rebar inspected approved for concreting? Cleanliness?
14 Suitable pouring method? Vibrated sufficiently?
CONCRETE FINISHED & CURING
15 Curing: Approved method? Sufficent Curing Time?
16 Concrete Surface: need any concrete repairs?
17 Work area clean from unwanted to allow next activities?

Inspection Result & Status


PART A - Inspection Result & Status (By Main Contractor) Name of Inspector (Main Contractor)
Comments: …………………………………………………………………
………………………………………………………………………………. Company : …………………………….
Date of Inspection:
PART B - Inspection Result & Status (By Client Representative) Name of Inspector (Client Representative)
Comments: …………………………………………………………………
……………………………………………………………………………….
……………………………………………………………………………….
………………………………………………………………………………. Company : …………………………….
Date of Inspection:
ICL/C&S/RCW

Date
Inspection
Location/ Unit : ……………………………………………………… Gridline/ Area: …………………………………...

Inspection Checklist for RC Works (Concreting)

Inspection
No. Item to be Inspect? Remarks
Status
FORMWORK, SUPPORT & BRACING
1 Formwork surface in good conditions? Cleanliness? Y N
2 Formwork installled to the correct position & alignment? Y N
3 Formwork properly fixed to size, width and dimension? Y N
4 All gaps properly sealed off to prevent loss of grout? Y N
5 Conduits/openings/sleeves/ embeds checked? Spacing? Y N
6 Formwork supports/bracings properly installed? Y N
REINFORCEMENT BAR & BRC MESH
7 Rebar size/material/grade as per specified specification? Y N
8 Rebar cutting/bending mesurement as per bar schedule? Y N
9 Rebar condition visually acceptable; no excessive rust? Y N
10 Rebar clearances acceptable and no rebar constraint? Y N
11 Rebar properly tied? Sufficient spacer block installed? Y N
PLACEMENT OF CONCRETE
12 Weather condition: acceptable for concreting? Y N
13 Rebar inspected approved for concreting? Cleanliness? Y N
14 Suitable pouring method? Vibrated sufficiently? Y N
CONCRETE FINISHED & CURING
15 Curing: Approved method? Sufficent Curing Time? Y N
16 Concrete Surface: need any concrete repairs? Y N
17 Work area clean from unwanted to allow next activities? Y N

Inspection Result & Status


PART A - Inspection Result & Status (By Main Contractor) Name of Inspector (Main Contractor)
Comments: …………………………………………………………………. Company : …………………….
………………………………………………………………………………… Date of Inspection:

PART B - Inspection Result & Status (By Client Representative) Name of Inspector (Client Representative)
Work Inspected and Approved
Work Inspected and Approved With Comments …………………
………………………………………………………………………….
Work Inspected Not Acceptable / Non Conformance Issued Company : …………………….
Date of Inspection: