T he measurements shall be carried out with an instrument conf orming to ISO 2954 (10-1000 Hz frequency
range). With the motor at normal operating temperature, the vibration velocity shall not exceed 2.8 mm/s
RMS, or 4 mm/s PEAK, in any direction.
For bearings f itted with proximity probes, the unf iltered peak-to-peak value of vibration (including shaft
‘run-out‘) at any load between no load and f ull load, shall not exceed the f ollowing values:
50 µm f or two-pole motors
Page 1 of 7
60 µm f or f our-pole motors
75 µm f or six-pole or higher motors
Rolling bearings:
Sleeve bearings:
T his may be measured and rectif ied during installation or detected during running by the loosening of each
holding-down bolt in turn while measuring motor vibration.
‘Sof t f eet’ are those which do not have solid f lat contact with the base prior to the tightening of the
holding-down bolts; one or more f eet may be ‘sof t’ as shown in Figures 1 to 3.
Figure 1 -
Machine
resting on 3
f eet, f oot 4 is
raised or
‘sof t’ The p ro file o f the fo o t c o ntac t are a (Fig ure s 1, 2 and 3)
Figure 2 -
Machine resting on diagonal f ormed by f eet 3 and 4, f eet 1 and 4 are ‘sof t’
Figure 3 - Bottoms of all 4 f eet are not parallel with base, f eet 3 and 4 are ‘sof t’
Page 2 of 7
NOTE: Re-
machining of
rotor f eet is
required in
Figures 4 and 5;
temporary use
of wedge-
shaped shims Pro file o f ' s o ft fo o t' c o ntac t are a
may be
acceptable (maintenance).
Advertisement
Forms
Form 14 – Inspect ion of elect ric mot or – Cage-induct ion t ype (incl. cont rol unit )
Page 3 of 7
Ins p e c tio n o f e le c tric mo to r c ag e -ind uc tio n typ e (inc lud ing c o ntro l unit)
Page 4 of 7
Ins p e c tio n o f Switc hing Units - HV Switc hg e ar
Page 5 of 7
Ins p e c tio n O f O utg o ing Unit - LV Switc hb o ard
Reference: Field Commissioning and Maintenance Of Electrical Installations and Equipment Manual
Edvard - Electrical engineer, programmer and f ounder of EEP. Highly specialized f or design
of LV high power busbar trunking (<6300A) in power substations, buildings and industry
f ascilities. Designing of LV/MV switchgears. Prof essional in AutoCAD programming and web-
design. Developer of awsome electrical design sof tware ePlusMenuCAD. Present on
Google+.
Become EEP's Contributor and introduce yourself to 70k+ of our readers all across the web.
Page 6 of 7
Page 7 of 7