100% found this document useful (1 vote)
383 views17 pages

Business Plan

It is a mechanical and electrical base project to produce energy/electricity through Piezoelectric material and generator which is cheaper as compared to other processes. We will integrate Application from which can keep track of Energy Produced and further the amount will given against the stored Energy. Stated below are mechanism used.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
383 views17 pages

Business Plan

It is a mechanical and electrical base project to produce energy/electricity through Piezoelectric material and generator which is cheaper as compared to other processes. We will integrate Application from which can keep track of Energy Produced and further the amount will given against the stored Energy. Stated below are mechanism used.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

Introductory Page

Introduction of the Business

TEQtrailz
Name and Address of the business
Flat 10 Office No. 07 Near Albabar Centre F-8 Markaz,
Islamabad

Name (s) and address(es) of Khaleeq ur Rehman& Flat 10 Room No. 07 Near Albabar
principal (s) Centre F-8 Markaz, Islamabad
[email protected]
00923045977988

Engineering solution, project management and deals with the


Nature of business export of all electric components.

Statement of financing needed Rs. 4 Lacs Pakistani Rupees

Statement of confidentiality of This all data is patent and confidential and cannot be forward
report without permission.
Executive Summary

Overview: -
It is a mechanical and electrical base project to produce energy/electricity through Piezoelectric
material and generator which is cheaper as compared to other processes. We will integrate
Application from which can keep track of Energy Produced and further the amount will given
against the stored Energy. Stated below are mechanism used.
For Generator: -
For generator, when the force is applied, Rack moves downward and pinion rotates the shaft.
This rotation is transferred to the gear 5 in the below figure through chain drive that is attached
to the flywheel (for continuous rotation). The second shaft transfers the rotation to the generator
to rotate it and the energy/electricity produced by rotation is stored in the batteries after
rectification and vice versa.

For Piezo-electric Material: -


The energy harvesting via Piezoelectricity uses direct piezoelectric effect when mechanical stress
is applied it produce energy/electricity. Further energy is converted into smooth signals after
electronic circuitry and then stored in battery.

Both mechanisms are used together to generate energy/Electricity so that effiency can be
increased.
Comparison between (footstep generator/PZT) and Normal Generator
Footstep power generator and Piezoelectric Normal generator (With diesel)
Material
It is low cost. It is high cost.
It works on the footstep and where there is some It consume diesel and petrol which is high cost.
motion.
It can produce cheap electricity. It produce highly cost energy.
Low cost for repair. High cost for repair.

Block Diagram:-

Piezo Electric Material


Mechanical Assembly Energy Produced
Footstep Generator App Integration

Energy Utilization Energy Storage Money Against


Energy Produced
Market Need:
The main market need is that we have monopoly in Pakistan for electricity production. We have
only one option to take electricity from Wapda as that’s the only organization providing this
facility all over Pakistan.Market need is to break the monopoly created by Wapda. Demands of
customer for electricity is much higher then it’s production so there is a market need to have any
other source that generate electricity so that load shedding can be reduced.

Opportunity Size: -
As all demands depends on need and opportunity size varies also on need. Target Market is
enormous as it can be implemented at anywhere. Stated below are few examples where it can be
implemented.
• At the entrance of any educational institute / Offices / government sectors.
• At any speed breaker / foot paths.
• At any walking grounds / Football grounds / jogging areas.
• On the dance floors / Stages.
• On any volleyball / Basket courts / Badminton courts.
• At any gym areas etc.
Discussed below are the few examples which shows the worth of the market.
Worth of the Target Market
Sr. Place Area Piezo Unit Tot Power With foot Unit Tot Power Total
No. (foot) Electric Price/ produced step Price/ produced Price
Material Unit per plate generator Unit per (PKR)
( (Watt) ( PKR Generator
PKR )
)
1. At any 1.5*1.5 12 50 Min. 5 3 4500 Depend 8000
Entrance on load
2. Speed 5*1 - - 5 5000 Depend 9000
Breaker on load
3. Foot path 10*1 25 500 Min. 5 15 9000 15000
Total Price 32000
PKR

Industry Analysis: -
As a future outlook, it is a revolutionary idea and with the passage of time everyone will accept
it. It has a great impact on growth rate of the country as most of the population will get job,
country can be more prosperous and people can produce their own electricity. With the
revolutionary idea people can save from the load shedding problems. Government can adopt this
idea and on large scale implementation like on roads, foot paths and speed breaker etc. cheap
electricity can be made.
For now, there is no competitor Pakistan as this is a new technology in Pakistan most of the
population did not know about this concept so it can be more benefit for the people of Pakistan
and for business man also.

Solution and its competitive advantage


It is a mechanical and electrical base project to produce energy/electricity through piezoelectric
material and generator which is cheaper as compared to other processes. It’s a new and
revolutionary idea that there is no competitor in Pakistan. Our product is better, more reliable,
environmental friendly and easy to use. There are two mechanisms in one project so there is a
high chance people will buy the product from our company.

Current or Potential Customers:


Air University is our current customer as there is an agreement to implement this idea at the
entrance of the Air university gate, speed breaker and different walking paths in the university.
Potential customers are
• Educational institutes
• Private department
• Private office
• Government sectors
• Play grounds, Sport grounds, homes and areas where there is no electricity provided etc.

Market Strategy
As the market is very enormous so following are the few calculations where this idea can
implemented in the given below table.
Note: - All the calculations are in Pakistan (PKR) currency.

Total Price
Sr. Place Area Piezo Unit Tot With foot Unit Tot Total
No. (foot) Electric Price/ step Price/ Price
Material Unit generator Unit (PKR)
( ( PKR
PKR )
)
1. At any 1.5*1.5 12 50 3 4500 8000
Entrance
2. Speed 5*1 - 5 5000 9000
Breaker
3. Foot 10*1 25 100 15 9000 15000
path
Total Price 32000
PKR

This is the one unit calculations and stated below are the Revenue and profit for 10 Units.

Total Profit
Sr. Place Area Piezo Unit Tot With foot Uni Tot Total Total Total
No. (foot) Elect Price step t Price/ Cost for Revenue Profit for
ric / generator Unit 10 units for 10 10 units
Mate Unit ( Rs ) (Rs) units T.P=(T.R
rial ( Rs ) (Rs) – T.C)
1. At any 1.5*1.5 12 50 3 4500 80,000 95,000 15,000
Entrance
2. Speed 5*1 - 5 5000 90,000 105,000 15,000
Breaker
3. Foot path 10*1 23 500 15 9000 150,000 177,000 27,000
- 320,000 377,000 57,000

Total Profit = Total Revenue – Total Cost 57,000 PKR


Our Team
There are 2 members behind this venture who are Founder and CEO of the company and other 3
person include in which one is technical manager and rest of them are Marketing and Sales
Manager respectively. Both CEO has technical management skills as well as marketing skills,
know how to work as a team and has solved different problems regarding design and
implementation, marketing and sales problems. Other than the team there is a board with
professional skills who has helped us solving knotty problems and even changed the
management plans.
Our team is best for this venture because we have CEO, Technical manager, marketing and sales
manager and one board member. Together as a Team developed the prototype and solved several
problems. No one can do better than us.

Team Member
Sr. No. Name Professional Degree Designation
1. Khaleeq ur Rehman Mechatronics Eng. CEO & Founder
2. Zunaira Illyas Civil Engineer Marketing Head
3. Arslan Certified Web developer
4. Sadia Bachelors Graphic Designer
5. Samad Khan Computer Science App /Web developer
6. Eman Khan Computer Science Content Writer/ Technical
Head

Risks and Mitigation Plans


SWOT Analysis
Strength Weakness
First to launch in the Market It’s a new idea people are
Cheap method to produce Electricity not aware of that
Cheap to repair/ Low cost to repair Less research on
Low cost to install/ Portability piezoelectric material
Green solution of Energy Harvesting Will take time to implement
Min Half-life for PZT is 30 years this idea in all over Pakistan
Environmental friendly / Donot consume
any Hydrocarbon

Opportunity Threats
After Implementation Rate of jobs will Large Investment
become high. Future threats of the
People can easily make Electricity at competitor.
homes.
This is the solution for load shedding in
Pakistan
Contingency Plan or Plan B
Following steps will be performed as Plan B

Contingency Plan or Plan B


• Will change the design of the Project to give more
options.
• Give the Promotions to the customers.
• Price can be lower of the project
Steps • Profit Margin can be decreased so that sale Margin
can be higher.

Financials: -

Financials
Sr. Place Area Piezo Unit Tot With foot Uni Tot Total Total Total
No. (foot) Electric Price step t Price/ Cost for Revenue Profit for
Materia / generator Unit 10 units for 10 10 units
l Unit ( Rs ) (Rs) units T.P=(T.R
( Rs ) (Rs) – T.C)

1. At any 1.5*1 12 50 3 4500 80,000 95,000 15,000


Entrance .5
2. Speed 5*1 - 5 5000 90,000 105,000 15,000
Breaker
3. Foot path 10*1 23 500 15 9000 150,000 177,000

- 320,000 377,000 57,000

Total Profit = Total Revenue – Total Cost 57,000 PKR

These are the calculation for 100 units. 5,700,000 PKR


For 50 Units, Profit margin will become 2,850,000 PKR
For 25 Units, Profit margin will become 1,425,000 PKR
𝑻𝒐𝒕𝒂𝒍 𝑪𝒐𝒔𝒕 𝒇𝒐𝒓 𝟏 𝒖𝒏𝒊𝒕 (𝑺𝒓. 𝑵𝒐. 𝟏 − 𝟑) 𝑻𝒐𝒕𝒂𝒍 𝑪𝒐𝒔𝒕 𝒇𝒐𝒓 𝟐𝟓 𝒖𝒏𝒊𝒕 (𝑺𝒓. 𝑵𝒐. 𝟏 − 𝟑)
= 𝟑𝟐, 𝟎𝟎𝟎 𝐏𝐊𝐑 = 𝟖𝟎𝟎, 𝟎𝟎𝟎 𝐏𝐊𝐑
𝑻𝒐𝒕𝒂𝒍 𝑹𝒆𝒗𝒆𝒏𝒖𝒆 𝒇𝒐𝒓 𝟏 𝒖𝒏𝒊𝒕 (𝑺𝒓. 𝑵𝒐. 𝟏 − 𝟑) 𝑻𝒐𝒕𝒂𝒍 𝑹𝒆𝒗𝒆𝒏𝒖𝒆 𝒇𝒐𝒓 𝟐𝟓 𝒖𝒏𝒊𝒕 (𝑺𝒓. 𝑵𝒐. 𝟏 − 𝟑)
= 𝟑𝟕, 𝟕𝟎𝟎 𝐏𝐊𝐑 = 𝟗𝟒𝟐, 𝟓𝟎𝟎 𝐏𝐊𝐑
𝑻𝒐𝒕𝒂𝒍 𝑷𝒓𝒐𝒇𝒊𝒕 𝒇𝒐𝒓 𝟏 𝒖𝒏𝒊𝒕 (𝑺𝒓. 𝑵𝒐. 𝟏 − 𝟑) 𝑻𝒐𝒕𝒂𝒍 𝑷𝒓𝒐𝒇𝒊𝒕 𝒇𝒐𝒓 𝟐𝟓 𝒖𝒏𝒊𝒕 (𝑺𝒓. 𝑵𝒐. 𝟏 − 𝟑)
= 𝟓𝟕𝟎𝟎 𝐏𝐊𝐑 = 𝟏𝟒𝟐, 𝟓𝟎𝟎 𝐏𝐊𝐑

Total Money Lend or lease 400,000 PKR

Total Profit in 25 units 142,500 PKR


Total profit in 100 units 5,577,000 PKR
Break Even Point in 3 years 350 unit’s sale’s per year
Breakeven point can easily be achieved after
one year of sale
Payback period After 1.5 year
Industry Analysis

Macro Environment
The six macro environment factors of the PESTEL Analysis are the following
Political factors
Our company considered the political environment when creating the business strategies.
Political instability can influence the business and duration of time but with the time being this
matter can be solved by reforming the management plan.
Economical factor
The economic factors of the business environment are all the variables that impact how the
consumer spends their money and the power of that purchase. The exchange rate of a country
can have extensive impact but sale price can be increased to meet this problem.
Socio-cultural
This project has not any influence on the language, values, belief and religion but the literacy is
the major issues. People are not aware of that kind of this technology but with the passage of
time and through social media it can be easily solved.
Technological factors
The technological environment is becoming a lot more important in the modern day business
environment. New technology produces new opportunities for companies and organization, with
the help of social media like Facebook, YouTube and Advertisement channels this gap can be
easily be fulfilled.
Environment factors
In the project, piezo electric material and generator is used to produce the energy / electricity.
There are not any hydrocarbons elements(like diesel and petrol etc.) are used in the project, it
will just produce the energy with the motion/force. The main benefit factor of this project is that
it is environmental friendly. It will not pollute the nature and environment.
Legal factors
As this project is environmental friendly and it will not pollute the environment. Employment
rate will become high, there is no harm in using the product and all product safety and
advertising regulation are kept in mind to make the product more successful.

Specific Industry Environment


As a future outlook, it is a revolutionary idea and with the passage of time everyone will accept
it. It has a great impact on growth rate of the country as most of the population will get job,
country can be more prosperous and people can produce their own electricity. With the
revolutionary idea people can save from the load shedding problems. Government can adopt this
idea and on large scale implementation like on roads, foot paths and speed breaker etc. cheap
electricity can be made.
For now, there is no any competitor in the Pakistan as this is a new technology in Pakistan most
of the population did not know about this concept so it can be more benefit for the people of
Pakistan.

Competitor Analysis

Indirect Competitors Direct Competitors


There are few indirect competitors but their There are not any direct competitors in the Pakistan
efficiency is not as better than our footstep power which are fulfilling the same need in the same way
generation through piezo electric material which as ours.
are following Our project has dual mechanism that’s the
• Energy through solar panel advantage and it produces very cheap energy.
• Energy through bio gas generator
• With steam boiler but it is not
environmental friendly as it causes
pollution.
• Diesel Generator / It is highly cost.
• Water turbine in the canals, it is effective
when water has a continuous otherwise it’s
not so effective.

Market Segmentation Basis


Market can be segmented in many ways some of the examples are following
Geography
It can be used in every part of the city where’s there’s a motion or people walk or travel in the
transport. It can be implemented on every speed breaker, footpaths and walking grounds of the
country. It can be implemented where it has need.
Demographic values
This does not depend on any age and gender, our product is cheaper, easy to use and more of that
it can’t harm other and it is environmental friendly. It is so cheaper that every person can easily
afford it.
Psychographic variables
It will change the lifestyle of the people if there is a load shedding in the region, people walking
outside the home on the piezo electric material can produce energy, with the help of this it can
easily light up bulbs and fans. People will be more comfortable rather than spending money high
cost diesel/petrol and generator.
Product type
Our product type will vary customer to customer and place to place if there’s a high consumption
of energy more piezo electric material would be placed and vice versa.
Identification of Target Market
As a startup venture, our target market would be small like foot paths, speed breaker and walking
ground etc. so that profit can be made and also to solve the primarily problems. If the project is
implemented on the enormous scale, all the measure can be made before the implementation.
This is the need of every person and every sector like educational institutes, non-electrified areas,
homes/offices, public as well as private sectors etc.

Description of Venture

Mission Statement A product that can produce the cheap


energy/electricity so the every person can easily
afford it
History of venture As the load shedding is increasing year by year
so why not build the solution for that problem that
can easily reduce the impact of load shedding and
to produce low cost electricity.
Location Islamabad
Size of business Size of the business depends on the market needs
and demand.
Product/Service Details It is a mechanical and electrical based project
which will produce electricity through foot step
and piezo electric material. Due to its portability
features, It can be installed easily anywhere there
is a motion.
Service (s) It will be installed by the company where there is
maximum effiency to produce electricity.
Office equipment and personnel Laptop & Records
Back ground of entrepreneurs Most of them are final semester students in the
university.
Board member is currently doing his business and
teaching in the recognized university.

Production Plan

Complete Manufacturing process


First of all, idea and design of the project was implemented on the piece of paper then design
was implemented on the SolidWorks Professional 2017 software to design the parts of the
project more clearly. After completing this steps, Parts were made by the manufacturer by our
specification. Specially designed springs were made for this project so that it can give maximum
efficiency of the piezo-electric material. For chain sprocket, locally made chain sprocket were
used in order to make the product low costly.
Machinery and Equipment’s
Following pictures are the part of the model made in SolidWorks Professional software
Final Design of the project:-

Details of suppliers of raw materials

Suppliers of Raw Materials

Piezo Electric Materials Munir General Traders

Generators Munir General Traders

Chain Sprocket / Springs Local Market

Gear / Shaft Local Market

Material required of Base Local Market


Operational Plan

Operational Plan
There will be website through user can order the
desired number of units and where to implement
the unit. After completing the step there will be
the transaction of money in the Bank account to
the secure the order. After that, in the few days it
Description of company’s operation will be implemented to the customer place. All the
mechanical and electrical work will be done. User
will be provided the instruction manual if in case
there is a problem occur otherwise our team
member will come to that place and solved the
problem.
• Order will be placed by the customer.
• How much units required.
• How much energy consumption.
Order placement by customers and fulfillment • Place where it has to implement.
• Transaction of money in Bank Acc.
• On the fixed day, Product will be
installed.

Storage and Inventory Control For storage specially designed inventory control is
used after getting the energy from the mechanisms
further it will stored in the batteries.
Technology utilization in Operations Fitter and Electrician can easy install the product
because it so simple, user friendly and easy to
implement.

Marketing Plan
Product
• User Friendly.
• Environmental friendly.
• It meets the specified standards.
• Its minimum life is 15 years.
Quality • Its repair cost is so low.
• Its produce cheap electricity.
• It will give the desired power.

Styles It has a unique style it can be used as both


mechanisms. It has a cubical shape.
It has dual features, it can produce energy using
Features piezo electric material and with footstep power
generation
Size With the demand of the user, its shape will be
varied. It does not have fixed shape.
Brand Name E-Step
It will packed in different parts so after that it can
Packing be joined together where it is to be implemented
on the specific area.
Services Company will give the shipment and a person to
install the product at your desired place.
Pricing
List price There will be fixed price of the package in the list.
It can be varied with the passage of time to high
the profit margin.
If the customer buy the 10 units at the time then
Discounts there will be discount of roundabout 2 to 3
percent.
Distribution
With the passage of time, business grows there
Use of wholesalers/retailers will be wholesalers/retailers which will play the
important part to expand the business.
Almost in every city there will one branch who
Geographic coverage will providing the product and will cover the
needs of all demands.
There will be another person to hire to do this job,
Inventory and transportation all inventory and transportation will be deal by
this member of the team who will join the
venture.
Promotion

For advertising social media like Facebook and


YouTube can be used. Advertising the product in
Advertising and Media selection the Television channels, Newspaper, magazines
and radio are also the options to do it.
Advertisement gives the reasons to buy the
product.

Sales Promotion In sale promotion, short term incentives motivates


the purchase.

Public Relations By building mutually beneficial relationships


between organizations and their publics.
Controls

Estimation about future sales will be 10,000 unit


Sale forecast sale per year it will gives us the approximation
profit of 80,00,000 dollars
• Increase sales.
• Build brand awareness.
• Grow market share.
• Launch new products or services.
Marketing Objectives • Target new customers.
• Enter new markets internationally or locally.
• Improve stakeholder relations
• Increase profit
In the first and half year, by selling the 1500 units
Sales Targets company will complete its sale target and starting
to earn the profit.
Organizational-Plan

Form of ownership

Single Owner/Partnership or Pvt. Limited Partnership


Company
Identification of partners or principal Founder & CEO Khaleeq Rehman
shareholders and their respective Authorities Co-Founder Umer Sultan
Technical Manager Emran Khan
Marketing Manager Zunaira Illyas
Web & Transportation Samad Khan
Graphic Designer Sadia Khan
Middle Level Management-team (job Same as Above
description and job specifications of
Managerial Staff)

Assessment of Risk

SWOT Analysis
Described earlier in the Risks and Mitigation Plans

Contingency Plan ( PlanB )


Described earlier in the Risks and Mitigation Plans

You might also like