Scope of Works: TOTAL AMOUNT .

The document is a quotation for labor and power tools for construction work at a project location in Quezon City, Philippines. It includes the scope of works such as masonry, interior works, and exterior works. Masonry works include CHB laying, wall plastering, and concrete works. Interior works include ceiling, partitions, electrical works, a wood mezzanine, and door repairs. Exterior works include metal gates, beams, welding, and cleaning. The total amount quoted is 150,000 Philippine pesos. Materials needed are also listed. Payments will be 50% down and 50% upon progress billing. The completion time is estimated at 20-25 working days.

Uploaded by

alvin bautista
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views

Scope of Works: TOTAL AMOUNT .

The document is a quotation for labor and power tools for construction work at a project location in Quezon City, Philippines. It includes the scope of works such as masonry, interior works, and exterior works. Masonry works include CHB laying, wall plastering, and concrete works. Interior works include ceiling, partitions, electrical works, a wood mezzanine, and door repairs. Exterior works include metal gates, beams, welding, and cleaning. The total amount quoted is 150,000 Philippine pesos. Materials needed are also listed. Payments will be 50% down and 50% upon progress billing. The completion time is estimated at 20-25 working days.

Uploaded by

alvin bautista
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Project Location: ROSEVELT QUEZON CITY.

December 04, 2020

ATTENTION: Mrs./Ms. Rezza Lynn S. Biteng

SUBJECT: Supply labor of man power & power tools for the construction of painting area, stock room,
over hauling and mezzanine second floor.

Ma’am/Sir;
We are pleased to submit here with our quotation for the above subject as follows;

SCOPE OF WORKS
Preliminary
Mobilization & Demobilization
Form & Scaffolding

1. Masonry Works
 CHB Laying works.
 Wall Plastering works.
 C.R CHB Laying.
 C.R Plastering works.
2. Interior Works
 Ceiling works.
 Partition of stock room area & Over hauling area.
 Electrical works (Lay-out of electrical wiring additional outlets & Switches.)
 Wood Mezzanine 2nd floor.
 Metal Railing works.
 Repair Door & Door knob.
3. Exterior Works
 Metal Gate works
 Metal Beam works ( G.I Galvanized Iron )
 Welding works
 General cleaning of plastic roof

TOTAL AMOUNT…………………………………………………………………………………………………………..Php.150,000.00

Excluded works: Supply of Materials, Excavation, Roofing works, Concrete works, Rebar works
& Painting works.

Materials Needed

MATERIALS / DESCRIPTION QTY


1. Tubular 2x3 13 pcs
2. Steel matting 4.5 8 pcs
3. Galvanized Steel 150mmØ 8 pcs
4. Galvanized Plain Sheet 1.5mm thick 5 pcs
5. Round bar 10mmØ 10 pcs
6. Hollow Blocks 4” 300 pcs
7. Cement 50kg 20 pcs
8. Ordinary Plywood 3/4" 8 pcs
9. Metal Stud 50 pcs
10. Sand ( Bestay ) 100 pcs
11. Ordinary Plywood 1/4” 30 pcs
12. Silver Insulation foam 1/2“ 1 roll
13. Metal Furring 10 pcs
14. W Clip for Ceiling 50 pcs
15. Carrying channel 10 pcs
16. Wall Angle 10 pcs
17. Blind Rivets 5 boxes
18. Wire 12 & 14 PHELPS DODGE 2 boxes
19. Flat Bar 5 pcs
20. Angle Bar 3-16 x 2” 5 pcs
21. Cutting Disc. 1 box
22. Welding rod 2 box
23. Plate Steel .5mm thick 8 pcs

50% - DOWN PAYMENNT UPON ACCEPTANCE OF PRPOSAL.


50%- UPON PROGRESS BILLING.

COMPLETION: Twenty (20) – Twenty-five (25) Working DAYs.

VALIDITY: ONE (1) WEEK.

We thank you for the opportunity to quote on your requirements and may we look forward to
serve your valuable order.

Thank you and God Bless!

Very truly yours;

Ms. Bing Balonzo

Conformed by: ________________________________


Customers Signature over Printed Name