Schedule - D Specifications and Standards 1 Construction: (See Clause 2.1)

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Construction of Six laning from Naidupeta (Green field) to Turpu Kanupur Ch: 57+046 to Ch:91+910 in the State of

Andhra Pradesh on EPC mode under Sagarmala Scheme

SCHEDULE – D
(See Clause 2.1)
SPECIFICATIONS AND STANDARDS

1 Construction

The Concessionaire shall comply with the Specifications and Standards set forth in
Annex-I of this Schedule-D for construction of the Project Highway.

Design Standards

The project Highway including Project Facilities shall conform to design requirements
set out in the following documents.
Manual of Specifications and Standards for Six laning of Highways through PPP IRC SP:
87-2019, referred to herein as the manual.

National Highways Authority of India Page-1


ANNEX – I
(Schedule – D)
SPECIFICATIONS AND STANDARDS FOR THE PROJECT

1 Manual of specifications and standards to apply

Six - Laning of the Project shall conform to the Manual of Specifications and Standards
for Six-Laning of Highways through Public Private Partnership published by the IRC
(IRC: SP: 87-2019).

2 Deviations from the Manual of Specifications and Standards

Notwithstanding anything to the contrary contained in the aforesaid Manual, the


following Specifications and Standards shall apply to the construction of the Project
Highway, and for purposes of this agreement, the aforesaid manual shall be deemed
to be amended to the extent set forth below:

Sr. Provision
Clause as Deviation/ Modified
No Description as per
per Manual Provision
. Manual
Paved
shoulder is
Paved Shoulder is 1.5 m
2.5 m and
1 2.6 Shoulders and Earthen shoulder is
Earthen
2.0 m
shoulder is
1.5 m
Typical Cross Section for
6-Lane Divided Highway Six Lane New
without Service Road and Construction/Realignmen
2 2.17 with Raised Median for a Fig 2.4 t in Built-up area with
new 6-lane Construction Service Road on Both
sides.(Type I)

Cross section of grade Typical Cross Section for


separated structure Six Lane VUP/Flyover
3 7.19 Vehicular Under pass and Fig 7.8 Approaches with Service
Elevated Section 6-Lane Road on Both sides (Type
Divided Highway II)
19.1.2 The Contract price
also includes the cost of
As regards, the work of
shifting of obstructing
utility shifting, the relevant
Utilities (including all
specifications, relevant
centages as applicable by
4 - rules, regulations and acts -
Utility Owning
of Utility owning
department except
Department/Agencies shall
supervision charges) as
be applicable.
given in 11.2 and
Schedule B