WPJ5 Bottle Warming Machine Instruction
WPJ5 Bottle Warming Machine Instruction
WPJ5 Bottle Warming Machine Instruction
Instruction
catalogues
二、MIDWAY STORAGE..........................................................3
三、SAFETY NOTICE...........................................................3
四、OVERVIEW................................................................4
4、TRANSMISSION..........................................................6
5、SAFETY DEVICES...........................................................6
WPJ5 温瓶机 第 2 页 共 17 页
八、BACKUP LIST............................................................11
Before the machine is put into operation for the first time, important information about
The safety of the machine complies with the regulations of professional associations, as
machine guidelines.
As long as the operation is proper and within the allowed range, the danger to the
operator and the machine will be reduced to a low level that modern technology can
achieve.
Use the
emergency
shutdown
switch only in
critical
situations!
The emergency shutdown switch on the operation panel and the machine can
only be used when the operator or the machine is in danger. Under normal
WPJ5 温瓶机 第 3 页 共 17 页
the machine!
The machine can only be restarted after eliminating the safety threat to
二、Midway storage
If storage is needed in the middle, the storage site must meet the following
sensitive parts:
Keep the machine and its parts away from dirt, dust and paint molecules. Cover
Prevent condensation inside and outside the machine. Ensure that the storage
There should be no volatilized vapors of solvents, acids, lyes in the area around
the machine.
Ensure that the machine is placed at the level of the ground, and the weight of the
all program units still exist. If you have any questions, please notify our staff.
The program unit is completely or partially lost due to too long storage time or
三、Safety instructions
of work, the machine must only be turned by hand, or use a jog switch.
If the switch is located outside the reach of the person doing this kind of
same time, then a person must be specially assigned for this purpose. This
person must be able to observe the work and Operate the machine at a
position where the machine can be stopped immediately, and the person
b)To protect long hair, use a hairnet or some other form of work cap.
c)When handling chemicals, hot water and steam, in order to prevent corrosion burns,
scalds and injuries, wear protective clothing (protective glasses, rubber aprons, boots,
d)When the machine is running normally, it is not allowed to cut off the power
suddenly.
四、overview
line. After the cold filling of the polyester bottle and glass bottle, the
ensures that the container can be clean and dry into the carton.
model:WPJ5
4.transmission
The main drive adopts stepless variable frequency reduction motor drive.
WPJ5 温瓶机 第 7 页 共 17 页
5.safety devices
Operators should be familiar with all safety devices and their use methods to
1、working principle
The bottle warming machine takes the low-temperature filling and capping
and sealing of the container bottle through the circular plastic chain
temperature to ensure the beverage The color, fragrance, taste and nutrition
of the product are convenient for labeling, labeling and packing after the
whole line.
2、structure
electrical control.
2.1、airframe:
The whole body is made of stainless steel, which consists of spray area,
2.2、Transmission part
a、In-machine conveying
variable motor to drive the active shaft to rotate. Several tooth pitch
sprockets mounted on the main drive shaft drive the plastic modular chain
polyester bottles in the machine. The bottle guide part is arranged in the
body to prevent the bottle from touching the frame during operation and
causing the bottle to fall. An open hole is provided on the conveyor belt, and
the water during spraying can flow into the water tank from the hole.
b、Spray device
There are two spray areas in the machine. The water heated by the
steam is pumped to the corresponding spray pipe, and the warm water is
sprayed from the pipe cone nozzle onto the polyester bottle to spray the
bottled beverage. The sprayed water flows into the sump at the bottom of
the body, and then circulates by the pipeline pump. The first and second
areas are independent spray areas. Before work, open the manual valve at
the upper end of the steam pipe to heat the water in the water tank to a
the water tank), and turn on the water pump for heat exchange. Speed up
the warm-up time. Then the pneumatic valve will automatically supplement
the heat (close the manual valve) to maintain the process temperature and
ensure the purity of the beverage. The first and second zone pipeline pumps
respectively drive into the spray pipeline in their own area. Spray the
polyester bottles in this area, and the sprayed water flows into the water
collection tank at the bottom of the body, and is heated by steam and
2.3、Electrical control
a.The electrical control box of the machine is placed on the left side
1.1 ready
Draw the reference line with ink according to the basic drawing of the
bottle warming machine, including the center line of the bottle cooling
machine, the parallel lines on both sides and the two front and back end
lines.
whether the direction of the equipment in and out of the bottle is consistent
with the plan before transporting in to avoid errors. Pay attention to safety
1.3 installation
a.First, it is required to place the body on the reference line, and align
the center of the body to the ground centerline, and the front and rear ends
b.Adjust the height and horizontal plane of the body, and adjust the
height to about 1100 mm based on the upper surface of the flat-top chain on
the bottle feeding and discharging machine, and then calibrate the body
c.After confirming that the machine body is installed correctly, check all
piping systems and remove debris before connecting all external piping.
1.4 adjustment
Adjust the positions of the pallets on the side plates of the bottle in and out
WPJ5 温瓶机 第 10 页 共 17 页
and the plastic ring conveyor chain to the correct position. The bottle inlet
plate is higher than the ring conveyor chain by 0.2 ~ 0.5mm, and the bottle
end pallet is slightly lower than the ring chain plate by 0.2 ~ 0.5㎜.
Commissioning
a、Check for dirt in the warm water pipe and keep the pipe clean.
c 、 Check whether all valve switches are flexible, whether the safety
protection device is reliable, and whether the supplied water and electricity
2.2、start up
b.Check whether the nozzles of the cone-shaped water jets in the two
spray areas are spraying smoothly. If you find that it is not smooth or
c.Turn the main switch to the position open position, and the power
d.Turn on the main drive operation key to make the main motor run, the
circular plastic chain in the machine body starts to run, and adjust the main
e.Turn on the operation key of the bottle delivery section to make the
f.Switch on the operation key of the bottle feeding section to make the
bottle feeding conveyor belt run. Adjust the speed of the bottle feeding
h.Manually adjust the manual valve to control the flow of warm water, so
required by the production within the specified processing time, and then the
i.First, manually open the manual valve at the top of the pneumatic
valve to heat the water in the water tank in the sterilization area, and wait
until the temperature is reached (displayed on the dial on the water tank).
Close the manual valve and open the pneumatic valve to automatically
control the temperature in the water tank. Ensure that the water temperature
a 、 Turn off the operation keys of the bottle feeding section to stop the
b、Turn off the main drive operation key to stop the circular plastic chain
in the machine.
c 、 Turn off the bottle-out section conveying operation key and stop the
d 、 Close the operation key of the water valve to stop the flow of clean
water.
e 、 Close the inlet and outlet valves of the cooling water and the steam
valve.
f、Turn off the operation key of the water pump to stop the water pump.
1.Machine operation
1.1 Before operation, empty the water tank in the machine, clean up the
dirt from the bottle, and then fill the water tank with spray water.
machine.
b 、 Monitor the speed of the production process and shut down at any
time.
any time.
e 、 Monitor the remaining water in each water tank, and adjust the
run.
a、When repairing, drain the water in the tank, rinse the tank with clean
water, and remove the debris in the tank (including the circular plastic
chain).
active motor)
b、Check the tightness of the connection and the tightness of all valves,
a 、 Disassemble and wash the water pump, check the degree of friction
of the moving parts and the degree of corrosion of the rotating wheel and
b、Check the wear condition of the transmission belt (plastic chain) and
the conveyor belt of the bottle in and out section, and replace the damaged
parts.
normal range
八、backup list:
Code Assembly
item Name material quantity remark
name part
Spray
1 Nozzle Nylon 20
pipe
Master
Mesh belt
2 and slave 2
sprocket
shaft
3 Comb plate Transition 3
Mesh belt
transmiss
4 chain 0.5m
ion
合 格 证
(ZJ—7.5—06) NO:
产品型号:
产品名称:
出厂编号:
本产品经检验合格,准予出厂。
WPJ5 温瓶机 第 16 页 共 17 页
检 验 员:
质检部长:
日期: 年 月 日
装 箱 单
(ZJ—7.5—01) NO:
包装箱号: 箱体尺寸:
净 重: 毛 重:
一、主机及辅机
序号 代号 名 称 规格 数量 备注
1
2
3
4
二、随机备件
见使用说明书
三、随机技术文件
序号 代号 名 称 规格 数量 备注
1
2 `
3
4
5
四、随机工具清单
序号 代号 名 称 规格 数量 备注
WPJ5 温瓶机 第 17 页 共 17 页
1
2
3
4
5