The document describes the chlorine dosing system from the chlorine tonner to the PRV (pressure reducing valve) and PRV to the dosing point. It lists possible parameters to monitor, expected deviations, potential causes, effects, and existing and proposed control measures. Specifically, it monitors pressure, flow, temperature and identifies possible issues like low/high pressure and flow, leaks or malfunctions that could impact chlorine release or water quality. It suggests preventative maintenance and calibration of equipment as well as ensuring proper safety protocols.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
94 views4 pages
Chlorine Dosing System: Chlorine Tonner To PRV
The document describes the chlorine dosing system from the chlorine tonner to the PRV (pressure reducing valve) and PRV to the dosing point. It lists possible parameters to monitor, expected deviations, potential causes, effects, and existing and proposed control measures. Specifically, it monitors pressure, flow, temperature and identifies possible issues like low/high pressure and flow, leaks or malfunctions that could impact chlorine release or water quality. It suggests preventative maintenance and calibration of equipment as well as ensuring proper safety protocols.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4
CHLORINE DOSING SYSTEM
CHLORINE TONNER TO PRV
S.NO parameter key word deviation cause Empty Tonner Control Valve malfunction
Pipe Failure
1.1 Nil No Pressure
Pipe & Flange leakage
Choke in Pipe line / filter
Pressure Control Valve malfunction
Pipe & Flange leakage
1.2 Less Less Pressure
Choke in Pipe line / filter
1.3 High High Pressure Choke in Pipe line / PRV
2.1 Less Less Flow same as above (1.1)
2.2 NO NO flow same as above (1.1) Flow Isolation valve ,Control Valve & PRV 2.3 More More Flow malfunction
Less Less temp Nil
3 Temperature More More Temp Nil PRV TO DOSING POINT
Control Valve malfunction
PRV malfunction
4.1 Pressure High High Pressure Ejector malfunction (Less or no raw
water flow)
Choke in Pipe line / AVR / glass
rotometer
Mal function of AVR / glass rotometer /
5.1 Less Less Flow Ejector same as above (1.1)
Flow Mal function of AVR / PRV malfunction
5.2 NO NO flow same as above (1.1) Mal function of AVR / glass rotometer / 5.3 More More Flow Ejector
Less Less temp Nil
6 Temperature
More More Temp Nil
LORINE DOSING SYSTEM HLORINE TONNER TO PRV effect existing control measure Proposed control measure Nil Nil Periodic testing & Calibration of the One number of Chlorine gas detector Chlorine gas detectors should be installed ensured
Compulsory use of PPEs (Chlorine
Ensuring availability & usage of PPEs & Release of chlorine. Mask & Kits) for all personnel operating in the area Kit
SOP on Handling emergencies is Ensuring SOPs are being followed
available & followed MSDS displays at the location same as above same as above (1.1) same as above (1.1) same as above (1.1) same as above (1.1)
same as above Changing of Filter element when
pressure reduction is observed in Periodic maintenace of Filter element Pr.Gauge Nil Periodic testing & Calibration of the One number of Chlorine gas detector Chlorine gas detectors should be installed ensured
Compulsory use of PPEs (Chlorine
Ensuring availability & usage of PPEs & same as above Mask & Kits) for all personnel Kit operating in the area SOP on Handling emergencies is Ensuring SOPs are being followed available & followed MSDS displays at the location same as above (1.1) same as above (1.1)
same as above (1.1) Changing of Filter element when
pressure reduction is observed in Periodic maintenace of Filter element Pr.Gauge same as above (1.1) same as above (1.1) Preventive maintenance & same as above (1.1) replacement when required same as above (1.1) same as above (1.1) same as above (1.1) same as above (1.1) same as above (1.1) same as above (1.1) Preventive maintenance & Nil replacement when required Ensuring proper maintenance
Nil Nil Nil
Nil Nil Nil
PRV TO DOSING POINT Release of chlorine & Preventive maintenance & water quality will be Ensuring proper maintenance replacement when required affected water quality will be Preventive maintenance & Ensuring proper maintenance affected replacement when required
Vacuum failure Water flow & pressure will be checked Ensuring PG & flowmeter calibration
same as above (1.1) same as above (1.1)
same as above Changing of Filter element when
pressure reduction is observed in Periodic maintenace of Filter element Pr.Gauge water quality will be Preventive maintenance & Ensuring proper maintenance affected replacement when required same as above (1.1) same as above (1.1) same as above (1.1) water quality will be Preventive maintenance & Ensuring proper maintenance affected replacement when required same as above (1.1) same as above (1.1) same as above (1.1) water quality will be Preventive maintenance & Ensuring proper maintenance affected replacement when required