1 Online Class Assessment Subject:: Engineering Management

This document contains details of a project management network for an engineering management subject. It includes two activity networks with durations for each activity and identification of predecessor activities. For the first network, the critical path is identified as "ACGHJK" as it has the least amount of slack time. For the second network, the critical path is "ADGJLM" since it has the least flexibility in schedule.

Uploaded by

Ju Naid Malik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views6 pages

1 Online Class Assessment Subject:: Engineering Management

This document contains details of a project management network for an engineering management subject. It includes two activity networks with durations for each activity and identification of predecessor activities. For the first network, the critical path is identified as "ACGHJK" as it has the least amount of slack time. For the second network, the critical path is "ADGJLM" since it has the least flexibility in schedule.

Uploaded by

Ju Naid Malik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

1st Online Class Assessment

Subject:

Engineering Management

Topic:

Project Management Network

Assigned By:

Sir Ali Sarosh

Prepared By:

Muhammad Junaid Anwar

Registration No.

2017-CH-716

Date:

December 03, 2020

MNS UET MULTAN


Activity #01
Activity Predecessor Duration (Days)
A - 4
B A 3
C A 5
D B 2
E D 3
F B 1
G C 6
H B,G 7
I H 5
J H 7
K E,F,J 4

B D E

A F K

C G H I

J
9 E 12
2 3 29
4 B 7 7 D 9 6
2 3 24 4 2 26
1

7 F 8
2 1 29
0 A 4 2 K 33
0 4 4 8
9
2 4 33
9

4 C 9 9 G 15 1 H 22 2 I 27
4 5 9 9 6 15 5 2
1 7 22 2 5 27
5 2

2 J 29
2
2 7 29
2
Critical Path Analysis:

Here the critical path is “ACGHJK” because on this path we have


restricted time limitation to complete the task i.e we are restricted on time.

Activity #02
Activity Predecessor Duration (Days)
A - 4
B A 3
C A 1
D A 2
E A 1
F B 1
G D 3
H E 3
I F 2
J C,F,G 3
K H 6
L J 2
M L 3

B F I

A J L M

D G

E H K
4 B 7 7 F 8 8 I 10
4 3 7 7 1 8 8 2 10

4 C 5
8 1 9

0 A 4 9 J 12 1 L 14
0 4 4 9 3 12 2
1 2 14
2

4 D 6
4 2 6
1 M 17
6 G 9 4
6 3 9 1 3 17
4 E 5 4
4 1 5
5 H 8 8 K 14
5 3 8 8 6 14
Critical Path Analysis:

Here the critical path is “ADGJLM” because on this path we have


restricted time limitation to complete the task i.e we are restricted on time.