This document outlines the project requirements for building a two-story residential structure in Brgy San Eugenio Aringay La Union. Key details include using DURARIB 1070mm thick profile panels, a project duration of 15 days, and the scope of works involving fabrication of trusses, roofing installation, bent installations, civil works, and truss works. Payment terms and safety requirements are also specified, including the need for full PPE, CARI insurance, medical clearances for workers, and supervision by a project manager and engineer. Temporary facilities, working hours and identification requirements are also listed. The customer Mrs. Renegios Mabalay has reviewed and confirmed the details.
This document outlines the project requirements for building a two-story residential structure in Brgy San Eugenio Aringay La Union. Key details include using DURARIB 1070mm thick profile panels, a project duration of 15 days, and the scope of works involving fabrication of trusses, roofing installation, bent installations, civil works, and truss works. Payment terms and safety requirements are also specified, including the need for full PPE, CARI insurance, medical clearances for workers, and supervision by a project manager and engineer. Temporary facilities, working hours and identification requirements are also listed. The customer Mrs. Renegios Mabalay has reviewed and confirmed the details.
This document outlines the project requirements for building a two-story residential structure in Brgy San Eugenio Aringay La Union. Key details include using DURARIB 1070mm thick profile panels, a project duration of 15 days, and the scope of works involving fabrication of trusses, roofing installation, bent installations, civil works, and truss works. Payment terms and safety requirements are also specified, including the need for full PPE, CARI insurance, medical clearances for workers, and supervision by a project manager and engineer. Temporary facilities, working hours and identification requirements are also listed. The customer Mrs. Renegios Mabalay has reviewed and confirmed the details.
This document outlines the project requirements for building a two-story residential structure in Brgy San Eugenio Aringay La Union. Key details include using DURARIB 1070mm thick profile panels, a project duration of 15 days, and the scope of works involving fabrication of trusses, roofing installation, bent installations, civil works, and truss works. Payment terms and safety requirements are also specified, including the need for full PPE, CARI insurance, medical clearances for workers, and supervision by a project manager and engineer. Temporary facilities, working hours and identification requirements are also listed. The customer Mrs. Renegios Mabalay has reviewed and confirmed the details.
PROJECT NAME : RESIDENTIAL STRUCTURE TYPE : TWO STOREY LOCATION : BRGY SAN EUGENIO ARINGAY LA UNION Project Duration : 15 DAYS Date :
ITEM DETAILS/DESCRIPTIONS
I. MATERIAL SPECIFICATIONS:
1. Profile/s DURARIB1070MMTHK 2. Longest Panel 6.40METERS 3. Thickness 0.4 4. Bended Accessories WC,EF,BG.FC.EM II. BUILDING STRUCTURES: 1. Bungalow/Multi-Storey TWO STOREY BUILDING 2. Scope of Works: FABRICATION OF TRUSSES AND ROOFING INSTALLATION a. Roofing Installation YES b. Bended Installation YES c. With Insulations and Wire Mesh NO d. Civil Works YES e. Truss Works YES f. Ceiling Works (Interior/Exterior) NO h. Dry Wall Partitions YES i. Dismantling NO j. Rectification (Specify if any) III. PAYMENT TERMS: 1. Down Payment Upon Order (%) 2. Balance (%) 3. Bonds & Insurances IV. SAFETY REQUIREMENTS: 1. Full PPE? 2. Full-time Safety Engineer needed? 3. Contractor’s All Risk Insurance (CARI) required? 4. Lifting Method: a. Manual b. Crane, provided by owner? 5. Scaffoldings and/or Shoring: a. Owner supplied? 6. Clearances and Certificate required: a. Medical w/ X-ray b. NBI, Brgy, Police Clearances c. TESDA certificate (welders/scaffold erectors) V. SUPERVISION REQUIREMENTS: 1. Project Manager/Engineer 2. Project In-Charge 3. Quality Assurance VI. OTHER REQUIREMENTS: 1. Temporary Facilities (TEMFACIL) a. Stay-In ? i. Provided by owner? b. Power & H2O by owner? 2. Working Time a. What is Regular working time? b. Overtime allowed? c. Holidays & Sundays? d. Beyond regular time e. Is there working permit requirement? f. Worker's Uniforms and I.D. required?
Conformed by: MRS. RENEGIOS MABALAY Customer Union Galvasteel Corporation