Kapedo-Lokwamothing MARCH Report

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

Client:

Kenya National Highways Kenya National Highways Authority (KeNHA)


Authority
Project Name:
P.O Box 49712 – 00100
Routine Maintenance and Spot Improvement of CB
Mezzanine Floor, Blue Baringo (Kapedo)-Jnct 134 Lokwamothing(A10) Road.
Shield Towers
Hospital Road, Upper Hill Contract No:
Nairobi KeNHA/RD/M/2666/2018
Monthly Progress Report No. 6

Engineer: MARCH, 2019


Director (RA&CM)
Kenya National Highways
Authority
P.O Box 49712 – 00100
Nairobi

Resident
Engineer:
Regional Director, 25th March, 2019
KeNHA North Rift Region,
P.O Box 2000 – 30100
Eldoret

Contractor:
M/s Nicon Works
Contractors LTD
P.O. Box 4751 – 30100,
Eldoret.
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

TABLE OF CONTENTS
1. EXECUTIVE SUMMARY........................................................................................3
1.1. General....................................................................................................................................... 3
1.2. Contract Salient Features............................................................................................................. 3
2. PROJECT DESCRIPTION.....................................................................................4
2.1. Location...................................................................................................................................... 4
2.2. Scope of Works............................................................................................................................ 4
2.3. Contract Sum............................................................................................................................... 4
2.4. Contract Period........................................................................................................................... 4
2.5. Source of Funding........................................................................................................................ 4
2.6. Contract Documents.................................................................................................................... 4
2.7. Location Map.............................................................................................................................. 5
3. PROGRESS OF WORKS........................................................................................5
3.1. Permanent Works........................................................................................................................ 5
3.3. Programme of Works................................................................................................................... 6
3.4. Progress Compared to Clause 14 Programme...............................................................................6
3.5. Conclusion................................................................................................................................... 6
3.6. Summary of Lane Kilometres....................................................................................................... 6
4. CONTRACTOR’S MOBILIZATION.........................................................................7
4.3. Mobilization................................................................................................................................ 7
5. ENGINEER’S REPRESENTATIVE..........................................................................7
5.1. Period of Performance................................................................................................................. 7
5.2. Resident Engineer’s Staff............................................................................................................. 8
5.3. Supervision Activities................................................................................................................... 8
6. MATERIAL QUALITY CONTROL...........................................................................8
6.1. Material Sources......................................................................................................................... 8
6.1.1. Borrow Pits for Natural Material................................................................................................8
7. ENVIRONMENTAL QUALITY PROTECTION/HEALTH &SAFETY.............................8
7.1. Environmental Quality Protection................................................................................................ 8
7.2. Health & Safety........................................................................................................................... 8
8. FINANCIAL STATUS............................................................................................9
8.1. Payments to Contractor............................................................................................................... 9
9. WEATHER REPORT.............................................................................................9
9.1. Temperature............................................................................................................................... 9
9.2. Rainfall........................................................................................................................................ 9
10. VISITORS TO SITE.............................................................................................9
11. ANNEXES..........................................................................................................10
11.1. Progress Photographs................................................................................................................ 10

3
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

1. EXECUTIVE SUMMARY

1.1. General
The project is located along the existing Kapedo-Lokwamwothing road in Turkana County,
North –Rift Region.
The project road starts from Kapedo Market’ centre and runs in a north-eastern direction and
ends at Lokwamosing centre.

1.2. Contract Salient Features


The Contract data is as shown in Table 1 below.
Table 1: Contract data
Project Location Turkana County
Routine Maintenance and Spot Improvement of
Project Title CBBaringo(kapedo)-Jnct134
Lokwamothing(A10) Road
Contract No. KeNHA/RD/M/2666/2018
Project Length 115 km
Project Funding RMLF
Director General, Kenya National Highways
Employer
Authority
Engineer Director(RA&CM)
Resident Engineer Regional Director– North Rift
Contractor M/s NICON WORKS CONTRACTORS LTD
Project Award Date 1st August, 2018
Contract Sum KShs.27,213,832.00
Order to Commence 8th October ,2018
Date of Commencement 22nd October,2018
Completion Period 6 Months
Expected Completion Date 21st April, 2019
Performance Bond Expiry Date 7th June 2019
Time Elapsed 5 Months
% of Contract Period Elapsed 83.33%
Work Progress to Date 83.33%
Amount Certified to Date Kshs 23,796,314.94
% of Contract Sum Certified to Date 87.442%
Month of Reporting March, 2019
Date of this Report 25th March , 2019

2. PROJECT DESCRIPTION

4
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

2.

2.1. Location
The road is located along Kapedo- Lokwamothing road in Turkana county of North-Rift
Region.

2.2. Scope of Works


The works to be executed under the contract comprise mainly of but not limited to the following;
 Provision of Preliminaries
 Site Clearance
 Excavation and Filing for structures
 Culvert and drainage works
 Passage of traffic
 Grading and Gravelling
 Any other works as may be instructed by the Engineer

2.3. Contract Sum


The Contract Sum is KShs.27, 213,832.00.This amount is inclusive of 16% Value Added Tax
(VAT).

2.4. Contract Period


The Contract Period is set as 6 Months with the expected completion date being 21st April 2019.

2.5. Source of Funding


The project is financed by the Government of Kenya through the Road Maintenance Fuel Levy
(RMFL) fund.

2.6. Contract Documents


The contracts documents for this project consisted of the following;
i. Form of Agreement;
ii. Letters of Award and Acceptance;
iii. Form of Tender and Appendix to Form of Tender;
iv. Conditions of Tender and Instructions to Tenderers;
v. Conditions of Contract;
vi. Standard Specification;
vii. Special Specifications of Contract;
viii. Schedule of Supplementary Information;
ix. Priced Bills of Quantities.

5
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

2.7. Location Map

6
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

3. PROGRESS OF WORKS

3.1 Instructed Works


Table 2: Summary of Permanent works Progress
Completed
Activity Completed %
S/No. Extent of the works Sections this Remarks
Description Sections to date Progress
Month
Km 0+000 to Km
Km 0+000 to Km Km 65+000 to Km 30+000 LHS,
Activity is on going 70.00%
115+000 LHS 115+000 LHS Km65+000-Km to
Heavy bush Km 115+000 LHS
1.
clearing Km 0+000 to Km
Km 0+000 to Km 65+000 to Km 30+000 RHS,
Activity is on going 70.00%
115+000 RHS 115+000 RHS. Km65+000-Km
115+000RHS,
Km 0+000 to Km
Km 65+000- 30+000, Km
2. Light Grading as instructed Activity is on going 70.00%
Km115+000 65+000 to
Km115+000
Km 4+000 to Km Km 4+000 to Km Activity is
3 Gravelling as instructed 100%
4+700 Km 4+700 Km completed
Activity is
4. Culvert cleaning As instructed - - 100%
completed
Catch water
5. drains As instructed - - activity is completed 100%
excavation

6 Concrete works As instructed - - activity is on going 100%

7 Protection works As instructed - - activity is completed 100%

3.1. VALUE OF WORKS COMPLETED TO DATE


Below is a summary of the value of overall works completed versus the programmed as at 25 th
March, 2019.

Table 5: Value of Works Completed to date


Bill Billed Value of work Certified %
No. Activity Amount (Kshs) Completed Amount Certified
(Kshs) (Kshs) to Date
1 Preliminary and General 1,450,000.00 904,864.60 904,864.60 62.404%
4 Site Clearance 2,400,000.00 2,400,000.00 2,400,000.00 100%
5 Earthworks 3,500,000.00 3,500,000.00 3,500,000.00 100%
7 Excavation and filling for 308,000.00 308,000 308,000 100%

7
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

Bill Billed Value of work Certified %


No. Activity Amount (Kshs) Completed Amount Certified
(Kshs) (Kshs) to Date
Structures
Culverts and Drainage 1,347,700.00 1,347,700.00 100%
8 1,347,700.00
Works
10 Gravel Wearing Course 14,454,500.00 12,053,500.00 12,053,500.00 83.389%
3,282,250.34
Add 16% V.A.T 3,753,632.00 3,282,250.34

Totals 27,213,832.00 23,796,314.94 23,796,314.94 87.442%

3.3. Programme of Works


The Commencement Date for the project, as defined in Article 17 of the Conditions of Contract,
was 22nd October, 2018. This was 14 days after the issue of the Order to commence by the Engineer,
dated 8th October, 2018.
The Contractor is yet to provide RE’s office with his programme of works.

3.4. Progress Compared to Clause 14 Programme


Programmed Progress Progress compared to
Period
Completion (Executed) programme
November, 2018 16.67% 0.00%
December,2018 16.67% 5%
January, 2019 16.67% 33%
February,2019 16.67% 30%
March,2019 16.67% 20%
Overall progress to date 83.35% 88% Ahead of schedule
3.5. Conclusion
4. The progress achieved this month is 20% which translates to a physical weighted progress of
88% against the programmed 83.35%

3.6 Summary of Lane Kilometres


The Linear Kilometres achieved is as shown in the below;

8
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

* Total Lane Kilometres


Previous
This Month (Lane-Km) achieved
Month

30 50 80

Lane Kilometres achieved (Lane-


Km)

4.0 ENGINEER’S REPRESENTATIVE

4.1 Period of Performance


Date of Commencement Order 22nd October 2018
Contract Commencement Date 8th October 2018
Expected Completion Date 21st April 2019
Contract duration 6 Months

4.2 Mobilization
By the end of the reporting period, the Resident Engineer’s supervision team comprised of the
following:
Table 7: Resident Engineer’s Key & Support Staff
KEY STAFF
Name Position Date Started
Eng. F.K. Kipyator RE 01/01/2019
Eng. B.B. Anambo ARE 01/01/2019
Roads 8/10/2018
Mr. George Sule
Superintendent
Assistant 15/01/2019
Mr. Gilbert Ouma
Engineer
Mr Baraza Opicho Inspector Roads 8/10/2018

4.3 Supervision Activities


In the month of reporting the Resident Engineer’s supervision team were involved in the following.
(a) Issuance of Site Instructions and Correspondences
(b) Monitoring and review of Contractor’s weekly Programme of Works

9
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

(c) Inspection of work areas and quality control testing


(d) Preparation of site reports and records
.

4.4 Site Meetings


So far no site meeting has been held in the month of April, 2019.

6.0 Material Sources


4.4.1 Borrow Pits for Natural Material
The Contractor has submitted sample for natural gravel for use in the works, mainly for gravelling
works and the same has been approved.

7.0 ENVIRONMENTAL QUALITY PROTECTION/HEALTH &SAFETY

7.1 Environmental Quality Protection

Pursuant to Clause 146 of Special Specifications the Contractor is required at all times to
preserve the environmental quality of the project area.

7.2 Health & Safety


Pursuant to Clause 117 of Special Specifications the Contractor has been providing, equipping
and maintaining health and safety throughout the works.
The contractor has been providing staff with reflective jackets, safety boots and masks
The contractor has been employing two people who will be flagging the traffic as the work
progresses.

10
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

8.0 FINANCIAL STATUS

8.1 Payments to Contractor


The following is the summary of Payments made to the Contractor to date;
Table 8: Summary of Payments to date
IPC Amount Percentage of
IPC No. Date Certified Status
(KShs) Contract Sum

21st
1 12,008,575.20 Fully paid
December,2018 44.1

2 11,787,739.74 21st March,2019 43.315 Fully paid

9.0 WEATHER REPORT

9.1 Rainfall and Temperature

9.1.2Temperature
The temperatures were generally high for the period under review.

9.1.3 Rainfall
There has been no rainfall during the period under review.

11
1. KeNHA North Rift MONTHLY PROGRESS REPORT No.6 April, 2019
Routine Maintenance and Spot Improvement of CB Baringo(Kapedo)-JN 134 Lokwamothing (A10) Road

10.0ANNEXES

10.1 Progress Photographs

S/No. Photographs Remarks

Previous completed graded


1. section at Km 100+000

2
Grading at Km 95+950

Grading at Km 110+000
3

Completed section at Km
108+000

12