SBP Ring Beam Reinforcement

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

8 sheet of 19

A
- BUILDING AND CONSTRUCTION AUTHORITY
CAPPING BEAM APPROVED UNDER SECTION 5 / SECTION 5A OF THE
GROUND BUILDING CONTROL ACT (CHAPTER 29)
LEVEL +10.44
Project Reference No : A1875-00014-2017 ST261
1000

T.L.
SOIL
FACE
MAIN REINFORCEMENT -2.53
+9.44 18H20 (1.8m) EXCAVATION
FACE

T.L.
for Commissioner of Building Control

+8.23
MAIN REINFORCEMENT
18H20 (12m)
-

1200
6H20
(T&B)

H10-300
RB2 (600X800)
-6.63
MATCH
MAIN REINFORCEMENT LINE H10-300
18H20 (12m)

(E.F.)
7H20
1000

T.A.L.
T.A.L.
SPIRAL LINK H13-150
H10-300
SBP WALL WITH REBAR

75
B
1 SECTION MAIN REINFORCEMENT
OF BORED PILE
- 1 : 25
-

SPIRAL LINK H13-150


A CAPPING BEAM DETAIL
+1.68 - 1 : 25

600
RB1 (600X800) 3H20
(T&B) H10-300
H10-300
∅1000 BORED
PILE

200
2 SECTION

(E.F.)
2H20
600

800
TAL
- 1 : 25

T.L.

200
-13.29
2x2H16 BENT OUT
BARS (IN HARD PILE) H10-300
T.L.

500 1 04/03/2019 SKETCH IM CWM


SOIL
FACE REV DATE DESCRIPTION REVIEWED AUTHORIZED
C
-2.53 CLIENT:
EXCAVATION -
FACE
RB3 (600X800)
B RING BEAM DETAIL (RB1 AND RB2)
40 SCOTTS ROAD #15-01 ENVIRONMENTAL BUILDING SINGAPORE 228231
- 1 : 25 TEL. 6225 5782
-15.88
MAIN REINFORCEMENT
18H20 (12m) PROGRAMME MANAGER:

MAIN REINFORCEMENT 600


-
18H25 (12m)
4H25
2 (T&B)
H10-300 DTSS PHASE 2 PROJECT OFFICE
∅1000 BORED 2 BUKIT MERAH CENTRAL #07-01 SINGAPORE 159835
H10-300
PILE

200
CONTRACTOR:
Ed. Züblin AG

(E.F.)
3H25
47 SCOTTS ROAD

800
TAL
#17-02 GOLDBELL TOWERS
RB2 (600X800) SPIRAL LINK H16-150 SINGAPORE 228233

200
-6.63
MATCH TEL.: +65-63390436
LINE FAX: +65 63390460
3x2H16 BENT OUT EMAIL: [email protected]
500
BARS (IN HARD PILE) H10-300 CONTRACTOR CONSULTANT:

-20.22 1 MAGAZINE ROAD


#05-01 CENTRAL MALL SINGAPORE 059567
TEL: 65 6222 3888 FAX: 65 6234 7089
UEN: T18FC0019A
1200

QUALIFIED PERSON:

C RING BEAM DETAIL (RB3)


- 1 : 25
400 29 INTERNATIONAL BUSINESS PARK
SPIRAL LINK H13-150 #03-01 ACER BUILDING TOWER A SINGAPORE 609923
TEL: 65 69220718 FAX: 65 69222173
UEN : 198905658K

PROJECT TITLE:

PROPOSED CONSTRUCTION OF SEWER


TUNNELS FOR THE DEEP TUNNEL
400 THK. CAST-IN-SITU WALL
NOTES SEWERAGE SYSTEM PHASE 2 PROJECT-
200

INFERRED 1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH


CONTRACT T-07
ROCKHEAD OTHER RELEVANT DRAWINGS AND THE SPECIFICATION.
-24.25 DRAWING TITLE:
2. THE SECANT BORED PILE WALL IS DESIGNED FOR THE SITE X1-LS1
TOLERANCE AS BELOW:
MIN. 1000
INTO S-III

- MAXIMUM 1:200 OUT-OF-VERTICALITY SHAFT A5-X1-LS1-MH107


T.L.

THE MINIMUM REQUIRED OVERLAP BETWEEN ANY SECANT BORED PILE WALL AND RING BEAM
-25.25 ADJACENT HARD/SOFT PILES IS 570mm. AFTER
COMPLETION OF DRILLING, THE CONTRACTOR SHALL DETAILS
DETERMINE BASED ON AS-BUILT PILE POSITIONS AND
INCLINATION WHETHER THERE IS ANY INSTANCE WHERE
THIS OVERLAP IS NOT ACHIEVED. IN ANY SUCH INSTANCE, DRAFTED: DESIGNED: SHEET SIZE:
THE QP(D) SHALL BE NOTIFIED AND STRENGTHENING CWC TFL A1
MEASURES SHALL BE PROPOSED. DRAFTING CHECK: DESIGN CHECK: SCALE:
TFL CHK AS SHOWN
DATE: REVIEWED: PBS:
15/06/2020 IM 122101
CONTRACT: DRAWING NUMBER:

- REINFORCEMENT OF SBP WALL (HARD PILE) PUB-DTSS2-2020


- 1 : 50
T-07 SHEET NUMBER: REVISION:

SK01 -
THIS DRAWING IS COPYRIGHT
PlotDate:15.06.2020 By:CHAN, BILL Cad File:SBP and Ring Beam Reinforcement.dwg