Kempegowda International Airport - NSPR: Before Concreting Description Checked & Found Ok Remarks YES NO N/A

This document contains checklists for concrete pouring activities at Kempegowda International Airport. It includes checks to be performed before, during, and after concrete pouring. Checks before pouring include reinforcement installation, formwork preparation, and embedded items. During pouring, aspects like weather, mix properties, and pouring times are checked. After pouring, checks are for curing and ensuring the poured concrete meets dimensional and surface quality requirements. The document is to ensure quality control of concrete construction work between the contractor and client representatives at the airport construction site.

Uploaded by

dhanush gt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
784 views2 pages

Kempegowda International Airport - NSPR: Before Concreting Description Checked & Found Ok Remarks YES NO N/A

This document contains checklists for concrete pouring activities at Kempegowda International Airport. It includes checks to be performed before, during, and after concrete pouring. Checks before pouring include reinforcement installation, formwork preparation, and embedded items. During pouring, aspects like weather, mix properties, and pouring times are checked. After pouring, checks are for curing and ensuring the poured concrete meets dimensional and surface quality requirements. The document is to ensure quality control of concrete construction work between the contractor and client representatives at the airport construction site.

Uploaded by

dhanush gt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

KEMPEGOWDA INTERNATIONAL AIRPORT - NSPR

EMPLOYER : Bangalore International Airport Limited CF/08/CHECKLIST&POUR CARD


CONTRACTOR : Larsen & Toubro Ltd.- L&T Construction, TIIC Rev No: 0, Date : 14.12.2017

CONCRETE CHECKLIST & POUR CARD


IR No : DATE :
AREA/LOCATION OF POUR : POUR NO. :
CHAINAGE/OFFSET : REF.DRAWING :
GRADE OF MIX : QUANTITY :
CHECKED & FOUND OK
BEFORE CONCRETING DESCRIPTION REMARKS
YES NO N/A
Allignment Checked
Centre lines checked
REINFORCEMENT
a) Dia & Shape ( as per Drawing )
b) Extra Reinforcement
( Apart from Drawing )
c) Extra Laps ( if any )
d) No.Of Chairs & Length
e) Binding As per specification
f) Cover to Reinforcement
FORMWORK
a) Center lines
b) Shuttering line,Level &Plumb
c) Demoulding agent applied
d) Concrete top level
e) Supports adequecy
EMBEDED ITEMS ( If any )
a) BOLTS
c) INSERTS
CLEARED FOR POUR DATE : TIME :

For Contractor Representative For Client Representative

CHECKED & FOUND OK


DURING CONCRETING DESCRIPTION REMARKS
YES NO N/A
a) Date of Concreting
b) Weather
c) Ambient Temperature
d) Mix grade
e) Vibrator & needle
f) Slump
g) Time of concrete start
h) Time of concrete end
i) No. of cubes for sampling
j) Cube identification

Prepared by : Witnessed & Reviewd By


For L&T Representative For Employer Representative
Name : Name :
Date : Date :
KEMPEGOWDA INTERNATIONAL AIRPORT - NSPR
EMPLOYER : Bangalore International Airport Limited CF/08/CHECKLIST&POUR CARD
CONTRACTOR : Larsen & Toubro Ltd.- L&T Construction, TIIC Rev No: 0, Date : 14.12.2017
CONCRETE CHECKLIST FOR POST CONCRETING
IR No : DATE :
AREA/LOCATION OF POUR : POUR NO. :
CHAINAGE/OFFSET : REF.DRAWING :
GRADE OF MIX : QUANTITY :
CHECKED & FOUND OK
DESCRIPTION REMARKS
YES NO N/A
a) De-shutturing on and at time
b) surface of the structure
c) Plumb within acceptance
d) Repair of surface with respect to approved method ( If any )
e) Dimensions are within specification requirement
f) Curing method
g) Curing started on & at time
h) Any other observations

Prepared by : Witnessed & Reviewd By


For L&T Representative For Employer Representative
Name : Name :
Date : Date :