Kempegowda International Airport - NSPR: Before Concreting Description Checked & Found Ok Remarks YES NO N/A
This document contains checklists for concrete pouring activities at Kempegowda International Airport. It includes checks to be performed before, during, and after concrete pouring. Checks before pouring include reinforcement installation, formwork preparation, and embedded items. During pouring, aspects like weather, mix properties, and pouring times are checked. After pouring, checks are for curing and ensuring the poured concrete meets dimensional and surface quality requirements. The document is to ensure quality control of concrete construction work between the contractor and client representatives at the airport construction site.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
784 views2 pages
Kempegowda International Airport - NSPR: Before Concreting Description Checked & Found Ok Remarks YES NO N/A
This document contains checklists for concrete pouring activities at Kempegowda International Airport. It includes checks to be performed before, during, and after concrete pouring. Checks before pouring include reinforcement installation, formwork preparation, and embedded items. During pouring, aspects like weather, mix properties, and pouring times are checked. After pouring, checks are for curing and ensuring the poured concrete meets dimensional and surface quality requirements. The document is to ensure quality control of concrete construction work between the contractor and client representatives at the airport construction site.
IR No : DATE : AREA/LOCATION OF POUR : POUR NO. : CHAINAGE/OFFSET : REF.DRAWING : GRADE OF MIX : QUANTITY : CHECKED & FOUND OK BEFORE CONCRETING DESCRIPTION REMARKS YES NO N/A Allignment Checked Centre lines checked REINFORCEMENT a) Dia & Shape ( as per Drawing ) b) Extra Reinforcement ( Apart from Drawing ) c) Extra Laps ( if any ) d) No.Of Chairs & Length e) Binding As per specification f) Cover to Reinforcement FORMWORK a) Center lines b) Shuttering line,Level &Plumb c) Demoulding agent applied d) Concrete top level e) Supports adequecy EMBEDED ITEMS ( If any ) a) BOLTS c) INSERTS CLEARED FOR POUR DATE : TIME :
For Contractor Representative For Client Representative
CHECKED & FOUND OK
DURING CONCRETING DESCRIPTION REMARKS YES NO N/A a) Date of Concreting b) Weather c) Ambient Temperature d) Mix grade e) Vibrator & needle f) Slump g) Time of concrete start h) Time of concrete end i) No. of cubes for sampling j) Cube identification
Prepared by : Witnessed & Reviewd By
For L&T Representative For Employer Representative Name : Name : Date : Date : KEMPEGOWDA INTERNATIONAL AIRPORT - NSPR EMPLOYER : Bangalore International Airport Limited CF/08/CHECKLIST&POUR CARD CONTRACTOR : Larsen & Toubro Ltd.- L&T Construction, TIIC Rev No: 0, Date : 14.12.2017 CONCRETE CHECKLIST FOR POST CONCRETING IR No : DATE : AREA/LOCATION OF POUR : POUR NO. : CHAINAGE/OFFSET : REF.DRAWING : GRADE OF MIX : QUANTITY : CHECKED & FOUND OK DESCRIPTION REMARKS YES NO N/A a) De-shutturing on and at time b) surface of the structure c) Plumb within acceptance d) Repair of surface with respect to approved method ( If any ) e) Dimensions are within specification requirement f) Curing method g) Curing started on & at time h) Any other observations
Prepared by : Witnessed & Reviewd By
For L&T Representative For Employer Representative Name : Name : Date : Date :