Building Plan - Proposed Two Storey 6 Unit Apartment PDF
Building Plan - Proposed Two Storey 6 Unit Apartment PDF
Building Plan - Proposed Two Storey 6 Unit Apartment PDF
ARCHITECTURAL
OFFICE OF THE BUILDING OFFICIAL
A-001 PERSPECTIVE VIEW
SITE DEVELOPMENT PLAN
LOCATION PLAN / VICINITY MAP
STRUCTURAL
N T S
ARCHITECTURAL :
PLUMBING
SANITARY :
ELECTRICAL
SITE DEVELOPMENT
MECHANICAL :
VICINITY MAP
CIVIL ENGINEER : PROJECT TITLE : OWNER : SHEET CONTENT : REVISIONS : DRAWING NO. :
NO. DESCRIPTIONS
PERSPECTIVE
PROPOSED
SITE DEVELOPMENT
VICINITY MAP
A-001
SHEET NO. :
TWO STOREY SIX UNIT APARTMENT
DATE : DATE :
01 OF 05
GROUND FLOOR PLAN FRONT SIDE ELEVATION REAR SIDE ELEVATION
1 SCALE : 1: 100 4 SCALE : 1: 100 5 SCALE : 1: 100
1 2 3 4 4 3 2 1
1 2 3 4 14.38 14.38
13.50 0.80 3.20 1.30 1.30 3.20 3.20 1.30 1.30 3.20 3.20 1.30 1.30 3.20 0.80
W W W W
1.70
1.70
2 3 3 2 2 3
1.60
1.60
A
CEILING LINE N.P.T.+5.95 CEILING LINE N.P.T.+5.95
1.50
0.30
0.30
KITCHEN T/B T/B KITCHEN KITCHEN T/B
DINING AREA D D AREA DINING DINING AREA D
AREA 3 3 AREA AREA 3
3.00
3.00
2.70
2.70
5.20
7.95
7.95
SECOND FLOOR LINE N.P.T.+3.25 SECOND FLOOR LINE N.P.T.+3.25
D D D
0.30
0.30
2 BEDROOM BEDROOM 2 2 BEDROOM
B D W W D D W
1 1 1 1 1 1
1.20
3.00
3.00
C
2.70
2.70
GROUND FLOOR LINE N.P.T.+0.25 GROUND FLOOR LINE N.P.T.+0.25
0.25
0.25
FINISHED GRADE LINE FINISHED GRADE LINE
SECOND FLOOR PLAN RIGHT SIDE ELEVATION LEFT SIDE ELEVATION SECTION THRU A - A
2 SCALE : 1: 100 6 SCALE : 1: 100 7 SCALE : 1: 100 8 SCALE : 1: 100
A B C C B A C B A
1 2 3 4 5.20 5.20 5.20
W W W W
2 3 3 2 2 3
1.70
1.70
1.70
1.60
1.60
1.60
A SEE ROOF DETAILS
1.50
0.30
0.30
0.30
KITCHEN T/B T/B KITCHEN KITCHEN T/B
DINING AREA D D AREA DINING DINING AREA D
AREA 3 3 AREA AREA 3
3.00
3.00
3.00
2.70
2.70
2.70
5.20
7.95
7.95
7.95
SECOND FLOOR LINE N.P.T.+3.25 SECOND FLOOR LINE N.P.T.+3.25 SECOND FLOOR LINE N.P.T.+3.25
D D D
2 BEDROOM BEDROOM 2 2 BEDROOM
0.30
0.30
0.30
B D W W D D W
1 1 1 1 1 1
1.20
3.00
3.00
3.00
2.70
2.70
2.70
GROUND FLOOR LINE N.P.T.+0.25 GROUND FLOOR LINE N.P.T.+0.25 GROUND FLOOR LINE N.P.T.+0.25
0.25
0.25
0.25
FINISHED GRADE LINE FINISHED GRADE LINE FINISHED GRADE LINE
D D D
1 2 3 4 0.80 1 0.60 2 0.60 3
14.38
2.10
2.10
2.10
4.50 4.50 4.50 WOODEN DOOR JAMB WOODEN DOOR JAMB PVC FRAME & 2" x 4" JAMB
1.70
3.00
2.70
SCHEDULE OF WINDOWS
11
7.95
SCALE : 1: 75
SECOND FLOOR LINE N.P.T.+3.25
5.20
2.50
0.30
W W W
1 2 3
1.80
B TYPE : 1.00 TYPE :
0.50
TYPE :
3.00
2.70
0.50
C 6mm THK. BRONZE GLASS 6mm THK. BRONZE GLASS 6mm THK. BRONZE GLASS
0.50
1.20
DS DS DS DS GROUND FLOOR LINE N.P.T.+0.25 ON POWDER COATED ON POWDER COATED ON POWDER COATED
ALUMINUM FRAME WITH SCREEN ALUMINUM FRAME WITH OPEN ALUMINUM FRAME WITH OPEN
& LOCK ACCESSORIES BACK, SCREEN & LOCK ACCS. BACK, SCREEN & LOCK ACCS.
0.25
CIVIL ENGINEER : PROJECT TITLE : OWNER : SHEET CONTENT : REVISIONS : DRAWING NO. :
NO. DESCRIPTIONS
FLOOR PLANS
PROPOSED
ROOF PLAN
FRONT/REAR/LEFT/RIGHT ELEVATIONS
A-002
SECTIONS
SCHEDULE OF DOORS AND WINDOWS SHEET NO. :
TWO STOREY SIX UNIT APARTMENT
DATE :
02 OF 05
FOUNDATION PLAN ROOF STRUCTURAL PLAN & DETAILS WALL FOOTING DETAILS
1 SCALE : 1: 100 4 SCALE : 1: 100 7 SCALE : NTS
A A
FTB1 FTB1 FTB1 t
1.50
1.50
WF1 WF1 WF1 B
FTB1
FTB1
FTB1
FTB1
1.70
1.60
FTB1
FTB1
FTB1
FTB1
5.20
5.20
2.50
2.50
SCHEDULE OF WALL & FOOTING
0.30
FTB1 FTB1 FTB1
LONGITUDINAL HOOP VERTICAL HORIZONTAL
B FTB1 FTB1 FTB1
B MARK ( B ) mm ( L ) mm ( t ) mm BARS BARS
DEPTH ( h ) DEPTH ( H ) CHB ( t ) mm
BARS BARS
C1F1 C1F2 C1F2 C1F1 4.00 1.20
1.20
1.20
5.20 WF1 300 VERIFY 150 @ 300mm O.C. 650mm 800mm 150 @ 800mm O.C. EVERY 3 LAYERS
OF CHB
C C
SECOND FLOOR FRAMING PLAN REINFORCED CONCRETE BEAM DETAILS CONSTRUCTION NOTES
2 SCALE : 1: 100 5 SCALE : NTS 8 SCALE : NTS
@ SUPPORT @ MIDSPAN
GENERAL COLUMNS
1 2 3 4
13.50
L/2
A
1.50
SCHEDULE OF BEAMS
RCB1
RCB1
RCB1
RCB1
S-1 S-1 S-1 BEAM WIDTH DEPTH LEFT SUPPORT MIDSPAN RIGHT SUPPORT
WEB STIRRUPS
5.20
BARS FOUNDATION
2.50
RCB1
RCB1
1.20
CONCRETE
a a
1 2 3 4
13.50 PROTECTION OF ADJOINING PROPERTY
4.50 4.50 4.50
RFB1
RFB1
RFB1
EXCAVATION
5.20
2.50
REMOVAL OF FORMS
RFB1 RFB1 RFB1 SCHEDULE OF COLUMN & FOOTING
B BARS BARS VERTICAL
MARK ( B ) mm ( L ) mm ( t ) mm DEPTH ( h ) DEPTH ( H ) ( a ) mm ( b ) mm LATERAL TIES
RFB2
RFB2
RFB2
RFB2
CIVIL ENGINEER : PROJECT TITLE : OWNER : SHEET CONTENT : REVISIONS : DRAWING NO. :
NO. DESCRIPTIONS
FOUNDATION PLAN
PROPOSED
FRAMING AND ROOF FRAMING
FOOTING, WALL FOOTING, COLUMN & BEAM DETAILS
S-001
TRUSS DETAILS
CONSTRUCTION NOTES SHEET NO. :
TWO STOREY SIX UNIT APARTMENT
DATE :
03 OF 05
PLUMBING LAYOUT @ WASTELINE DETAILS OF SEPTIC TANK DETAILS OF WATER CONNECTION
1 SCALE : 1: 100 5 SCALE : 1: 25 6 NTS
KS CO CO KS KS CO KS CO CO KS KS CO
WC WC WC WC WC WC
FD FD FD FD FD FD
3500
TO DS DS DS DS DS DS DS DS
STREET
CANAL M.H. C.O. M.H. C.O. M.H.
CB CB CB CB
TO
SEWER
LINE
(SECTION)
SEPTIC TANK
C.O.
( PLAN )
DETAILS OF WATER CONNECTION
7 NTS
875
125
875
125
WATER LINE
SPACED @ 800mm
SAND
3/4" GRAVEL
1" GRAVEL
SPACED @ 200mm
O.C. BOTHWAYS
(PLAN) (SECTION)
LAV LAVATORY 2. ALL HORIZONTAL RUNS SHALL HAVE A MINIMUM SLOPE OF 2%.
VSTR VENT. STACK
THRU ROOF 3. ALL MATERIALS, PIPINGS, FITTINGS, VALVES & FIXTURES SHALL BE
WC WATER CLOSET 6MM x 25MM FLATBAR
WITH 25MM CLEAR SPACING STANDARD BRAND WITH HIGHEST GRADE & QUALITY, FREE FROM ANY
6MM x 25MM FLATBAR
WM WATER METER WITH 25MM CLEAR SPACING DEFECTS & OTHER IMPERFECTIONS.
FD FLOOR DRAIN
100MM THK. CHB 100MM THK. CHB 4. ALL SEWER LINE & WATER LINE MATERIALS TO BE INSULATED OR PASS
GV GATE VALVE THRU & CHIPPED-OFF TO THE PARTITION RESPECTIVELY, OR WHEREVER
KS KITCHEN SINK POSSIBLE, PROVIDED THAT THE MANNER OF INSTALLATION WILL NOT
CB CATCH BASIN STRUCTURALLY WEAKEN THE BUILDINGS.
LS LAUNDRY SINK
WATER LINE
WF WATER FAUCET
SEWER LINE
SHO SHOWER EQUALLY BOTHWAYS
500 500
STORM DRAIN 7. ALL WORKS TO BE DONE SHALL BE UNDER THE DIRECT SUPERVISION OF A DULY
C.O. CLEAN OUT PIPE LINE ( PLAN ) LICENSED SANITARY ENGINEER OR AT LEAST A MASTER PLUMBER.
( SECTION ) (SECTION)
M.H. MANHOLE
CIVIL ENGINEER : PROJECT TITLE : OWNER : SHEET CONTENT : REVISIONS : DRAWING NO. :
NO. DESCRIPTIONS
PLUMBING LAYOUT @ WASTELINE
PROPOSED
PLUMBING LAYOUT @ WATERLINE
DETAILS OF SEPTIC TANK
P-001
DETAILS OF WATER CONNECTION
DETAILS OF CATCH BASIN SHEET NO. :
TWO STOREY SIX UNIT APARTMENT LEGENDS AND PLUMBING NOTES
DATE :
04 OF 05
LIGHTING LAYOUT
1 SCALE : 1:100 5 ONE LINE DIAGRAM
C C C C C C
1 1 1 1 1 1
b c c b b c b c c b b c
Sc Sc Sc Sc Sc Sc
Sb Sb Sb Sb Sb Sb
1 2
C
2 a a
C
2
C
2 a
C
2 a a
C
2
C
2 a 20A 20A
3 4
15A 20A
5 6
M KWHR METER
GROUND FLOOR LAYOUT SECOND FLOOR LAYOUT 20A 20A
7 8
20A SPARE
MAIN C.B. 9 10
60 AT, 2P, 230 V
CONCRETE IN NEMA 3R ENCL.
PEDESTAL
POWER LAYOUT
2 SCALE : 1: 100
DETAILS OF
ELECTRICAL NOTES
C
4
UNIT 1 UNIT 2
C
4
C
4
UNIT 3
C
4
UNIT 4 UNIT 5
C
4
C
4
UNIT 6
6 SERVICE POST 7
1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACORDANCE WITH THE PROVISIONS
OF THE PHILIPPINE ELECTRICAL CODE & SHALL COMPLY WITH THE RULES AND REGULA-
TIONS OF THE LOCAL GOVERNMENT AUTHORITIES CONCERNED IN THE ENFORCEMENT OF
ELECTRICAL LAWS & ORDINANCE AND WITH THE REQUIREMENTS OF THE LOCAL ELECTRIC
GROUND FLOOR LAYOUT SECOND FLOOR LAYOUT 200
UTILITY COMPANY.
2. SERVICE ENTRANCE TO THE PROJECT SHALL BE 230 VOLTS, SINGLE PHASE, 2 WIRES PLUS
GROUND WIRE AND 60 HERTZ.
3. TYPE OF WIRING INSTALLATION SHALL BE DONE IN RIGID STEEL CONDUIT ( HOT DIP GAL-
VANIZED MILD STEEL COAT ) FOR SERVICE ENTRANCE & PVC TO ALL BRANCH CIRCUIT
WIRING.
3 ELECTRICAL SYMBOLS 4 LOAD SCHEDULE
4. UNLESS OTHERWISE SPECIFIED ON THE PLAN MINIMUM SIZE OF WIRE TO BE USED SHALL
KW-HR METER 8. SWITCHES FOR LIGHTING WILL BE 15 AMPERES, 230V & QUIET MATIC TYPE.
PANEL BOARD
9. OUTLET FOR SPECIAL PURPOSE WILL HAVE A RATING OF 230 AMPERE VOLTS.
C 10. ALL SPARE CIRCUITS SHALL HAVE A BOX 10cm IN SIZE AND MOUNTED IMMEDIATELY
CIRCUIT HOMERUN
CONDUIT
11. MOUNTING HEADS :
M KW-HOUR METER A. LIGHTING CONTROL SWITCH : 1.48 M ABOVE FINISHED FLOOR LINE
B. CONVENIENCE OUTLET : 0.30 M ABOVE FINISHED FLOOR LINE
C. SPECIAL PURPOSE OUTLET : AS REQUIRED BY EUIPMENT SERVED
NAT. GRD. LINE
:
S abc THREE-GANG TOGGLE SWICTH
D. PANEL BOARD 1.50 M ABOVE FINISHED FLOOR LINE OR
AS DIRECTED BY THE FIELD CONDITIONS.
13. ALL ELECTRICAL WORKS HEREIN SHALL BE UNDER THE DIRECT SUPERVISION OF A DULY
Sa ONE-GANG TOGGLE SWICTH LICENSED PROFESSIONAL ELECTRICAL ENGINEER, REGISTERED ELECTRICAL ENGINEER,
OR A REGISTRED MASTER ELECTRICIAN.
SERVICE ENTRANCE
CIVIL ENGINEER : PROJECT TITLE : OWNER : SHEET CONTENT : REVISIONS : DRAWING NO. :
NO. DESCRIPTIONS
LIGHTING LAYOUT
PROPOSED
POWER LAYOUT
ONE LINE DIAGRAM
E-001
SERVICE POST DETAILS
LOAD SCHEDULE SHEET NO. :
P.T.R. NO. : PRC REG. NO. : TWO STOREY SIX UNIT APARTMENT ELECTRICAL SYMBOLS AND NOTES
DATE ISSUED :
PLACE ISSUED :
VALIDITY :
T. I. N. : DATE :
05 OF 05