X= 4335
Y= 147177.3326
Z= -27987820.6
C= 65.14889382
Axially loaded Cmin = 600. d/(600-fy) = 1326
Notes
min clear concrete cover must be the graeter of:
1- 40 mm
2- vertical bar dia.
3- 1.5 Max agg. Size
4- and only for surface in contact to earth concrete over = 75 mm
min Vertical bar Spacing
1- S > = 1.5 f main
2- S = Max agg. Size
3- 38 mm
take the greatest value for S
min No. of Bars vertical bars
1- 4 f16 for rectangular column
2 -6 f 16 for circular column
p = 3.141592654
for circular column DIA = 400
GROSS AREA= 125663.7062
min steel req. = Asmin = 1256.637062
Column AL
Linear (Column AL)
500
0
0 50 100 150 200 250 300
500
0
0 50 100 150 200 250 300
Mn
Mn` e` e Mn Pn
Column AL
Linear (Column AL)
50 300
50 300
Slabs
Span = 3 3000 mm concrete wt. =
h = 150 150 mm f1 =
ROW min = 0.002 0.002
ROW max = 0.008 0.008 h slab thi ckness i n mm
Smax = 2h 300 mm
cc clear concrete cover
Smax = 450 mm
Live Load = 300 lb/ft2 bar di a in mm.
Concrete sw. = 150 lb/ft3 d h cc
2
fy = 400 400 Mpa
fy = 58013.2 psi 600 d
Cb
As min = 0.0018 b h(60000/fy) = 279.2468 mm2 600 fy
As min = 0.002 b h = 300 mm2
Cm ax 0.75 Cb
am ax 1 Cm ax
a
Mn 0.85 fc' a 1000 d
2
Mu 0.9 Mn
a Mn = 70.72 kn-m
0.85 fc' a 1000 d
2
0.9 Mn Mu = 63.648 kn-m
678.584 mm2
As provided = 6 # 12 for Im width
a = 15.96668 mm
Mn = 31.49082 kn-m
Mu = 28.34174 kn-m
sheet wt. = 0.18 kn/m2
bolts & coneters = 0.05 kn/m2
Live Load = 0.75 kn/m2
wind Load = 0.75 kn/m2
h= 466
bf = 180
Tf = 8
tw = 6
h= 203.2
bf = 203.2
Tf = 11
tw = 7.3
Wlong = 18.096
Wshort = 15.08
S= 6
L= 7
k= 1.166667
W= 50 kn/m2
W.S.S = 1800 KN
F1 = 0.25W S.S = 450 kn k > 4/3
F2 = 0.5(k-0.5) W.S.S = 450 KN k > 4/3
F3 = 5 W.S.S/12 750 KN k > 4/3
F1 = 3 F3/5 = 450
F2 =(3/16)k.k.W.S.S = 459.375
F3= (5/8) k (1-(3k/8)) = 738.2813
S= 3.5
L= 6.6
k= 1.885714 L.S.W =
W= 15.08 kn/m2 R1 =
W.S.S = 184.73 KN R2 =
F1 = (3/16)W.S.S = 34.63688 kn R3 =
F2 = (3/5) F3 104.6528 KN R4 =
F3 = (5/64)(8K-3) W.S.S = 174.4214 KN SUM =
S= 6
L= 8
k= 1.333333 L.S.W =
W= 13.36 kn/m2 R1 =
W.S.S = 480.96 KN R2 =
R3 =
R4 =
SUM =
S= 6
L= 8
k= 1.333333 L.S.W =
W= 13.36 kn/m2 R1 =
W.S.S = 480.96 KN R2 =
R3 =
R4 =
SUM =
S= 6
L= 6
k= 1 L.S.W =
W= 13.36 kn/m2 R1 =
W.S.S = 480.96 KN R2 =
R3 =
R4 =
SUM =
S= 5
L= 5
k= 1 L.S.W =
W= 13 kn/m2 R1 =
W.S.S = 325 KN R2 =
R3 =
R4 =
SUM =
S= 6
L= 12
k= 2 L.S.W =
W= 15 kn/m2 R1 =
W.S.S = 540 KN R2 =
R3 =
R4 =
SUM =
S= 6
L= 12
k= 2K < = 2 L.S.W =
W= 15 kn/m2 R1 =
W.S.S = 540 KN R2 =
R3 =
R4 =
SUM =
S= 6
L= 12
k= 2 L.S.W =
W= 15 kn/m2 R1 =
W.S.S = 540 KN R2 =
R3 =
R4 =
SUM =
S= 6
L= 12
k= 2 L.S.W =
W= 15 kn/m2 R1 =
W.S.S = 540 KN R2 =
R3 =
R4 =
SUM =
100
L.S.W = 2100
R1 = 450
R2 = 459.375
R3 = 738.2813 731.25 0.990476
R4 = 459.375
2107.031
348.348
34.636875 9.89625
104.65284375 15.85649
34.636875 9.89625
174.42140625 26.42749
348.348
641.28
90.18 15.03
150.3 18.7875
150.3 25.05
250.5 31.3125
641.28
641.28
150.3 25.05
127.755 15.96938
150.3 25.05
212.925 26.61563
641.28
480.96
72.144 12.024
144.288 24.048
120.24 20.04
144.288 24.048
480.96
325
81.25 16.25
81.25 16.25
81.25 16.25
81.25 16.25
325
1080
0 0
472.5 39.375
135 22.5
472.5 39.375
1080
1080
472.5 78.75
0 0
472.5 78.75
135 11.25
1080
1080
0 0
0 0
270 45
810 67.5
1080
1080
0 0
341.71875 28.47656
168.75 28.125
569.53125 47.46094
1080
thikness g Load factor total b=
m kn/m3
slab 0.15 24 1.4 5.04
Mosiac + cement
morter 0.05 22 1.4 1.54
Live load 5 1 1.7 8.5
15.08 kn/m2 67.86
7.5
5
1.5 2.352
area= 0.5625
load = 8.4375
w= 13.602
p= 102.015
P= 200 KN 250
a= 5m
b= 5m
7850
Wt ((H h) (B b ) )
1000000
h= 900
bf = 300
Tf = 10
tw = 8
A= 13040 130.4
Ix = 1642514666.66667 164251.4667
Iy = 45037546.6666667 4503.754667
Zx = 3650032.59259259 3650.032593
Zy = 300250.311111111 300.2503111
rx = 354.908035554891 35.49080356
ry = 58.7690359883676 5.876903599
D/T = 90 90
L/ry = 340.315264044125
wt. = 102.364
w= 1 kn/m
P= 93.75 kn
L= 20 m
Mx = 518.75 kn-m
Zx = 3650033 mm3
Mx/Zx = 142.122 Mpa
h b
IPE 360 360 170
1PE400
UB 16"x 5.5" x 46 kg/m 46
UB 18"x 7.52" x 89 kg/m 89
IPE 750 x 210
UB 33" x 11.5" x 194 kg/m
76.5 50 m
10 10 No.
15.25 15 m
12 6m
15 8m
3 2m
4.1667 5
7.65 5m
5000 20000 kg
600 2000 kg
4880 6600 kg
550 1000 kg
37 37 kg/m
53 194 kg/m
6.885 11.55 kn
37.375 53.75 kn
70 275 kn
2.8 11
0.57 0.57 kn/m2
4.3605 2.85 kn/m
0.28 0.6 kn/m2
2.142 3 kn/m
1.25 1.25 kn/m2
5 5 kg/m2
10 10 kg/m2 thermal insulated
0.5 0.5 kg/m2
No.
kg/m
2.8 11 kn = 10%(crap wt. + crane load capacity)/2
114.26 340.3 kn = 1.25 (crab wt + crane load + one end carrage wt. + 0.5 crangirder wt) + (one pay one side rail wt. + one pay one side run way beam)
44.26 65.3 kn = 1.25(one end carrage wt. + 0.5 crangirder wt) + (one pay one side rail wt. + one pay one side run way beam)
79.26 202.8 kn = 1.25(0.5(crab wt + crane load + crangirder wt) + one end carrage wt.) + one pay one side rail wt. + one pay one side run way beam)
79.26 202.8 kn = 1.25(0.5(crab wt + crane load + crangirder wt) + one end carrage wt.) + one pay one side rail wt. + one pay one side run way beam)
0 1 kn = 0 (No movment)
92.785 274.55 kn = (crab wt + crane load + one end carrage wt. + 0.5 crangirder wt + one pay one side rail wt. + one pay one side run way beam)
36.785 54.55 kn = + one end carrage wt. + 0.5 crangirder wt + one pay one side rail wt. + one pay one side run way beam)
64.785 164.55 kn = 0.5(crab wt + crane load + crangirder wt) + one end carrage wt. + one pay one side rail wt. + one pay one side run way beam)
64.785 164.55 kn = 0.5(crab wt + crane load + crangirder wt) + one end carrage wt. + one pay one side rail wt. + one pay one side run way beam)
73.57 109.1 kn = crane bridg wt. + 2 end carriage Wt. + 2 (rail + run way beam)
107.375 328.75 kn = 1.25(crab wt + crane load + one end carrage wt. + 0.5 crangirder wt)
span
20
20
20
18
20
18.3
7.65
15
Cm2
Cm4
Cm4
Cm3
Cm3
Cm
Cm
H V q H
m km/hr Kn/m2 feet
4.6 140 0.744 15
4.7 140 0.749 16
4.8 140 0.754 17
4.9 140 0.758 18
5 140 0.762 19
6 140 0.803 20
7 140 0.839 22
8 140 0.872 24
9 140 0.902 26
10 140 0.929 28
11 140 0.955 30
12 140 0.979 32
13 150 1.150 34
14 140 1.023 36
15 140 1.044 38
18 160 1.436 44.44444
10 160 1.214
8 120 0.641
8 130 0.752
P = q x GCP where GCP peak combined coefficient for main framing or part, as given in tables 5.2 a & b a
and tables 5.3 to 5.6 of MBMA Manual
A 33% increase in allowable stress is permitted for stress resulting combinations including wind loads
Wspeed= 44.4444444
S1 = 1.00 Topography factor, which taken = 1 (according to D.2)
h= 8m S2 (8) = 0.81 Ground roughness, building size and height above ground level. Taken from ta
h = 10 m S2(10) = 0.85 Ground roughness, building size and height above ground level. Taken from ta
S3 = 1.00 Statistical factor
V (8) = 36
v (10) = 37.7777778
q1= 81
q2= 89.1975309
V q
mile/hr pcf
100 20.436
100 20.817
100 21.180
100 21.529
100 21.864
100 22.187
100 22.800
100 23.374
100 23.914
100 24.426
100 24.912
100 25.376
100 25.819
100 26.244
100 26.653
4.448 N
Uu' 35 fc' 145.0263 Uu' 330.09389
25.4 mm
U fc' N
db U 5.58196
2
mm
As fy d b L U
As fy 1
L 0.01594
d b fc'
db
As fy
L L 286.63778
fc'
Workng stress design
fc` = 20 Mpa
fy = 260 Mpa
fc allow. = 9 Mpa fc allow. = 0.45fc`
ft allow. = 1.8 Mpa
fs allow. = 130 Mpa fs allow. = 0.5 fy
b= 1000 mm
t= 400 mm
EC = 21019 Mpa Ec 4700 fc'
Es = 200000 Mpa
n = 9.51518 n=Es/Ec
db = 20 mm
cc = 40 mm
d= 350 mm d=t-cc-db/2
fc 0.45 fc'
ft = 1.3 Mpa controld value fc d
k
fc = 1.8 Mpa controld value ft fc h
k= 0.5080645 fc.d/[(ft+fc).t] (1 k)
fs n fc
fs = 16.583604 Mpa n(1-k) fc/k k
As = 1052.8446 mm2
M1 = 56.014113 Kn - m
M2 = 3.4745084 Kn - m
M= 59.488621 Kn - m
fc 0.45 fc'
fc d
k
ft fc h
(1 k)
fs n fc
k
Gauge thickness
24 0.6
Es = 20340 kn/cm2
a= 1.17E-05 coefficient of thermal expansion for each degree Celsius
t= 5 difference in temperature in degree Celsius
d= 1.18989 change in unit stress = Es a t
egree Celsius
T - Shape dimensions and prpoprtes
mm unit wt. (kn/m3) kn/m Load Factor kn/m2 kn/m
bf= 3000
h= 850
bw= 400
hf= 150
24 1 17.52 1.4 24.528
Load on slab
thick. (mm) unit wt. (kn/m3) Load (kn/m2) kn/m Load Factor kn/m2 kn/m
clean soil= 100 18 1 1.8
sand = 40 18 1 0.72
shtyger= 40 22 1 0.88
tiles = 30 22 0 0
morter = 20 22 0 0
3.4 10.2 1.4 4.76 14.28
wall load =
mm unit wt. (kn/m3)
hight = 3600
thick. = 250
18 0 0 1.4 0
29.97 42.633
m
span = 2.5 74.925 106.5825
TEE Beam with flange work in tension as special case:
Es = 29000000 psi 199954.4931 Mpa
Ec = 3600000
n= Es/Ec = 8.0555555556
bw = 400 mm
bf = 2000 mm
d = 700 mm
fc` = 3000 psi 20.68922712 Mpa
fy = 60000 psi 413.6989513 Mpa
Asmin -1 = 7668.1158051 mm2 = 6 bf d sqroot(fc`) /fy
Asmin -1 = 4666.6666667 mm2 = 200 bf d /fy
Asmin = 4666.6666667 mm2 = the min vale of 1 & 2
As-max= 11200 mm2 = 0.04 bw d
af = hf = 100 = hf
Cf = af/ b1= 120.12076942
fs` (Cf) = 225.377025 = 600 (Cf - d`)/Cf
check fs`(Cf) = 225.377025 = < fy
Nf = 3187.5 = 0.85 fc` bf hf + AS` (fs` - 0.85 fc`)
1 in= 25.4000000 mm
1 in^2= 645.1600000 mm2
1 in^3= 16387.0640000 mm3
1 in^4= 416231.4256000 mm4
1 m= 39.3700787 in 3.280839895 ft
1 ft= 304.8000000 mm 0.3048 m
1 ft^2 = 92903.0400000 mm2 0.09290304 m2
1 ft^3 = 28316846.5920000 mm3 0.028316847 m3
1 yd^3 = 0.7650000 m3 765000 cm3
1 lb/ft3= 16.0300000 kg/m3
1 lb/in2= 0.0068950 Mpa
1 kip/in2= 6.8950000 Mpa
1 lb = 4.4480000 N
1 kip = 4.4480000 kn
1 lb/ft3 = pcf = 0.1571000 kn/m3
1 kip/ft = 14.5900000 kn/m
1 lb/ft2 = 0.0479000 kn/m2
1 kip/ft2 = 47.9000000 kn/m2
1 lb/in2= 0.0068950 Mpa 145.0326323
1 kip/in2= 6.8950000 Mpa
1 ft-lb = 1.3560000 N-m
1 ft-kip= 1.3560000 kN-m
1 Mpa = 145.03263 psi
Load Factors
DL= 1.5 kip/ft
LL= 2.5 kip/ft
Live Load = 2.5 kn/m2
Dead Load = 7 kn/m2
Wind Load = 1 kn/m2
E = Sesmic = 1 kn/m2 substit w = E = earth quake load
U1 = 14.4 kn/m2 = 1.2 D + 2.4 L
U2 = 19 kn/m2 = 2 (D+L) for Axially Loaded Member
U3 = 17.1 kn/m2 = 1.8 (D+L) for for flexture
U4 = 15 kn/m2 = 1.2 D + 2.4 L + 0.6 W
U5 = 12.3 kn/m2 = 1.2 D + 0.6 L + 2.4 W
20 kn/m2 = 2 (D+ L+ 0.5 W) for Axially Loaded Member
18.5 kn/m2 = 2 (D + 0.5 L+ W) for Axially Loaded Member
kn/m2 = 1.8 (D+ L+ 0.5 W) for for flexture
kn/m2 = 1.8 (D + 0.5 L+ W) for for flexture
kn/m2 = 1.5 D + 1.8 L
kn/m2 = 1.25 (D + L +W)
= 0.9 D + 1.1 W
765000000 mm3
case = 3
case 1 = No Need for web reinf.
10 sqroot (fc`) bw d
Slab Rectangular Section - SINGLE BEEM
Ec = 29000000 psi
bw = 1000 mm
Cc = 25 mm
h= 150 mm
d = 112.3 mm
fc` = 2900.06 psi 20 Mpa
fy = 58013.2 psi 400 Mpa
Asmin -1 = 312.73586 mm2 = 3 bw d sqroot(fc`) /fy
Asmin -2 = 387.15327 mm2 = 200 bw d /fy
Asmin -2 = 300 mm2 = 0.002 b h
Asmin = 387.15327 mm2 = the max vale of 1 & 2
As-max= 4492 mm2 = 0.04 bw d
p = 3.1415927 ~
As provide = 1520.1224 mm2 3# 25.4 OK
Cb = 67.38 mm = 600 d /(600+fy)
b1 = 0.85 ~ = 0.85-0.05 (fc` - 4 ksi) = 0.904997
ab = b1 Cb = 57.273 mm
Ncb = 973.641 Kn = 0.85 fc` ab bw
Nc max = 0.75 Ncb = 730.23075 kn
a max = 0.75 ab = 42.95475 mm = Nc max/ (0.85 fc` bw)
As max = 1825.5769 mm2 = Ncmax/ fy
Nt = As fy = 608.04897 kn = As fy
N = MIN(Nt,Ncmax) = 608.04897 kn
u= 14450 N = 0.85 fc` b1 bw
C = 42.079514 mm = N /(0.85 fc` b1 bw)
a = 35.767587 mm = b1 C
Mn= 57.409678 kn - m Mn = 0.85 fc` a bw (d-0.5 a)
Mu = 51.66871 kn - m MU = 0.9 Mn
b = 300 Pn = 1000 kn fc` 0.85 fc`
h = 300 Mn = 80 kn-m 20 17
fy = 400 20 17
fc` = 20 20 17
p = 3.14159265359 20 17
As min = 900 = 4.47623 # 16 20 17
As = 1013.4149582 2# 25.4 20 17
As` = 1013.4149582 2# 25.4 20 17
f web = 12.7 20 17
Cc = 40 20 17
d` = 65.4 20 17
d = 234.6 20 17
C1 = 78.1 20 17
C2 = 67.3070325901 20 17
Co = 78.1 20 17
fs` = 97.5672215109 Mpa = 600 (C-d`)/C = < fy 20 17
b 1 = 0.85 20 17
0.85 fc` = 17 20 17
Nc1= 338563.5 = 0.85 fc` b1 C b 20 17
Nc2 = 81648.0274193 = As` (fs` - 0.85 fc`) 20 17
Nc = 420211.527419 = Nc1 + Nc2 20 17
fs = 400 = ABS[600 (d - C)/C]=< fy 20 17
Nt = 405365.983278 = As fs 20 17
Nc-Nt = 14.8455441413 20 17
Mn`= 80.0209386644 = Nc1 (d-0.5 b1 C) + Nc2 (d-d`) 20 17
e` = 5390.23277978 mm 20 17
e = 5305.63277978
2500
mm
2000
1500
Axis Title
Column AH
1000
500
0
-20 0 20 40 60 80 100 120 140
Axis Title
0
-20 0 20 40 60 80 100 120 140
Axis Title
b1 b As As` C a d` d d-0.5 a
0.85 300 1013.415 1013.415 78.1 66.385 65.4 234.6 201.4075
0.85 300 1013.415 1013.415 15.65 93.75 79.6875 65.4 234.6 194.7563
0.85 300 1013.415 1013.415 109.4 92.99 65.4 234.6 188.105
0.85 300 1013.415 1013.415 125.05 106.2925 65.4 234.6 181.4538
0.85 300 1013.415 1013.415 140.7 119.595 65.4 234.6 174.8025
0.85 300 1013.415 1013.415 156.35 132.8975 65.4 234.6 168.1513
0.85 300 1013.415 1013.415 172 146.2 65.4 234.6 161.5
0.85 300 1013.415 1013.415 187.65 159.5025 65.4 234.6 154.8488
0.85 300 1013.415 1013.415 203.3 172.805 65.4 234.6 148.1975
0.85 300 1013.415 1013.415 218.95 186.1075 65.4 234.6 141.5463
0.85 300 1013.415 1013.415 234.6 199.41 65.4 234.6 134.895
0.85 300 1013.415 1013.415 11.834 246.43 209.469 65.4 234.6 129.8655
0.85 300 1013.415 1013.415 258.27 219.528 65.4 234.6 124.836
0.85 300 1013.415 1013.415 270.1 229.587 65.4 234.6 119.8065
0.85 300 1013.415 1013.415 281.94 239.646 65.4 234.6 114.777
0.85 300 1013.415 1013.415 293.77 249.705 65.4 234.6 109.7475
0.85 300 1013.415 1013.415 305.6 259.764 65.4 234.6 104.718
0.85 300 1013.415 1013.415 317.44 269.823 65.4 234.6 99.6885
0.85 300 1013.415 1013.415 329.27 279.882 65.4 234.6 94.659
0.85 300 1013.415 1013.415 341.11 289.941 65.4 234.6 89.6295
0.85 300 1013.415 1013.415 352.94 300 65.4 234.6 84.6
0.85 300 1013.415 1013.415 300 652.94 300 65.4 234.6 84.6
0.85 300 1013.415 1013.415 952.94 300 65.4 234.6 84.6
0.85 300 1013.415 1013.415 1253 300 65.4 234.6 84.6
0.85 300 1013.415 1013.415 1553 300 65.4 234.6 84.6
Column AH
ii
0
0
d-d` d-0.5 h fy fs` fs Nc1 Nc2 Nc Nt Pn
169.2 84.6 400 97.567 400 338563.5 81648.03 420211.5 405366 14845.54
169.2 84.6 400 181.44 400 406406.3 166646 573052.2 405366 167686.2
169.2 84.6 400 241.32 400 474249 227325.5 701574.5 405366 296208.5
169.2 84.6 400 286.21 400 542091.8 272816.9 814908.6 405366 409542.7
169.2 84.6 400 321.11 400 609934.5 308188.3 918122.8 405366 512756.9
169.2 84.6 400 349 300.3 677777.3 336478.7 1014256 304316.2 709939.8
169.2 84.6 400 371.86 218.4 745620 359620.9 1105241 221301.5 883939.4
169.2 84.6 400 390.89 150.1 813462.8 378903 1192366 152133.8 1040232
169.2 84.6 400 400 92.38 881305.5 388137.9 1269443 93615.02 1175828
169.2 84.6 400 400 42.89 949148.3 388137.9 1337286 43461.82 1293824
169.2 84.6 400 400 0 1016991 388137.9 1405129 0 1405129
169.2 84.6 400 400 28.81 1068292 388137.9 1456430 29199.38 1485629
169.2 84.6 400 400 54.99 1119593 388137.9 1507731 55722.87 1563454
169.2 84.6 400 400 78.86 1170894 388137.9 1559032 79922.18 1638954
169.2 84.6 400 400 100.7 1222195 388137.9 1610333 102090 1712423
169.2 84.6 400 400 120.9 1273496 388137.9 1661633 122471.8 1784105
169.2 84.6 400 400 139.4 1324796 388137.9 1712934 141275.1 1854209
169.2 84.6 400 400 156.6 1376097 388137.9 1764235 158676.4 1922912
169.2 84.6 400 400 172.5 1427398 388137.9 1815536 174827 1990363
169.2 84.6 400 400 187.3 1478699 388137.9 1866837 189856.8 2056694
169.2 84.6 400 400 201.2 1530000 388137.9 1918138 203878.8 2122017
169.2 84.6 400 400 384.4 1530000 388137.9 1918138 389578.6 2307717
169.2 84.6 400 400 400 1530000 388137.9 1918138 405366 2323504
169.2 84.6 400 400 400 1530000 388137.9 1918138 405366 2323504
169.2 84.6 400 400 400 1530000 388137.9 1918138 405366 2323504
Mn` e` e Mn Pn
82004074.37 5523.817 5439.217 80.74814 14.84554 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
107346653 640.1638 555.5638 93.1604 167.6862 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
127672077 431.021 346.421 102.6128 296.2085 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
144525200 352.8941 268.2941 109.8779 409.5427 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
158763544 309.6273 225.0273 115.3843 512.7569 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
170901291 240.7265 156.1265 110.8404 709.9398 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
181265487 205.0655 120.4655 106.4842 883.9394 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
190074073 182.7228 98.12278 102.0704 1040.232 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
196280209 166.9293 82.3293 96.80513 1175.828 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
200021313 154.597 69.99696 90.56377 1293.824 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)- As fs
202859939 144.371 59.77105 83.98603 1405.129 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`)
204407199 137.5896 52.98965 78.72297 1485.629 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
205438424 131.4004 46.8004 73.17025 1563.454 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
205953614 125.6616 41.06163 67.29812 1638.954 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
205952767 120.2698 35.66983 61.08182 1712.423 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
205435885 115.1479 30.54785 54.50058 1784.105 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
204402967 110.2373 25.63726 47.53685 1854.209 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
202854013 105.4932 20.89315 40.17569 1922.912 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
200789024 100.8806 16.2806 32.40431 1990.363 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
198207999 96.37214 11.77214 24.2117 2056.694 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
195110938 91.94599 7.345993 15.58832 2122.017 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
195110938 84.54718 -0.052815 -0.121883 2307.717 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
195110938 83.97272 -0.627283 -1.457493 2323.504 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
195110938 83.97272 -0.627283 -1.457493 2323.504 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
195110938 83.97272 -0.627283 -1.457493 2323.504 Pn = 0.85 fc` b1 C b + As`(fs`-0.85 fc`) + As fs
80 1000
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`)- As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs
0.85 fc`) + As fs