1 – Double circuit:-
-The worst design condition is taken for suspension poles
when side body of the pole subjected to the wind effect.
-The design calculation of tension steel frame takes into
consideration the tension of cables and wind force in same
direction.
-Conductor tension is kept less than 50% of its U.T.S. ( i.e min.
factor of safety in respect of conductor tension should be 2 .
Calculation method:-
= 1.68 kgf/m
Tatal of weight Wt = ( + ) + ( )
. ( )
Sag of conductor S = = =0.73 m
(1 of 26)
(2 of 26)
The distance between conductors not less than 1.5m.
Ө= cos-1(0.48)
.
Ssl = = 1.5
.
Lact = 83m
.
S500c =
Wt500c = ( ) + ( )
= 1.75kgf/m
. ( . )
S500c = = 1.13
R = 0.85 + +
= 0.85√1.13 + 1+
= 1.46 m
(3 of 26)
where, Li : is the length of the suspension string in m and equals to
(1m) length of double suspension insulator string .
V : voltage in kilovolt
Projected area of the wind face of double lattice steel pole Ap = hxL
Wind pressure for pole can also be obtained from Bs. 449, cp3.
Pw = 1 KN/m2
Mp = fw pole x Lp
Where, Lp is the distance from center line to end of I-section of the pole.
Mp is the actual bending moment due to wind force on the pole.
(4 of 26)
= 0.922 KN/m2 x Ap x Lp
= 13.277 KN.m
. . .
= 2x + =1.38x10-6 m4
I1 = AD2
= [ 2(t.b)+(h-2t)xs]D2
= [ 2(11.3x90)+(177.4x7.5)](255)2
Mc = fWcond. X Lc
= Pw x Ac x 6 x Lc
= 77.92 KN.m
(5 of 26)
Actual bending stress (Ơb) applying on the cross section of pole at
ground level.
. .
Ơb = = = 53N/mm2
.
Ơ
Stability factor of design (Ɣ) = ≥1
Ơ
.
= 2.2 Ɣ˃1
Mt = Mfw + Mc
=[Pwp(2xAp(Lp/2)+6xAchxLch)] + (6xTxLc)
= [0.922(2x2.3x5.75+6x(2.5x0.12)x9.94)] + (6x21x8.81)
Where, Mfw is the moment of wind force which impacts the tension
frame body .
(6 of 26)
Actual bending stress Appling on the cross section of the frame at ground level (Ơbf).
.
Ơbf = = = 333.3 N/mm2
.
NOTE: - The planting depth of lattice poles of tension steel frame is 2.5m,
while the planting depth of suspension poles along the whole
overhead line is 2m.
. . .
= 2x + = 1.4 x 10-6 m4
(7 of 26)
I-1 = AD2
- .
Z sp = = = 1373.6 x 10-6 m3
.
- ( . . )
Ơb= = = 66.4 N/mm2
.
-
for design purpose , consider Z sp = 687 x 10-6 m3
- .
Ơ b= = 133 N/mm2
.
Ɣ= = 0.58 Ɣ<1
Therefore, IPE section poles are not suitable for tension frame .
( 8 of 26)
2) Single circuit:
.
S= = 1.13 m
.
Cos Ө = = 0.48
.
.
SsL = = 2.4 m
.
R = 0.85 √1.76 1 + = 1.63 m
(9 of 26)
Wind moment acted on side body of the suspension pole for single circuit:
= 173.3 N/mm2
.
Ɣ= = 1.4
.
Ɣ>1
(10 of 26)
Calculation of numbers of suspension poles between 2 tension steel
frames :-
(11 of 26)
References:
1: IEC 1089-91, conductors steel - reinforced (ACSR aluminum) .
2- BS.449.cp3,chapter v,loading,part 1 (deal and imposed loads) .
3- DIN17100, steel grade classification and chemical composition
of the steel.
4- BS.4360 HR steel for general engineering purposes.
5- BS. 4848 part 2.
6- D-46,technical specification of lattice steel poles. Revision 2012
7- ﺗوزﯾﻊ ﻛﮭرﺑﺎء اﻟﻣﺣﺎﻓظﺎت/اﻟﻣواﺻﻔﺎت اﻟﻘدﯾﻣﺔ ﻟﻠﻣؤﺳﺳﺔ اﻟﻌﺎﻣﺔ ﻟﻠﻛﮭرﺑﺎء
Tender specification for supply (9&11) m steel lattice poles with
cross-arms.
8-٢٠٠٩ اﻟطﺑﻌﮫ اﻻوﻟﻰ، اﻟﻣﮭﻧدس ﻣﺣﻣد ﻋﺑد اﻟرﺿﺎ اﻟﺷﻣري،ﺧواص وﻣﻘﺎوﻣﺔ اﻟﻣواد
9- power system ,mechanical design of overhead line .
10- D-43, technical specification of medium span-double circuit
33&11kv lattice steel towers, revision 2006.
11- AISC, American institute for steel construction.
12- German specification VDE 0211.
(12 of 26)
اﻻﻋﻣﺎل اﻟﻣدﻧﯾﺔ
-أن ھذه اﻟدراﺳﺔ اﻋﺗﻣدت ﻋﻠﻰ ﺧواص ﺗرﺑﺔ ﻣﻌﯾﻧﺔ ﺑﻣواﺻﻔﺎت ﻛﺛﺎﻓﺔ وزاوﯾﺔ اﺣﺗﻛﺎك داﺧﻠﻲ
ﻣﺣددة وﺑﺎﻟﺗﺎﻟﻲ ﻓﺄن اﺑﻌﺎد اﻟﻘواﻋد اﻟﻛوﻧﻛرﯾﺗﯾﺔ ﺗﻣﺛل اﻗﺗراﺣﺎ ﻏﯾر ﻣﻠزﻣﺎ ﻟﺣﺎﻟﺔ ﺧﺎﺻﺔ وﻓﻲ ﺣﺎل
وﺟود ﻣواﺻﻔﺎت ﺗرﺑﺔ اﺧرى ﯾﺗم اﻋﺗﻣﺎد اﺑﻌﺎد ﻗواﻋد ﻛوﻧﻛرﯾﺗﯾﺔ اﺧرى .
,
-ﯾﺗم ﺻب ﺣﻠﯾﺔ ﻛوﻧﻛرﯾﺗﯾﺔ ﻟﻠﻌﻣود ) ( Pole s concrete collarﺑﺳﻣك ٤٠ﺳم وﻓق اﻻﺑﻌﺎد اﻟﺗﺎﻟﯾﺔ:
-١ﻋﻣود اﻟﺗﻌﻠﯾق ) ( ٦٠ /١٠٠ﺳم
-٢رﻛﯾزة اﻟﺷد ) (١٤٠ /١٠٠ ) (tension steel frameﺳم ،وﺗﺛﺑت ﻛﺎﻓﺔ رﻛﺎﺋز اﻟﺷد اﻟﺣدﯾدﯾﺔ ﺑﺳﻠك ﺷداد ﺣدﯾدي
)(stay wireوﻛﻣﺎ ﻣوﺿﺢ ﻓﻲ اﻟرﺳم ادﻧﺎه
-ﯾﺗم ﻓرش طﺑﻘﺔ ﻣن اﻟﺣﺻﻰ اﻟﺟﻠﻣود ﺗﺣت اﻟﻘﺎﻋدة اﻟﻛوﻧﻛرﯾﺗﯾﺔ ﻗﺑل اﻋﻣﺎل اﻟﺻب .
Soil properties:
ᶲ internal angle of friction = 30 degree
ɣ soil density = 18 kn
Ka= (1-sin ᶲ) / (1+sin ᶲ) = 0.33
Kp= (1+sin ᶲ) / (1-sin ᶲ) = 3
Ea= 0.5 * ɣ *ka* H2
Ep= 0.5 * ɣ *kp* H2
)(13 0f 26
Materials properties :
Materials
- Cements
-concrete mix
Cement 350 kg
(14 of 26)
Calculation Of Foundation Stability for certain case of soil
Taking moment (M) at the concrete base regarding the forces resisting the overturning and
the forces causing overturning with required factor of safety
1.Wind load
Solving the equation above for this type of soil to get the suggested dimensions for this certain
case of soil.
(15 of 26)
Tensile from wires due
Wind load
Weight of concrete
And poles
Ea Ep
(16 of 26)
رﻛﯾزة ﺷد )ﺧط ﻣزدوج( ﺑداﯾﺔ وﻧﮭﺎﯾﺔ
Ka= 0.33
2
Kp=3
Ea=20 Kn
2.6
Ep=183 kn
Wind load total moment on the steel pole and channels frame = 41 kn.m
F.O.S= 874.5
Must be add 50 cm from the top of foundation and bond tightly with pole
(17 of 26)
Steel mesh
ﻗﺎﺑﻠﯾﺔ اﻟﺗﺣﻣل ﻟرﻛﯾزة )ﺧط ﻣزدوج( ﺑداﯾﺔ وﻧﮭﺎﯾﺔ
Bearing capacity of soil assume 7 ton/m2
-Total vertical weights:
1-1580 kg poles weight
2-195 kg channels weight
3-100 kg live load
4- 40,040 weight of foundation
5-weight of conductors: 348 kg
Total weight = 42203 kg / foundation area (7 m2)
= 6.03 ton/ m2 less than 7 ton/m2 o.k
(18 of 26)
رﻛﯾزة )ﺧط ﻣزدوج( وﺳطﯾﺔ
F.O.S =431.85/226.96=1.9 ok
For bonding purpose between the steel pole
And the concrete base a steel mesh of steel bars
With 10 mm diameter and a spacing 30 cm both direction
Must be add 50 cm from the top of foundation and bond tightly with pole 1m
2m
(19 of 26)
ﻗﺎﺑﻠﯾﺔ ﺗﺣﻣل اﻟﺗرﺑﺔ ﻟرﻛﯾزة )ﺧط ﻣزدوج( وﺳطﻲ
(20 of 26)
(ﻋﻣود ﺗﻌﻠﯾق )ﺧط ﻣزدوج
Ka= 0.33
1
Kp=3
Ea=13 Kn
2.1
Ep=119 kn
790 kg = 790
Wind load total moment on steel poles and conductors =91.2 kn.m
F.O.S= 113.736
(21 of 26)
رﻛﯾزة ﺷد )ﺧط ﻣﻔرد( ﺑداﯾﺔ وﻧﮭﺎﯾﺔ
Ka= 0.33
1.5
Ea=20 Kn 2
Kp=3
2.6
Ep=182.5 kn
Wind load total moment on the steel pole and channels frame = 33 kn.m
F.O.S= 554.1
Must be add 50 cm from the top of foundation and bond tightly with pole
( 22 of 26 )
Steel mesh
ﻗﺎﺑﻠﯾﺔ ﺗﺣﻣل اﻟﺗرﺑﺔ ﻟرﻛﯾزة ﺳﻧﻛل ﻻﯾن ﺑداﯾﺔ وﻧﮭﺎﯾﺔ
Bearing capacity of soil assume 7 ton/m2
(23 of 26)
رﻛﯾزة ﺷد )ﺧط ﻣﻔرد( وﺳطﯾﺔ
Ka= 0.33
1.5
Ea=20 Kn
Kp=3
2.6
Ep=182.5 kn
Wind load total moment on the steel pole and channel frame = 33 kn
F.O.S= 431.85
F.O.S =431.85/226.96=1.9 ok
Must be add 50 cm from the top of foundation and bond tightly with pole 1m
2m
(24 of 26 )
ﻗﺎﺑﻠﯾﺔ ﺗﺣﻣل اﻟﺗرﺑﺔ ﻟرﻛﯾزة )ﺧط ﻣﻔرد( وﺳطﻲ
Bearing capacity of soil assume 7 ton/m2
(25 of 26)
(ﻋﻣود ﺗﻌﻠﯾق )ﺧط ﻣﻔرد
Ka= 0.33
0.7
Kp=3
Ea=13 Kn
2.1
Ep=119 kn
790 kg = 790
Wind load total moment on the steel pole and conductors = 52.4 kn.m
F.O.S= 91.89
(26 of 26)