Method of Statement Replacement and Testing Current Diff Relays
Method of Statement Replacement and Testing Current Diff Relays
Method of Statement Replacement and Testing Current Diff Relays
SUPPLY, ERECT AND COMMISSIONING OF 275KV GIS, 132KV AIS, 2 X 240MVA
AUTOTRANSFORMER AND ANCILLARY EQUIPMENT COMPLETE WITH ASSOCIATED
CIVIL WORKS FOR PMU 275/132KV KANGKAR TEBRAU, JOHOR
Contract No: TNB 99/2015
TENAGA SWITCHGEAR SDN BHD – TOSHIBA TRANSMISSION & DISTRIBUTION SYSTEMS ASIA SDN BHD JV
Lot 3, Jalan Teknologi 3/6, Taman Sains Selangor 1, Kota Damansara, 47810 Petaling Jaya,
Selangor Darul Ehsan
Tel: 03-6140 6520 Fax: 03-6140 6530
CONTENTS:
A. Background Information
1. WORK OBJECTIVE
2. WORKING AREA
3. SCOPE OF WORK
3.1 Scope of Works Involves
3.2 Work Program
4. HIRADC
7 NORMALIZATION
9 ATTACHMENT
Appendix 1: Work Program
Appendix 2: HIRADC
Appendix 3: NTSP & Calibration Certificate (external worker), S. Semak 235
Appendix 4: CT Core & Start Point Verification Checklist – Not Available
Appendix 5: Daily DC Monitoring Checklist
Appendix 6: Isolation Checklist
Appendix 7: Existing Wiring Schedule – Not Available
Appendix 8: DC Supply Continuity Test
Appendix 9: Schematic Drawing
Appendix 10: Final Setting Sheet – Not Available
Appendix 11: Cable Block Diagram
Appendix 12: Cable Core Schedule
Appendix 13: Photo
Appendix 14: Testing method of statement-MS
10 DECLARATION
4
A. background information
COMPANY DETAILS TENAGA SWITCHGEAR SDN BHD – TOSHIBA
TRANSMISSION & DISTRIBUTION SYSTEMS ASIA SDN
BHD JV
Lot 3, Jalan Teknologi 3/6, Taman Sains Selangor
1, Kota Damansara, 47810 Petaling Jaya
No. Tel : 03-6140 6520
No. Fax : 03-6140 6530
SITE ADDRESS PMU 275/132KV Kangkar Tebrau GIS, Johor
1 (=D03+R1) 275kV Permas Jaya No. 1 OHL Feeder Protection Panel No. 1 D03
2 (=D03+R2) 275kV Permas Jaya No. 1 OHL Feeder Protection Panel No. 2 D03
3 (=D01+R1) 275kV Skudai No. 2 OHL Feeder Protection Panel No. 1 D01
4 (=D01+R2) 275kV Skudai No. 2 OHL Feeder Protection Panel No. 2 D01
5 (=D06+R1) 275kV Skudai No. 1 OHL Feeder Protection Panel No. 1 D06
6 (=D06+R2) 275kV Skudai No. 1 OHL Feeder Protection Panel No. 2 D06
3.2 Work Program (Attach work plan with each work activities & tally with outage period)
Refer to Appendix 1
5
4.0 HIRADC
4.1 Detail work description and risk involve (Hazard identification, risk assessment and
determining control)
Attach as per ISO portal for related work in Appendix 2 (ISO portal > Document type:
Level 3 (HIRADC) > Choose the appropriate HIRADC table according to related work)
Table 1
5.1Personnel Details:
NTSP No./ Staff Expiry
No Name No. (for TNB staff) Date Position
1 Mohd Khairul Fatah bin Talha TNB034335N 30/05/2022 Engineer
2 Abu Bakar bin Abd Rahim TNB001570N 30/05/2022 Engineer
3 Ahmad Syazwan bin Ahmad Lotfi TNB003413N 14/03/2022 Engineer
4 Mohamad Rusydi Bin Jusoh TNB034763N 16/04/2021 Engineer
5 Teng Say Chuan TNB004891C 21/03/2022 Engineer
6 Samian Bin Samsudin TNB002337C 11/06/2021 Engineer
7 Yap Meng Fai TNB035064N 27/05/2021 Wireman
8 Che Kusyairi bin Che Hamid TNB055411N 01/11/2021 Wireman
9 Rohimi bin Hassin TNB016776N 06/08/2023 Wireman
10 Mohd Saiful Adli bin Kamaruddin TNB034508N 25/07/2022 Wireman
11 Mohamed Khairuddin bin Mohd Ali TNB015631N 04/10/2021 Engineer
5.3 Copy of Electrical Service Engineer / Electrical Competent Engineer / EAP and Other
Workers Certificate & NTSP Card. Refer to Appendix 3 (For Non-TNB worker only)
No Equipment Condition
1 Safety helmet OK
2 Safety shoes OK
3 Goggle OK
4 Glove OK
5 Face Mask OK
6 Safety Vest OK
5.5 List of Equipment (For TNB, kindly attach Senarai Semak 235 as per TOMAS ver2.0
in Appendix 3)
Serial Calibration
No Equipment
Number Due Date*
1 Digital Multimeter 35470272WS 18/11/2020
2 Grinder NA
3 Jigsaw NA
4
* For Non-TNB, kindly attach the calibration certificate in Appendix 3
8
5.6 Specific Site Hazard (can cause tripping) verification check before proceed to start
work:
Readiness (Please
No Item
fill up accordingly)
PTW issuance:
1 Issued by:
Received by:
2 Safety Briefing & doa
DC Measurement*:
+VE to E: V
3
-VE to E: V
+VE to –VE: V
4 Barricade adjacent panel / other live relays or equipment & lock
Record daily DC monitoring as per Appendix 5 before start
5
and after stop work
Site Communication Board. To notify Outage work program,
6 every day activities completion and outstanding defects &
problems.
*Please don’t proceed work if there is DC Earth Fault and please inform and get acknowledgement from
authorized personnel.
Related Involve
No Standard Isolation List According to Categories Status
Document (Yes/No)
Isolation List General Appendix 6 Yes
1 Common DC supply isolation Appendix 6a Yes
2
3
4
5
*Any unknown wiring with DC supply has to isolate at the source point
10
No Description Status
1 Use proper tools for cutting the panel to minimize vibration.
Install relay as per approved layout as below (kindly
2
attached the existing and new layout)
11
6.6 To perform internal and external wiring as per approved schematic drawing in
Appendix 9
Person in charged must get the approval for the new drawing (additional circuit that
does not cover during approval stage) related to this work from either GSE, HEAD of
PROA or HEAD of RnR).
No Description Status*
Perform external wiring (from relay, test block and it’s accessories to
1 NA
terminal block at relay panel) as per approved drawing
*NA - Not Applicable: If replacement involving same model with existing or not involving
changes of arrangement in relay panel (i.e.; no modification of existing wiring)
No Description Status
Perform wiring check and make sure all wire is terminated as per
approved drawing.
1
Perform continuity check and highlight each wires in the working
copy which has been check according to the drawing
2 Make sure working copy drawing updated.
Make sure all wire are crimped properly & no loose wire at all new
3
termination
4.1 Remove unused wire.
4 4.2 Remove/cut lug and keep properly in cable tray for unused
wire
To perform continuity test for each type DC supply circuit (based on
site condition/scheme) before switch on MCB to make sure there is
no shorting to ground or between +VE & -VE DC supply as per
5 Appendix 8
If the continuity test failed, trace & rectify the shorting point.
1. Site access road/path for evacuation to be inform during safety briefing before work
start and should be cover under item 6.2 above
9.0 ATTACHMENT
10.0 DECLARATION
I declare that all the works mentioned in this MS have been implemented & carried out at
site accordingly
NAME:
POSITION:
DATE:
14
APPENDIX 1
Work Program
15
WORK PROGRAM FOR PMU KANGKAR TEBRAU BAY D03- ABB RED670 RELAY CHANGE – 275 PERMAS JAYA NO 1: D03+R1 (PROTECTION PANEL)
1.1 TNB to issue PTW. Switching / Outage Taken / Busbar Out of Service
1 Testing
2 Normalise Line KTRU-PMJY NO 1
16
WORK PROGRAM FOR PMU KANGKAR TEBRAU BAY D01- SCHNEIDER P543 RELAY CHANGE – 275 SKUDAI NO 2: D01+R2 (PROTECTION PANEL)
1.1 TNB to issue PTW. Switching / Outage Taken / Busbar Out of Service
1 Testing
2 Normalise Line KTRU-SKUDAI NO 2
17
WORK PROGRAM FOR PMU KANGKAR TEBRAU BAY D06- SCHNEIDER P543 RELAY CHANGE – 275 SKUDAI NO 1: D06+R2 (PROTECTION PANEL)
1.1 TNB to issue PTW. Switching / Outage Taken / Busbar Out of Service
1 Testing
2 Normalise Line KTRU-SKUDAI NO 1
18
APPENDIX 2
HIRADC
17
18
19
20
APPENDIX 3
NTSP & Calibration Certificate
Or
Senarai Semak 235
21
22
23
24
APPENDIX 5
Daily DC Monitoring Checklist
25
Appendix 5
DC Measurement
No. Date Measured By Verified By Remarks
+VE to E -VE to E +VE to –VE
26
APPENDIX 6
Isolation Checklist
27
Voltage Voltage After Voltage Before Voltage
Norm Drawing No
No Description Location T/B No Before Isolate Isolate Normalize After
alize and Sheet
Isolate Internal External Internal External Normali
1 To Shut Down MCB
MCB –F72/1 D03+R1 TTDA KTRU 808814
275 S 11-3B SH.031
MCB –F72/2 D03+R2
APPENDIX 8
DC Supply Continuity Test
32
APPENDIX 9
43
44
45
APPENDIX 11
Cable Block Diagram
LAMPIRAN 3: HANDING OVER CHECKLIST FROM MAIN CONTRACTOR TO TNB LICENSED TESTER
LAMPIRAN 3A: PROJEK OLEH PIHAK GD/ PENGUJIAN OLEH PENGUJI BERLESEN (Licensed tester)
2 Wiring Completed
3 Wiring Checked
4 Updated Drawing
LAMPIRAN 3B: PROJEK OLEH PIHAK GM/ PENGUJIAN OLEH PIHAK GM (Internal Testing)
2 Wiring Completed
3 Wiring Checked
4 Updated Drawing
METHOD OF STATEMENT
CURRENT DIFFERENTIAL RELAY TEST
MAIN CONTRACTOR
iii. STAGE 3
a. Nil
iv. STAGE 4
a. Current Differential Relay Trip Test
b. SCADA Operation Test
To test new Current Differential Relay ensuring that its working as required and
working within the fault current levels
Personnel Personnel
a. Electric shock caused by induced a. i) Use proper PPE.
voltage. ii) Extra earthing placed at area exposed
to induce voltage.
b. Falling down from equipment If testing need earthing to be isolated
under test. always discharge and isolate earthing
only after connection for testing has
c. Working in the live bay by mistake been done.
will cause high voltage hazard. b. Use full body harness and follow safety
regulation.
c. Barricade and hang proper “Danger”
sign around the working area.
System System
a. i) Take care to work in a working party.
a. Touching of high voltage part will (not alone)
cause busbar tripping. ii) Abide strictly to the safety regulation
when carrying long objects.
iii) Use proper material for barricade, do
not use ribbons or tapes which can be
blown
by wind causing flashover.
System System
Personnel Personnel
a. Electric shock caused by a. i) Use proper PPE.
induced voltage. ii) Extra earthing placed at area exposed to
induce voltage.
b. Falling down from equipment If testing need earthing to be isolated
under test. always discharge and isolate earthing
only after connection for testing has been
c. Working in the live bay by done.
mistake will cause high voltage b. Use full body harness and follow safety
hazard. regulation.
c. Barricade and hang proper “Danger” sign
around the working area.
BQE ENGINEERING SDN BHD Date Issued:
No 4 Jalan Sepadu D 25/D, Taman Axis Premier
Revision No:
40000, Seksyen 25, Shah Alam, Selangor D.E
Contract No:
RISK ANALYSIS Tender No:
System System
a. i) Take care to work in a working party.
a. Touching of high voltage part (not alone)
will cause busbar tripping. ii) Abide strictly to the safety regulation
when carrying long objects.
iii) Use proper material for the barricade,
do not use ribbons or tapes which can
be blown by wind causing flashover.
Personnel Personnel
1. Switch off each MCB and identify the circuit that is causing the earth fault.
2. Investigate and clear the dc earth.
3. If dc earth is from the existing system inform TNB’s authorized personnel.
4. Recovery time duration of 30 minutes.
Mohd Fazli
Testing & Commissioning Coordinator
BQE ENGINEERING SDN BHD Date Issued:
No 4 Jalan Sepadu D 25/D, Taman Axis Premier
Revision No:
40000, Seksyen 25, Shah Alam, Selangor D.E
Contract No:
WORK PROGRAM Tender No:
NTSP NO. /
NO NAME DESIGNATION I/C NO.
VALID THRU
TNB002864N
1 Ir Mohd Najeeb Bin Khalid EAP 600123016037
10/01/2023
TNB000376N
2 Ir Khairul Azmin Bin Abdul Ghani EAP 650720107311
06/12/2022
TNB000380N
3 Mohd Fazli Bin Md Nor EAP 821226075143
06/12/2022
Adan Zulherman Bin Zakaria TNB046926J
4 EAP 830216145771
Dharamaraj 30/01/2021
Nor Azzizi Sham Bin Abdul TNB047055J
5 EAP 700514105297
Mutalif 13/02/2021
6 Mohd Khairul Bin Abdul Kadir EAP 740321105731 TNB032524K
25/06/2023
TNB032528K
7 Mohd Azhar Bin Nazmi Tech 850531045429
25/06/2023
Mohammad Kamarunzaman Bin TNB015496N
8 Tech 910710086877
Adnan 02/11/2020
TNB006495N
9 Azizie Bin Amrah Tech 720201065923
03/05/2021
TNB027239N
10 Nor Akmal Bin Abdul Kadir Tech 920822016805
06/12/2022
11 Morizan Bin Jamaat Tech 631013045445 TNB008546N
12/09/2022
Muhamad Saiful Bin Mohd TNB025494N
12 Tech 940613086223
Othman 25/02/2023
13 Mohd Rosli Bin Mohd Subakir Tech 75072606011 TNB032525K
25/06/2023
14 Mohd Rosnizan Bin Mohd Suabkir Tech 901016085941 TNB032526K
25/06/2023
15 Muhamad Adlan Bin Mohd Najeeb Engineer 920909085811 TNB023886N
23/05/2021
16 Muhammad Asraf Bin Romainor Engineer 94023065365 TNB047757J
30/04/2021
Mohammad Fairul Hafiz Bin TNB047054J
17 Engineer 830512035871
Mohamed Zain 13/02/2021
TNB002078C
18 Muhammad Hafiz Bin Idris Engineer 940929115385
23/05/2021
TNB051916J
19 Mohd Afiq Bin Abdul Wahab Engineer 910819145463
15/07/2022
Megat Mohd Sufyan Bin Megat TNB052617J
20 Engineer 941009085579
Mohad Wazer 28/08/2022
TNB031076K
21 Amir Zarif Bin Abu Hanifah Lim Tech 991114055107
27/11/2022
BQE ENGINEERING SDN BHD Date Issued
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No
Tender No
BQE ENGINEERING SDN BHD Date Issued
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No
Tender No
BQE ENGINEERING SDN BHD Date Issued
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No
Tender No
BQE ENGINEERING SDN BHD Date Issued
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No
Tender No
BQE ENGINEERING SDN BHD Date Issued
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No
Tender No
BQE ENGINEERING SDN. BHD.
No 4A, Jalan Sepadu D 25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE
Tel: (03) 5121 3629, (03) 521 3695 Fax: (03) 5121 3501
LIST OF EQUIPMENT
Calibration Due
No. Instrument Model Serial No.
Date
Fluke
1 Digital Multimeter 47781339WS 3/Jan/2021
15B+
Omicron
2 3 Phase Secondary Injection Test Set PC833N 18/Jun/2021
CMC 156
.\\\\rrlrr/ii,.
s.
s rVz
\r,''r,2- /, _-----------\ \
"
sl RIlt,|
Irffi
:u zzA::
( (srAN*f,m,$
\Gqry@ )
24,fi\r
S ST ':li?J'ffi-lJRi'
CERTIFICATE OF CALIBRATION
DATE OF ISSUE : 03 January 2020 CERTIFICATE NUMBER : SST/SA tW2O2OAt147
Calibration Date : 03 January 2020 Requested Calibration Due Date 03 January 2021
Calibration Method :
This instrurnent was calibrated using the Calibration procedure No ESD/ 0340 R.ev. 13.0
The standard instruments used in this calibration are traceable to either the National Standard maintained at
the National Metrology Institute ofMalaysia or other recognised International Standard Laboratories.
This certiflcate is issued h accordance with the conditions of accreditation grantcd by the SAMM which has assessed. the measurement capability of
the laboratory md its kaceability to recognised national standards and to the units ofrneasurement realised at the corresponding national standards
laboratory Copyright ofthis certif,rcate is ovnred by the issuing laboratory and may not be reproduced other than in full except with the prior writtcn
approval ofthe Head ofthe issuing laboratory-
\\\\rrlr//i//_
'. \-./ ,''2
s.S \v_/ i_
llGffi*
---l^\---
SIRT]t,l ',//r'a\\\.:
SST "/,,i,r i,\'. ISO/lEC 17025
t\,1S
CALIERATION
SAMI\,4 NO, 088
CERTIFICATE OF CALIBRATION
DATE OF ISSUE . 03 January 2020 CERTIFICATE NUMBER : SST/SAIR/2020Afi47
CALIBRATION RESULTS
Function I Applied Test Meter Measurement
Range Value Limits Display Uncertainty
AC Voltage Test
400 mV 350 mV 50 Hz 339.2 to 360.8 m V 351.0 mV + 0.34 mV
4Y V 50 Hz
3.5 3.462 to 3.538 V 3.500 v + 3.4 mV
40v 35 V 500 Hz 34.62 to 35.38 V 35"08 V +21 mV
400 v 350 V 50 Hz 346.2 to 353.8 V 3 s0.1 + 0.24 V
1000 v 1000 V 50 Hz 987 to 1013 V 1 004 + 0.85 V
DC Voltage Test
400 mV 350 mV 345.5 to 354.5 mV 351.0 m V + 85 pV
4Y 3.5 V 3.480 to 3.520 V 3.503 v + 0.86 mV
4AV 35V 34.80 to 35.20 V 35.08 v + 8.9 mV
400 v 350 V 348.0 to 352.0 V 3s0.3 v + 71 mV
1000 v 1000 v 992 to 1008 V 1003 v + 0.58 V
Diode Test
0.898 to 1"102 V 1.016 + 0.58 mV
Ohm 2 Wire Test
400 o 350 () 347.9 to 352.1 O 350.3 f2 * 0.12 C)
4 ko 3.5 k() 3.480 to 3.520 kf) 3.496 k o + 0.84 O
40 ko 35 ke2 34.80 to 35.20 KO 35.04 k o + 9.7 e)
400 ko 350 kf) 348.0 to 352.0 ko 350.0 k o + 97 C)
4 MO 3.5 M f) 3.480 to 3.52A Mf2 3.501 M CI * 0.19k o
40 MO 35 MO 34.45 to 35.55 MO 35.01 M 12 + 5.5k O
This certificate is issued in accordance with the conditions of accreditation granted by the SAMM which has assessed the measurement capability of
the laboratory md its taceability to recognised national stddards and to tho mits of moaouromonl r9a1ised. at thg eoffgsponrliag lationaistandard.s
laboratory. Copyright ofthis certificate is owned by the issuing laboratory and may not be roproducod othor than in fulI exoept with the prior written
approval ofthe Head ofthe issuing laboratory.
sl ]lI[l,l
S ST MS tSO/tEC 17025
CALIBRATION
SAMM NO 088
CERTIFICATE OF CALIBRATION
DATE OF'ISSUE : 03 lanuary 2020 CERTIFICATE NUMBER I SST/SAtR/2020At147
PAGE3OF3 PAGES
CALIBRATION RESULTS
Function / Applied Test Meter Measurement
Range Value Limits Display Uncertainty
DC Current Test
400 pA 350 pA 344.4 to 355.6 pA 350.9 p L + 0.15 pA
4000 p L 3500 p A 3444 to 3556 1tA 3509 p A + 1.5 pA
40 mA 35 mA 34.45 to 35.55 mA 35.03 m A +17pA
400 mA 350 mA 344.5 to 355.5 mA 350.3 m A + 0.35 mA
4A 3.5 A 3.445 to 3.555 A
3.504 A * 3.1 mA
10A 10A 9.82 to 10.18 A 10.00 A + 8.6 mA
AC Current Test
400 pA 350 pA 40 Hz 344.4 to 355.6 1tA 351.3 p A + 4.57 pA
4000 p A 3500 pA 200112 3444 to 3556 1t A, 3511 p A + 5.9 pA
40 mA 35 mA 200I{2 34.44 to 35.56 mA 35.12 m A + 63 pA
400 mA 350 mA 50 Hz 344.5 to 355.5 mA 350.4 m A I 0.86 mA
4A 3.5A 50 Hz 3.444 to 3.556 A 3.508 A + 1i mA
l0A 10A 50Hz 9.82 to 10.18 A 9.99 A + 24 mA
q
Calibrated ,r,
Hafizul Fahmi Zailani
This certificate is issued in accordmce wilL tLe conditions of accreditation granted by the SAMM which has assessed rhe measurement capability of
the laboratory and its traceability to recognised national standard.s and to the units of measurement realised at tho corresponding nationaf
standards
laboratory. Copltight of this oertificats is ownod by tho issuing laboratory and may not be reproducod other than in fu1l except with the prior written
approval ofthe Head ofthe issuing laboratory
.-'l
,
,}ENDi SMSB
iarir SENDI MAHIR SDN. BHD.
(SVC TAX NO: 816-1910-32000018)
(33313&r)
CERTIFICATE OF CALIBRATION
Certificate No. sM20833013 Date oflssue : 18 Jun 2020
tiltilililililililtilfliltililtililtilflililililIillilflilflilililItfl
Calibration Venue : This Instrument has been calibrated at Sendi Mahir Sdn Bhd
Calibration Result : The result as following page(s). The expanded uncertainties are based on an estimated confidence
probability of approximately at95a/o and have a coverage factor of k=2 unless stated otherwise.
ofsuch equipmeut that Sendi Mahir Sdn. Bhd. in any way guarmtees the equipment's performance after calibration. Test/calibrations maked "Not SAMM Accredited" in this
(SVC TAX NO: B{6-1910-320000{8)
NO.6, 8, 1O & 12, JALAN KAPAR 27189, MEGAH INDUSTRIAL PARK,
SEKSYEN 27, 4O4OO SHAH ALAM, SELANGOR DARUL EHSAN, MALAYSIA.
TEL: 03-5191 7388 FAX: 03-5'191 0675
#w
EMAIL: [email protected] ; [email protected] Website: www.sendimahir.com
CERTIFICATE OF CALIBRATION
Certificate No. : SM20833013 Page2of4Pages
CERTIFICATE OF CALIBRATION
Certificate No. : SM20833013 Page of Pages
DC Current
20mA 0.000 pA 0.0000 pA
2.00000 mA 2.0080 mA 4.38-04 mA ,k= 2
4.00000 mA 4.0040 mA 5.8E-04 mA ,k= 2
8.00000 mA 8.0040 mA 9.88-04 mA ,k= 2
12.0000 mA 12.0015 mA 2.0E-03 mA ,k= 2
16.0000 mA 16.0010 mA 2.48-03 mA ,k= 2
20.0000 mA 20.0030 mA 2.7E-03 mA .k= 2
SITE:
CLIENT:
BAY:
ANALYSIS CHECKLIST
Description
1 PTW Issued from TNB competent persent.
2 Identified panel or location under test
3 Lock shutter busbar side and barricade the others panel to isolate
isolate working area
4 Toolbox on scope of work and safety procedure
Description
1 Isolation Checklist provided
2 Test procedure provided
3 Connection diagram provide
4 Isolate and marked cleary all terminal block which can
use the unwanted tripping ( n/r not existing tripping )
B Q E Procedure Ref: TECH-750-202-WI-001
BQE ENGINEERING SDN BHD Date Issued: 15-Aug-07
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No: 1
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No:
Tender No:
MULTICORE CABLE TERMINATION TEST PROCEDURE Page: 1 of 3
SITE:
CLIENT:
BAY:
1. TEST OBJECTIVE
To ensure the wiring termination point to point is correct with proper termination
i.e. lugs and ferrule no. In accordance with the cable schedule provided. Also to ensure the
multicore cable insulation in good condition.
2. TEST EQUIPMENT
ii) Multimeter
3. REFERENCE
i) Test certificate
4. SAFETY
Isolation of circuit need to be done for insulation test for safety to the equipment.
i) Continuity check
5. TEST PROCEDURE
To ensure the wiring termination point to point is correct with proper termination
material i.e. lugs and ferrule no. In accordance with the cable schedule provided.
Test Equipment:
i) Multimeter or buzzer
Test Procedure:
i) One terminal of the cable is connected to the ground and the other terminal is connected to the
Test Equipment:
Test Procedure:
ii) One lead of the test equipment is connected to cable while the other one is connected to
6. DIAGRAM
B Q E Procedure Ref: TECH-750-202-WI-014
BQE ENGINEERING SDN BHD Date Issued: 15-Aug-07
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No: 1
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No:
Tender No:
CURRENT DIFFERENTIAL RELAY TEST PROCEDURE Page: 1 of 2
SITE:
CLIENT:
BAY:
1. TEST OBJECTIVE
a. To ensure the device is in good operating condition and safe for operation.
b. To ensure that the bias current is equal for both sides of the relays.
c. To ensure that the differential protection is stable during through fault current.
2. TEST EQUIPMENT
i) Multimeter
3. REFERENCE
i) Test Certificate
4. TEST PROCEDURE
xi) Record the measured values and the expected values accordingly.
B Q E Procedure Ref: TECH-750-202-WI-014
BQE ENGINEERING SDN BHD Date Issued: 15-Aug-07
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No: 1
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No:
Tender No:
CURRENT DIFFERENTIAL RELAY TEST PROCEDURE Page: 2 of 2
xii) Record the values for remote end and local end.
SITE:
CLIENT:
BAY:
1. TEST OBJECTIVE
a. To ensure the device is in good operating condition and safe for operation.
d. Block all autoreclose in zone 2, zone 3, SOTF, MCB trip and 3 phase fault.
e. Condition of sync is abided, Dead line, dead bus, live line -live bus.
f. Test all condition of A/R switch, 1 +3, On/FF , 1 phase auto relocse, 3 phase A/R.
2. TEST EQUIPMENT
ii) Multimeter
3. REFERENCE
i) Test Certificate
4. TEST PROCEDURE
v) Inject the protection relay that can initiate autoreclosing for example differential relay according to
drawings from the terminal block.
vi) Generate injections for differential; the circuit breaker should auto-reclose.
xi) Record the master trip operation, for successful auto-reclosing, the master trip must not trip.
Record that it did not trip.
xii) Generate injection for lockout operation, it must not auto-reclose, and master trip lockout operated.
xiv) Tick the appropriate values and the expected operation accordingly.
SITE:
CLIENT:
BAY:
1. TEST OBJECTIVE
a. To ensure correct tripping of the protection relay to the designated circuit breaker and as per required scheme.
b. To ensure the circuit breaker trip with correct operation of the alarms, RTU, SCS, indication and fault recorder.
c. To ensure that the circuit breaker that is not suppose to trip did not trip.
2. TEST EQUIPMENT
iv) Multimeter.
v) Test leads.
3. REFERENCE
i) Test certificate
iii) Checklist
4. SAFETY
Make sure all necessary safety pracaution has been taken during the injection and
inform to all people working in that area not to touch our injection area. Use only standard
test equipment and follow the specification given by supplier. Safety guidelines for working
with electric supply have used.
B Q E Procedure Ref: TECH-750-202-WI-062
BQE ENGINEERING SDN BHD Date Issued: 15-May-06
No 4A, Jalan Sepadu D25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE Revision No: 1
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Contract No:
Tender No:
SCHEME TEST PROCEDURE Page: 2 of 3
5. TEST PROCEDURE
i) All breakers in the plant should be kept in closed position during the trip test.
Only the breaker meant to trip shall trip.
ii) Trip test shall be performed using the actual CB not dummy breaker.
iii) To test the DC supply segregation of the tripping scheme, only the protection DC supply
of the trip coil under test kept on. All other DC supply.
vi) For trip scheme with two trip coil, the tripping shall be repeated for each coil with the
other coil isolated.
vii) For main and duplicate busbar protection scheme each main duplicate scheme shall be tested
independently. When performing trip test for the main, the DC supply of the duplicate scheme
shall be switch off.
x) Perform all the test listed in the table below for a double busbar configuration.
6 NEGATIVE CHECK
i) when test plug is inserted, the relay operation is blocke as per SAT document.
7 ACCEPTANCE CRITERIA
The result value compared to the expected value error shall be not less than 10%
B Q E
BQE ENGINEERING SDN BHD
No 4A, Jalan Sepadu D 25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE
Tel: (03) 521 3629, (03) 521 3695 Fax: (03) 521 3501 Reference : TECH-750-202-QR-014
Contract No:
CURRENT DIFFERENTIAL RELAY TEST CERTIFICATE Tender No:
SITE:
CLIENT:
BAY:
Equipment Used:
Serial Number/Tag Number:
Date Calibration:
1. Relay Details
Make: Dc input Version
Type: Relay amp
Serial no. Frequency
2. Inspection
Signature: Signature:
Date/Time: Date/Time:
Page: of
1
B Q E
BQE ENGINEERING SDN BHD
No 4A, Jalan Sepadu D 25/D, Taman Axis Premier, 40000 Shah Alam, Selangor DE
Tel: (03) 521 3629, (03) 521 3695 Fax: (03) 521 3501 Reference : TECH-750-202-QR-014
Contract No:
CURRENT DIFFERENTIAL RELAY TEST CERTIFICATE Tender No:
SITE:
CLIENT:
BAY:
3. Operating Current
-Setting =
4. Operating Time
Phase Measured ( ms )
Pick-up Reset
R-N
Y-N
B-N
R-Y
Y-B
B-R
Requirement:
Operating Time : ≥ 30ms
Reset Time max : 55ms
Signature: Signature:
Date/Time: Date/Time:
Page: of
5. Relay Measurement Check
SITE:
CLIENT:
BAY:
Y-N
B-N
8. CT Supervision
CTSU operated
Not Blocked differential
Able to record disturbance injected to relay and print out disturbance record
Signature: Signature:
Date/Time: Date/Time:
Page: of
3
B Q E
ENGINEERING SDN BHD
No 4A, Jalan Sepadu D 25/D, Taman Sri Axis Premier, 40000 Shah Alam, Selangor DE
Tel: (03) 5121 3629, (03) 5121 3695 Fax: (03) 5121 3501 Reference: TECH-750-202-QR-027
Contract No:
AUTORECLOSE RELAY TEST CERTIFICATE Tender No:
SITE:
CLIENT:
BAY:
INJECTION / SIMULATION RELAY A/R RELAY TRIP RELAY FACIA INDICATION DUMMY
INDICATION CB
RN
A/R SUCCESSFUL
SN
A/R SUCCESSFUL
TN
A/R SUCCESSFUL
RN - 2 SHOTS
A/R LOCKOUT IN
RECLAIM TIME
2ND SHOT AFTER 1sec
RS
A/R SUCCESSFUL
ST
A/R SUCCESSFUL
TR
A/R SUCCESSFUL
3 PHASE FAULT
Will lock-out
Signature:
Date/Time:
Page 1 of 1