13. The following table gives the activities of a construction project and duration
(in days)
Activity 1-2 1-3 2-3 2-4 3-4 4-5
Duration 20 25 10 12 6 10
Draw the network diagram and find the critical path.
14. Write down limitations of linear programming.
15. Calculate mean deviation from the mean for the following data:
X 1 2 3 4 5 6 7 8 9 10
F 21 30 28 40 26 34 40 9 15 57
Page 1 of 3
16. A Project has the following characteristic
Activity Duration Preceding
activities
A 3 --
B 8 --
C 4 A,B
D 2 B
E 1 A
F 7 C
G 5 E,F
H 6 D,E
I 8 G,H
J 9 I
Construct the network diagram; find the critical path and the project duration.
17. Explain the limitation of Statistics.
18. The weekly salaries of a group of employees are given in the following table.
Find the mean and standard deviation of the salaries.
Salary (in 75 80 85 90 95 100
Rs.)
No. of 3 7 18 12 6 4
persons
19. Calculate the correlation Coefficient between the age of husband and the age of
wife from the following data.
Age of husband 35 34 40 43 56 20 38
Age of wife 32 30 31 32 53 20 33
20. Explain the Characteristics of a good Table.
SECTION - C (2 X 20 = 40 MARKS)
(Answer Any TWO Questions)
21. A project has the following time schedule
Activity Time in Activity Time in months
months
1-2 2 3-7 5
1-3 2 4-6 3
1-4 1 5-8 1
2-5 4 6-9 5
3-6 8 7-8 4
8-9 3
(i) Construct the network
(ii) Find the total float for each activity
(iii) Find the Critical Path and the project duration.
Page 2 of 3
22. Ten competitors in a beauty contest are ranked by three judges in the following
order.
First Judge 1 4 6 3 2 9 7 8 10 5
Second Judge 2 6 5 4 7 10 9 3 8 1
Third Judge 3 7 4 5 10 8 9 2 6 1
23. Find the Mean, Median and Mode for the following data and verify the empirical
relation.
Class Frequency
1-10 3
11-20 7
21-30 13
31-40 17
41-50 12
51-60 10
61-70 8
71-80 8
81-90 6
91-100 6
******