COCHIN SHIPYARD LIMITED

TURNKEY WORK FOR THE CONSTRUCTION, SUPPLY, ERECTION AND COMMISSIONING OF


PLANT AND MACHINERY FOR INTERNATIONAL SHIP REPAIR FACILITY(ISRF)

JOINT RECORD FOR PILING WORK

TURNKEY WORKS FOR THE CONSTRUCTION, SUPPLY, ERECTION AND COMMISIONING OF PLANT & MACHINERY FOR
(a) Name of work :
ISRF PROJECT

(b) Situation : ISRF PROJECT SITE, CoPT

(c) Agency by which work executed : M/s SIMPLEX INFRASTRUCTURES LIMITED, KOLKATA

(d) Number and date of agreement or Work Order : INFRA/ISRF/100/2017 dt. 10.OCTOBER.2017
(e) Date of measurements : For the month of April-18
(g) Date of commencement of work : 17-NOVEMBER-2017
(h) Date of completion of work : Work in progress

Liner Date of Rebar Quantity in Kg Concrete


Sl. Liner Tip Terminatio Cut off Boring Concrete
Location Pile mark Pile Type EGL Quantity Liner Signature Signature Signature Quantity Date Signature
No. Level n Level Level (Rm) 8 mm dia 10 mm dia 12 mm dia 16 mm dia 20 mm dia 25 mm dia 28 mm dia 32 mm dia Total in MT Grade
(MT) Installation (Cum)

1 WSN E18 P1 1.4 -46 -46 2.85 4.947 08-Mar 47.4 823.00 1,600.00 - 80.00 8,521.00 - 11024 M-40 55.25

TOTAL QUANTITY 4.95 47.40 - - 823.00 1,600.00 - 80.00 8,521.00 - 11,024.00 55.25