No Site ID Status Validator Scenario Test Type Validation Date
No Site ID Status Validator Scenario Test Type Validation Date
Test Date
No Site ID type status Validator Scenario
1 112130 PHU pass Kedir 3 4/24/2020
2 112129 PHU pass Kedir 0 4/24/2020
56 117139 PHU
58 111273 PHU
59 111392 PHU
61 111424 PHU
Fail Kedir #N/A 5/17/2020
62 112106 PHU
65 111567 Nemo
70 111603 Nemo
71 111609 Nemo
74 111852 Nemo
75 111086 Nemo
77 111114 Nemo
78 111845 Nemo
81 112250 Nemo
82 113001 Nemo Fail Kedir #N/A 6/3/2020
Fail Kedir #N/A 6/3/2020
83 117137 Nemo
85 111858 Nemo
86 111862 Nemo
pending Kedir #N/A 6/11/2020
87 111864 Nemo
88 111882 Nemo Fail Kedir #N/A 6/11/2020
93 112082 Nemo
94 112134 Nemo pending Kedir #N/A 6/12/2020
95 112141 Nemo
96 112151 Nemo
pending Kedir #N/A 6/13/2020
97 112158 Nemo
98 112173 Nemo
106 Nemo
107 Nemo
110 Nemo
111 Nemo
112 111557 Nemo Fail Kedir 6/16/2020
111561 Fail Kedir 6/16/2020
113 Nemo
114 Nemo
115 Nemo
119 Nemo
120 Nemo
111721 Fail Kedir 6/16/2020
121 Nemo
122 Nemo
123 Nemo
124 Nemo
125 Nemo
111413
111709
111580
111086
111162
112126
117138
111864
112033
112037
112134
111673
111712
Validation date after Signature
Type
Snag clearance status
6/3/2020 Signed 2T2R
6/6/2020 Signed 2T2R
5/28/2020 Signed 2T2R
5/27/2020 Signed 2T2R
5/19/2020 Signed 2T2R
5/19/2020 Signed 2T2R
6/6/2020 Signed 2T2R
6/3/2020 Signed 2T2R
5/19/2020 Signed 2T2R
6/12/2020 Signed 2T2R
6/8/2020 Signed 2T2R
6/6/2020 signed 2T2R
5/19/2020 Signed 2T2R
6/6/2020 Signed 2T2R
6/7/2020 Signed 2T2R
8/19/2020 Pending 2T2R
5/27/2020 Signed 2T2R
5/20/2020 Signed 2T2R
5/18/2020 Signed 2T2R
2T2R
6/3/2020 Signed 2T2R
5/20/2020 Signed 2T2R
6/6/2020 Signed 2T2R
5/22/2020 Signed 2T2R
7/30/2020 Signed 2T2R
6/5/2020 Signed 2T2R
5/18/2020 Signed 2T2R
6/6/2020 Signed 2T2R
6/6/2020 Signed 2T2R
5/26/2020 Signed 2T2R
5/20/2020 Signed 2T2R
5/27/2020 Signed 2T2R
6/1/2020 Signed 2T2R
6/8/2020 Signed 2T2R
5/26/2020 Signed 2T2R
6/12/2020 Signed 2T2R
5/27/2020 Signed 2T2R
5/19/2020 Signed 2T2R
5/19/2020 Signed 2T2R
5/20/2020 Signed 2T2R
6/6/2020 Signed 2T2R
5/23/2020 Signed 2T2R
2T2R
4T4R
and CA
4T4R
and CA
4T4R
and CA
4T4R
and CA
4T4R
and CA
4T4R
and CA
4T4R
and CA
4T4R
and CA
4T4R
and CA
8/19/2020 2T2R
8/5/2020 2T2R
2T2R
2T2R
8/19/2020 2T2R
2T2R
2T2R
4T4R
2T2R
8/5/2020 2T2R
8/6/2020 2T2R
8/12/2020 2T2R
2T2R
2T2R
2T2R
8/11/2020 2T2R
2T2R
2T2R
8/6/2020 2T2R
8/6/2020 2T2R
2T2R
8/19/2020 2T2R
2T2R
4T4R
2T2R
4T4R
2T2R
8/11/2020 2T2R
2T2R
4T4R
2T2R
8/5/2020 2T2R
2T2R
8/25/2020 2T2R
8/25/2020 2T2R
2T2R
2T2R
4T4R
2T2R
8/17/2020 2T2R
8/19/2020 4T4R
8/25/2020 2T2R
2T2R
2T2R
4T4R
8/25/2020 2T2R
4T4R
4T4R
Remark
The site has feeder cross and after fixing cross mobility test
should be retested
256QAM is activated
UL sec1 and sec2 average throughput below target
DL sec1 is not locked
DL all sectors average and max throughput failed
256QAM is activated
one call is not returned to LTE in sec3
DL all sectors average and max throughput failed
The site seems have cross after fixing cross mobility test
should be retested
256QAM is activated
DL all sectors average and max throughput failed
The lat long for this site is not wright,so its diffcult to check
mobility test
256QAM is activated
DL all sectors average and max throughput failed
256QAM is activated
SHC sec3 is not locked
DL all sectors failed
The site seems have cross after fixing cross mobility test
should be retested
256QAM is activated
SHC sec1& sec2 are not locked
UL sec1 max and average throughput failed
DL all sectors max and average throughput failed
256QAM is activated
SHC sec3 is not locked
ping 1460 sec1 above thresold value
UL sec3 average throughput failed
DL all sectors both average and max throughput failed
256QAM is activated
DL all sectors both average and max throughput failed
Incompleted log file
Detach time and Erab setup time are not checked for all
secrors
attach time for sec2 is above target
almost one third of the serving cell is PCI 0
The site azimuth should be checked and the PCI s are not
mapped to each respective sectors
sec2 is not served in UL mobility test
DL mob average throughput failed
Detach time and erab setup time for all sectors are above
target for all sectors
SHC sec2 is not locked
SHC all sectors are not done 5 times
ping test is done 20 times for all sectors
almost one third of the serving cell is PCI 0
DL all sectors test is not done in the right methodology
Incompleted log file
almost one third of the serving cell is PCI 0
PS session termination success rate is done 5 times
The lat long is not right,so it sis diffcult to check mobility test
SHC sec3 is not locked
Detach time and erab setup time for all sectors are above
target for all sectors
ping32 sec1 and sec3 and ping1460 sec1 are not locked
ping test is done 20 times for all sectors
DL all sectors test is not done in the right methodology