No Site ID Status Validator Scenario Test Type Validation Date

The document contains validation test results for 135 sites identified by ID numbers. The tests were conducted by validator Kedir on various dates between April 24, 2020 and August 25, 2020. The majority of the sites received a "pass" status, while some were marked as "pending" or "fail". Kedir performed the validation tests across different scenarios and types of sites denoted as PHU and Nemo.

Uploaded by

Anaakoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views34 pages

No Site ID Status Validator Scenario Test Type Validation Date

The document contains validation test results for 135 sites identified by ID numbers. The tests were conducted by validator Kedir on various dates between April 24, 2020 and August 25, 2020. The majority of the sites received a "pass" status, while some were marked as "pending" or "fail". Kedir performed the validation tests across different scenarios and types of sites denoted as PHU and Nemo.

Uploaded by

Anaakoo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 34

Validation

Test Date
No Site ID type status Validator Scenario
1 112130 PHU pass Kedir 3 4/24/2020
2 112129 PHU pass Kedir 0 4/24/2020

pass Kedir 3 4/28/2020


3 112187 PHU
4 112180 PHU pass Kedir 1 5/13/2020
5 111084 PHU pass Kedir 0 4/28/2020
6 112221 PHU pass Kedir 0 4/28/2020
7 112245 PHU pass Kedir 1 4/28/2020
8 112198 PHU pass Kedir 1 5/13/2020
9 111400 PHU pass Kedir 1&2 4/30/2020
10 111102 PHU pass Kedir 1 4/30/2020
11 112214 PHU pass Kedir #N/A 4/30/2020
12 111229 PHU pass Kedir 1 5/1/2020
13 111437 PHU pass Kedir 1 4/30/2020
14 112137 PHU pass Kedir 3 5/1/2020
15 111093 PHU pass Kedir 1 5/1/2020
17 111413 PHU pending Kedir 3 5/2/2020
18 111262 PHU pass Kedir 1 5/2/2020
19 111060 PHU pass Kedir 1 5/2/2020
20 112176 PHU pass Kedir 1 5/2/2020
21 111583 PHU Fail Kedir 1 5/2/2020
22 111103 PHU pass Kedir 3 5/2/2020
23 111896 PHU pass Kedir 1 5/3/2020
24 112208 PHU pass Kedir 1 5/30/2020
25 111702 PHU pass Kedir 1 5/3/2020
26 111165 PHU pass Kedir 1 5/3/2020
27 111407 PHU pass Kedir 2&3 5/4/2020
28 111582 PHU pass Kedir 1 5/4/2020
29 112149 PHU pass Kedir 3 5/4/2020
30 111408 PHU pass Kedir 1 5/5/2020
31 111729 PHU pass Kedir 1 5/5/2020
32 111773 PHU pass Kedir 1 5/5/2020
33 112142 PHU pass Kedir 1 5/5/2020
34 112246 PHU pass Kedir 1 5/5/2020
35 111659 PHU pass Kedir 1 5/6/2020
36 117116 PHU pass Kedir 1 5/6/2020
37 111584 PHU pass Kedir 1 5/7/2020
38 112159 PHU pass Kedir 1 5/7/2020
39 111733 PHU pass Kedir 1 5/7/2020
40 112242 PHU pass Kedir 1 5/7/2020
41 111657 PHU pass Kedir 1 5/8/2020
42 111859 PHU pass Kedir 1 5/8/2020
43 111626 PHU pass Kedir 1 5/8/2020

Fail Kedir 1 5/8/2020


44 112148 PHU
45 111398 PHU pass Kedir 1 5/9/2020
46 112184 PHU pass Kedir 0 5/9/2020
47 111666 PHU pass Kedir 1 5/9/2020
48 111642 PHU pass Kedir 1 5/9/2020
49 111577 PHU pass Kedir 3 5/10/2020
50 111243 PHU pass Kedir 1 5/13/2020
51 111555 PHU pass Kedir 1 5/10/2020
52 111576 PHU pass Kedir 1 5/10/2020
53 111549 PHU pass Kedir 1 5/11/2020
54 111574 PHU pass Kedir 3 5/30/2020
55 111211 PHU pass Kedir 3 5/11/2020

Fail Kedir 2&3 5/15/2020

56 117139 PHU

Fail Kedir 1 5/15/2020


57 111136 PHU

Fail Kedir 1&2 5/15/2020

58 111273 PHU

Fail Kedir 1 5/15/2020

59 111392 PHU

Fail Kedir #N/A 5/17/2020


60 111412 PHU

Fail Kedir #N/A 5/17/2020

61 111424 PHU
Fail Kedir #N/A 5/17/2020

62 112106 PHU

Fail Kedir #N/A 5/17/2020


63 117140 PHU
64 111105 PHU Fail Kedir #N/A 5/17/2020

Fail Kedir 1 5/30/2020

65 111567 Nemo

Fail Kedir 1 5/30/2020


66 111593 Nemo
pending Kedir #N/A 5/31/2020
67 111709 Nemo

pending Kedir #N/A 5/31/2020


68 111738 Nemo
pending Kedir #N/A 6/9/2020
69 111580 Nemo

Fail Kedir #N/A 6/9/2020

70 111603 Nemo

Fail Kedir #N/A 6/9/2020

71 111609 Nemo

Fail Kedir #N/A 6/9/2020


72 112135 Nemo
73 111842 Nemo Fail Kedir #N/A 5/31/2020
Fail Kedir #N/A 6/10/2020

74 111852 Nemo

pending Kedir #N/A 6/1/2020

75 111086 Nemo

pending Kedir 1 6/1/2020


76 111162 Nemo

Fail Kedir #N/A 6/10/2020

77 111114 Nemo

Fail Kedir #N/A 6/2/2020

78 111845 Nemo

pending Kedir #N/A 6/2/2020


79 112126 Nemo
Fail Kedir #N/A 6/2/2020
80 112152 Nemo

Fail Kedir #N/A 6/3/2020

81 112250 Nemo
82 113001 Nemo Fail Kedir #N/A 6/3/2020
Fail Kedir #N/A 6/3/2020

83 117137 Nemo

pending Kedir #N/A 6/7/2020


84 117138 Nemo

Fail Kedir #N/A 6/10/2020

85 111858 Nemo

Fail Kedir #N/A 6/10/2020

86 111862 Nemo
pending Kedir #N/A 6/11/2020
87 111864 Nemo
88 111882 Nemo Fail Kedir #N/A 6/11/2020

Fail Kedir #N/A 6/11/2020


89 111890 Nemo
90 112033 Nemo pending Kedir #N/A 6/11/2020
91 112037 Nemo pending Kedir #N/A 6/11/2020

pending Kedir #N/A 6/11/2020


92 112075 Nemo
Fail Kedir #N/A 6/12/2020

93 112082 Nemo
94 112134 Nemo pending Kedir #N/A 6/12/2020

Fail Kedir #N/A 6/12/2020

95 112141 Nemo

Fail Kedir #N/A 6/12/2020

96 112151 Nemo
pending Kedir #N/A 6/13/2020
97 112158 Nemo

Fail Kedir #N/A 6/13/2020

98 112173 Nemo

Fail Kedir #N/A 6/13/2020


99 112183 Nemo

Fail Kedir #N/A 6/13/2020


100 112186 Nemo
Fail Kedir #N/A 6/13/2020

101 112188 Nemo

Fail Kedir #N/A 6/14/2020


102 112190 Nemo

Fail Kedir #N/A 6/14/2020

103 112209 Nemo

Fail Kedir #N/A 6/14/2020

104 112091 Nemo

Fail Kedir #N/A 6/14/2020

105 112230 Nemo


111014 Fail Kedir 6/15/2020

106 Nemo

111072 Fail Kedir 6/15/2020

107 Nemo

111244 pending Kedir 6/16/2020


108 Nemo

111246 Fail Kedir 6/16/2020


109 Nemo

111285 Fail Kedir 6/16/2020

110 Nemo

111406 Fail Kedir 6/16/2020

111 Nemo
112 111557 Nemo Fail Kedir 6/16/2020
111561 Fail Kedir 6/16/2020
113 Nemo

111585 Fail Kedir 6/16/2020

114 Nemo

111600 Fail Kedir 6/16/2020

115 Nemo

111628 pending Kedir 6/16/2020


116 Nemo

111654 Fail Kedir 6/16/2020


117 Nemo
118 111673 Nemo pending Kedir 6/16/2020

111674 Fail Kedir 6/16/2020

119 Nemo

111712 pending Kedir 6/16/2020

120 Nemo
111721 Fail Kedir 6/16/2020

121 Nemo

111767 Fail Kedir 6/16/2020

122 Nemo

111108 Fail Kedir 6/26/2020

123 Nemo

111440 Fail Kedir 6/26/2020

124 Nemo

111599 Fail Kedir 6/26/2020

125 Nemo

111099 Fail Kedir 8/19/2020


126 Nemo

111300 Fail Kedir 8/25/2020


127 Nemo
128 111720 Nemo
129 111584 Nemo
131 111058 Nemo

111670 Fail Kedir 8/25/2020


132 Nemo
133 111144 Nemo
134 111155 Nemo

111413
111709
111580
111086
111162
112126
117138
111864
112033
112037
112134
111673
111712
Validation date after Signature
Type
Snag clearance status
6/3/2020 Signed 2T2R
6/6/2020 Signed 2T2R
5/28/2020 Signed 2T2R
5/27/2020 Signed 2T2R
5/19/2020 Signed 2T2R
5/19/2020 Signed 2T2R
6/6/2020 Signed 2T2R
6/3/2020 Signed 2T2R
5/19/2020 Signed 2T2R
6/12/2020 Signed 2T2R
6/8/2020 Signed 2T2R
6/6/2020 signed 2T2R
5/19/2020 Signed 2T2R
6/6/2020 Signed 2T2R
6/7/2020 Signed 2T2R
8/19/2020 Pending 2T2R
5/27/2020 Signed 2T2R
5/20/2020 Signed 2T2R
5/18/2020 Signed 2T2R
2T2R
6/3/2020 Signed 2T2R
5/20/2020 Signed 2T2R
6/6/2020 Signed 2T2R
5/22/2020 Signed 2T2R
7/30/2020 Signed 2T2R
6/5/2020 Signed 2T2R
5/18/2020 Signed 2T2R
6/6/2020 Signed 2T2R
6/6/2020 Signed 2T2R
5/26/2020 Signed 2T2R
5/20/2020 Signed 2T2R
5/27/2020 Signed 2T2R
6/1/2020 Signed 2T2R
6/8/2020 Signed 2T2R
5/26/2020 Signed 2T2R
6/12/2020 Signed 2T2R
5/27/2020 Signed 2T2R
5/19/2020 Signed 2T2R
5/19/2020 Signed 2T2R
5/20/2020 Signed 2T2R
6/6/2020 Signed 2T2R
5/23/2020 Signed 2T2R

2T2R

5/23/2020 Signed 2T2R


Signed 2T2R
5/19/2020 Signed 2T2R
5/26/2020 Signed 2T2R
8/21/2020 Signed 2T2R
Signed 2T2R
8/20/2020 Signed 2T2R
5/18/2020 Signed 2T2R
5/20/2020 Signed 2T2R
Signed 2T2R
5/26/2020 Signed 2T2R

4T4R
and CA

4T4R
and CA

4T4R
and CA

4T4R
and CA

4T4R
and CA

4T4R
and CA
4T4R
and CA

4T4R
and CA
4T4R
and CA

8/19/2020 2T2R

8/5/2020 2T2R

8/20/2020 Pending 2T2R

8/24/2020 Pending 2T2R

8/17/2020 Pending 2T2R

2T2R

2T2R

8/19/2020 2T2R

2T2R
2T2R

8/19/2020 Pending 2T2R

8/20/2020 Pending 2T2R

4T4R

2T2R

8/5/2020 Pending 2T2R

8/5/2020 2T2R

8/6/2020 2T2R

8/12/2020 2T2R
2T2R

8/19/2020 Pending 2T2R

2T2R

2T2R

8/17/2020 Pending 2T2R


2T2R
8/10/2020 2T2R
8/6/2020 Pending 2T2R
8/11/2020 Pending 2T2R
8/24/2020 Pending 2T2R
4T4R

8/10/2020 Pending 2T2R

8/11/2020 2T2R

2T2R

8/24/2020 Pending 2T2R

2T2R

8/6/2020 2T2R

8/6/2020 2T2R
2T2R

8/19/2020 2T2R

2T2R

4T4R

2T2R
4T4R

2T2R

8/25/2020 Pending 2T2R

8/11/2020 2T2R

2T2R

4T4R

2T2R
8/5/2020 2T2R

2T2R

8/25/2020 2T2R

8/24/2020 Pending 2T2R

8/25/2020 2T2R

8/6/2020 Pending 2T2R

2T2R

8/19/2020 Pending 2T2R


4T4R

2T2R

4T4R

2T2R

8/17/2020 2T2R

8/19/2020 4T4R

8/25/2020 2T2R

2T2R
2T2R
4T4R

8/25/2020 2T2R
4T4R
4T4R
Remark

almost one third of the serving cell is PCI 0

Incompleted log file


256QAM is activated during test
call duration is not 30 sec
DL all sectors max and average throughput failed

The site has feeder cross and after fixing cross mobility test
should be retested
256QAM is activated
UL sec1 and sec2 average throughput below target
DL sec1 is not locked
DL all sectors average and max throughput failed

256QAM is activated
one call is not returned to LTE in sec3
DL all sectors average and max throughput failed

The site seems have cross after fixing cross mobility test
should be retested
256QAM is activated
DL all sectors average and max throughput failed

The lat long for this site is not wright,so its diffcult to check
mobility test
256QAM is activated
DL all sectors average and max throughput failed

256QAM is activated
SHC sec3 is not locked
DL all sectors failed

The site seems have cross after fixing cross mobility test
should be retested
256QAM is activated
SHC sec1& sec2 are not locked
UL sec1 max and average throughput failed
DL all sectors max and average throughput failed
256QAM is activated
SHC sec3 is not locked
ping 1460 sec1 above thresold value
UL sec3 average throughput failed
DL all sectors both average and max throughput failed
256QAM is activated
DL all sectors both average and max throughput failed
Incompleted log file

Detach time and Erab setup time are not checked for all
secrors
attach time for sec2 is above target
almost one third of the serving cell is PCI 0

Attach and detach sec1 is not locked


almost one third of the serving cell is PCI 0

almost one third of the serving cell is PCI 0

almost one third of the serving cell is PCI 0

Almost one third of the serving cell is PCI 0

DL mobility avearge throughput failed


DL stationary test for all sectors is not done in the right
methodology
UL sec3 and ping 32 sec3 are not locked
all ping tests of all sectors are done 20 times
UL sec1 average,UL sec2 max and averrage and UL sec3
average throughput failed
almost one third of the serving cell is PCI 0
DL stationary test for all sectors is not done in the right
methodology

DL mobility has no log file


SHC sec1 is done 4 times where as sec2 and sec3 are done 4
times
all ping tests of all sectors are done 20 times
UL sec1 max and average throughput failed
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

Most of the DT routes have no samples in DL mobility test


almost one third of the serving cell is PCI 0
Incompleted log file
DL mobility average throughput failed
SHC sec3 is done 4 times where as sec1 and sec2 are done 3
times
Both ping32 and 1460 are done 20 times for all sectors
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

almost one third of the serving cell is PCI 0

Almost one third of the serving cell is PCI 0

DL mobility average throughput failed


SHC sec1,att det sec1&sec2 are not locked
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

Sec1 is not almost served in mobility test


DL mobility average throughput below target
SHC, attach detach and ping tests of sec2 are not locked
all ping tests(both pin32 and ping 1460) are done 20 times
DL all sectors max and average throughput failed
Detach time and Erab setup time are not checked for all
secrors
almost one third of the serving cell is PCI 0
DL stationary test for all sectors is not done in the right
methodology

almost one third of the serving cell is PCI 0


PS session termination is 5 times
almost one third of the serving cell is PCI 0

many samples has taken at one point in DL mobility test so it


should be retested
almost one third of the serving cell is PCI 0

GPS is not connected during test


There is no mobility test log file
SHC,att&detach,ping32&1460 sec2 are not locked
UL sec1 and sec2 and DL sec2 are not locked
DL all sectors throughput max and average throughput failed
UL sec1 average throughput,UL sec2 averagge and max
throughput are failed
Detach time and Erab setup time are not checked for all
secrors
almost one third of the serving cell is PCI 0

almost one third of the serving cell is PCI 0

DL mobility average throughput failed


there is transfer failure in UL sec2 and UL sec3
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

In idle test the sectors are not served in their respective


regions
UL & DL mobility average throughput failed
attach time for sec2&sec3 is above target and detach time for
sec1 is above target
ping 32 sec3 is not locked
all ping tests for all sectors are done more than 10 times
UL sec3 is not locked
UL max and average throughput of all sectors failed
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0
almost one third of the serving cell is PCI 0

Incompleted log file


Detach attempt is 4 times for sec2
Almost one third of the serving cell is PCI 0
Almost one third of the serving cell is PCI 0
Almost one third of the serving cell is PCI 0

almost one third of the serving cell is PCI 0


sec2 is not served in its direction in all mobility test
SHC,att detach and UL of sec2 are not locked
detach time and erab set up timeis above target for all sectors
No log file for ping 32 sec2
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0
Almost one third of the serving cell is PCI 0

almost one third of the serving cell is PCI 0


The lat long is not wroght,so its diffcult to validate mobility
test
PS session termination is 3 times for DL sec2
64 QAM is not enabled for DL(for all sectors) stationary test

DL mobility average throughput failed


SHC sec1 and sec2 and attach detach sec2 are not locked
attach time of sec1 is above target
detach time and erab set up timeis above target for all sectors
all ping tests for all sectors are done 20 times
There is transfer failure in UL all sectors
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

almost one third of the serving cell is PCI 0

Sec1 is not properly served in idle test


UL and DL mobility average throughput failed
detach time and erab set up timeis above target for all sectors
All sector 1 tests are not done
There is transfer failure in UL sec2 and sec3
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

64QAM is not enabled


PS sussion termination is 5 times
almost one third of the serving cell is PCI 0

PS session termination is 5 times


almost one third of the serving cell is PCI 0
detach time and erab set up timeis above target for all sectors
all ping tests for all sectors are done 20 times
DL stationary test for all sectors is not done in the right
methodology

The lat long is not wright,so it is diffcult to check mobility test


almost one third of the serving cell is PCI 0

UL mobility test is not done


DL mobility average throughput failed
SHC sec1 is not locked
SHC sec2 and sec3 are done less than 5 times
detach time and erab set up timeis above target for all sectors
ping 1460 sec2 is not locked
all ping tests for all sectors are done 20 times
There is transfer failure in UL all sectors
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

Mobility test is not done


Attach detach sec1 is not locked
detach time and erab set up timeis above target for all sectors
all ping tests for all sectors are done 20 times
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

UL and DL mobility average throughput failed


SHC sec3 is not locked
detach time and erab set up timeis above target for all sectors
ping 32&1460 sec3 are done 9 times
There is transfer failure in UL sec3
UL sec1 average throughput failed
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0
The lat long is not wright,so its diffcult to cjheck mobility test
SHC sec1,attach detach sec1 and ping 1460 sec1 are not
locked
attach time is above target for sec2
Detach time and erab setup time for all sectors are above
target for all sectors
ping test is done 20 times for all sectors
there is transfer failure in UL sec2
UL sec1 and UL sec2 average throughput failed
almost one third of the serving cell is PCI 0
DL all sectors test is not done in the right methodology

No mobility log file


SHC all sectors test is not done 5 times
attach detach is not done for all sectors
ping test is done 20 times for all sectors
almost one third of the serving cell is PCI 0
DL all sectors test is not done in the right methodology

almost one third of the serving cell is PCI 0

Almost one third of the serving cell is PCI 0


Detach attempt is 4 times for attach detach sec1

DL mobility average throughput failed


SHC all sectors are not done 5 times
ping 32 sec3 not done and oing 32 sec2 done 9 times
Detach time and erab setup time for all sectors are above
target for all sectors
DL stationary test for all sectors is not done in the right
methodology
almost one third of the serving cell is PCI 0

The site azimuth should be checked and the PCI s are not
mapped to each respective sectors
sec2 is not served in UL mobility test
DL mob average throughput failed
Detach time and erab setup time for all sectors are above
target for all sectors
SHC sec2 is not locked
SHC all sectors are not done 5 times
ping test is done 20 times for all sectors
almost one third of the serving cell is PCI 0
DL all sectors test is not done in the right methodology
Incompleted log file
almost one third of the serving cell is PCI 0
PS session termination success rate is done 5 times

DL mob average throughput failed


ping test is done 20 times for all sectors
UL sec2 average throughput failed
Detach time and erab setup time for all sectors are above
target for all sectors
almost one third of the serving cell is PCI 0
DL all sectors test is not done in the right methodology

almost one third of the serving cell is PCI 0


DL sec1 is not locked
DL sec3 is not retested
There is transfer failure in DL sec2

almost one third of the serving cell is PCI 0

There is transfer failure in DL sec1


almost one third of the serving cell is PCI 0

Almost one third of the serving cell is PCI 0

No mobility log file


SHC sec1 and sec3 are not done 5 times
ping32 and 1460 sec2 latency is above target
ping32 sec3 is not done
transfer failure in UL all sectors
ping test is done 20 times for all sectors
Detach time and erab setup time for all sectors are above
target for all sectors
almost one third of the serving cell is PCI 0
DL all sectors test is not done in the right methodology

Almost one third of the serving cell is PCI 0


most of the routes are served by another site in mobility test
All sec3 tests are not locked
ping test for all sectors is not done 10 times
transfer failure in UL all sectors
Detach time and erab setup time for all sectors are above
target for all sectors
almost one third of the serving cell is PCI 0
DL all sectors test is not done in the right methodology

No mobility test log file


SHC sec1 and sec2 failed
ping test is done 20 times for all sectors
Detach time and erab setup time for all sectors are above
target for all sectors
almost one third of the serving cell is PCI 0
DL all sectors test is not done in the right methodology
UL sec2 is not locked and has a transfer failure

The lat long is not right,so it sis diffcult to check mobility test
SHC sec3 is not locked
Detach time and erab setup time for all sectors are above
target for all sectors
ping32 sec1 and sec3 and ping1460 sec1 are not locked
ping test is done 20 times for all sectors
DL all sectors test is not done in the right methodology

SHC sec2 is done 4 times


UL sec2 is not done
Detach time and erab setup time for all sectors are above
target for all sectors
DL all sectors test is not done in the right methodology

The site azimuth needs to be checked


DL mob average throughput failed
Almost one third of the serving cell is PCI 0
Sec2 and sec3 is detached 7 times
Mobility test is not done in the right way
DL all sectors max and average throughput failed

The site azimuth needs to be checked


Attach detach sec2 test detached more than 5 times
Attach detach sec3 is not done

ping 32 sec1 is not locked


There is transfer failure and PS sesion termination is 5 times in
DL sec1
SSV Validation Summary_Kedir
Tool Failed Passed pending Retest Signed Total
Nemo 47 0 17 0 0 64
PHU 11 51 0 48 50 62