0% found this document useful (0 votes)
98 views3 pages

"Rohan Square ": Members Present

The document outlines the weekly work schedule and progress for the Rohan Square residential and commercial building project from December 12-19, 2020. It notes delays in several tasks for blocks A, B, and C, including retaining walls, slabs, and columns. Key actions include finalizing drawings from consultants, readying the steel yard, and arranging for a swimming pool consultant to address leaks. The project team is asked to complete structural work and finishing per the original schedule.

Uploaded by

Pon Malai Krish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views3 pages

"Rohan Square ": Members Present

The document outlines the weekly work schedule and progress for the Rohan Square residential and commercial building project from December 12-19, 2020. It notes delays in several tasks for blocks A, B, and C, including retaining walls, slabs, and columns. Key actions include finalizing drawings from consultants, readying the steel yard, and arranging for a swimming pool consultant to address leaks. The project team is asked to complete structural work and finishing per the original schedule.

Uploaded by

Pon Malai Krish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

1

Project :
"ROHAN SQUARE "
Residential / Commercial Building Minutes Of Meeting :45
Red Building, Near Garodi temple , Mangalore - 2
Date :24.12.2020
575002
LOCATION SITEOFFICE Minutes By: Rohan square
OWNER PROPERTY INFRATECH INDIA PVT LTD
ARCHITECT Mr. SURESH KUMAR
STRUCTURAL CONSULTANT Mr. VIMAL ANIL
PROJECT MANAGEMENT M.R CONSULTANCY
ELECTRICAL & PLUMBING CONSULTANT Mr. SATHISH SHETTY (Sans Electrical )
FIRE CONSULTANT Mr. SURAJ
STP CONSULTANT Mr. GODFREY
Members Present
1 Mr. Madhukar MR Consultancy
2 Mr. Nagaraja. A Project Engineer -Rohan Corporation
3 Mr. Shekar MFAR
4 Mr. Santhosh Savadi MFAR
5 Mr. Siddarth shetty MFAR
6 Mr. Kiran Rohan Corporation
7 Mr. Vidyadhar SK Associates
8 Mr. Sanath kumar Vimal Anil
9 Mr. Prashanth MR Consultancy
Minutes of the meeting
SL.NO Details Action
Discussion regards Rohan square

1 Breakup schedule within one week from 12.11.2020 to 19.11.2020 from MFAR Constructions

WEEKLY WORK SCHEDULE -12.11. 2020 to 19.11.2020

Schedule Date
Sl.No Description of work, Tower, Name of Structure Remarks
Start Date Finish Date
A Block
1 Earth consolidation and levelling If work not completed,penalty will be put
A Block 11-Dec-20 31-Dec-20 for Mfar Construction

2 Retaining wall above plinth upto 1'6" hieght upto expansion joit (Level difference)
i) Reinforcement 15-Dec-20 18-Dec-20
ii)Shuttering 19-Dec-20 21-Dec-20
iii)Concreting 22-Dec-20 26-Dec-20 Delay by 4days from revised schedule

3 onstruction of commrcial space entrance steps-40mts


i) Reinforcement 17-Dec-20 18-Dec-20
ii)Shuttering 18-Dec-20 21-Dec-20
iii)Concreting 19-Dec-20 29-Dec-20 Delay by 7days from revised schedule

4 A Block - 4th floor slab-pour2


i)Shuttering 17-Dec-20 22-Dec-20
ii)Reinforcement 20-Dec-20 26-Dec-20
iii)Concreting 27-Dec-20 31-Dec-20 Delay by 10days from revised schedule

5 A Block - 4th floor columns -pour1 - 15nos


i) Reinforcement 27-Dec-20 29-Dec-20
ii)Shuttering 24-Dec-20 26-Dec-20
iii)Concreting 26-Dec-20 31-Dec-20 Delay by 4days from revised schedule

B Block

1 B Block plinth beam


i) Reinforcement 18-Dec-20 17-Dec-20
ii)Shuttering 18-Dec-20 19-Dec-20
iii)Concreting 26-Dec-20 27-Dec-20 Delay by 7days from revised schedule

2 Columns and Ret.wall -LGF


i) Reinforcement 18-Dec-20 19-Dec-20
ii)Shuttering 19-Dec-20 22-Dec-20
iii)Concreting-M40 Grade 26-Dec-20 28-Dec-20 Delay by 5days from revised schedule
1
3 B Block - UGF-slab- pour-5
Shuttering 17-Dec-20 23-Dec-20
Reinforcement 21-Dec-20 26-Dec-20
Concreting 31-Dec-20 31-Dec-20 Delay by 22 days from revised schedule

4 B block - 2nd slab - Pour 03


i)Shuttering 17-Dec-20 26-Dec-20
Reinforcement 21-Dec-20 30-Dec-20
Concreting 07-Jan-21 07-Jan-21 Delay by 33 days from revised schedule

C Block
1 Footing - EF17A
i) Reinforcement 28-Dec-20 28-Dec-20
ii)Shuttering 29-Dec-20 30-Dec-20
iii)Concreting-M25 Grade 30-Dec-20 31-Dec-20

2 Ret.wall - UGF - 37Mtr-


i) Reinforcement 17-Dec-20 21-Dec-20
ii)Shuttering 18-Dec-20 24-Dec-20
iii)Concrete - M40 grade 19-Dec-20 31-Dec-20 Delay by 5 days from revised schedule

3 C Block - FF Slab -pour4


ii)Shuttering 17-Dec-20 05-Jan-21 Delay by 10 days from revised schedule

Important Points
i) Structural work & finishing work to be completed as per original schedule without fail.
ii) MFAR team should arrange 6no's of Vibrators for further concreteing works as to improve the Quality of concrete
work.

1 Steel yard to be kept ready

2 Consultant for swimming pool garden to be arranged so the all leakage to be tackalled & taken care .

3 Steel indent to be given one week early

Car parking area plastering is not there so it should be proper plumb & levelling. If any problem MFAR team should do the need full like
4
plastering to be done .

5 Land scapping detailsfrom architect Rohith to be received in 15 days -

6 Plumbing & electrical contracters to be finalised by MRC

10 Drawing Requirments :
a. Hotel side driway ramp details with levels from SK Associates --Received
b First floor masonry drawing from SK Associate -02/01-2021
c Updated floor plans from SK associate - 29/12/2021
d Updated structural and architectural dwg to be sent to sans electrical and architect to be cordinating with sans electricals-31/12/2020
e B and C block 3rd slab structural dwg on before - -26.12.2020
f Electrical drawing typical floors from sans electricals -30/12/2020
g B and C block 3rd slab structural dwg from vimal anil associates - -24.12.2020
h commercial and hotel collection tank structural and architectural dwg - 30/12/2020
i 7th slab shuttering dwg frm sk associates before 03/01/2021

10 General Note :
Regarding aluminium shuttering for column box converting from feet to meter there will be slite change in column size so the dimension
a
will be taken from centerline only
b Pull out test to be done for rebar fixing work - instructed by structural engineer
Retaining wall as per BOQ( M 25) but precautionaly we need to do (M40) because of difficulties in pouring columns M40 & retaining wall
c
M25 comparision to be made by MFAR constructions

d AC air chill plant to be provided near STP plant. Hotel and commercial separately.
e Plumbing pipe line duct passing at commercial & residential level to be taken care

11 Shuttering work procedure:


i) Filling will be done after slab. Shuttering will be carried out immediately above footing

12 Vendor to be finalised for following work ( all detailing to be done before one month)
1
Consultant for :
* Access Control
Anil Enterprises to submit all details - 22.11.2020
* Boom Barrier
* Camera, TV cable ,Lightening & Earthing - Sathih Shetty

a)Lift
i) Kone Elevator - Bharath - 9686898354
ii)Johnson lift - Laxmana - 9384899559
iii)Mitsabishi Elevator - Sudindra - 7022034519
iv)OTIS - Rakshith - 9900587374
v)Schindler - Sameer shetty - 7349125796

b)Fire
i)Suraj Rai - 9448253545
ii)Santhosh- 8618863577
iii) Adrian - 9844246239

c) STP
i)Godfray - 9739768055
ii)Dinesh Mallya - 9449827711
iii) Sudhir bhandary
iv) Oxident

d) AC
i) Sumith Rao
ii) Sandeep

e) Hotel Kitchen
i) Ravindra - Adarsha Kitchen - 9845392696
ii) Vijay -Canara Kitchen - 944887535

Discussion with Rohan sir through Suresh kumar


f)Swimming pool
Architect (Regarding vendors of Hotel Kitchen,
i) Walrus pool - Dharmaraj - 9880597867 Swimming pool & Garden)
ii)Siolom pools - Kline fernandis - 9591743277
iii) Ocean pool Bangalore 9342246053, 7411295396

g) Garden
i) Nishith - 8660855455 (illumination) Rohith Maroli finalised drawing by 20.11.2020
ii)Rohith Maroli - 9900513031

h)Plumbing & Electrical Contractor


i)Swasthik Electricals - 944882379
ii)Sri Devi Electricals - 9901142076
iii) Cypriyan - Plumbing
iv) Vaman - Plumbing - 9902021702
v) Akshaya power services - Electrical

i)Plumbing & Fixtures


i)Grohe - Hemanth - 9686920966
ii)Jaquar- Lakshmikanth - 9972167800
iii) Kohler

Next meeting :19.11.2020

CC Copy Enclosed :
1 [email protected]

2 [email protected]

3 [email protected]

4 [email protected]

5 [email protected]

6 [email protected]

7 [email protected]

8 [email protected]

9 [email protected]

10 [email protected]

You might also like