Quality Manual
SECTION Page
0 TABLE OF CONTENTS 1
1 INTRODUCTION 4
1.1 Purpose
1.2 Scope
1.3 Exclusions
1.4 Proprietary Information
1.5 Codes and Standards
1.6 Control of Codes and Standards
1.7 Chemco and Customer Responsibilities
1.8 Approved Certification Organizations
1.9 Variances
1.10 Safety
1.11 Access
1.12 Application of Manual
2 QUALITY POLICY 7
3 TERMINOLOGY 8
5 MANAGEMENT RESPONSIBILITY 18
5.1 Management Commitment
5.2 Customer Focus
5.3 Quality Policy
5.4 Planning
5.4.1 Quality Objectives
5.4.2 Quality Management System Planning
SECTION Page
6 RESOURCE MANAGEMENT 21
6.1 Provision of Resources
6.2 Human Resources
6.2.1 General
6.2.2 Qualifications and Training
6.3 Infrastructure
6.4 Work Environment
7 PRODUCT REALIZATION 23
7.1 Planning of Product Realization (Quality Plans)
7.1.1 Quality Planning
7.1.2 Inputs and Outputs
7.1.3 Quality Plan Development
7.1.4 Documentation of Quality Plans
7.2 Customer Related Processes
7.2.1 Determination of Requirements Related to the
Product-Bid Review
7.2.2 Review of Requirements Related to the Product-
Contract Review
7.2.3 Customer Communication
7.3 Design and Development - EXCLUDED
7.4 Purchasing
7.4.1 Purchasing Process
7.4.2 Purchasing Information
7.4.3 Verification of Purchased Product
7.5 Production and Service Provision
7.5.1 Control of Production and Service Provision
7.5.2 Identification and Traceability
7.5.3 Customer Property
7.5.4 Preservation of Product
7.6 Control of Monitoring and Measuring Devices
7.6.1 General
SECTION Page
7.6.2 Calibration
7.6.3 Use of Test Equipment
SECTION 1 - INTRODUCTION
1.1 PURPOSE
1.2 SCOPE
Chemco is an Alberta owned company with over forty years experience in the
construction industry offering: electrical, instrumentation, fibre optic procurement
and installation, and high voltage installation, testing and commissioning
services.
1.3 EXCLUSIONS
1.3.1 Chemco does not include design in this quality system, since its
Customers provide the design.
• Project Drawings
• Project Specifications
• Canadian Electrical Code Part I
• Alberta Safety Codes Act
• Vendor instructions
SECTION 1 - INTRODUCTION
1.5.2 The inspection and testing of the installation for the facilities shall be
carried out in accordance with this manual. This manual, in conjunction
with approved checking, testing and operating instructions from
equipment manufacturers, shall be followed to determine that the
facilities are properly installed and are without defects or omissions.
1.6.1 Chemco shall maintain the most current issue of the Canadian Electrical
Code Part I. The Quality Manager shall issue the CEC to personnel, as
deemed appropriate, as a controlled document.
1.6.2 Code and regulatory notices and bulletins in Alberta are maintained and
issued via the " " system. The Quality Manager shall be
registered with this provincial system to obtain and subsequently issue
as controlled documents, the latest published notices and bulletins to
Quality Personnel within the Company.
1.7.1 It shall be the Customer’s responsibility to ensure that all drawings and
specifications meet applicable codes and standards, and bear the cost of
the same.
1.7.2 The Customer shall be responsible for all materials and equipment
certification and labeling to recognized Canadian Standards, by an
accredited Certification Organization which is authorized to provide
certification under the Safety Codes Act (In Alberta) or (Government
Standards elsewhere) for all Customer supplied materials and
equipment.
1.7.3 Chemco shall be responsible for all materials and equipment certification
and labeling to recognized Canadian Standards, by an accredited
Certification Organization which is authorized to provide certification
under the Safety Codes Act (In Alberta) or (Government Standards
elsewhere) for all Chemco supplied materials and equipment.
SECTION 1 - INTRODUCTION
1.9 VARIANCES
1.9.1 Variances may be issued by a Safety Codes Officer under the provision
of Section 34 of the Alberta Safety Codes Act, provided the issuer is of
the opinion that the variance provides approximately equivalent or
greater safety performance with respect to persons and property.
1.10 SAFETY
1.10.1 Chemco shall establish and follow a system of control through work
permit procedures incorporating tags, work authorizations, isolation
permits, and lockout procedures, to establish an effective safety
procedure to protect personnel while working on and operating
potentially energized electrical circuits.
1.11 ACCESS
1.11.1 Chemco shall allow free access to work sites and quality records during
normal working hours to personnel authorized by the Customer, internal
and external auditors, and authorized government inspectors.
1.12.1 There are numerous procedures and exhibits included, or referred to, in
this quality system manual and associated documentation. Not all
procedures and exhibits apply to all projects at all times, therefore, it is
the project specific Quality Plan and Inspection and Test Plan (ITP)
which governs the application and use of these procedures and exhibits
for a particular project.
The Quality Policy is a separate document, HR-028, included in Volume 1 of the Quality
Management System Manuals.
SECTION 3- TERMINOLOGY
3.6 CUSTOMER – the party to which products and services are provided. The term
“Customer” and “Client” have the same meaning.
3.8 INSTALLATION – the sum total of all plans, specifications, equipment and
materials pertaining to a specific contract.
SECTION 3- TERMINOLOGY
3.11 SAFETY CODES INSPECTIONS – for projects in Alberta, electrical work shall be
inspected for compliance using the appropriate agencies as approved by the
Alberta Safety Codes Council, Electrical Technical Council.
3.12 SAFETY CODES OFFICER – is the individual as defined by the Safety Codes
Act, Province of Alberta, who is authorized to carry out inspection services and
enforce safety codes requirements for accredited corporations or accredited
agencies.
The Company has established this Quality Manual, describing the Quality
Management System (QMS) and its processes used to achieve quality
and to continually improve its effectiveness as follows:
Management
Review
5.6
Corrective /
Quality
Preventive
Planning
Action 5.4
8.5
Processes:
Bid Review
Contract Review
Purchasing
Receiving
Preservation and Storage
Control of Nonconforming Product
Inspection and Testing
Customer Process
Feedback / Control
8.2.3
Analysis
8.2
Assessment
8.4
The sequence and interaction of the key processes required for quality is
documented in the following flowchart:
Customer Inquiry
or Revision
Customer
Approval
Award? No
Yes
Customer
Purchasing
Supplied Product
7.4.1
7.5.2
Inspection & Testing
7.5.1 / 8.2.4
Inspection and
Release / Delivery END
Test
Receiving
(Verification Of
Installation
Purchased Product)
7.4.3
Control of
Preservation /
Nonconforming
Storage
Product
7.5.3
8.3
4.2.1 General
Quality Manual
Level 3
...establishes the Quality
Policy and describes the
overall Quality Management
System
Procedures
Level 2
...detail the implementation requirements for the
various operations in support of the Quality
Manual
This manual documents; the scope of the QMS, the justification for any
exclusions, the QMS procedures or references to them, and a description
of the interaction between the processes of the QMS.
Assigned holders of this manual and all associated quality documents are
responsible for maintaining their controlled copies in accordance with the
latest revisions.
4.2.3.4 The Quality Manager shall control and issue the QMS documents
and maintain a log showing the revision history, current approved
status and distribution to their points of use.
4.2.3.7 The Quality Manager, with input from Company personnel, shall
review existing documentation for adequacy on an ongoing basis.
• Paper
• Electronic / Magnetic Media
• Optical Media
• Audit Reports
• Nonconformance Reports
• Corrective & Preventive Action Reports
• Management Review Minutes and Records
• Customer Feedback Records
• QMS Document Control Log
• QMS Actions (Improvement) Records
• Analysis / Trending Reports
Project Specific
Inspection & Test QC QC / QM QC QM QC
Exhibits / Forms
CM / PM / PM / QM /
Quality Plans PM / QC PM / QC PM
QM / QC QC
ITP’s QC QC QC QC QC
4.2.6.2 Chemco shall file quality documents in the job file, which shall
reference job titles and any other identifying numbers assigned to
a particular package of work.
4.2.6.3 The job file documents shall be stored in logical groups and
appropriately labeled; on plan holders, in binders or in file folders.
Files shall be segregated by job, and by work package or by
system as appropriate. All files shall be organized so as to be
readily retrievable.
• Signature log
• Clarifications, Change Requests and RFI’s
• Turnover Documentation
• All other records identified in the Inspection and Test Plan(s)
4.2.7.1 Chemco shall maintain quality records for five years after
completion of the project, after which they may be disposed of.
5.3.2 Management reviews the quality policy at least annually for its continuing
suitability.
5.4 PLANNING
5.6.1 General
6.2.1 General
The Company ensures that personnel performing work that affects quality,
have the appropriate education, training, skills and experience.
6.2.2.2 Craft installation personnel shall hold valid certification under the
Alberta Apprenticeship and Industry Training Act, or hold valid
Canadian Interprovincial Red Seal Certification.
6.2.2.3 Upon hire, craft qualification certificates (cards) are obtained and
copied to the job file as proof of qualification. Copies of these
certificates shall be forwarded to the corporate office.
6.3 INFRASTRUCTURE
• Office workspace
• Storage space
• Utilities
• Communications
• Computer hardware and software
• Tools, equipment and maintenance
• Vehicles and maintenance
• Temporary facilities where required
6.4.1 The Company maintains a work environment appropriate for the tasks to
be performed including comfortable indoor workspace for office work,
heated and non-heated storage for equipment and materials as required.
CUSTOMER REQUIREMENTS
(Plans, Specifications, Codes, Standards)
PLANNED
CHEMCO QUALITY SYSTEM RESULTS
PROCEDURES
QUALITY PLAN (Completed
Project)
HUMAN TEST
RESOURCES EQUIPMENT
INFRASTRUCTURE
& WORK
ENVIRONMENT
Excluded
7.4 PURCHASING
7.4.1.1 Chemco shall ensure and verify that all equipment, materials or
apparatus procured by Chemco for installation shall bear the label
of an approved certification agency.
• Safety record
Items shall be inspected to verify that they are marked and tagged
for identification in accordance with the purchasing documents
and specifications.
7.4.3.5 Testing
7.5.1.1 This article provides the minimum requirements for inspection and
testing of installations and equipment.
7.5.1.5 Subcontractors
7.5.1.6 Records
7.5.2.5 For equipment that is inspected and/or tested, the inspection and
test records shall bear the Customer’s designated tag number,
linking the equipment to the drawings, specifications and
purchasing documentation.
7.5.2.6 Inspection and test records from receiving through turnover to the
Customer shall bear the name and/or signature of the person
responsible for completing the record. On projects where
numerous personnel may be signing documentation, a signature
and initial log shall be maintained.
7.6.1 General
The Company determines, for each specific project, the test equipment to
be utilized to demonstrate conformity to the requirements of the contract.
7.6.2 Calibration
7.6.2.3 Test equipment shall be calibrated at least yearly, except that the
Doble Test Set shall be calibrated every five (5) years as
recommended by the Doble Engineering Company, Watertown,
MA.
8.1 GENERAL
• Management Reviews
• Corrective Action Reports
• Customer Feedback
• Employee Feedback
• Ongoing observations
• Nonconformance Reports
8.2.4.3 Inspections and Test Plans document the following: the quality
activities required to demonstrate product conformity throughout
appropriate stages of product realization, the governing
procedures, acceptance criteria, frequency of examinations and
tests, the quality records required to provide objective evidence of
conformity, predetermined Hold and Witness points allowing the
Customer to monitor key activities, Chemco and Customer sign off
for release of the product.
8.3.1 Purpose
8.3.3.2 The Customer shall decide the final disposition, which may differ
from Chemco’s proposed disposition and shall record the final
disposition on the nonconformance report.
8.3.3.3 The Customer shall then forward the original copy of the
nonconformance report including the Customer’s final disposition
to Chemco.
8.4.1 The Quality Manager collects and analyses data to demonstrate the
suitability and effectiveness of the QMS and to evaluate where continual
improvement can be made. Typical data includes:
• Customer feedback
• Employee feedback
• Product conformity
• Audit results
• Process conformity
• Preventive actions
• Corrective actions
• Results of management reviews
• Trends of any data collected
• QMS improvements
Revision 3 June 16, 2009 QSP-000 R3 Quality System Procedures Index.doc Page 1 of 1
6/17/2009 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QSP-040
NONCONFORMANCE PROCESS
1.0 PURPOSE
2.0 SCOPE
This procedure applies to all Chemco projects where nonconformances are discovered
and is supplementary to the Quality Manual.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the implementation and maintenance of this
procedure.
3.2 The Project Manager is responsible for implementing and carrying out the
requirements of this procedure.
NONCONFORMANCE PROCESS
OR QUARANTINE VENDOR
Product is
released from Return quarantined
Product or
quarantine product to Vendor for Vendor corrects
Incoming Process non-
Place product in corrections including non-
Equipment or conformance
designated shipping bill and a conformance
Materials reported by any
quarantine holding copy of the NCR
employee
area
Vendor returns
Receiving
product & NCR,
Inspection
signed & dated
Tag product as to
nonconformance
CUSTOMER
QC prepares NCR
including proposed
disposition, Customer
Pass ? No
signature and date Update NCR Log generated NCR
Yes
Customer
Store in documents the
designated Customer final disposition
storage area disposition or on the NCR,
Yes
concession signs, dates and
required? returns it to
Chemco
Issue for
Installation No
Disposition is
recorded on NCR
and is signed &
Installation
dated at this point Customer
Copy
No Yes
RESPONSIBLE
NCR is reviewed PARTY
In Process by QC & issued to
Pass? the party most Return
Inspections Corrective action is
responsible for product to No
completed
corrective action Vendor?
Yes
NCR is returned to
QC with the
Corrective corrective action
No Action taken documented,
Acceptable? signed & dated
Yes
CORPORATE OFFICE
Quality Assessment
Document Control
Document Control to keep up to date records of incoming documents, in 30 day
1)
intervals.( Monthly )
The 30 day document list is distributed to Superintendents, QA/QC, Estimating for
2)
check off.
Document Control to verify Control Set, Superintendents to verify their copies and all
2a)
field copies,
3) QA/QC to verify all for as-build drawings, Estimating to verify take off copies.
Organization Chart
1) To be submitted with QA Manual.
2) Copy required to be on site.
3) Must be current.
Construction Work Package Log
1) Indicates the status of following:
Received \ Estimated \ Material Ordered \ Construction Start \ Construction Complete
\ Turn Over
Request For Information Log
1) Indicates status and quantity of R.F.I.'s that are Open \ Closed \ Overdue
1.0 PURPOSE
To describe the system used to store and preserve product from receipt to
incorporation into the work.
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and distribution
of this procedure.
3.2 Receiving personnel are responsible to carry out the provisions of this
procedure.
5.0 GENERAL
5.2 Generally, equipment and fittings shall be stored indoors, protected from
weather. Electronic instruments and control panels shall be stored
indoors in a warm, dry environment.
• Specifications
• Suppliers’ / vendor recommendations relating to matters of
equipment protection
• Report of condition upon receipt
• Schedule showing dates of inspection, shaft rotation, condition
of item and protective action taken
• Applicable correspondence
7.1 General
7.2.2 Oily/water proof tape shall be used to seal opening between shaft
and case.
7.2.4 Renew shaft coupling coatings and plastic film cover as required.
7.2.5 If drain fluid shows sign of contamination, drain and solvent flush
with Type A oil and fill oil-bearing housing as instructed by the
manufacturer.
7.2.7 Supply power to all motors with heaters upon arrival to job site.
Measure insulation resistance (Megger) of all motors when they
are received and record values on equipment storage and
protection record.
• Motors any size rated above 2300 volts, Megger test 1/2
minute at 1000 volts at 3-month intervals
7.4.1 Except for large outdoor type units, this equipment shall be stored
indoors, in a dry, dust free area, and where condensation cannot
occur.
7.5.1 Large cable reels and wire spools, may be stored outdoors on a
paved or well-drained area, on wood supports, and protected from
physical and moisture damage.
7.6.1 Instrument, control valve and enclosure openings for pipe, tubing
and electrical connections shall be kept closed by temporary caps
or plugs until permanently connected.
7.6.2 Large valves and control valves may be stored outdoors, in the
closed position, with their stems in the approximate upright
position, provided they are stored on pavement or on dunnage in
well drained areas.
7.6.3 Exposed stems of stored control valves shall be coated with a rust
preventative in accordance with manufacturer’s or project
specifications.
7.7.2 Stainless steel pipe and fittings shall not be handled or stored so
as to come in contact with dissimilar metals.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of
this procedure.
5.1 A project QC Instrument Mechanic shall assist and give guidance in any
way or form on any concerns dealing with documents or materials that
deals with quality control and shall assist the main Chemco office with any
concerns dealing with the receiving and warehousing.
6.0 Receiving
6.1 A dedicated person shall inspect all incoming products for damage and
conformance to the purchase requisition.
6.2 If damages are suspected, sign, date and mark the carrier’s waybill
“Subject to Inspection” to cover the possibility of concealed damage.
6.3 Check received goods against the shipping / packing list to ensure the
quantities stated are received. Ensure part numbers received match the
packing list.
6.4 Ensure shipments of pipe or fittings are accompanied with Mill Test
Reports (MTRs) and that the Heat Numbers stamped on the pipe or
fittings match to the MTR. Retrieve MTRs accompanying the shipment
and record on the receiving report. If MTRs are missing or are incorrect,
quarantine the materials and issue a Materials Exception Report (MER)
Form QS-085. See Article 7.1.
6.5 On the packing list, hi-light the checked items that conform and sign and
date the packing list.
6.6 On the packing list, circle the checked items that are incorrect, over, short
or damaged and make a suitable notation.
6.7 Check received goods against the purchase requisition to ensure the
quantities stated are received. Ensure part numbers received match the
purchase requisition.
6.8 On the purchase requisition, hi-light the checked items that conform and
sign and date the purchase requisition.
6.9 On the purchase requisition, circle the checked items that are incorrect,
over, short or damaged and make a suitable notation.
6.10 Record the inspection results on receiving report form QS-082. Note any
nonconforming items, overages, shortages or damages on the receiving
report. Sign and date the report.
6.12 Cover the shipping documents with the receiving report and clip together.
6.15 Submit the receiving report QS-082 and attachments to the warehouse
supervisor or his designate for logging and filing.
The Warehouse Supervisor will ensure the following actions are taken:
7.2 Log the MERs on the Material Exception Report Log (MERL), Form QS-
086). Record all corrective actions taken and completion dates on the
MERL.
8.1 After receiving activities are complete, accept the goods for storage.
8.2 Store goods indoors, except where noted below, on labeled: racks,
shelving, bins, pallets in an organized fashion segregated by material
type, grade, size, design temperature requirements.
8.5 Pipe may be stored outdoors, elevated off the ground on dunage or racks
with sufficient slope to allow water drainage.
9.3 File the completed preservation forms in the dedicated file along with the
manufacturer’s instructions which came with the shipment. See 6.13
above.
QSP-085 R0 Site Receiving - Instrumentation
Revision 0 May 25, 2004 Page 7 of 8
Materials.doc
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QSP-085
RECEIVING
INSPECTION
No
Yes
MATERIAL
PLACE EXCEPTION
MATERIALS IN REPORT
STORAGE
ISSUE TO
CONSTRUCTION
To Supplier
(Chemco) for
Correction / Action
Chemco Purchasing
WRITTEN
RESPONSE
Return
ReOrder
Accept with reason
etc.
1.0 PURPOSE
2.0 SCOPE
This procedure applies to all projects and is supplementary to the Quality Manual.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the implementation, maintenance and
issuing of this procedure.
3.2 The Project Manager is responsible for carrying out the requirements of this
procedure.
5.0 QUALIFICATIONS
Revision 3 June 7,
QSP-090 R3 Qualifications and Training.doc Page 2 of 5
2004
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QSP-090
5.8 Upon hire, craft qualification certificates (cards) are obtained and
copied to the job file as proof of qualification. Copies of these
certificates shall be forwarded to the corporate office.
6.0 AWARENESS
6.1 All new hire craft personnel shall be made aware of the following:
Revision 3 June 7,
QSP-090 R3 Qualifications and Training.doc Page 4 of 5
2004
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QSP-090
6.3 Existing employees at the time of issue of this procedure shall be made
aware of the requirements of 6.1 above at regular "tool box talks", weekly
safety meetings or at other times as deemed appropriate.
7.0 TRAINING
Revision 3 June 7,
QSP-090 R3 Qualifications and Training.doc Page 5 of 5
2004
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QSP-094
ROLES AND RESPONSIBILITIES
QC LEVELS 1, 2 & 3
1.0 PURPOSE
To establish the Roles and Responsibilities of Chemco QC personnel.
2.0 SCOPE
This procedure applies all projects and is supplementary to the Quality Manual.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance of this procedure.
3.2 Project Management is responsible for the implementation of this procedure.
3.3 All Chemco QC and craft personnel are responsible for carrying out the
requirements of this procedure.
Level 3
Quality Lead
Level 2
Quality
Assistant(s) /
Specialists
Level 1
Quality Support
(Inspectors / Field Crews)
5.3.7 Discuss jointly with QC Level 2 the ITP’s and procedures for each
specific Job, MPC, etc.
5.4.9 Verify, sign off and date all completed tasks (line items) on the ITP’s.
5.4.10 Attend meetings as requested by QC level 3.
5.4.11 Report to QC Level 3 on progress and status of processes, inspections,
documentation and turnover.
5.4.12 Other duties as assigned by QC Level 3.
JOB# CWP
NONCONFORMANCE OR COMPLAINT
ACTION TAKEN:
CLOSE-OUT
Quality Manager Approval: Close Out Date:
MANAGEMENT REVIEW
Comments:
LOOK AHEAD
ACTION STATUS
Item ACTIVITY ACTION
BY (Open / Closed)
PLANT OR CWP COUNT RESPONSES OPEN CLOSED COUNT RESPONSES OPEN CLOSED
OTHER
JOB# CWP#
OBSERVATION
SUGGESTED ACTION
ACTION TAKEN:
CLOSE OUT
Comments:
Title
Name:
Organization:
Position/Title:
Location:
Issued By: Date:
If you transfer this document to another person, please fill out the following section and return to:
Quality Manager
Chemco Electrical Contractors Ltd.
9220 39 Avenue
Edmonton, AB
T6E 5T9
Ph: 780-436-9570
Fax: 780-701-0130
------------------------------------------------------------------------------------------------
Title
Name:
Organization:
Position/Title:
Location:
Signature: Date:
To
Date
Attention
Attention:
We are submitting /returning (under separate cover) the following documents which are:
( ) Approved ( ) For Your Approval ( ) Preliminary
( ) Approved as Noted ( ) For Your Records ( ) Revised
( ) Not Approved ( ) As Built
NUMBER
DRAWING NUMBER REV. TITLE OR DESCRIPTION
OF COPIES
Remarks
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0 April 7, 2004 QS-020 R0 Equipment Preservation - Weekly Page 1 of 1
Equipment Preservation
QS-021
Monthly Record
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0 April 7, 2004 QS-021 R0 Equipment Preservation - Monthly Page 1 of 1
INSPECTION & TEST PLAN (I.T.P.)
QS-030
CWP: SYSTEM:
This ITP is in effect when subject activities are included in the contract scope of work.
Codes: R=Review, W=Witness, H=Hold, SU=Surveillance, C=By Client, I=In House, S=Subcontractor, O=Others
QS-030 R2 ITP Page 1 of 1
QS-032
INSPECTION and TEST PLAN (ITP)
ITP Title:
Project Title:
RFP Number:
Project Number:
Chemco Job Number:
Plant:
CWP: SYSTEM:
ITP Number:
Rev:
ITP Revision Date:
APPROVAL
Chemco:
(Print Name) (Signature) (Initial) (Date)
Client:
(Print Name) (Signature) (Initial) (Date)
Other:
(Print Name) (Signature) (Initial) (Date)
This ITP is in effect when subject activities are included in the contract scope of work.
Codes: R= Review, W= Witness, H= Hold, SU= Surveillance, I= In-House, S= Subcontractor, O= By Others
Miscellaneous Inspection and
QS-036
Test Record
CONTRACT# TITLE OF RECORD SYSTEM
CLIENT REF:
Revision 0 December 22, 2003 QS-036 R0 Misc Inspection & Test Record Page ______ of ______
Release Notice QS-038
CONTRACT# SYSTEM
TITLE OF RECORD
CLIENT REF:
To: Date:
Company:
Re: Plant / Location:
Per Chemco:
Name Signature Date
Received By::
Name Signature Date
Revision 1 August 30, 2004 QS-038 R1 Release Notice Page ______ of ______
Nonconformance Log QS-040
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
JOB# CWP
ROOT CAUSE:
PROPOSED DISPOSITION:
RECOMMENDED ACTION: [ ] SCRAP [ ] REWORK [ ] USE AS IS [ ] RETURN
ACTION TAKEN:
FINAL SIGN-OFF:
CHEMCO QCS CUSTOMER OTHER
Name: Name: Name:
Signature: Signature: Signature:
Date: Date: Date:
Revision 0 October 1, 2004 QS-042 R0 NCR Page 1 of 1
Loss Control Report Log QS-044
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
JOB# CWP
PROPOSED DISPOSITION:
RECOMMENDED ACTION:
ACTION TAKEN:
FINAL SIGN-OFF:
CHEMCO QCS CUSTOMER OTHER
Name: Name: Name:
Signature: Signature: Signature:
Date: Date: Date:
Revision 0 December 1, 2005 QS-045 R0 LCR.doc Page 1 of 1
Notice To Inspect QS-050
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
EQUIPMENT TAG #
NOTICE OF COMPLETION
Transfer of System, Care, Custody and Control
Dated:
SYSTEM: CWP:
The System / CWP has been completed in accordance with Specifications and is now
available for commissioning procedures.
Attached to this turn-over package is a punchlist indicating the Client’s / Owner’s agreement
that certain punchlist items may be completed after your acceptance of the subject turnover
package.
Please sign and return one copy within five working days of its receipt in acknowledgement of
your acceptance. This document shall be considered accepted if not returned within the time
period specified.
Care, custody and control of the above system is transferred to the Client with the
understanding that there will be no energization of field circuits from this system without the
verbal notification between the Turn-over Co-ordinator for Chemco and the Client.
Sincerely,
Client / Owner
Comments:
JOB# CWP
CLIENT REF:
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0, March 11, 2004 QS-054 R0 Equipment Turnover Log Page 1 of 1
Equipment Turnover QS-056
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
DOCUMENT TURNOVER
Copy #
Documents Comments
Submitted
Receiving Report
Equipment test form containing Namplate Data:
Preservation log
Manufacturer’s Testing Procedures
Manufacturer’s Shipping Documents
Other:
RELEASED BY:
Company Name:
Company Representative:
Representative’s Position:
Representative’s Signature
Date Signed:
RELEASED TO:
Company Name:
Company Representative:
Representative’s Position:
Representative’s Signature
Date Signed:
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0, March 11, 2004 QS-056 R0 Equipment Turnover Page 1 of 1
QS-058
Date:
Attached to this shipping release authorization is a punch list indicating the Client’s / Owner’s
agreement that certain punch list items may be completed after your acceptance of this
shipping release authorization.
Please sign and return one copy within one working day of receipt in acknowledgement of
your acceptance.
Signed,
Chemco Representative
Certificate of Acceptance
Comments:
Enclosures / Attachments:
JOB# CWP
Area: Page Of
Location: Date:
ITEM CATEG- DATE DATE SIGN-
DESCRIPTION ORY
NO. INITIATED COMPLETE OFF
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 1 February 20, 2004 QS-060 R1 Punch List Page ____ of ____
PURCHASE ORDER
QS-062
9220 – 39 Avenue
Edmonton, Alberta T6E 5T9
Telephone: (780) 436-9570 Fax: (780) 434-0811 Date 20
To Ship To
ALL MATERIALS MUST BE SUPPLIED WITH MTRs. ALL FITTINGS MUST BE REGISTERED WITH THE
ALBERTA BOILERS SAFETY ASSOCIATION (ABSA).
Purchase Authorized by Amount of Sales Tax MUST be shown separately on all invoices
00000
Revision 0 October 1, 2004 QS-062 R0 Sample Purchase Order
QS-064
CERTIFICATE OF COMPLIANCE
Signature
Title
Date
9220 – 39 Avenue • Edmonton, AB T6E 5T9 • Phone (780) 436-9570 • Fax (780) 434-0811
#6 – 210 MacAlpine Crescent • Fort McMurray, AB T9H 4A6 • Phone (780) 790-9722 • Fax (780) 790-1610
Quality Assessment QS-070
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
JOB# CWP
CHEMCO OTHER
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 1 January 12, 2004 QS-070 R1 Quality Assessment Page 2 of 2
Receiving Log QS-080
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
PO# Page Of
Supplier
ITEM CSA DATE RECEIVED
QTY DESCRIPTION CONDITION
NO. CERTIFIED? RECEIVED BY
ITEM QUANTITY UNIT GIVE COMPLETE DESCRIPTION OF MATERIAL COST CODE & CLASS PURCHASE ORDER
ALL MATERIALS MUST BE SUPPLIED WITH MTRs. ALL FITTINGS MUST BE REGISTERED WITH THE
ALBERTA BOILERS SAFETY ASSOCIATION (ABSA).
Requisitioned By Date
Approved By Date
PROJECT MANAGER
JOB # CWP
PURCH X-NO.
SHIPPED FROM: F.O.B. TERMS: PREPAID COLLECT
REMARKS:
ATTACHED BILL NO.
SHORTAGE CONCEALED DAMAGE, RECEIVER'S AFFIDAVIT ATTACTED
TYPE: VISIBLE CONCEALED NOT ACCEPTED, HELD FOR SALAVAGE & DISPOSITION
VISIBLE SHORTAGE ACKNOWLEDGED BY CARRIER PER WILL RETAIN AND REPAIR MATERIAL PER
ATTACHED BILL NO.
CONCEALED SHORTAGE, RECEIVER'S AFFIDAVIT ATTACHED FIELD X-NO.
REMARKS REMARK
PERFORMED BY FIE
ACTION
REPORTED BY:
JOB # CWP
Inventory Commodity
MER Date Line # Quantity UOM Description of Exception Corrective Action Complete
Requisition Code
JOB# CWP
RESPONSE BY CLIENT:
Answer
RFI CWP System Submitted
Subject / Description Submitted By Received Waiting On: RFI Closed
Number Number Number Date
Date
JOB# CWP
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
1.0 DATA
1.1 Tag No.: 1.6 Manuf:
1.3 Location: 1.7 Detail #:
1.4 Descr: 1.8 Ref Dwg:
1.5 PO / Req 1.9
2.0 INSPECTIONS
Qty Equipment Checks / Observations Results Comments
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
Attachments
COMMENTS:
JOB# CWP
Revision 2 March 8, 2005 QS-094 R2 Test Equipment Log Page _____ of _____
Welders' / Welding Operators' Log QS-098
Job No.:
Welding Max.
Welder's / Welding Operators Mat.erial Electrode
Procedure Position Deposit Min. Pipe PQ Card
Name Process "P" "F"
Qualified To Qualified Weld Metal Diameter Expiry Date
& Symbol & ABSA File No. No. No.
(WPS #) Thickness
W-
W-
W-
W-
W-
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 Field QC Specialists and Inspectors are responsible for implementation and
compliance with this procedure.
• Scope of Work
• Approved for Construction drawings
• Cable Schedules
• Specifications
• Instrument Index
• Standard Details
• Inspection & Test requirements
• Calibration requirements
6.2 An Inspection and Test Plan (ITP) shall be developed based on project
requirements and shall be sufficiently detailed to indicate:
6.3 The Inspection and Test Plan (ITP) shall be submitted to the Customer and
approved by the Customer prior to commencement of work. The Customer
has the option of identifying his/her comments and placing Hold / Witness
points on the approved copy.
6.5 ITP’s shall be signed off by Chemco and optionally by the Customer as the
inspections and tests are completed. The signed off copy shall be included
in the project turnover documentation.
7.0 RECEIVING
7.2 All items shall be inspected for damage or missing components upon
receipt.
8.1 Test equipment shall be calibrated and logged in accordance with the Quality
Manual Sub-Section 7.6.
9.1 Determine from the contract documents and scope of work the requirements
for calibration of instruments.
9.2 Some types of instruments may not normally require calibration on receipt.
Examples are:
9.3 Arrange for bench calibration for all instruments requiring calibration.
9.6 Affix calibration sticker to the calibrated instrument showing the calibration
date, tag number and name or initials of the person performing the
calibration.
9.8 Instruments shall not be issued for installation without proper identification
tags.
10.0 INSPECTIONS
10.1 Field inspections shall be conducted as the work progresses for the duration
of the work. Such inspections shall verify conformance to the applicable
codes, project drawings, standard details and specifications.
10.2 Incomplete installations shall be recorded on a Punch List. Punch list items
must be completed and signed off prior to system testing or loop checking.
10.4 If necessary to deviate from the specifications during the installation of the
work, the proposed deviation must be submitted to the Customer for
approval in writing.
11.0 RECORDS
11.2 All appropriate field inspection and test forms shall be completed, signed
and dated by the Chemco Instrument QC Inspector. Test forms shall be
witnessed by the Customer as called for in the ITP.
11.3 Completed test forms become quality records and are to be kept in the
project QC file, suitably labeled, maintained and secured for ease of
retrieval.
11.4 Quality records shall be logged and transmitted to the Customer on system
or project turnover or as agreed with the Customer in advance.
12.3 Field run instrument piping shall be recorded on As-Built field piping
drawings or isometrics. The “Heat Numbers” of installed piping materials
shall be documented on the As-Built drawings.
Storage and preservation shall be in accordance with the Quality Manual and
Procedure QP-080
1.0 PURPOSE
To establish a procedure for minimum electrical equipment safety requirements.
2.0 SCOPE
This procedure applies to electrical equipment installations and is supplementary
to the Quality Manual. The contract documents and project specifications must
be consulted to determine the scope of work and project specific requirements.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for development, issue and
maintenance of this procedure.
3.2 Purchasing is responsible to ensure these requirements are conditional to
purchased equipment.
3.3 Field QC Specialists and Inspectors are responsible for inspection and
compliance with this procedure.
4.0 DEFINITIONS
4.1 Guarded means: covered, shielded, fenced, enclosed, or otherwise
protected by means of suitable covers or casings, barriers, rails or
screens, or mats or platforms to remove the liability of dangerous contact
or approach by persons or objects.
4.2 Accessible means: admitting close approach because the equipment is
not guarded by locked doors, elevation, or other effective means.
4.3 Exposed means: live parts can be inadvertently touched or approached
nearer than a safe distance by a person, and the term is applied to parts
not suitably guarded, isolated, or insulated.
4.4 CEC means: The Canadian Electrical Code in force by the Provincial
Authority Having Jurisdiction.
1.0 PURPOSE
To describe the procedure used for inspection of electrical / electronic
instruments and testing of instruments.
2.0 SCOPE
This procedure applies to electrical / electronic instruments primarily installed by
the electrical trade.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of
this procedure.
3.2 Project QC Manager / QC Leads & Specialists are responsible for the
implementation of the requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this
procedure and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-127, Section 1.0, may be partially completed (pre-filled) prior to
inspections taking place in the project’s early stages. Data in this Section
is recorded from the Instrument Index and / or Datasheets as applicable.
5.2 Any errors are to be redlined on QC-127 at the time of inspection.
Item
2.11 Stand Grouted: Verify complete at grade level or mark N/A.
2.12 Verify instrument is glanded & terminated.
2.13 Verify remote element (e.g. TE) is glanded & terminated.
2.14 Cable Tag: Cable tag is installed and labeling corresponds with
project specifications, details, or drawings.
2.15 Verify cables are supported.
2.16 Enclosure Heater Wiring: Confirm wiring to external junction box
and heater is installed per details and the specified hazardous area
classification.
2.17 Seals Packed / Poured: Required depending on instrument area
classification and wiring method. Confirm color coding for packed
seals and that poured seals are complete and marked. If seals are
not to be poured until pre-commissioning is complete, mark “N/A”.
1.0 PURPOSE
2.0 SCOPE
This procedure applies to all motors requiring a bump and/or run in. It is assumed the
DCS will not be utilized for motor control or status. DCS control and status will be
verified as part of loop checks to be performed later.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for maintenance and distribution of this
procedure.
4.0 PRECAUTIONS
4.1 The motor power supply can cause personal injury. Assume all systems
are LIVE. Follow proper procedure for isolation and for de-isolation.
4.2 Caution: Visually examine the cubicle control wiring terminations to external
points to ensure the terminations match the schematic/wiring diagram.
4.3 Shut down the motor immediately if any unusual noises or vibrations are
observed during the bump or run-in.
5.0 REFERENCES
6.1 Give all parties 24 hour notice (or sufficient notice as agreed with Client) and a
brief bump and run-in schedule in advance of the tests.
6.2 The following personnel are suggested. To be confirmed with the Client in
advance of bump and run-in tests.
7.0 EQUIPMENT
8.0 PREPARATION
8.1 Discuss and decide who will lead (command) these tests.
8.2 Discuss and decide who will conduct the radio communications.
8.3 All personnel involved will review this procedure before commencing.
8.4 Ensure JHA is in place and reviewed with all personnel involved in the test. All
personnel shall sign-off the JHA as reviewed and accepted.
8.5 Ensure Permits to complete function, bump and run-in tests on the motor are in
place.
8.6 Ensure dedicated channel radio communication is established.
8.7 You must verify the work location and equipment to be worked on.
8.8 Walk down the installation to ensure readiness.
8.9 Flag-off and tag the area of the motor to be tested.
8.10 Have all related As-Built drawings: single line diagrams, motor schematics and
wiring diagrams readily available.
8.11 Have all related QC documents available and ready for recording test results.
8.12 Have vendor’s rep available, if required.
8.13 Motor starter must be isolated and locked out.
8.14 Verify the following Mechanical QC activities have been performed and
documented on the appropriate Mechanical Release form:
8.15 Verify the following Electrical QC activities have been performed and
documented on the appropriate form:
11.7 The motor will be operated until winding and bearing temperatures have
stabilized for a period of at least 30 minutes (2 successive reading sets), or for a
period of time specified by the Client.
11.8 It is expected the test run period will be from 2 to 4 hours for temperatures to
stabilize.
11.9 Record test run data on the appropriate form. (Amperage, Volts, Vibration,
Bearing Temperature). It is not anticipated that low horsepower motors will have
bearing temperature tests. Temperature readings should be taken for the motor
horsepower(s) specified by the Client.
11.10 Construction Millwright shall record test run data on the appropriate form. It is
not anticipated that low horsepower motors will have vibration tests. Baseline
vibration readings should be taken for the motor horsepower(s) specified by the
Client.
11.11 The Client verifies the test data indicates motor and bearing temperatures are
stabilized and test run is complete.
11.12 Stop motor after completion of run-in test.
11.13 Return H/O/A (L/O/R) to OFF position.
11.14 Isolate the motor starter.
11.15 Remove any jumpers installed for the test.
11.16 Close up the motor starter.
11.17 Lockout the motor starter.
11.18 Remove flagging and cleanup the area.
12.0 CLOSEOUT
13.3 The criteria described in 13.1 and 13.2 above is reprinted from the 2003 NETA
Acceptance Testing Specifications in which it is stated:
“Purchasers may reproduce and use all or a portion of the Specifications after
paying the charges so long as the 2003 NETA Acceptance Specifications are
clearly and obviously identified in writing as the source of all such uses or
reproductions.”
© Copyright 2003
InterNational Electrical Testing Association
PO Box 687, 106 Stone Street
Morrison, CO 80465
1.0 PURPOSE
To establish a procedure for testing a dry type transformer, below 300 KVA, 600 V
and below.
2.0 SCOPE
This procedure applies to all installations using dry type transformers, below 300
KVA with the primary voltage at or below 600 V. This procedure is supplementary
to the Quality Manual. The contract documents and project specifications must be
consulted to determine the project specific requirements.
This scope is based on the transformer being part of a new installation that is
installed and/or commissioned for the first time.
3.0 RESPONSIBILITY
3.3 Field-testing personnel are responsible for the documentation of test results
and compliance with this procedure.
5.0 PREPARATION
5.2 Discuss with the Client to identify any hold points. Ensure that any hold
point that is witnessed by the Client is initialed by the Client on the test
sheet.
5.4 Prior to starting the test, ensure that all Client and Chemco requirements
necessary to allow work access to the equipment are followed (i.e. permit,
JHA etc). Follow safe work practices (i.e. equipment locked out, tagged out
and grounded where applicable) to ensure the equipment is safe to work on.
5.5 Check the calibration date of the test equipment to be used and ensure it is
within the calibration period for that equipment.
5.7 Check to ensure that the power supply that is connected to the test
equipment is not being overloaded or subject to nuisance tripping. Use a
portable generator if the power quality and reliability is questionable.
5.8 Fill in the nameplate data onto the test sheet. Check to ensure that the
nameplate data of the transformer matches the data from the Single Line
Diagram (SLD).
5.9 Test will be done with the transformer in its final location. No work
described in this procedure is to be performed on the unit if the transformer
is to be moved.
5.10 All power cables at the transformer are disconnected and safely removed
and isolated away from the transformer.
6.0 INSPECTIONS
6.1 Verify with the construction foreman that the transformer is in its final
location and that no further physical adjustments are necessary.
6.2 Unless previously done so by others, clean out the entire cell. If possible,
use a paint brush with the bristles cut back so there is only 1 inch of the
bristles remaining and clean the entire unit from top to bottom.
6.3 Check the core ground strap at the transformer. Is it a solid connection. Is
there any severe kinks or tears in the strap.
6.4 Check to ensure that transformer frame and XO are grounded. Ensure these
connections are tight.
6.6 Check if there are any shipping braces. Remove them if any are found.
6.7 Inspect the entire transformer for signs of water. (Rust, water stains on dust
areas etc). Inform the QC Foreman if any evidence is found.
Are there filters on the doors to keep out dust and foreign material out.
Have they been cleaned. If not, vacuum them and put back in place.
6.9 If specified by project specifications, have rubber ISO pads been installed at
the base of the transformer.
6.10 If the transformer is equipped with insulators, are any of them chipped,
cracked or loose.
6.12 Check the mounting clearances as per CEC 26-248 subrules 1 to 3 which
states
(1) Transformers of dry core open ventilated type shall be mounted so that there is an
air space of not less than 150 mm between transformer enclosures and between a
transformer enclosure and any adjacent surface except floors.
(2) Notwithstanding Subrule (1), where the adjacent source is a combustible material,
the minimum permissible separation between the transformer enclosure and the
adjacent surface shall be 300 mm.
(3) Notwithstanding Subrule (1), where the adjacent surface is the wall on which the
transformer is mounted, the minimum permissible separation between the
enclosure and the mounting wall shall be 6 mm if the adjacent surface is of:
(c) Combustible material shielded by grounded sheet metal with an air space
of not less than 50 mm between the sheet metal and the combustible
material.
6.13 If required by project specifications, verify there are phase markings present
on the transformer connections.
6.14 Confirm that the transformer housing and (where applicable) the transformer
core has been anchored correctly.
6.15 Ensure that the tap position is correct and the connection is tight.
7.1.4 Get a test lead, connect one end of the lead to ground. The other
end is to be used to discharge the windings after the test.
7.1.5.4 Touch the ends of the leads together, the needle should
read a short.
7.1.5.5 Remove the leads from each other, the reading should go
back to full scale.
7.1.5.6 If the megger does not do any of the above, inform the QC
Foreman.
7.1.6.4 With the Megger at 1000 V, turn the megger on and leave
on for 1 min (unless there is an immediate problem
evident).
7.1.6.5 After 1 minute turn megger off. Touch the grounded test
lead to the HV bushings to discharge the windings.
7.1.7.4 With the Megger at the voltage specified by NETA for the
LV winding, turn the megger on and leave on for 1 min
(unless there is an immediate problem evident).
7.1.7.5 After 1 minute turn megger off. Touch the grounded test
lead to the HV bushings to discharge the windings.
7.1.9 If the insulation value is less than the calculated result in the following
formula (NETA table 10.5 of, “Acceptance Test Voltage and Minimum
Results for Transformers”) for any test then clean all the windings
and bushings and retest. Inform the QC Foreman if test results are
the same or if the cause for these megger readings cannot be
determined.
Revision 0 February 24, 2004 QP-161 R0 Dry Type Transformer.doc Page 5 of 6
Printed on 09/02/04
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-161
DRY TYPE TRANSFORMER TEST PROCEDURE
Less than 300 KVA and 600 V and below
IR = CE
√kVA
= 30 x 600
√250
= 1138.4 MΩ
IR = CE
√kVA
= 30 x (208 / √3)
√250
= 227 MΩ
Using an ohmmeter, check on both the High and low side of the transformer
from a – b, b – c, c – a for a Delta Connection. For a Wye connection,
check the phase to Xo winding resistance for each phase.
1.0 PURPOSE
To establish a procedure for field inspection and testing of Low Voltage (600 V and
below) Motor Control Centers (MCC’s)
2.0 SCOPE
This procedure applies to MCC’s as a whole, with all of the testing and inspections
for the individual wrappers and the components within these wrappers done by the
respective procedure for that component.
This scope is based on the MCC lineup being installed and commissioned for the
first time and that the lineup (if any) that this MCC is being connected too is dead at
the time the work below is being done.
3.0 RESPONSIBILITY
3.3 Field-testing personnel are responsible for the documentation of test results
and compliance with this procedure.
5.0 PREPARATION
Discuss with the Client to identify any hold points. Ensure that any hold point
that is witnessed by the Client is initialed by the Client on the test sheet.
5.2 Prior to starting the test, ensure that all Client and Chemco requirements
necessary to allow work access to the equipment are followed (i.e. permit,
JHA etc). Follow safe work practices (i.e. equipment locked out, tagged out
and grounded where applicable) to ensure the equipment is safe to work on.
5.3 Check the calibration date of the test equipment to be used and ensure it is
within the calibration period for that equipment.
5.4 Check to ensure that the power supply that is connected to the test
equipment is not being overloaded or subject to nuisance tripping. Use a
portable generator if the power quality and reliability is questionable.
5.5 Fill in the nameplate data onto the test sheet. Check to ensure that the
nameplate data and the data from the Single Line Diagram (SLD) match.
5.7 Draw a sketch of the layout of the structure in single line diagram form in the
test sheet using the following as a guide. Repeat similar layout for ground
bus.
Main Incoming
Cell Section 1 Section 2 Section 3 Section 4
Cable from
XYZ
Feeder
C D E F
Vertical Bus 1 Vertical Bus 2 Vertical Bus 3 Vertical Bus 4
Figure 1.0
Typical Layout Drawing for an MCC Assembly
The vertical dotted lines represent the different vertical sections within the
MCC.
The primary purpose of this inspection is to inspect all of the items that were not
covered in the wrapper inspections. This inspection would concentrate on the main
bus, all of the components in the main incoming cell and looking at the structure as a
whole.
6.1 Ensure the entire lineup has been vacuumed, all insulators wiped down with
lint free rags and there are no metallic burrs or chips of any kind in any of the
cells.
6.2 On connections where Belleville washers are used, ensure that the Belleville
washer is not completely compressed (Typically, the Belleville washer is
6.3 Check if the system ground is connected to the ground bus at both ends of
the lineup and be no less than 2/0 AWG copper (CEC 36-302 (3a)).
6.4 Perform a visual inspection on all hardware to ensure the connections are
tight. Perform a torque spot check at an inconspicuous connection point
where tightening of a bolt may be difficult to do.
6.5 If the lineup was shipped in sections, check at these shipping splits the
following:
6.5.1 Check the alignment of the main and ground bus connections.
Inspect the insulators for any undue stress at these connections.
6.5.2 Shine a flashlight at the cell walls where the shipping split is located.
This should be a flush fit. If there is a gap, use the flashlight to see the
extent of the gap. (On several occasions where this gap was
apparent, the main bus was visible when viewing from this gap.)
6.7 If part of the Client’s requirements, ensure that the bus marked A, B, C or
Red, Black, and Blue in the main incoming cell.
6.8 If the lineup is fed from a transformer that has an NGR, ensure that there are
warning signs mounted at the NGR and at the MCC it is feeding. These
signs should indicate the following:
6.8.2 The maximum voltage at which the neutral may be operating relative
to the ground.
6.9 If the bus is encapsulated, check to ensure that joints where cables are
connected too are either taped for that value of voltage or have bus boots
that are rated for the system voltage.
6.10 Check the overall condition of the lineup looking for shipping or installation
damage as well as scratch marks to the paint. Look for corrosion or rust
within the lineup to identify any moisture exposure. Flag as required.
6.11 Check the Kirk Key system on the main incoming cell. If so equipped,
ensure that access to the main incoming bus cannot be obtained until the
upstream supply is in the racked out condition and the Kirk keys (if
equipped) that allow it to be racked in are physically captured at the main
incoming door cell interlock.
6.12 If the MCC has heaters in the main incoming cell, if it has not been done
previously, perform the following on this heater. Any heaters in the wrapper
units would be done at the time the wrapper was being inspected.
6.12.1 Measure the resistance of the heater. Using the information on the
heater nameplate (using watts, volts or current to calculate
resistance), check to ensure that the resistance measured is the
same as the resistance calculated.
6.12.2 Verify control schematic back to the thermostat controlling the heater.
6.12.3 Power up the control schematic and verify that the thermostat
controlling the heater as well as the heater itself functions correctly.
6.13 Double-check the tightness on the terminations on any control wiring in the
main incoming cell. Do wiggle and tug checks on the wiring and crimps.
6.15 If required by project specifications, check to ensure each device within the
MCC has a lamacoid or label to identify the device.
6.16 Ensure that the MCC has been bolted to the floor as per the manufacturer’s
or project specifications.
7.1.1 On the test sheet identify the section as per figure 1.0 in section 5.7.
Revision 0 February 24, 2004 QP-162 R0 MCC Assembly.doc Page 5 of 8
Printed on 09/02/04
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-162
7.1.2 Using the main incoming cell as the main reference point (A), connect
one current and voltage lead to the A phase bus where the incoming
cables connect.
7.1.3 Connect the other set of voltage and current leads to the opposite end
of the main horizontal bus (point B)
7.1.4 Set the ductor to 100 A and turn it on. Record the result on the test
sheet once the reading has settled. This result would be From A To
B.
7.1.6 Turn off the ductor and remove the ductor leads from point B and
connect them to the first vertical section of bus (point C). It is
important that all of the A phase bus be done to avoid breaking the
ductor connection at point A. This eliminates the connection point at
A as a source of error if there is a high resistance found. If this
connection point is not broken, all of the points taken for that phase
can be compared to each other.
When measuring the vertical bus, take into account the size of the
bus. The resistance for a 400A bus will be in vertical section 1 will
have a higher resistance than the 800 bus in vertical section 2.
7.1.7 Set the ductor to 100 A and turn it on. Record the result on the test
sheet once the reading has settled
7.1.8 Once complete, repeat 7.1.6 for all other vertical sections connected
to the A Phase bus.
7.2.1 On the test sheet, clearly show the entire length of the main bus and
any ground bus going into the front portion of the MCC. Identify each
point to be measured including any accessible joints.
Start in the main incoming cell. Identify this point as A. The bus at the
next joint (or adjacent vertical section) would be marked as B.
7.2.2 Using the main incoming cell as the main reference point (A), connect
one ductor and voltage lead to the ground bus at that end of the bus.
7.2.3 Connect the current and voltage probe to the ground bus in the
adjacent vertical section or the next accessible bus joint. This would
be identified as B.
7.2.4 Set the ductor to 100 A and turn it on. Record the result on the test
sheet once the reading has settled. This result would be From A To
B.
7.2.5 Turn off the ductor; repeat 7.2.3 and 7.2.4 for all remaining exposed
joints and vertical sections.
7.3.1 The test voltage value should be available from the manufacture’s
specifications. If these values are not available from the
manufacturer, default to NETA standard of 1000 V.
7.3.2.4 Touch the ends of the leads together, the needle should
read a short.
Revision 0 February 24, 2004 QP-162 R0 MCC Assembly.doc Page 7 of 8
Printed on 09/02/04
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-162
7.3.2.5 Remove the leads from each other, the reading should go
back to full scale.
7.3.2.6 If the megger does not do any of the above, inform the QC
foreman.
7.3.3 Get a test lead and connect one end to ground the other end is to be
used to discharge the Bus Duct after the test
7.3.5 Connect the negative lead of the megger to ground and the positive
lead to A phase.
7.3.6 Move the voltage selector switch on the megger to the test voltage to
be applied to the bus duct.
7.3.7 Turn megger on and leave on for the duration specified by the QC
Foreman (unless there is an immediate problem evident).
7.3.8 After the specified period turn megger off. Touch the grounded test
lead to the A phase buss.
7.3.9 Move the ground from B to A phase. Repeat 7.3.5 to 7.3.8 for B
phase.
7.3.10 Move the ground from C to B phase. Repeat 7.3.5 to 7.3.8 for C
phase.
1.0 DEFINITION:
A wrapper, in the context of this procedure, is the individual self contained cubicle
that is attached to the vertical bus within a Low Voltage Motor Control Center from
which down stream loads such as motors, lighting panels, etc are supplied power.
2.0 PURPOSE
To establish a procedure for field inspection and testing of individual wrappers (in
Low Voltage (600 V and below) Motor Control Centers (MCC’s)
3.0 SCOPE
This procedure applies to all the individual wrappers and the components mounted
within the wrapper that are used and connected to an MCC.
This scope is based on the wrapper being installed and commissioned for the first
time and that the lineup (if any) that this wrapper is being connected too is dead at
the time the work below is being done.
4.0 RESPONSIBILITY
4.1 The Quality Manager is responsible to maintain and issue this procedure.
4.3 The field testing personnel are responsible for the documentation of test
results and compliance with this procedure.
6.0 PREPARATION
Discuss with the Client to identify any hold points. Ensure that any hold point
that is witnessed by the Client is initialed by the Client on the test sheet.
6.2 Prior to starting the test, ensure that all Client and Chemco requirements
necessary to allow work access to the equipment are followed (i.e. permit,
JHA etc). Follow safe work practices (i.e. equipment locked out, tagged out
and grounded where applicable) to ensure the equipment is safe to work on.
6.3 Check the calibration date of the test equipment to be used and ensure it is
within the calibration period for that equipment.
6.4 Check to ensure that the power supply that is connected to the test
equipment is not being overloaded or subject to nuisance tripping. Use a
portable generator if the power quality and reliability is questionable.
6.5 Fill in the nameplate data onto the test sheet. Check to ensure that the
nameplate data and the data from the Single Line Diagram (SLD) match.
7.1 Ensure the wrapper has been vacuumed, all components within the wrapper
have been wiped down with lint free rags and there are no metallic burrs or
chips of any kind remaining.
7.2 Check if there is a ground connection within the wrapper and that it is solidly
connected to the MCC ground.
7.3 Perform a visual inspection on all hardware to ensure the connections are
tight. Perform a torque spot check at an inconspicuous connection point
where tightening of a bolt may be difficult to do.
7.4 If part of the Client’s requirements, ensure that the line side of the main
switching device is marked A, B, C or Red, Black, and Blue.
7.5 Check the overall condition of the wrapper looking for shipping or installation
damage as well as scratch marks to the paint. Look for corrosion or rust
within the wrapper to identify any moisture exposure. Flag as required.
7.6 If the wrapper has any heaters, perform the following on this heater.
7.6.1 Measure the resistance of the heater. Using the information on the
heater nameplate (using watts, volts or current to calculate
resistance), check to ensure that the resistance measured is the
same as the resistance calculated.
7.6.2 Verify control schematic back to the thermostat controlling the heater.
7.6.2 Verify that control schematic is safe to power up and all point to point
checks have been completed and accepted for this wrapper (and any
field devices that may be part of the control schematic).
7.6.3 Power up the control schematic and verify that the thermostat
controlling the heater as well as the heater itself functions correctly.
7.7 Double-check the tightness on the terminations on any control wiring in the
main incoming cell. Do wiggle and tug checks on the wiring and crimps.
7.8 If required by project specifications, check to ensure each device within the
wrapper has a lamacoid or label to identify the device.
7.9 Ensure that the wrapper has been correctly connected onto the bus and that
it is securely bolted to the MCC frame as per the manufacturer’s
specifications.
7.10 Check all components within the wrapper and compare to the single line.
Flag any items that were not the same as the single line.
7.11 Check the programmable overloads to ensure that they have been
programmed according to the engineered settings. If the relays have not
been programmed, and it is required by the project specifications to do so,
then program the relays.
Overcurrent injection tests to verify the trip curves of the overloads are not
part of the standard commissioning procedure for wrappers and therefore
not included in this procedure. Defer this test to the High Voltage testing
group if required by project specifications.
7.12 If there are any electrically powered control devices on the door that the door
is bonded using a dedicated bonding wire (hinges are insufficient).
7.13 With the door closed, attempt to open and close the main switching device.
The device should operate smoothly with no binding. (If the device is a
Breaker with UV protection, perform this test during the function test found in
section 9.0).
7.14 With the main switching device closed, attempt to open the door. The door
should not be able to be opened.
7.15 With the door open and the main switching device open, attempt to close the
device. The device should not be able to close.
7.16 Check all Power Fuses to ensure that they are all of the same rating and that
they have the same rating as shown on the single line. Check to ensure that
they are correctly mounted and if possible, that the current rating of the fuse
is facing the front of the wrapper.
Point to point checks will be done using the control schematic only. The wiring
diagram can be used as a cross-reference but it is not required to be highlighted.
Point to point checks will also include any and all field wiring entering/existing the
wrapper.
When the beeper function is used on Fluke meters, it will make an audible
noise if the resistance is 400 Ω or less. If using the beeper function
exclusively, (not looking at the resistance reading just depending on the
meter making a beeping noise), there would be no way of knowing if the
circuit was inadvertently miswired to a low resistance item (such as a control
relay) when it should have been directly wired to a terminal.
The meter will also show an open circuit on anything above 400 Ω. This has
also been known to cause problems.
The correct method of using the ohmmeter is to put it on auto range, touch
the leads together; the display should read 0.7Ω– 0.9Ω. Ensure that the
beeper function is off. Look at the display on the meter each time a
continuity check is performed looking specifically at the resistance. Check
any reading which has a resistance (excluding the resistance of the test
leads) when it should read a short, and vice versa.
8.2 Verify the operation of any switching device, any contacts on a relay (by
manually pulling in the relay if it is not solid state) as well as any other device
or auxiliary contacts (such as those used on a contactor) used within the
control circuitry.
8.3 Using the control schematic as a reference, check each point (including
termination points) identified on the control schematic.
8.4 Measure the resistances of the coils in the circuit. Write this resistance on
the drawing next to the coil as well as on the test sheet.
8.5 Ensure that the identification on the drawing for a particular device is
consistent with the identification of the device in the cell. (i.e. relay on
drawing is identified as TR 1. The relay in the cell that corresponds to this
relay in the drawing is identified as TR 1). Flag any device that is not
identified in the cell.
8.6 The point to points are considered to be done when all of the wiring on the
drawing is highlighted as well as any extra circuits or wiring that has been
found in the cell is identified and added to the drawing.
QP-163 R0 LV MCC Wrapper
Revision 0 February 24, 2004 Page 5 of 10
Inspection.doc
Printed on 09/02/04
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-163
LOW VOLTAGE MCC WRAPPER
INSPECTION AND TEST PROCEDURE
8.7 When complete, write down the date the drawing was complete as well as
the initials of the individual that did the drawing on the AS BUILT drawing.
9.1 Once the AS BUILT drawing and the visual inspections for the wrapper are
completed, verify with everyone involved that it is safe to connect supply
power to the wrapper.
Also verify that it is 100% safe to have power applied to the control circuit.
This includes checking with the construction foreman for that area and getting
his authorization to put power in the control cell.
9.2 Connect the hot lead of a cheater cord to the X1 of the control PT. Connect
the other lead of the cheater cord to ground.
Pull the high side fuses on the control PT so that power is not reverse fed
back onto the breaker stabs.
9.4 Turn off the power bar and connect the cheater cord to the power bar. Turn
the power bar on.
9.5 Once the control wiring has been safely energized, go through the control
schematic, line by line and verify the functionality of each and every device in
the circuit and that the circuit functions as designed.
Verify the functionality of the remote devices such as local start / stop
stations, any permissives or start / stops from DCS or PLC outputs etc.
9.6 Once all complete, proceed to section 10.2 “Continuity Checks of the Power
Components”. When this is complete, proceed to section 9.7 below
9.7 Turn the power bar off and remove the cheater cord from the power bar.
Disconnect the cheater cord from the wrapper and return the control PT to As
Found conditions.
This test will verify the insulation integrity of the power components within the
wrapper only. Therefore, the field power cables will have to be removed from the
outgoing field terminations.
This test is not intended to be used to check the cables to the load or the load itself.
Testing of the cables and the load is covered in other procedures in the quality
manual.
This test is to be applied to the power (main current carrying) side of all power
components within the wrapper.
Precautions have to be made when performing a megger test on the line side of the
device which connects to the MCC bus as voltage is now being applied to the bus.
Ask the client if the insulation checks performed on the bus is sufficient for the
insulation test on the line side of the device. If it is sufficient, only perform insulation
checks on the load side of the device. Record the results from the bus insulation
test (found in the QC-162 testsheet for the MCC lineup) in the line to ground column
of the test sheet.
If the insulation check is not sufficient, check to ensure that work on the bus is
complete. Also check and isolate any PT’s or capacitors that may be connected
across the bus.
10.1.1 Disconnect the field power cables from the outgoing field termination
at the wrapper.
10.1.2 Remove the fuses from the control PT high side (if applicable).
10.1.1 The test voltage value should be available from the manufacture’s
specifications. If these values are not available from the
manufacturer, default to NETA standard of 1000 V.
10.1.2.4 Touch the ends of the leads together, the needle should
read a short.
10.1.2.5 Remove the leads from each other, the reading should go
back to full scale.
10.1.2.6 If the megger does not do any of the above, inform the QC
Specialist.
10.1.3 Get a test lead and connect one end to ground the other end is to
be used to discharge the device after the test.
10.1.4 Connect the load side of A and both sides of B and C phase to
ground
10.1.5 Connect the negative lead of the megger to ground and the
positive lead to line side of A phase.
10.1.6 Move the voltage selector switch on the megger to the test voltage
to be applied to the device.
10.1.7 Turn megger on and leave on for the duration specified by the QC
Specialist (unless there is an immediate problem evident).
10.1.8 After the specified period turn megger off. Touch the grounded
test lead to the line side of A phase.
10.1.9 Move the ground from the load side of A to the line side of A
phase. Repeat 10.1.5 to 10.1.8 for the load side of A phase.
10.1.10 Move the ground from the line side of B phase and connect to the
load side of A phase.
10.1.11 Repeat 10.1.5 to 10.1.10 for line and load of all phases of the
device.
10.1.12 Repeat all of the above for all power components within the
wrapper unit.
10.1.13 When complete, reinstall the PT fuses (if applicable) and the field
termination leads to as found conditions.
1.0 PURPOSE
To establish a procedure for field inspection of Low Voltage (600 V and below)
Transfer Switches.
2.0 SCOPE
This procedure applies to Low Voltage Transfer Switches and the components
within these Transfer Switches
This scope is based on the Transfer Switch being installed and commissioned for
the first time and that the lineup (if any) that this Transfer Switch is being connected
too is dead at the time the work below is being done.
3.0 RESPONSIBILITY
3.3 Field-testing personnel are responsible for the documentation of test results
and compliance with this procedure.
5.0 PREPARATION
5.1 Determine from the Client if it is required if any of the inspections are to be
witnessed. If so, try and identify if it is required by the Client to witness all of
the inspections performed or just a portion of several.
Discuss with the Client to identify any hold points. Ensure that any hold point
that is witnessed by the Client is initialed by the Client on the test sheet.
5.2 Prior to starting the test, ensure that all Client and Chemco requirements
necessary to allow work access to the equipment are followed (i.e. permit,
JHA etc). Follow safe work practices (i.e. equipment locked out, tagged out
and grounded where applicable) to ensure the equipment is safe to work on.
5.3 Check the calibration date of the test equipment to be used and ensure it is
within the calibration period for that equipment.
5.4 Fill in the nameplate data onto the test sheet. Check to ensure that the
nameplate data and the data from the Single Line Diagram (SLD) match.
6.1 Check to ensure that the Transfer Switch is bolted to the floor and the vendor
instructions for bolting the Transfer Switch to the floor are followed.
6.2 Vacuum out the entire Transfer Switch enclosure to ensure that there are no
metal filings or chips in the switch components.
6.3 Check all hardware to ensure that grade 5 hardware is used and no
connections are missing flat washers or splits.
6.4 Inspect the entire enclosure for signs of corrosion or water entry.
6.5 If the enclosure uses heaters, check that these heaters are correctly installed
and function correctly.
6.6 Check the alignment of the breakers with the bus to ensure no undue stress
at those connections. Also check the alignment of the cables to the breaker
lugs to ensure that there is not too much tension on the lugs.
6.7 Verify that all field and factory wiring is complete. Once this is done, perform
point to point checks of the entire enclosure.
6.8 Check the overall physical condition of the enclosure making note of any
dents, damage to the paint etc.
6.9 Check the electrical connections to ensure that the electrical clearances are
not compromised.
6.10 Check the bus supports and bus barriers to ensure that all are in place, none
are loose and none are missing.
6.11 Check the cable lug terminations and bus joints to ensure that they are
torqued.
6.12 Check the cable lug terminations to ensure that they are not too big or too
small for the cables being used.
6.13 Ensure that the grounding has been complete and follows code standards.
§ Cables from the line side of the normal breaker come from the normal
source
§ Cables from the line side of the emergency breaker come from the
emergency source.
§ Cables from the transfer switch load breaker go to the emergency load
6.16 Perform a phase rotation check on both the source and the emergency
supply; ensure that both have the same ABC sequence.
6.17 Check that the cables from the normal and emergency sources are
connected in ABC sequence
6.18 Check the Transfer switch current and voltage rating and ensure that it
agrees with the system current and voltage.
1.0 PURPOSE
2.0 SCOPE
This scope is based on the annunciator panel being installed and commissioned for
the first time and that the equipment that this annunciator panel is monitoring is
dead at the time the work below is being done.
3.0 RESPONSIBILITY
3.3 Field-testing personnel are responsible for the documentation of test results
and compliance with this procedure.
5.0 PREPARATION
5.1 Determine from the Client if it is required if any of the inspections are to be
witnessed. If so, try and identify if it is required by the Client to witness all of
the inspections performed or just a portion of several.
Discuss with the Client to identify any hold points. Ensure that any hold point
that is witnessed by the Client is initialed by the Client on the test sheet.
5.2 Prior to starting the test, ensure that all Client and Chemco requirements
necessary to allow work access to the equipment are followed (i.e. permit,
JHA etc). Follow safe work practices (i.e. equipment locked out, tagged out)
to ensure the equipment is safe to work on.
5.3 Check the calibration date of the test equipment to be used and ensure it is
within the calibration period for that equipment.
5.4 Fill in the nameplate data onto the test sheet. Check to ensure that the
nameplate data and the data from the Single Line Diagram (SLD) match.
6.1 Vacuum out the entire annunciator panel enclosure to ensure that there are
no metal filings or chips remaining.
6.2 Check all terminations within the annunciator panel to ensure all are tight and
none are stripped.
6.3 Inspect the entire enclosure for signs of corrosion or water entry.
6.4 Verify that all field and factory wiring is complete. Once this is done, perform
point to point checks of all of the wiring associated with the annunciator panel
including any wiring to field devices.
6.5 Check the overall physical condition of the enclosure, making note of any
dents, damage to the paint etc.
6.6 Compare the placement and description of each window within the
annunciator panel with the supplied drawings. Ensure to record the revision
of the drawing on the test sheet.
6.7 Verify the power supply and the wiring from the power supply going to the
annunciator. If the annunciator is powered with DC voltage ensure that the
polarity is checked throughout the entire circuit. (There have been instances
in the past where the polarity was reversed causing the power supply to the
annunciator to be replaced as it was damaged beyond repair.)
6.8 After the point to point and the power supply checks have been completed.
Obtain permission from the construction foreman for clearance to energize
the annunciator. Once clearance is obtained, inform everyone in the vicinity
that the annunciator will be powered up and the annunciator horn may go off.
6.9 Power up the annunciator. Have someone at the annunciator panel to reset it
as the horn should go off and all the lights on the panel should be illuminated.
If this does not occur, investigate and rectify.
6.10 Using the radio protocol stipulated by the client (i.e. use intrinsically safe
radios where required), use 2 way radios and 2 men to test each window on
the annunciator that has an alarm description on it.
6.11 One man will be at the annunciator panel while the other man will go to the
field device. Once everyone is in place, the field device will be operated and
the alarm should sound as well as the window with the alarm description on
the annunciator should be illuminated.
The alarm should then be reset and then the process is repeated until all field
devices wired to the annunciator are checked.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
5.0 THEORY
This current is also high when the test voltage is initially applied and
decreases as the voltage application time increases but at a slower
rate and not as a high a current than the capacitance charging
Revision 0 July 26, 2005 QP-178 R0 MV & HV Cable IR Test.doc Page 1 of 5
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-178
Surface Leakage
This is the leakage current that flows through the insulation itself
and is of primary importance. This current is used to evaluate the
conditions of the insulation under test. Sufficient time should be
allows for this current to stablize before the test readings are
recorded.
5.2 Reason for cables being grounded for after the test.
After a time when the applied voltage is removed from the insulation, the
polarized molecules will eventually revert to their initial random
arrangement so that the polarization approaches zero. To ensure that the
cable has been discharged, a cable is to remain grounded for a period at
least equal to the test time.
6.1 Prior to starting the test, obtain the DC voltage test limit and duration from
the Client. If the Client does not have a value, ask permission to default to
NETA Levels. Once permission is received, proceed to 6.2.
6.2 Check the calibration date of the test set to ensure it is within calibration.
Ensure that the test set is capable of reaching the DC value specified by
the Client or NETA.
6.3 Cross-reference the cable with the reference drawings. Ensure that the
cable to be tested is the correct cable type. Check that the voltage and
insulation ratings as well as the conductor size are the same as the
drawing. If not, notify your supervisor.
6.4 Visually check the location of both ends of the cables. DO NOT TOUCH
THE CABLES AT THIS TIME. CONSIDER THEM ENERGIZED UNTIL
IT’S PROVEN OTHERWISE. Check for the proximity of live equipment
relative to the ends of the cables. (i.e. if doing a cable in a load break
cubicle, is the bus side of the switch is hot. If so, is the cable side of the
switch safely grounded and isolated.
6.5 Visually inspect entire run of cable, where possible, looking for any
obvious physical damage to cable or workers or items in the area that
would prevent a test to be done.
6.6 Using proper High Voltage safety procedures, check if cable is energized.
Once it has been proven that the cable is de energized, use Hot-gloves to
ground the cable to discharge any static charges in the cable. (This is
especially important on cables that were just taken out of service.) This is
required on both ends of the cable (to eliminate the possibility that the
cable went to wrong location and another cable is at the opposite end.)
6.7 Once it has been proven that both ends are de-energized, ring out the
cable to check origin and destination points.
6.9 Using red flagging, flag off both ends of the cable to ensure there is no
possibility of accidental contact with the ends of the cable while they are
being tested. Ensure Client's and Chemco’s procedure for flagging and
tagging are followed when this is done.
6.10 Ensure that the equipment that the cables will be connected to is properly
grounded.
7.1 Using a test lead, have the field person jumper the shield to the conductor
at that end of the cable.
7.2 At the testing end, put one lead of the ohmmeter on the shield and the
other on the conductor. Record this shield resistance on the test sheet.
Typical readings are 0.8 – 1 ohms.
7.3 Flag if the resistance if above 2 ohms as it could indicate a problem with
the shield. Repeat for each conductor.
8.1.1 Move the voltage selector switch on the insulation tester to 1000 V
DC.
8.1.2 Connect one lead of the megger to the positive terminal and the
other lead to the negative terminal. Leave the leads in open air and
do not touch.
8.1.4 Touch the ends of the leads together, the needle should read a
short.
8.1.5 Remove the leads from each other, the reading should go back to
full scale. Turn the megger off.
8.1.6 If the megger does not do any of the above, inform your supervisor.
8.2.1 Have the individual at the field end separate the conductors for
testing.
8.2.2 At the test end, isolate one conductor, jumper the remaining
conductors and all shields together and connect them all to ground.
8.2.4 Confirm with the field watchman that it is safe to proceed. Connect
the positive lead of the megger to the isolated conductor, and the
other lead of the megger to the grounded conductors.
8.2.5 Megger for 1 minute. Discharge cable through the megger and
then ground for 1 minute. Repeat steps 8.2.2 to 8.2.4 for each
conductor. Record results on the test form.
8.2.6 When complete, repeat 8.1 to ensure there was no failure to the
test set during the test.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
• Scope of Work
• Approved for Construction drawings (e.g. Plans, P&ID’s)
• Specifications
• Instrument Index
• Instrument Data Sheets
• Standard Details
• Inspection & Test requirements
• Calibration requirements
6.2 An Inspection and Test Plan (ITP) shall be developed based on project
requirements and shall be sufficiently detailed to indicate:
6.3 The Inspection and Test Plan (ITP) shall be submitted to the Customer and
approved by the Customer prior to commencement of work. The Customer
has the option of identifying his/her comments and placing Hold / Witness
points on the approved copy.
6.5 ITP’s shall be signed off by Chemco and optionally by the Customer as the
inspections and tests are completed. The signed off copy shall be included
in the project turnover documentation.
7.0 RECEIVING
7.2 All items shall be inspected for damage or missing components upon
receipt.
7.5 Orifice plates will be measured and verified upon receipt and logged on the
appropriate exhibit.
7.6 A Receiving Report shall be completed for each instrument received and for
materials received in bulk.
8.1 Test equipment shall be calibrated and logged in accordance with the Quality
Manual Sub-Section 7.6.
9.1 Determine from the contract documents and scope of work the requirements
for calibration of instruments.
9.2 Some types of instruments may not normally require calibration on receipt.
Examples are:
9.3 Arrange for bench calibration for all instruments requiring calibration.
9.8 Instruments shall not be issued for installation without proper identification
tags.
10.0 INSPECTIONS
10.1 Field inspections shall be conducted as the work progresses for the duration
of the work. Such inspections shall verify conformance to the applicable
codes, project drawings, standard details and specifications.
10.2 Incomplete installations shall be recorded on a Punch List. Punch list items
must be completed and signed off prior to system testing or loop checking.
10.4 Ensure that inline devices are not installed until line hydro-testing and flushing
has been completed and released in writing for reinstatement.
10.5 If necessary to deviate from the specifications during the installation of the
work, the proposed deviation must be submitted to the Customer for
approval in writing.
11.1 Consult the contract documents for loop checking responsibility. Loop
checking may, or may not, be included in the Contract Scope of Work.
11.3 Loop checks are usually performed with the Customer’s representative(s).
12.0 RECORDS
12.2 All appropriate field inspection and test forms shall be completed, signed
and dated by the Chemco Instrument QC Inspector. Test forms shall be
witnessed by the Customer as called for in the ITP.
12.3 Completed test forms become quality records and are to be kept in the
project QC file, suitably labeled, maintained and secured for ease of
retrieval.
12.4 Quality records shall be logged and transmitted to the Customer on system
or project turnover or as agreed with the Customer in advance.
13.3 Field run instrument piping shall be recorded on As-Built field piping
drawings or isometrics. The “Heat Numbers” of installed piping materials
shall be documented on the As-Built drawings.
Storage and preservation shall be in accordance with the Quality Manual and
Procedure QP-080
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
4.0 REQUIREMENTS
4.1 Finished copy shall be drawn on 11” x 17” isometric sketching paper.
4.2 Finished copy to be in pencil. The object lines should be darker than the
extension and dimension lines. All valves and fittings shall be depicted in
their correct or actual orientation.
4.4 Use a ruler / template when drawing lines, symbols, balloons, valves etc.
4.6 All co-ordinates and dimensions are to be in feet and inches on imperial
based projects and shall be in meters and millimeters on metric based
projects.
4.10 Dimension line arrowheads (pointers) are to touch and stop at the
extension lines.
4.11 Extension lines are not to touch object lines; leave a 1mm gap. (approx.).
4.12 A title block is to be included on the bottom right corner of each finished
drawing.
E.g.
PROJECT:
Plant Design Area Tag No.
4.13.2 From the balloon, draw a straight line with a small arrowhead that
just touches the item.
4.13.3 Use a numerical sequence. All pipe and fittings that are identical
in size and heat numbers will use the same item numbers.
Otherwise a new item number will be assigned.
4.14 Legend:
4.14.3 State the description of the item followed by its heat number.
1.0 PURPOSE
This document defines general requirements for assembly of flanged joints in
piping systems where controlled tightening of stud bolt using torque
measurement is mandated.
2.0 SCOPE
This procedure applies to mechanical instrumentation bolting as required by the
Contract Scope of Work. The Client’s specifications, if available, should be
consulted to ensure conformance.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for maintenance and issue of this
procedure.
3.2 Field QC Leads, Specialists, Inspectors and Foremen are responsible for
implementation and compliance with this procedure.
1.0 PURPOSE
To describe the procedure used for inspection of mechanical capillary type instruments.
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of this
procedure.
3.2 The Project QC Manager / Specialists are responsible for the implementation of the
requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this procedure
and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-303, Section 1.0, may be partially completed prior to inspections taking
place and/or while assembling loop / turnover folders at the project’s early stages.
5.2 Any errors are to be redlined on QC-303. All pre-filled data must be initialed and/or
highlighted at the time of inspection.
FORM HEADER
Record the Contract Number, Job Number, System Number, CWP Number and the
Client’s Reference Form Number the spaces provided.
Data in this Section is recorded from the Instrument Index and / or Datasheets as
applicable.
ATTACHMENTS
COMMENTS
Record any punch items / deficiencies observed during inspections and tests in
above Sections that cannot be readily repaired on the spot. When recording punch
items, record item number from the above inspection and the description of the
punch item. If more space is needed, attached Punchlist.
FORM FOOTER
Field personnel responsible for the tasks sign off the “TESTED BY” Section.
QC personnel responsible for the tasks sign off the “CHEMCO” Section.
Client’s Representative responsible for verifiying or witnessing the tasks sign off the
“CLIENT” Section, as required by Contract and ITP arrangements.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of this
procedure.
3.2 The Project QC Manager / Specialists are responsible for the implementation of the
requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this procedure
and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-305, Section 1.0, may be partially completed prior to inspections taking
place and/or while assembling loop / turnover folders at the project’s early stages.
5.2 Any errors are to be redlined on QC-305. All pre-filled data must be initialed and/or
highlighted at the time of inspection.
FORM HEADER
Record the Contract Number, Job Number, System Number, CWP Number and the
Client’s Reference Form Number the spaces provided.
Data in this Section is recorded from the Instrument Index and / or Datasheets as
applicable.
ATTACHMENTS
COMMENTS
Record any punch items / deficiencies observed during inspections and tests in
above Sections that cannot be readily repaired on the spot. When recording punch
items, record item number from the above inspection and the description of the
punch item. If more space is needed, attached Punchlist.
FORM FOOTER
Field personnel responsible for the tasks sign off the “TESTED BY” Section.
QC personnel responsible for the tasks sign off the “CHEMCO” Section.
Client’s Representative responsible for verifiying or witnessing the tasks sign off the
“CLIENT” Section, as required by Contract and ITP arrangements.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of this
procedure.
3.2 The Project QC Manager / Specialists are responsible for the implementation of the
requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this procedure
and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-309, Section 1.0, may be partially completed prior to inspections taking
place and/or while assembling loop / turnover folders at the project’s early stages.
5.2 Any errors are to be redlined on QC-309. All pre-filled data must be initialed and/or
highlighted at the time of inspection.
FORM HEADER
Record the Contract Number, Job Number, System Number, CWP Number and the
Client’s Reference Form Number the spaces provided.
Data in this Section is recorded from the Instrument Index and / or Datasheets as
applicable.
ATTACHMENTS
COMMENTS
Record any punch items / deficiencies observed during inspections and tests in
above Sections that cannot be readily repaired on the spot. When recording punch
items, record item number from the above inspection and the description of the
punch item. If more space is needed, attached Punchlist.
FORM FOOTER
Field personnel responsible for the tasks sign off the “TESTED BY” Section.
QC personnel responsible for the tasks sign off the “CHEMCO” Section.
Client’s Representative responsible for verifiying or witnessing the tasks sign off the
“CLIENT” Section, as required by Contract and ITP arrangements.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of this
procedure.
3.2 The Project QC Manager / Specialists are responsible for the implementation of the
requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this procedure
and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-311, Section 1.0, may be partially completed prior to inspections taking
place and/or while assembling loop / turnover folders at the project’s early stages.
5.2 Any errors are to be redlined on QC-311. All pre-filled data must be initialed and/or
highlighted at the time of inspection.
FORM HEADER
Record the Contract Number, Job Number, System Number, CWP Number and the
Client’s Reference Form Number the spaces provided.
Data in this Section is recorded from the Instrument Index and / or Datasheets as
applicable.
ATTACHMENTS
COMMENTS
Record any punch items / deficiencies observed during inspections and tests in
above Sections that cannot be readily repaired on the spot. When recording punch
items, record item number from the above inspection and the description of the
punch item. If more space is needed, attached Punchlist.
FORM FOOTER
Field personnel responsible for the tasks sign off the “TESTED BY” Section.
QC personnel responsible for the tasks sign off the “CHEMCO” Section.
Client’s Representative responsible for verifiying or witnessing the tasks sign off the
“CLIENT” Section, as required by Contract and ITP arrangements.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of this
procedure.
3.2 The Project QC Manager / Specialists are responsible for the implementation of the
requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this procedure
and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-327, Section 1.0, may be partially completed prior to inspections taking
place and/or while assembling loop / turnover folders at the project’s early stages.
5.2 Any errors are to be redlined on QC-327. All pre-filled data must be initialed and/or
highlighted at the time of inspection.
FORM HEADER
Record the Contract Number, Job Number, System Number, CWP Number and the
Client’s Reference Form Number the spaces provided.
Data in this Section is recorded from the Instrument Index and / or Datasheets as
applicable.
3.1 Prior to any testing taking place, confirm test equipment is within the
calibration period. Follow project safety requirements then proceed with test
and record all results in Section 3.0.
3.2 Using project specification for test pressure, test medium and test duration,
perform/document pressure tests and verify acceptable leak rates on the
following lines where applicable:
• Impulse Lines
• Pneumatic Lines
• Air Supply Lines
• Air Sub - Header / Branch Lines
• Hydraulic Lines
3.4 Confirm all impulse lines have been drained and cleaned.
ATTACHMENTS
COMMENTS
Record any punch items / deficiencies observed during inspections and tests in
above Sections that cannot be readily repaired on the spot. When recording punch
items, record item number from the above inspection and the description of the
punch item. If more space is needed, attached Punchlist.
FORM FOOTER
Field personnel responsible for the tasks sign off the “TESTED BY” Section.
QC personnel responsible for the tasks sign off the “CHEMCO” Section.
Client’s Representative responsible for verifiying or witnessing the tasks sign off the
“CLIENT” Section, as required by Contract and ITP arrangements.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of this
procedure.
3.2 The Project QC Manager / Specialists are responsible for the implementation of the
requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this procedure
and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-334, Section 1.0, may be partially completed prior to inspections taking
place and/or while assembling loop / turnover folders at the project’s early stages.
5.2 Any errors are to be redlined on QC-334. All pre-filled data must be initialed and/or
highlighted at the time of inspection.
FORM HEADER
Record the Contract Number, Job Number, System Number, CWP Number and the
Client’s Reference Form Number the spaces provided.
Data in this Section is recorded from the Instrument Index and / or Datasheets as
applicable.
ATTACHMENTS
COMMENTS
Record any punch items / deficiencies observed during inspections and tests in
above Sections that cannot be readily repaired on the spot. When recording punch
items, record item number from the above inspection and the description of the
punch item. If more space is needed, attached Punchlist.
FORM FOOTER
Field personnel responsible for the tasks sign off the “TESTED BY” Section.
QC personnel responsible for the tasks sign off the “CHEMCO” Section.
Client’s Representative responsible for verifiying or witnessing the tasks sign off the
“CLIENT” Section, as required by Contract and ITP arrangements.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of this
procedure.
3.2 The Project QC Manager / Specialists are responsible for the implementation of the
requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this procedure
and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-341, Section 1.0, may be partially completed prior to inspections taking
place and/or while assembling loop / turnover folders at the project’s early stages.
5.2 Any errors are to be redlined on QC-341. All pre-filled data must be initialed and/or
highlighted at the time of inspection.
FORM HEADER
Record the Contract Number, Job Number, System Number, CWP Number and the
Client’s Reference Form Number the spaces provided.
Data in this Section is recorded from the Instrument Index and / or Datasheets as
applicable.
ATTACHMENTS
COMMENTS
Record any punch items / deficiencies observed during inspections and tests in
above Sections that cannot be readily repaired on the spot. When recording punch
items, record item number from the above inspection and the description of the
punch item. If more space is needed, attached Punchlist.
FORM FOOTER
Field personnel responsible for the tasks sign off the “TESTED BY” Section.
QC personnel responsible for the tasks sign off the “CHEMCO” Section.
Client’s Representative responsible for verifiying or witnessing the tasks sign off the
“CLIENT” Section, as required by Contract and ITP arrangements.
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and issuing of this
procedure.
3.2 The Project QC Manager / Specialists are responsible for the implementation of the
requirements of this procedure.
3.3 Field QC personnel are responsible to carry out the provisions of this procedure
and to accurately record inspection and test results.
5.0 PROCEDURE
5.1 Form QC-345, Section 1.0, may be partially completed prior to inspections taking
place and/or while assembling loop / turnover folders at the project’s early stages.
5.2 Any errors are to be redlined on QC-345. All pre-filled data must be initialed and/or
highlighted at the time of inspection.
FORM HEADER
Record the Contract Number, Job Number, System Number, CWP Number and the
Client’s Reference Form Number the spaces provided.
Data in this Section is recorded from the Instrument Index and / or Datasheets as
applicable.
ATTACHMENTS
COMMENTS
Record any punch items / deficiencies observed during inspections and tests in
above Sections that cannot be readily repaired on the spot. When recording punch
items, record item number from the above inspection and the description of the
punch item. If more space is needed, attached Punchlist.
FORM FOOTER
Field personnel responsible for the tasks sign off the “TESTED BY” Section.
QC personnel responsible for the tasks sign off the “CHEMCO” Section.
Client’s Representative responsible for verifiying or witnessing the tasks sign off the
“CLIENT” Section, as required by Contract and ITP arrangements.
1.0 PURPOSE
2.0 SCOPE
2.2 Chemco does not intend to replicate, verify or assume any of the vendor’s
quality activities since the product was manufactured, inspected and tested
to the vendor’s program, quality plan, inspection and test plan, Client
specifications, regulatory and code requirements as approved and accepted
by the Client.
2.3 Vendor equipment will not be disassembled for the purpose of inspection.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for maintenance and distribution of this
procedure.
3.2 Field QC Specialists and Inspectors are responsible for implementation and
compliance with this procedure.
5.0 INSPECTION
5.1 Vendor equipment shall be visually inspected for damage and obvious
missing components upon receipt when Chemco receives the equipment, or
such inspection shall take place following installation when the equipment is
installed by others.
5.2 It is a prerequisite that the Client issues Chemco the reference documents
listed in 4.0 above to facilitate this inspection procedure.
5.3 Electrical Inspection
7.0 PRESERVATION
7.2 For rotating equipment, confirm and coordinate preservation activities with
the Client’s rotating equipment specialist or designee.
8.0 RECORDS
8.1 Quality Records maintained for the inspection, as applicable, shall consist
of:
8.2 Completed records shall be kept in the project QC file, suitably labeled by
system, maintained and secured for ease of retrieval.
8.3 Quality records shall be logged and transmitted to the Client on system
turnover.
9.0 PRE-COMMISSIONING
1.0 PURPOSE
2.0 SCOPE
3.0 RESPONSIBILITY
3.3 Field-Supervision and testing personnel are responsible for the documentation of
test results and compliance with this procedure.
6.1 Preparation in advance of conducting pressure tests shall include the following
checks:
Revision 4 November 25, 2005 QP-352 R4 Process Lead Pneumatic Test Procedure.doc Page 2 of 4
QP-352
Revision 4 November 25, 2005 QP-352 R4 Process Lead Pneumatic Test Procedure.doc Page 3 of 4
QP-352
6.3 CAUTION:
6.3.1 No unauthorized personnel will be allowed within 5 feet of the test location.
6.3.2 No personnel are to be allowed within the barriers during pressurization.
7.0 PRESSURE TEST
7.1 Typically, instrument process leads shall be pneumatically tested at 110% of the
design pressure. Consult the Line Table (LT) or Line Designation table (LDT) for
the correct pressures. See the instrument nameplate for the maximum pressure
the instrument can withstand.
7.2 No work, tightening of flanges or glands, etc. shall be done on process leads at
pressures greater than 30 psig (207 kPa).
7.3.1 Pressurize the system to 25 psig (173 kPag) and make a preliminary
check for leaks.
7.3.2 If leaks are detected. “snoop” all threads and other possible leak
sources.
7.3.3 Depressurize carefully and repair all leaks found.
7.3.4 Repeat the leak test until the system is gas tight to 25 psig (173 kPag).
7.3.5 Increase pressure gradually in 25% increments of the remaining test
pressure, allowing sufficient time to equalize strains after each increment
and observing for leaks until the final test pressure is reached.
7.3.6 Check for leakage by monitoring the pressure to remain constant after
each pressure increment.
7.3.7 If leaks are detected. “snoop” all threads and other possible leak
sources.
7.3.8 Depressurize carefully and repair all leaks found.
7.2.9 Repeat the leak test until the system is gas tight.
7.3.10 Once the final test pressure is reached, hold the pressure for a minimum
of 10 minutes. After the hold time, reduce the pressure to the design
pressure and examine all joints for leaks (snoop). An acceptable test
occurs when no continuous bubbling is observed.
8.0 PRESSURE TEST COMPLETION
8.1 Complete the following activities:
8.1.1 Depressurize the system carefully.
8.1.2 Restore all removed components and connections.
8.1.3 Complete the applicable Pressure Test Record.
Revision 4 November 25, 2005 QP-352 R4 Process Lead Pneumatic Test Procedure.doc Page 4 of 4
QP-353
1.0 PURPOSE
To establish a hydrostatic test procedure for instrument process leads in the field.
2.0 SCOPE
This procedure is supplementary to the Quality Manual and applies to field installed
instrument process / impulse leads, including the instrument manifold.
3.0 RESPONSIBILITY
3.1 Quality Manager is responsible to maintain and issue this procedure.
3.2 Project QC Managers / Specialists are responsible for implementation and
compliance with this procedure.
3.3 Field-Supervision and testing personnel are responsible for the documentation of
test results and compliance with this procedure.
4.0 REFERENCE DOCUMENTS
4.1 Project Specifications
4.2 Project Drawings, Line Lists (Tables)
4.2 Instrument Datasheets
5.0 EXAMINATION PRIOR TO PRESSURE TEST
5.1 The following shall be examined:
5.1.1 Tubing material: size, schedule and specification correct.
5.1.2 Fittings such as tube fittings (e.g. Swagelok) etc., size, schedule and
material specification are correct.
5.1.3 Ensure that Teflon tape is not used.
5.1.4 Line supports shall be adequate.
5.1.5 The applicable quality control inspection and QC Record should be
completed prior to pressure tests. E.g. QC-327.
6.0 PRESSURE TEST PREPARATION
6.1 Preparation in advance of conducting pressure tests shall include the following
checks:
6.1.1 A Job Hazard Analysis (JHA), if required.
6.1.2 The test fluid typically may be un-chlorinated water, distilled or de-
mineralized water, a glycol / water or CF7 / water mixture. Consult the
project specifications for the required test fluid.
6.1.3 Verify the instrument, the manifold, piping, tubing and all components
are capable of withstanding the test pressure.
Revision 1 October 30, 2006 QP-353 R1 Process Lead Hydro Test Procedure.doc Page 1 of 4
QP-353
6.1.4 For flow and differential pressure instruments, close block valves at the
commodity line and open the manifold equalization valve and block
valves at the instrument.
6.1.5 For pressure instruments, close block valve at the commodity line and
open the block valve at the instrument.
6.1.6 Analyzer sample lines shall be tested up to the instrument. Disconnect
and do not pressurize the analyzer instrument. Pressure reducing
regulators or sample vaporizers should be removed and a jumper line
installed prior the test.
6.1.7 Test manifolds, temporary piping and hoses feeding gas to the test shall
themselves be tested at 100% of the maximum test pressure to be
applied on the project prior to the start of tests. Record the test on
Pressure Test Record QC-624.
6.1.8 A minimum of 2 calibrated pressure gauges shall be used to monitor the
pressure, selected so that the test pressure falls between 1/3 and 2/3 of
the full-scale reading on the gauge. Pressure gauges shall have an
accuracy of at least 0.50% of full scale reading over the entire range of
the gauge.
6.1.9 Ensure test manifolds, relief valves and test pressure gauges have
identification numbers applied and are logged as test equipment on QS-
094, including calibration dates. Ensure calibration certificates are on
file.
6.1.10 Do not conduct instrument lead pressure tests at temperatures below the
minimum temperature specified by the Client.
6.1.11 Install warning signage indicating testing is in progress in the immediate
test area.
Revision 1 October 30, 2006 QP-353 R1 Process Lead Hydro Test Procedure.doc Page 2 of 4
QP-353
Revision 1 October 30, 2006 QP-353 R1 Process Lead Hydro Test Procedure.doc Page 3 of 4
QP-353
6.3 CAUTION:
6.3.1 No unauthorized personnel will be allowed within the immediate test area.
6.3.2 Install red tape and warning signage indicating testing is in progress in the
immediate test area.
7.0 PRESSURE TEST
7.1 Typically, instrument process leads shall be hydrostatically tested up to 150% of
the design pressure. Consult the Line Table (LT) or Line Designation table (LDT)
for the correct pressures. See the instrument nameplate for the maximum
pressure the instrument can withstand.
7.2 For instrument leads, conduct the pressure test as follows:
7.2.1 Open a process lead connection to bleed air from the system.
7.2.2 Fill the system with test fluid until the system is full and air is purged out.
7.2.3 Tighten all loosened connections.
7.2.4 Pressurize the system up to 300 psig (2068 kPag) and make a
preliminary check for leaks.
7.2.5 If leaks are detected, depressurize carefully and repair all leaks found.
7.2.6 Repeat the leak test until the system is tight to 300 psig (2068 kPag).
7.2.7 Increase pressure gradually to 100% of the final test pressure.
7.2.8 Once the final test pressure is reached, hold the pressure for a minimum
of 10 minutes and verify the system is leak free.
7.2.9 If leaks are detected, depressurize carefully and repair all leaks found.
7.2.10 Repeat the leak test until the system is tight to 100% of the final test
pressure.
8.0 PRESSURE TEST COMPLETION
8.1 Complete the following activities:
8.1.1 Depressurize the system carefully and completely drain the test fluid back
into the reservoir.
8.1.2 Disconnect the fill & test equipment.
8.1.2 Blow down the system with clean dry air, when specified. (Consult project
specifications.)
8.1.3 Restore all removed components and connections.
8.1.4 Complete the applicable Pressure Test Record.
Revision 1 October 30, 2006 QP-353 R1 Process Lead Hydro Test Procedure.doc Page 4 of 4
QP-354
1.0 PURPOSE
To establish a hydrostatic test procedure for instruments, manifolds, piped process
connections and tubing for instruments pre-fabricated in the shop.
2.0 SCOPE
This procedure is supplementary to the Quality Manual and applies to instrument piped
process / impulse leads, tubing, including the instrument manifold for instruments pre-
fabricated in the shop.
3.0 RESPONSIBILITY
3.1 Quality Manager is responsible to maintain and issue this procedure.
3.2 Project QC Managers / Specialists are responsible for implementation and
compliance with this procedure.
3.3 Supervision and testing personnel are responsible for the documentation of test
results and compliance with this procedure.
4.0 REFERENCE DOCUMENTS
4.1 Project Specifications
4.2 Project Drawings, Line Lists (Tables)
4.2 Instrument Datasheets
5.0 EXAMINATION PRIOR TO PRESSURE TEST
5.1 The following shall be examined:
5.1.1 Piping / Tubing material: size, schedule and specification correct.
5.1.2 Fittings such as tube fittings (e.g. Swagelok) etc., pipe fittings, size,
schedule and material specification are correct.
5.1.3 Ensure that Teflon tape is not used.
5.1.4 Line supports shall be adequate.
5.1.5 The applicable quality control inspection and QC Record should be
completed prior to pressure tests. E.g. QC-327.
6.0 PRESSURE TEST PREPARATION
6.1 Preparation in advance of conducting pressure tests shall include the following
checks:
6.1.1 A Job Hazard Analysis (JHA), if required.
6.1.2 The test fluid typically may be un-chlorinated water, distilled or de-
mineralized water, a glycol / water or CF7 / water mixture. Water shall
not contain more than 25 ppm chlorides. Consult the project
specifications for the required test fluid.
Revision 2 February 20, 2007 QP-354 R2 Instrument Hydro Test Procedure.doc Page 1 of 4
QP-354
6.1.3 Verify the instrument, the manifold, piping, tubing and all components
are capable of withstanding the test pressure.
6.1.4 For flow and differential pressure instruments, plug commodity line ends
and open the manifold equalization valve and block valves at the
instrument.
6.1.5 For pressure instruments, plug commodity line end and open the block
valve at the instrument.
6.1.6 Disconnect and do not pressurize analyzer instruments.
6.1.7 Test manifolds, temporary piping and hoses feeding test medium to the
test shall themselves be tested at 100% of the maximum test pressure to
be applied on the project prior to the start of tests. Record the test on
Pressure Test Record QC-624.
6.1.8 A minimum of 2 calibrated pressure gauges shall be used to monitor the
pressure, selected so that the test pressure falls between 1/3 and 2/3 of
the full-scale reading on the gauge. Pressure gauges shall have an
accuracy of at least 0.50% of full scale reading over the entire range of
the gauge.
6.1.9 Ensure test manifolds and test pressure gauges have identification
numbers applied and are logged as test equipment on QS-094, including
calibration dates. Ensure calibration certificates are on file.
6.1.10 Do not conduct instrument pressure tests at temperatures below the
minimum temperature specified by the Client.
6.1.11 Install warning signage indicating testing is in progress in the immediate
test area.
Revision 2 February 20, 2007 QP-354 R2 Instrument Hydro Test Procedure.doc Page 2 of 4
QP-354
Revision 2 February 20, 2007 QP-354 R2 Instrument Hydro Test Procedure.doc Page 3 of 4
QP-354
Revision 2 February 20, 2007 QP-354 R2 Instrument Hydro Test Procedure.doc Page 4 of 4
QP-355
9220 – 39 Avenue • Edmonton, AB T6E 5T9 • Phone (780) 436-9570 • Fax (780) 434-0811
#6 – 210 MacAlpine Crescent • Fort McMurray, AB T9H 4A6 • Phone (780) 790-9722 • Fax (780) 790-1610
1.0 PURPOSE
To establish a standard service leak test procedure.
2.0 SCOPE
2.1 This procedure applies to instrument or utility air piping and tubing systems
where service leak testing is permitted by the Client.
2.2 This procedure applies to leak tests not exceeding design gage pressures not
over 150 psi (1035 kPa) and the design temperature is from -29 °C (-20 °F)
through 186 °C (366 °F).
2.3 The Client’s specifications may further restrict these limits and must be
addressed prior to any test taking place.
2.4 The Client must approve this test procedure prior to any tests being undertaken.
2.5 Where Chemco is required to service test the piping system and tubing to users
by contract, complete Articles 5.0 through 8.1 inclusive.
2.6 Where the piping system is the responsibility of others and where Chemco is
required to service test tubing to users only, conduct the tubing leak test in
conjunction with the piping contractor, examine tubing materials and fittings for
conformance to the design & installation details and complete Articles 6.0, 7.0
and 8.2.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible to maintain and issue this procedure.
3.2 Project QC Managers, QC Leads & Specialists are responsible for
implementation and compliance with this procedure.
3.3 Field-testing personnel are responsible for the documentation of test results and
compliance with this procedure.
4.0 REFERENCE DOCUMENTS
4.1 Project Test Specifications, Installation Details
5.0 EXAMINATION PRIOR TO LEAK TEST
5.1 The following, when in Chemco’s scope to install, shall be visually examined:
5.1.1 Pipe Material: Size, Schedule and Specification.
5.1.2 Flanges: Ratings, Size, Schedule and material Specification.
5.1.3 Fittings size, schedule and material specification.
5.1.4 Valves: Installed correctly, orientation, clearance for removal,
Identification, etc.
5.1.5 Tubing materials in accordance with the design & installation details.
Revision 0 November 21, 2006 QP-355 R0 Service Leak Test Procedure.doc Page 1 of 3
QP-355
5.1.6 Bolts, studs, nuts: length and material correct. Studs at least flush with
heads. The maximum thread exposure beyond nut should be about 2
threads.
5.1.7 Gaskets: size, type, and material.
5.1.8 All welding is satisfactory, documented and traceable to welder’s
symbol.
5.1.9 All NDE, heat treatments complete, documented and records filed.
5.1.10 Installation and supports in accordance with the design & installation
details.
5.1.11 All deficiencies recorded on Punch List QS-060.
6.0 LEAK TEST PREPARATION
6.1 Preparation in advance of conducting leak tests shall include the following
checks:
6.1.1 Test gauges are calibrated and the calibration date is not expired.
6.1.2 Test gauge calibration certificates are logged and on file.
6.1.3 Deficiencies from Punch List (QS-060) have been corrected & re-
inspected where required.
6.1.4 All items which could be contaminated with dirt or damaged by the leak
test are isolated or removed, such as control valves, instruments,
pressure regulators, etc.
6.1.5 Equipment with internals, such as filters, that could be contaminated with
dirt or damaged are isolated as required.
6.1.6 Vents and drains are correctly installed.
6.1.7 "Open" and "Close" positions of all valves have been verified.
6.1.8 Install a minimum of 2 calibrated pressure gauges on the system under
test. Pressure gauges shall be selected so that the test pressure falls
between 1/3 and 2/3 of the full-scale reading on the gauge. Pressure
gauges shall have an accuracy of at least 0.50% of full scale reading
over the entire range of the gauge.
6.1.9 The test pak drawing (ISO) shall be marked up showing the leak test
system limits when Chemco is the installer.
6.1.10 With equipment disconnected (e.g. air users), blow down the piping and
tubing system to clean it out.
6.1.11 Plug the tubing end at the user.
Revision 0 November 21, 2006 QP-355 R0 Service Leak Test Procedure.doc Page 2 of 3
QP-355
Revision 0 November 21, 2006 QP-355 R0 Service Leak Test Procedure.doc Page 3 of 3
QP-004
1.0 PURPOSE
To describe the procedure used for the Pre-placement, Post Placement and Post
Termination testing of Fiber Optic Single Mode and Multi Mode fiber optic cables.
2.0 SCOPE
This procedure applies to all cables where project specifications require Fiber
Optic OTDR (Optical Time Domain Reflectometer) or Power Meter testing of Multi
Mode or Single Mode cables and patchcords.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and distribution of
this procedure.
3.2 Field testing personnel are responsible for the implementation of and
documentation of test results as per the requirements of this procedure.
5.0 PREPARATION
5.1 Prior to starting the test, review Scope of Work in the specific Work Plans for
the optical loss values for Single Mode and Multi Mode fiber, splices and
connectors. The design values should be used to determine if the measured
values are consistent with expected values.
5.2 Check the calibration date of the test equipment to ensure the calibration
date is valid. When utilizing the OTDR, ensure the optic module being
utilized is conducive to cable length being tested. The short range and
medium range modules are capable of measures cables 200 meters – 20
km while the long range module is capable of testing fiber cables of 700
Revision 0, May 27, 2004 QP-402 R0 Fibre Optic Cable Testing.doc Page 1 of 6
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-402
meters - 40 km. If the cable length is not known, the medium range module
should be utilized to obtain the cable length and the module used to conduct
subsequent testing should be changed as required.
5.3 When conducting pre-placement testing, obtain the test data sheet from the
factory, which should be attached to the cable reel. This data can be used to
compare with the field test data to ensure the on site testing is comparable to
the factory testing. The factory test data sheet is to be submitted to the on
site testing Supervisor.
5.4 Cross-reference the cable with the reference drawings. Ensure cable to be
tested is the correct cable type and in the correct location.
5.5 Ensure all necessary PPE is available and follow the Fiber Optic Safety
Practices documentation for all fiber handling procedures.
5.6 Install necessary flagging to secure the test area. Ensure caution signs are
placed in locations that are clearly visible. The caution signs should indicate
that fiber optic testing is being conducted and the risk of laser radiation is
possible.
5.7 Ensure far end of the cable is capped and signage placed indicating fiber
optic testing is being conducted. If performing fiber optic post termination
testing, ensure far end is secured following the fiber optic lockout procedure.
This will prevent the risk of accidental laser radiation or equipment damage
in the event that test sets are connected at each end of the fiber unknowingly.
5.8 Assemble the OTDR test set, dead zone cable and bare fiber to provide
connectivity from the OTDR to the bare glass strand. In the event of Post
Termination Testing, the patch cord connected to the far side of the dead
zone cable can be connected to the desired optical port on the fiber optic
patch panel.
5.9 For Pre & Post Placement testing, prepare the fiber by removing one end of
the cable sheath to expose the internal fiber optic buffer tubes. Remove
center strength member and kevlar fabric.
5.10 Strip buffer tubes to expose the glass strands. Use Corning Fiber Clean to
remove gel compound from the glass strands.
5.11 Strip coating off of the desired glass strand to expose the bare glass. Clean
the glass strands with alcohol wipe.
Revision 0, May 27, 2004 QP-402 R0 Fibre Optic Cable Testing.doc Page 2 of 6
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-402
5.12 Use an approved fiber optic cleaver to cleave the fiber for insertion into the
Bare Fiber adapter assembly.
5.13 Dispose of the cut off glass strand into an approved glass waste container.
5.15 Insert the glass strand into the Bare Fiber adapter.
6.1 Adjust settings on the OTDR to match the type of fiber and fiber length.
6.2 Upon confirming that it is safe to transmit laser radiation into the fiber cable,
start the OTDR test. Test dual wavelengths of 850 & 1300nm for Multi mode
fiber and 1310 & 1550nm for Single mode fiber.
6.3 Upon confirming the test is valid record the test parameters and store the file
accordingly. Perform all additional tests required.
6.6 For Post Termination Testing, it is imperative to confirm that the far end is
secured with lockout testing notification and that there is no laser source from
network or test equipment. Post Termination testing requires Bi-directional
testing. Once the A-B testing has been completed, the B-A testing must also
be completed.
6.7 For patch cords and fiber lengths of less than 200 meters, the OTDR may not
be able to accurately test the fiber due to inherent dead zone constraints. In
this case, an optical source and power meter should be utilized. Follow set
up procedures including jumper reference test. Test fiber accordingly.
Testing of the fiber through terminated fiber optic connectors can then be
performed. The testing is to be bi-directional and performed at both 850
&1300nm for Multi Mode applications and 1310 & 1550nm for Single Mode
Revision 0, May 27, 2004 QP-402 R0 Fibre Optic Cable Testing.doc Page 3 of 6
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-402
6.8 Upon completion of all tests, the OTDR test results should be converted to
PDF electronic format for submission to the testing Supervisor. Hard copy
results of Power Meter testing should be submitted to the testing Supervisor.
The Supervisor shall submit all test results to QC. The QC department will
establish the format to be submitted to the Customer.
6.9 In the event that fiber cable, splice and loss specifications are not available
from the Customer, use the following table for calculating acceptable fiber
link budgets. Fiber tests should be equal to or less than the link calculated
from the following table.
TABLE 1
Single Mode Technical Objective: 0.3 dB/conn., 0.07 dB/splice, 0.4 dB/km
Multi Mode Technical Objective: 0.2 dB/conn., 0.03 dB/splice, 3.2 dB/km
7.1 Record all data on the QC forms provided. Modify related drawings to reflect
“AS BUILT” information. Submit all forms & drawings to the testing
Supervisor for review and submission to QC.
7.2 Electronic media of OTDR test results in PDF format, appropriately labeled,
are to also be submitted to QC on site for Customer Turnover and one
additional copy to Edmonton Chemco Corporate Office, attention: Quality
Manager, for archive purposes.
Revision 0, May 27, 2004 QP-402 R0 Fibre Optic Cable Testing.doc Page 4 of 6
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-402
Revision 0, May 27, 2004 QP-402 R0 Fibre Optic Cable Testing.doc Page 5 of 6
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-402
Revision 0, May 27, 2004 QP-402 R0 Fibre Optic Cable Testing.doc Page 6 of 6
09/02/04 THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QP-404
1.0 PURPOSE
To describe the procedure used for the Pre-placement, Post Placement and Post
Termination testing of Copper CAT 3 (Voice), CAT5e (Data) Copper and Coaxial
Communication cables.
2.0 SCOPE
This procedure applies to all cables where project specifications require
connectivity, inductance, capacitance, short circuit, cross talk, wire map, cable
length verification, frequency sweep and/or other related copper cable tests
indicated in the Client requirements.
3.0 RESPONSIBILITY
3.1 The Quality Manager is responsible for the maintenance and distribution
of this procedure.
3.2 Field testing personnel are responsible for the implementation of and
documentation of test results as per the requirements of this procedure.
Perform the test on the pair count indicted by the Client (i.e. – every pair,
every 5th pair, etc). If the Client does not indicate the pair count to be
tested, every pair is to be tested.
5.14 Submit electronic test data files to on site QC as indicated in Section 8.
7.3 Cross-reference the cable with the reference drawings. Ensure cable to
be tested is the correct cable type and in the correct location.
7.4 Ensure all necessary PPE is available and follow standard Safety for all
copper handling procedures.
7.5 Ensure that all Variances for the removal of Hard Hats and Gloves (if
applicable) are present and visible for review if requested by Safety or
Supervision personnel.
7.6 Install necessary flagging to secure the test area. Ensure caution signs
are placed in locations that are clearly visible.
7.7 Using the Fluke DSP4300 test set, insert the COAX personality module &
connect to the coax connector to be tested. Select the test parameter
from the menu for the test to be performed. Perform COAX sweep test
using the parameters in the test set menu. Upon confirming the test is
valid, store the file accordingly. Perform all additional tests required.
7.8 Complete the QC-420 record.
7.9 Submit electronic test data files to on site QC as indicated in Section 8.
Revision 9 June 16, 2009 QC-001 R9 Low Voltage Test Sheet Index.doc Page 1 of 3
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QC-001
Revision 9 June 16, 2009 QC-001 R9 Low Voltage Test Sheet Index.doc Page 2 of 3
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
QC-001
Revision 9 June 16, 2009 QC-001 R9 Low Voltage Test Sheet Index.doc Page 3 of 3
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
Electrical Test Acceptance
QC-100
Criteria
This Electrical Test Acceptance Criteria is based on the 2003 NETA "Acceptance Testing
Specifications for Electrical Power Distribution Equipment and Systems”.
Purchasers may reproduce and use all or a portion of the Specifications after paying the charges so long as the 2003 NETA
Acceptance Specifications are clearly and obviously identified in writing as the source of all such uses or reproductions.
In all events, the following sections of the 2003 NETA Acceptance Testing Specifications are incorporated by reference in each
subsection of the 2003 NETA Acceptance Testing Specifications as though set out in full in each subsection:
The purchaser is advised to include the above sections along with any section(s) of 7.0.
NETA intends that Section 7.0 of the 2003 NETA Acceptance Testing Specifications be reproduced and used on a “cut and paste”
basis for the particular type of equipment to be tested, in all events so long as the clear and obvious identification of the course
described above is provided in writing.
© Copyright 2003
InterNational Electrical Testing Association
PO Box 687, 106 Stone Street
Morrison, CO 80465
Voice: 303.697.8441 Facsimile: 303.697.8431
E-mail: [email protected] • Web: www.netaworld.org
TABLES
100.1 Insulation Resistance Test Values, Electrical Apparatus and Systems ................................. 3
100.2 Switchgear Withstand Test Voltages ..................................................................................... 4
100.3 Recommended Dissipation Factor/Power Factor at 20° C; Liquid-Filled Transformers,
Regulators, and Reactors; Acceptance Test Values.............................................................. 5
100.4 Insulating Fluid Limits
100.4.1 Test Limits for New Insulating Oil ....................................................................... 6
100.4.2 Test Limits for Silicone Insulating Liquid in New Transformers........................... 6
100.4.3 Typical Values for Less-Flammable Hydrocarbon Insulating Liquid ................... 7
100.5 Transformer Insulation Resistance ........................................................................................ 8
100.6 Medium-Voltage Cables
100.6.1 DC Test Voltages ................................................................................................ 9
100.6.2 AC Test Voltages ................................................................................................ 10
100.6.3 Partial Discharge Requirements ......................................................................... 11
100.6.4 Very Low Frequency Testing Levels ................................................................... 11
100.7 Inverse Time Trip Test at 300% of Rated Continuous Current,
Molded-Case Circuit Breakers ............................................................................................... 12
100.8 Instantaneous Trip Tolerances for Field Testing of Circuit Breakers ..................................... 13
100.9 Instrument Transformer Dielectric Tests ................................................................................ 14
100.10 Maximum Allowable Vibration Amplitude ............................................................................... 15
100.11 Reserved ............................................................................................................................ 16
100.12 US Standard Fasteners, Bolt Torque Values for Electrical Connections
100.12.1 Heat-Treated Steel - Cadmium or Zinc Plated .................................................... 17
100.12.2 Silicon Bronze Fasteners .................................................................................... 17
100.12.3 Aluminum Alloy Fasteners .................................................................................. 18
100.12.4 Stainless Steel Fasteners ................................................................................... 18
100.13 SF6 Gas Tests ........................................................................................................................ 19
100.14 Insulation Resistance Conversion Factors
100.14.1 Test Temperatures to 20° C................................................................................ 20
100.14.2 Test Temperatures to 40° C................................................................................ 21
100.15 High-Potential Test Voltage, Automatic Circuit Reclosers ..................................................... 22
100.16 High-Potential Test Voltage for Acceptance Test of Line Sectionalizers ............................... 23
100.17 Dielectric Withstand Test Voltages, Metal-Enclosed Bus ...................................................... 24
100.18 Thermographic Survey, Suggested Actions Based on Temperature Rise ............................. 25
100.19 Overpotential Test Voltages, Electrical Apparatus Other than Inductive Equipment ............. 26
100.20 Rated Control Voltages and their Ranges for Circuit Breakers
100.20.1 Circuit Breakers .................................................................................................. 27
100.20.2 Solenoid-Operated Devices ................................................................................ 28
TABLE 100.1
In the absence of consensus standards dealing with insulation-resistance tests, the Standards Review Council suggests
the above representative values.
See Table 100.14 for temperature correction factors.
Test results are dependent on the temperature of the insulating material and the humidity of the surrounding environment
at the time of the test.
Insulation-resistance test data may be used to establish a trending pattern. Deviations from the baseline information
permit evaluation of the insulation.
TABLE 100.2
Derived from ANSI/IEEE C37.20.1-1993, Paragraph 5.5, Standard for Metal-Enclosed Low-Voltage Power Circuit-
Breaker Switchgear, C37.20.2-1993, Paragraph 5.5, Standard for Metal-Clad and Station-Type Cubicle Switchgear and
C37.20.3-1987 (R1992), Paragraph 5.5, Standard for Metal-Enclosed Interrupter Switchgear, and includes 0.75
multiplier with fraction rounded down.
The column headed “DC” is given as a reference only for those using dc tests to verify the integrity of connected cable
installations without disconnecting the cables from the switchgear. It represents values believed to be appropriate and
approximately equivalent to the corresponding power frequency withstand test values specified for voltage rating of
switchgear. The presence of this column in no way implies any requirement for a dc withstand test on ac equipment or
that a dc withstand test represents an acceptable alternative to the low-frequency withstand tests specified in these
specifications, either for design tests, production tests, conformance tests, or field tests. When making dc tests, the
voltage should be raised to the test value in discrete steps and held for a period of one minute.
† Because of the variable voltage distribution encountered when making dc withstand tests, the manufacturer should be
contacted for recommendations before applying dc withstand tests to the switchgear. Voltage transformers above 34.5
kV should be disconnected when testing with dc. Refer to ANSI/IEEE C57.13-1993 (IEEE Standard Requirements for
Instrument Transformers) paragraph 8.8.2.
TABLE 100.3
In the absence of consensus standards dealing with transformer dissipation-factor or power-factor values, the NETA
Standards Review Council suggests the above representative values.
TABLE 100.4
ANSI/IEEE C57.106-2002, Guide for Acceptance and Maintenance of Insulating Oil in Equipment, Tables 1, 2, and 3.
Table 100.4.2
Test Limits for Silicone Insulating Liquid in New Transformers
Test ASTM Method Acceptable Values
Dielectric breakdown, kV minimum D877 30
Visual D2129 clear, free of particles
Water content, ppm maximum D1533 50
Dissipation/power factor, 60 hertz, % D924 0.1
max. @ 25° C
Viscosity, cSt @ 25° C D445 47.5 – 52.5
Fire point, ° C, minimum D92 340
Neutralization number, D974 0.01
mg KOH/g max.
ANSI/IEEE C57.111-1989 (R1995), Guide for Acceptance of Silicone Insulating Fluid and Its Maintenance in Transformers,
Table 2.
ANSI/IEEE C57.121-1998, IEEE Guide for Acceptance and Maintenance of Less Flammable Hydrocarbon Fluid in
Transformers, Table 3.
The test limits shown in this table apply to less-flammable hydrocarbon fluids as a class. Specific typical values for each
brand of fluid should be obtained from each fluid manufacturer.
a. If the purpose of the HMWH installation is to comply with the NFPA 70 National Electrical Code, this value is the
minimum for compliance with NEC Article 450.23.
TABLE 100.5
In the absence of consensus standards, the NETA Standards Review Council suggests the above representative
values.
See Table 100.14 for temperature correction factors.
NOTE: Since insulation resistance depends on insulation rating (kV) and winding capacity (kVA), values
obtained should be compared to manufacturer’s published data.
TABLE 100.6
Medium-Voltage Cables
Acceptance Test Values
Table 100.6.1
DC Test Voltages
Maximum DC Field
Nominal Test Voltages, kV
Insulation Thickness During/After
mils (mm) Installation
Rated Voltage 100% 133% 100% 133%
Phase-to-Phase Conductor Size Insulation Insulation Insulation Insulation
kV AWG or kcmil (mm) Level Level Level Level
8-1000 (8.4-507) 90 (2.29) 115 (2.92) 28 36
5
Above 1000 (507) 140 (3.56) 140 (3.56) 28 36
6-1000 (13.3-507) 115 (2.92) 140 (3.56) 36 44
8
Above 1000 (507) 175 (4.45) 175 (4.45) 36 44
2-1000 (33.6-507) 175 (4.45) 220 (5.59) 56 64
15
Above 1000 (507) 220 (5.59) 220 (5.59) 56 64
25 1-2000 (42.4-1013) 260 (6.60) 320 (8.13) 80 96
28 1-2000 (42.4-1013) 280 (7.11) 345 (8.76) 84 100
35 1/0-2000 (53.5-1013) 345 (8.76) 420 (10.7) 100 124
46 4/0-2000 (107.2-1013) 445 (11.3) 580 (14.7) 132 172
69 4/0-2000 (107.2-1013) 650 195
Tables derived from ANSI/ICEA S 93-639/NEMA WC 74-2000, 5-46 kV Shielded Power Cable for Use in the
Transmission and Distribution of Electric Energy; ANSI/ICEA S-94-649-2000, Standard for Concentric Neutral Cables
Rated 5,000 - 46,000 Volts; ANSI/ICEA S-97-682-2000, Standard for Utility Shielded Power Cables Rated 5,000 -
46,000 Volts; and The Okonite Company, High-Voltage Proof Testing.
DC test voltages are applied to discover gross problems such as incorrectly installed accessories or mechanical damage.
The dc field test voltages listed above are intended for cable designed in accordance with
ICEA specifications. When older cables or other types/classes of cables or accessories are
connected to the system, voltages lower than those shown may be necessary. Consult the
manufacturers of the cables and/or accessories before applying the test voltage.
Medium-Voltage Cables
Acceptance Test Values
Table 100.6.2
AC Test Voltages
Nominal
Insulation Thickness
Mils (mm) AC Test Voltage, kV
Tables derived from ANSI/ICEA S 93-639/NEMA WC 74-2000, 5-46 kV Shielded Power Cable for Use in the
Transmission and Distribution of Electric Energy; ANSI/ICEA S-94-649-2000, Standard for Concentric Neutral
Cables Rated 5,000 - 46,000 Volts; ANSI/ICEA S-97-682-2000, Standard for Utility Shielded Power Cables Rated
5,000 - 46,000 Volts.
Medium-Voltage Cables
Acceptance Test Values
Table 100.6.3
Partial Discharge Requirements
for Semiconducting Coating and Tape Designs Only
Rated Circuit Voltage
Phase-to-Phase Minimum Partial Discharge Extinction Level, kV
Volts 100% Insulation Level 133% Insulation Level
2001-5000 4 5
5001-8000 6 8
8001-15000 11 15
In the absence of consensus standards the NETA Standards Review Council suggests the above
representative values.
ANSI/ICEA S 93-639/NEMA WC 74-2000, 5-46 kV Shielded Power Cable for Use in the Transmission
and Distribution of Electric Energy.
Table 100.6.4
Very Low Frequency Testing Levels
0.1 Hz Test Voltage (rms)
In the absence of consensus standards the NETA Standards Review Council suggests the above
representative values.
TABLE 100.7
Derived from Table 5-3, NEMA Standard AB 4-1996, Guidelines for Inspection and Preventive Maintenance of Molded-
Case Circuit Breakers Used in Commercial and Industrial Applications.
a. Trip times may be substantially longer for integrally-fused circuit breakers if tested with the fuses replaced by solid
links (shorting bars).
TABLE 100.8
TABLE 100.9
Table 100.9 is derived from Paragraph 8.8.2 and Tables 2 of ANSI/IEEE C57.13-1993, Standard Requirements for
Instrument Transformers.
+ Periodic dc potential tests are not recommended for transformers rated higher than 34.5 kV.
* DC potential tests are not recommended for transformers rated higher than 200kV BIL. DC tests may prove beneficial
as a reference for future testing. In such cases the test direct voltage shall not exceed the original factory test RMS
alternating voltages.
TABLE 100.10
Derived from NEMA publication MG 1–1998, Section 7.8.1, Table 7–1. Table is unfiltered vibration limits for resiliently
mounted machines. For machines with rigid mounting multiply the limiting values by 0.8.
TABLE 100.11
— RESERVED —
TABLE 100.12
US Standard Fastenersa
Bolt-Torque Values for Electrical Connections
Table 100.12.1
Heat-Treated Steel - Cadmium or Zinc Plated
Grade SAE 1&2 SAE 5 SAE 7 SAE 8
Head Marking
Table 100.12.2
Silicon Bronze Fastenersb
Torque (Pound-Feet)
Bolt Diameter in Inches Nonlubricated Lubricated
5/16 15 10
3/8 20 14
1/2 40 25
5/8 55 40
3/4 70 60
US Standard Fastenersa
Bolt-Torque Values for Electrical Connections
Table 100.12.3
Aluminum Alloy Fastenersc
Torque (Pound-Feet)
Bolt Diameter in Inches Lubricated
5/16 8.0
3/8 11.2
1/2 20.0
5/8 32.0
3/4 48.0
Table 100.12.4
Stainless Steel Fastenersd
Torque (Pound-Feet)
Bolt Diameter in Inches Uncoated
5/16 14
3/8 25
1/2 45
5/8 60
3/4 90
a. Consult manufacturer for equipment supplied with metric fasteners.
c. This table is based on aluminum alloy bolts having a minimum tensile strength of 55,000 pounds per square inch.
d. This table is to be used for the following hardware types:
Bolts, cap screws, nuts, flat washers, locknuts (18–8 alloy)
Belleville washers (302 alloy).
TABLE 100.13
TABLE 100.14
Insulation Resistance Conversion Factors (20° C)
Table 100.14.1
Test Temperatures to 20° C
Temperature Multiplier
Apparatus Containing Apparatus Containing
°C °F
Immersed Oil Insulation Solid Insulation
-10 14 0.125 0.25
-5 23 0.180 0.32
0 32 0.25 0.40
5 41 0.36 0.50
10 50 0.50 0.63
15 59 0.75 0.81
20 68 1.00 1.00
25 77 1.40 1.25
30 86 1.98 1.58
35 95 2.80 2.00
40 104 3.95 2.50
45 113 5.60 3.15
50 122 7.85 3.98
55 131 11.20 5.00
60 140 15.85 6.30
65 149 22.40 7.90
70 158 31.75 10.00
75 167 44.70 12.60
80 176 63.50 15.80
85 185 89.789 20.00
90 194 127.00 25.20
95 203 180.00 31.60
100 212 254.00 40.00
105 221 359.15 50.40
110 230 509.00 63.20
Derived from Stitch in Time…The Complete Guide to Electrical Insulation Testing, Megger.
Derived from Megger’s Stitch in Time…The Complete Guide to Electrical Insulation Testing and ANSI/IEEE 43-2000,
IEEE Recommended Practice for Testing Insulation Resistance of Rotating Machinery.
Notes: The insulation resistance coefficient is based on the halving of the insulation resistance to the change in temperature.
Apparatus Containing Immersed Oil Insulation Table uses 10° C change with temperature halving.
Apparatus Containing Solid Insulation Table uses 15° C change with temperature halving.
TABLE 100.15
Derived from ANSI/IEEE C37.61-1973(R1992), Standard Guide for the Application, Operation, and Maintenance of
Automatic Circuit Reclosers and from C37.60-1981(R1992), Standard Requirements for Overhead, Pad-Mounted, Dry-
Vault, and Submersible Automatic Circuit Reclosers and Fault Interrupters for AC Systems.
TABLE 100.16
Derived from ANSI/IEEE C37.63-1984(R1990) Table 2 (Standard Requirements for Overhead, Pad-Mounted, Dry-
Vault, and Submersible Automatic Line Sectionalizers of ac Systems).
In the absence of consensus standards, the NETA Standards Review Council suggests the above representative values.
NOTE: Values of ac voltage given are dry test one minute factory test values.
TABLE 100.17
Derived from ANSI/IEEE C37.23-1987, Tables 3A, 3B, 3C, 3D and paragraph 6.4.2. The table includes a 0.75 multiplier
with fractions rounded down.
NOTE:
The presence of the column headed “DC” does not imply any requirement for a dc withstand test on ac equipment. This
column is given as a reference only for those using dc tests and represents values believed to be appropriate and
approximately equivalent to the corresponding power frequency withstand test values specified for each class of bus.
Direct current withstand tests are recommended for flexible bus to avoid the loss of insulation life that may result from
the dielectric heating that occurs with rated frequency withstand testing.
Because of the variable voltage distribution encountered when making dc withstand tests and variances in leakage
currents associated with various insulation systems, the manufacturer should be consulted for recommendations before
applying dc withstand tests to this equipment.
TABLE 100.18
Thermographic Survey
Suggested Actions Based on Temperature Rise
Temperature difference (∆T) based
Temperature difference (∆T) based upon comparisons between
on comparisons between similar component and ambient air
components under similar loading. temperatures. Recommended Action
Possible deficiency; warrants
1ºC - 3ºC 1ºC - 10ºC
investigation
Indicates probable deficiency; repair
4ºC - 15ºC 11ºC - 20ºC
as time permits
Monitor until corrective measures
-- -- -- 21ºC - 40ºC
can be accomplished
Major discrepancy; repair
>15ºC >40ºC
immediately
Temperature specifications vary depending on the exact type of equipment. Even in the same class of equipment (i.e.,
cables) there are various temperature ratings. Heating is generally related to the square of the current; therefore, the load
current will have a major impact on ∆T. In the absence of consensus standards for ∆T, the values in this table will provide
reasonable guidelines.
An alternative method of evaluation is the standards-based temperature rating system as discussed in Chapter 8.9.2,
Conducting an IR Thermographic Inspection, Electrical Power Systems Maintenance and Testing, by Paul Gill, PE, 1998.
It is a necessary and valid requirement that the person performing the electrical inspection be thoroughly trained and
experienced concerning the apparatus and systems being evaluated as well as knowledgeable of thermographic
methodology.
TABLE 100.19
In the absence of consensus standards, the NETA Standards Review Council suggests the above representative values.
a. Intermediate voltage ratings are placed in the next higher insulation class.
TABLE 100.20
100.20.1
Rated Control Voltages and their Ranges for Circuit Breakers
Direct Current Voltage Ranges Alternating Current
(1)(2)(3)(5) Voltage Ranges
Volts, dc (8)(9) (1)(2)(3)(4)(8)
Closing and Auxiliary Rated Control Voltage Closing, Tripping, and
Functions (60 Hz) Auxiliary Functions
(11) Outdoor Opening
Rated Control Indoor Circuit Circuit Functions
Voltage Breakers Breakers All Types Single Phase Single Phase
24 (6) --- --- 14–28 120 104–127 (7)
48 (6) 38–56 36–56 28–56 240 208–254 (7)
125 100–140 90–140 70–140
250 200–280 180–280 140–280 Polyphase Polyphase
--- --- --- --- 208Y/120 180Y/104–220Y/127
--- --- --- --- 240 208–254
Derived from Table 8, ANSI C37.06-2000, AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis
— Preferred Ratings and Related Required Capabilities.
Notes:
(1) Electrically operated motors, contactors, solenoids, valves, and the like, need not carry a nameplate voltage rating that
corresponds to the control voltage rating shown in the table as long as these components perform the intended duty
cycle (usually intermittent) in the voltage range specified.
(2) Relays, motors, or other auxiliary equipment that function as a part of the control for a device shall be subject to the
voltage limits imposed by this standard, whether mounted at the device or at a remote location.
(3) Circuit breaker devices, in some applications, may be exposed to control voltages exceeding those specified here due
to abnormal conditions such as abrupt changes in line loading. Such applications require specific study, and the
manufacturer should be consulted. Also, application of switchgear devices containing solid-state control, exposed
continuously to control voltages approaching the upper limits of ranges specified herein, require specific attention and
the manufacturer should be consulted before application is made.
(4) Includes supply for pump or compressor motors. Note that rated voltages for motors and their operating ranges are
covered by ANSI/NEMA MG-1-1978.
(5) It is recommended that the coils of closing, auxiliary, and tripping devices that are connected continually to one dc
potential should be connected to the negative control bus so as to minimize electrolytic deterioration.
(6) 24-volt or 48-volt tripping, closing, and auxiliary functions are recommended only when the device is located near the
battery or where special effort is made to ensure the adequacy of conductors between battery and control terminals.
24-volt closing is not recommended.
(7) Includes heater circuits
(8) Voltage ranges apply to all closing and auxiliary devices when cold. Breakers utilizing standard auxiliary relays for
control functions may not comply at lower extremes of voltage ranges when relay coils are hot, as after repeated or
continuous operation.
(9) Direct current control voltage sources, such as those derived from rectified alternating current, may contain sufficient
inherent ripple to modify the operation of control devices to the extent that they may not function over the entire
specified voltage ranges.
100.20.2
Rated Control Voltages and their Ranges for Circuit Breakers
Solenoid-Operated Devices
Closing Voltage Ranges
Rated Voltage for Power Supply
125 dc 90 - 115 or 105 - 130
250 dc 180 - 230 or 210 - 260
230 ac 190 - 230 or 210 - 260
Some solenoid operating mechanisms are not capable of satisfactory performance over the range of voltage specified in the
standard; moreover, two ranges of voltage may be required for such mechanisms to achieve an acceptable standard of
performance.
The preferred method of obtaining the double range of closing voltage is by use of tapped coils. Otherwise it will be
necessary to designate one of the two closing voltage ranges listed above as representing the condition existing at the
device location due to battery or lead voltage drop or control power transformer regulation. Also, caution should be
exercised to ensure that the maximum voltage of the range used is not exceeded.
JOB# CWP
CLIENT REF:
This Form is for Major Equipment. Mark “N/A” where Not Applicable
Tag Number: Date:
P.O. Number: Supplier: Report No.:
Req No: Carrier: Ref Dwg.:
Equipment Description:
INSPECTION CHECKLIST
Equipment Damage Equipment Tagged
Paint Damage Impact Recorder
Glass Damage Lifting Lugs
Water Damage Documentation Included (See Below)
Instrument Damage Estimated Weight
Loose Parts
Missing Parts H W L
Packing List [ ] Cal Cert [ ] Test Report [ ] Preservation Instructions [ ]
Attachments: O&M Manuals [ ] Data Sheet [ ] Manuf. Data [ ] Loose / Spare Parts [ ]
Storage Instructions[ ] Other [ ]
Comments:
NCR Issued: Yes [ ] No [ ] NCR Number: MER Issued: Yes [ ] No [ ] MER Number:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Equipment Tag #:
Cable Tag #:
Location:
Actual Torque
Termination
Bolt Size Torque
Bolt ID # Location (in or mm)
Marked Wrench Torqued By Date
(in lbs)
(ft lbs)
(For Torque) ID#
COMMENTS:
JOB# CWP
Client Ref:
JOB# CWP
CLIENT REF:
INSPECTIONS:
Inspection To Be Performed Result Comments:
All loose or open parts are contained in waterproof bags
Electrical Tracing
Equipment tag numbers checked
Cables installed, checked and tested
Thermostat’s installed
Capillaries protected
Cable ends protected and secure
Instrumentation
Junction boxes mounted and secure
Conduits complete and unused ends plugged
Wiring complete and checked
Instruments complete and checked
Tag numbers checked
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Equipment Description: Equipment Location:
Reference Drawings:
Installed
Install and Check for Connectors Cable
CSA Device Type Device Tag # as
Terminate Damage Tight Tag
Per Details
COMMENTS:
JOB# CWP
CLIENT REF:
1.0 DATA
Equipment Designation: Location :
Source Designation: CCT Number :
2.0 PERMIT
Permit Required: [ ]Y [ ]N Permit Obtained: [ ] Y [ ] N
3.0 SOURCE END INSPECTION
Results Results
Source De-energized / Locked Cables / Conduits Removed
Confirm loss of voltage Cables / Conduits Capped or Plugged
Wires Marked & Disconnected Breaker / Cell Marked Spare
Panel / Cable Opening Sealed Housekeeping Complete
Panel / MCC Schedule Updated ALL Prints As-Builts completed
Comments :
INSPECTED BY: DATE:
4.0 FIELD END INSPECTION
Equipment Designation:
Location :
Results Results
Source De-energized / Locked Cables / Conduits Capped or Plugged
Confirm loss of voltage Cables / Conduits Removed
Wires Marked & Disconnected Supports Removed
Equipment Removed ALL Prints As-Builts completed
Housekeeping Complete
Comments :
INSPECTED BY: DATE:
5.0 CABLE / CONDUIT DATA
Results Results
Cable / Wires Marked & Disconnected Cables / Wires Tagged 'SPARE'
Cables Coiled Cables Completely Removed
Conduit Removed All Holes Plugged / Capped
ALL Prints As-Builts completed Housekeeping Complete
INSPECTED BY: DATE:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
No. Rated Type Wires Wires Confirm Cable/Conduit Instr. Wires Tagged Verified By
Cable Tag Cond.
Size From Disconnected To Disconnected De-energized Removed Removed Spare
Volts Initial Date
Comments:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Wires Verified By
Equipment Equipment Cable/Conduit Wires As-builts
Equipment Designation Location Circuit # Tagged
Removed Openings, Sealed Removed Disconnected Complete Initial Date
Spare
Comments:
JOB# CWP
CLIENT REF:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Test Voltage for Insulation Tests (unless specified otherwise by Project Specifications):
Cable Insulation Rating Cable Insulation Rating
Test Voltage (DC) Test Voltage (DC)
(Volts) (Volts)
120 – 300 500 601 – 2400 2500
301 – 600 1000 Greater than 2400 V 5000
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NO TEMPORARY POWER PANELS SHALL BE ENERGIZED WITHOUT THIS FORM BEING FILLED IN COMPLETELY
AND BEING ACCEPTED BY AN AUTHORIZED CHEMCO QC REPRESENTATIVE BY MEANS OF A SIGNATURE AT THE
BOTTOM OF THIS FORM.
FEEDER CABLE
Cable Designation Cable Size
Cable Insulation Rating Cable Length
Cable Manufacturer Test Volts Result
Cable Megger
Cable Type
For Multiple cables use Form QC-
110 & attach
Test Equipment ID:
GROUNDING INSPECTIONS:
Conductor Size Connected to Skid
Connected to Grid Connected to Rods
Connected to other Gas Line Jumpers
Ground Rods Skid / Frame
Gas Line Transformer Xo
Metal Water Lines Glyptol O/S Connection
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
INSPECTION / CONTINUITY TEST Test Equipment Log#:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
INSPECTION / MEGGER TEST (Results in Meg Ohms) Test Equipment Log#:
Conductor
Shield To Overall
Shield To To Conduit
Conductor Armour or Shield to
No. Seals From To Cable Wire Conductor Shield SP Non-
Cable Tag Pair
Size From To Poured Term Term Tags Shrinks
To
To Shield
Conduit
MP Cables
Armour
shielded
Conductor SP Cables MP Cables
Only Cables
Only Only
Only
Megger Only When Specified. Megger at 500 VDC. MP = Multiple Pairs SP = Single Pair
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NSULATION RESISTANCE / CONTINUITY TEST Test Equipment Log#:
Megger Tested By
From To Continuity
No. Type Rated Test Test
Cable Tag Size From Check To Check Test
Cond. (Teck, TC etc.) Volts *1 *1 (Pass/Fail) Volts Result Initial Date
*2 *3
*1. Verify at source & destination ends: All conductor and ground connections are completed and tight, Cable Tags are installed, Phasing tape, Cable support, Lighting & Recept circuits are identified.
*2. Insulation Test Optional for Lighting and Receptacles Cables.
*3. Test performed with other phases jumpered to ground. Test duration - 1 minute.
Test Voltage for Insulation Tests (unless specified otherwise by Project Specifications):
Cable Insulation Rating (Volts) Test Voltage (DC) Cable Insulation Rating (Volts) Test Voltage (DC)
120 – 300 500 601 – 2400 2500
301 – 600 1000 Greater than 2400 V 5000
JOB# CWP
CLIENT REF:
NAMEPLATE DATA:
Tag Number: Type:
Manufacturer: Rated Voltage:
Series #: Rated BIL:
Rated Current: Reference Dwg and Rev #:
Cable Duct coming from: Cable Duct going to:
60 sec
COMMENTS
Note 1: Horizontal Buss supported not greater than 1.5 m unless suitable for supports at longer intervals. Vertical Bus supported at
each floor and at intervals not greater than 1.5 m unless marked as suitable for supports at longer intervals
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Test Voltage for Insulation Tests (unless specified otherwise by Project Specifications):
Cable Insulation Rating Cable Insulation Rating
Test Voltage (DC) Test Voltage (DC)
(Volts) (Volts)
120 – 300 500 601 – 2400 2500
301 – 600 1000 Greater than 2400 V 5000
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Drawing and Rev #:
Joiner Expansion Tray
Supports Tie Downs Cable Tray Cable Tray Tray
Cable Tray Designation Installed
Plates
Tightened
Joints
Grounded Tagged
Cleaned of
Cover
Installed Installed Debris
INSPECTIONS:
Description Results Comments
Tray Size and expansion joints installed according with drawings.
JOB# CWP
COMMENTS:
JOB# CWP
CLIENT REF:
CABLE DATA
Cable Type
Cable Size
Voltage
Insulation Type
Length
INSPECTIONS
Source End Field End Source End Field End
Connectors Tight Cable Supported
Terminations Complete Ground Connected
Cable Tag Wire Markers
Inspected By: Date:
PRINT
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Test Voltage for Insulation Tests (unless specified otherwise by Project Specifications):
Cable Insulation Rating Cable Insulation Rating
Test Voltage (DC) Test Voltage (DC)
(Volts) (Volts)
120 – 300 500 601 – 2400 2500
301 – 600 1000 Greater than 2400 V 5000
INSPECTIONS
Inspection Source End Field End Inspection Source End Field End
Connectors Tight Lug Size
Terminations Lug Compression
Ground Connected Cable Supported
Cable Tags Wire Markers
Lighting and Receptacle Circuits Identified Phasing Tape
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Cable Tested
Conduit Tag Wire Voltage Cable Source Cable Field Continuity Megger Cable
Pull By
Number Size Rating Location Destination Test Test Term
ID# Init./Date
1. Perform Insulation Resistance Test (megger) between each conductor and all other conductors and metallic
sheath (conduit) for cables with non-shielded conductors. Record lowest reading for each cable. Cable must
be isolated from equipment at each end.
NOTES:
.
2. Use 500 volts dc test set for cables rated 300V and 1000 volts dc test sets for 600 volt cable and 2500 volt
test sets for cables over 600 volts. Hold all tests for 1 minute.
Ambient Temperature °C °F
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0 March 11, 2004 QC-126 R0 Power Wires In Conduit Page 1 of 1
Instrument Installation - Electrical QC-127
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
This form is to be used for verification of electrical / electronic instruments typically installed by the Electrical trade.
3.0 COMMENTS:
JOB# CWP
CLIENT REF:
CABLE DATA
Cable Type
Cable Size
Voltage
Insulation Type
Length
CONTINUITY TEST (OHMS) Equipment Log #:
Description Open Closed Comments
Conductor to Conductor
Conductor to Ground
Conductor to Shield
Shield to Ground
INSPECTIONS
Source End Field End Source End Field End
Connectors Tight Shield Status
Terminations Complete Ground Connected
Cable Tag Wire Markers
Inspected By: Date:
PRINT
COMMENTS:
JOB# CWP
CLIENT REF:
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
JOB# CWP
CLIENT REF:
Terminations Tight:
Cable Tags Applied:
(Do wire tug test)
COMMENTS:
JOB# CWP
CLIENT REF:
INSPECTIONS:
Inspection To Be Performed Result Comments:
Trench Installed to Project Specifications
Location and Routing as per prints
Assembly Structure Interlocked and undamaged
Metal Trench Structure Bonded / Grounded
Metal Trench Vents Bonded and Grounded
Raceway Supports secure and properly spaced
Raceway mounted to supports (solid bond)
Raceway grounded
All cables installed (and listed below)
Cables secured
Cable entrances and exits protected.
CABLE DESIGNATIONS:
COMMENTS:
JOB# CWP
CLIENT REF:
NAMEPLATE DATA:
Manhole Tag Number: Manhole Location:
Drawing and Rev #:
COMMENTS:
JOB# CWP
CLIENT REF:
TRENCH INSPECTIONS:
Inspection To Be Performed Result Comments:
Check route is according to layout drawing
Check trench route is complete
Trench width, depth and slope is correct
Soft sand is provided in cable trench
Sand bedding has the correct thickness
Trench is free of any pebbles, nails, glass, metal etc
Cable Spacer has correct spacing
CABLE IN TRENCH INSPECTION
Cables are laid according to trench section
Cables are segregated as required
Cable numbers are installed at required intervals (if applicable)
Cables are clear from other underground services
Cables are not damaged during installation
End Caps are installed after cutting
BACKFILLING INSPECTION
Soft sand is provided over the cables
Sand is provided to the correct thickness
Red Dye concrete is provided
Warning Tape is installed
Trench is compacted
Route markers are installed
CABLE DESIGNATIONS FOR THIS TRENCH:
COMMENTS:
JOB# CWP
CLIENT REF:
TRENCH INSPECTIONS:
Inspection To Be Performed Result Comments: Initial Date
Screened Sand in Place
All Cables Accounted For
Proper Cable Type / Size
Proper Backfill Utilized
Underground Cable Marker Installed
Power / Instrument cables separated in trench
and at crossovers
Ground Cable Installed
As Builts Marked Up
RELEASED BY:
Company Name
Company Representative Name
Company Representative Signature
Date:
RELEASED TO:
Company Name
Company Representative Name
Company Representative Signature
Date:
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0 March 11, 2004 QC-134 RO Trench Release.doc Page 1 of 1
Duct Bank Inspection QC-135
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
COMMENTS:
JOB# CWP
CLIENT REF:
COMMENTS:
JOB# CWP
CLIENT REF:
COMMENTS:
JOB# CWP
CLIENT REF:
Coordinates
1. Record Splice Coordinates:
JOB# CWP
Client Ref:
JOB# CWP
CLIENT REF:
CABLE DATA::
Cable Type Number of Conductors
Cable Size Voltage Rating
Insulation Type Length
INSPECTIONS:
Description Source End Field End Description Source End Field End
Connections tight Cable tags installed
Terminations Circuit identified
Ground connected Cable supported
COMMENTS:
JOB# CWP
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA:
Tag Number Mounting Location:
Manufacturer: Model Number:
Serial Number: Type:
Voltage: Phase:
Amperage:
Drawing and Rev # Nameplate Agrees with Single Line:
INSPECTIONS:
Inspection To Be Performed Result Comments:
Panels installed to specifications and CEC
Wiring System Complete
All components within panel checked to drawings
Panel and component lamacoids installed or in place
Grounding complete
Wire shrinks applied
Panel fillers installed
Panel Overall Condition
All cable tags installed
Panduit covers installed (where required)
Covers / Doors in place
Terminations complete and tight
No stray strands of wire found at any termination point
All loops verified and complete
Main disconnect checked
COMMENTS:
JOB # CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA:
Tag Number Mounting Location:
Manufacturer: Model Number:
Serial Number: Type:
Voltage: Phase:
Amperage:
Drawing and Rev # Nameplate Agrees with Single Line:
INSPECTIONS:
COMMENTS:
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA:
Tag Number Mounting Location:
Manufacturer: Model Number:
Serial Number: Type:
Enclosure Rating: Accessories:
Drawing and Rev # Nameplate Agrees with Single Line: [ ]Y [ ]N
Rating: Volts: Amps: Phases: Wires: CSA: [ ]Y [ ]N
INSPECTIONS:
Inspection To Be Performed Result Comments:
Panel installed to specifications and CEC
Conduit System Complete
Wiring System Complete
Breaker / Fuse sizes checked to drawings
Panel directory completed / installed
Ground Bus & Grounding complete
Branch circuits complete, terminated, verified & labeled
Panel fillers installed
Panel Overall Condition
All cable tags installed and are correct
Panel tags installed and are correct
Covers / Doors in place
Any isolated grounds as per Project Specifications
Spare knockouts filled
Panel cleaned
Phase & Neutral Bus & Wire(s) correct size
Wire color codes as per project specifications
Sealed Enclosure?: Seals Packed / Poured [ ]Y [ ]N
TORQUE Line Lugs torqued to: [ ] Ft-Lbs [ ] In-Lbs Test Equipment Log:
INSULATION RESISTANCE TEST Test Equipment Log:
(Megger Phase to All Other Phases & Ground) Megger Across Main CB
Test A Line - B Line - C Line -
Device Type Phase A Phase B Phase C Neutral
Voltage Load Load Load
Bus (Main CB Closed if Equipped) --- --- ---
Main CB (CB Open) --- --- --- ---
Main CB (CB Closed) --- --- --- ---
Duration of test is 60 sec unless otherwise specified by Project Specifications Megger readings in Gig Ohms
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
INSPECTIONS
COMMENTS:
JOB# CWP
CLIENT REF:
Comments:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA
Tag Number: Cat. No.
Manufacturer: Model Number:
Voltage: Serial Number:
Amperage: CSA Certified (Y/N):
Phase: HL Classification:
Wire: Type:
Hz:
Receptacle Interlocked With Circuit Breaker For Hazardous Locations (Y/N)
CB Amperage: CB Cat. No.
INSPECTIONS
Feeder Size and Type Hardware
Terminations Correct Cleanliness
Termination Torqued Fit for Area Classification
Lamacoid Installed Mounted as per Detail
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable. USE QC-147 OR QC-347 FOR THIS INSPECTION.
1.0 DATA
1.1 Equip / Skid Tag No.: 1.5 P&ID:
1.2 Location: 1.6 Manuf:
1.3 Area: 1.7 Serial #:
1.4 Classification: 1.8 Ref / Locn Dwg:
2. ELECTRICAL INSPECTION
Checks Elect / Inst Tag No’s.▬►
2.1 Equipment tags are installed.
2.2 Cable is tagged at equipment JB and at Local Panel
2.3 Electrical equipment is CSA approved, or accepted equivalent.
2.4 Electrical equipment hazardous area classification is correct.
2.5 Electrical conduit / connector seals are marked.
2.6 All damaged or missing components are identified on Punchlist.
2.7 Accessible electrical terminations are landed and identified.
Equipment vendor’s drawings, data package and datasheets have
2.8
been issued to Chemco by Client.
2.9 Equipment mounting / support / orientation.
Vendor cables are supported and secured in tray, wire basket or
2.10
other raceway.
2.11 Unused entries are plugged.
2.12 Grounding / Bonding
2.13
2.14 COMMENTS:
3. INSTRUMENTATION INSPECTION
Checks Elect / Inst Tag No’s.▬►
3.1 Equipment tags are installed.
3.2 Instrument equipment is CSA approved, or accepted equivalent.
3.3 Instrument equipment hazardous area classification is correct.
3.4 All damaged or missing components are identified on Punchlist.
Equipment vendor’s drawings, data package and datasheets have
3.5
been issued to Chemco by Client.
3.6 Calibration units, range and span agree with datasheet.
When required by the project, calibrated instruments shall bear a
3.7
calibration sticker, placed on the instrument by the vendor.
3.8 Equipment mounting / support / orientation.
3.9 Unused entries are plugged.
Process lines and tubing: support, installation, connections and
3.10
elevation.
3.11 Tube bundle is supported and boot sealed at both ends.
3.12 Impulse lines size and connected to process.
3.13
3.14 COMMENTS:
4. ATTACHMENTS
Data Sheet [ ] Calibration Cert [ ] Punchlist [ ] Vendor Manual [ ] Other: [ ]
5. PRESERVATION REQUIRED:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Equipment Tag Number:
Location: Drawing and Rev #:
INSPECTIONS
Results Results
Accessibility / Orientation
Condition of Junction Box:
for maintenance personnel:
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA:
INSPECTIONS:
COMMENTS:
Revision 1 February 28, 2008 QC-149 R1 Highmast & Pole Lighting Inspection.doc Page 1 of 1
Control Station Inspection & Test
QC-150
Record
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
COMMENTS:
Button Types
Push Pull = P/ P Momentary = M Push Turn = P / T Lockable = L Selector = S Guarded = G
Indicate Contact Position With- Open = O And Closed = X
Task
Type of Button
(See Above)
Button Position
Contact Number
(Shrink)
NO
NC
NO
NC
NO
NC
COMMENTS:
JOB# CWP
CLIENT REF:
Revision 1 June 7, 2006 QC-151 R1 Motor & Control Test Record.doc Page 1 of 1
Motor Bump & Run-In Test Record for
600V (or less) Motors 200 HP and Below
QC-152
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
INITIALS
TEST TO BE PERFORMED RESULT CHEMCO MECH CLIENT OWNE REMARKS
1. LUBE Verified by Mechanical
2. ALIGNMENT Verified by Mechanical
Bonding resistance measured Ohms
3. RESISTANCE from motor frame to main
ground system tap. Test Eq #:
Revision 4 July 24, 2006 QC-152 R4 Motor Bump & Run In Test.doc Page 1 of 1
Motor Operated Valve
QC-153
Inspection
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
1.0 DATA:
Equipment Tag #: Location:
Description: Ref Drawing and Rev:
2.0 NAMEPLATE DATA:
Manuf: Type: Full Load Amperes:
Model: Serial #: Voltage:
Manuf: Model #:
Valve
Serial #: Type:
Location: Manuf: Size:
Voltage: Type: Fuse:
Starter
Amps: Breaker: HP:
Phase: O/L:
3.0 WINDING RESISTANCE: Test Equipment Log #:
Result Result Result
Winding Resistance: A – B: B - C: C – A:
4.0 INSULATION RESISTANCE: Test Equipment Log #:
Test Volts: A -.G: B - G: C – G:
5.0 LIMIT SWITCH
Contact Switch # Contact State Valve Position Comments
TESTED BY:
Name Signature Date
Designation:
6.0 INSPECTION
Result Comments
Grounding:
Terminations:
Valve Tagging:
Cable Tagging:
Clearances:
Check Against Datasheet:
7.0 COMMENTS:
JOB# CWP
CLIENT REF:
Comments
Revision 0 July 26, 2007 QC-154A R0 Belt Driven Equipment Alignment Record Page 1 of 1
Belt Driven Equipment Alignment
Record
QC-154B
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Comments
Revision 0July 26, 2007 QC-154B R0 Belt Driven Equipment Alignment Record Page 1 of 1
Dry Type Transformer
Less Than 300 KVA QC-161
600 V and Below
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
1.0 TRANSFORMER NAMEPLATE DATA
Tag Number Secondary Voltage
Manufacturer Primary Amps
Serial Number Sec. Amps
KVA Temp Rise
Type Percent Imp.
Connection Type (D-Y etc) Insulation Class
Primary Voltage Year
Nameplate agrees with Reference Drawing
Drawing and Revision #
2.0 INSULATION TEST (Results in gigohms) Test Equipment Log #:
Voltage Time Result
Low to Gnd 500V
High to Gnd 1000V 60 Seconds
Low to High 1000V
3.0 Winding Resistance (in ohms using an ohmmeter) Test Equipment Log #:
H1-H2 H2-H3 H3-H1 X1-X0 X2-X0 X3-X0
High Side
Low Side
4.0 INSPECTIONS: Result Result
Mounting Clearances met
Insulators (if applicable)
(CEC 26-248 (1), (2) and (3))
Transformer cleaned Core Ground Strap
Frame grounded Tap Setting
Rubber ISO Pads installed at base Corrosion
(if specified by Project) Xo Grounded
Connections Torqued (for ¼ bolts and [ ] Mechanical Lug
Type of connection to
above) or hand tight for screws and bolts
field cables [ ] Compression Lug
less than ¼ inch.
Finish
COMMENTS:
JOB# CWP
CLIENT REF:
NAMEPLATE DATA
Tag Number:
Manufacturer:
Series #
Rated Current:
Type:
Rated Voltage:
MVA Short Circuit (kA)
Rated BIL:
Reference Dwg #: Rev:
Nameplate Data agrees with Single Line Drawing
INSULATION RESISTANCE TEST RESULTS (with other phases to ground) Equipment Log:
Voltage Level Time Phase A Phase B Phase C
60 sec
Meggar readings in Gig Ohms,
MAIN BUS CONTACT RESISTANCE RESULTS (using 100 A ductor) Equipment Log:
From To Phase A Phase B Phase C
INSPECTIONS
Anchorage Paint Condition
Main Incoming Cell wiring
Cleanliness
check (if applicable)
Terminations Bus Supports
Hardware Bus barriers
Corrosion Bus Insulators
Heaters Electrical Clearances
Alignment Bus Joint/Torque Checks
Lamacoids Phase Markings
Kirk Keys Kirk Key Numbers
Fire Stops in place (if
applicable)
Ground bus connected at both ends of lineup to the system ground
COMMENTS
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
1.0 LOCATION
MCC Designation:
Wrapper Tag Number:
Cell Designation:
2.0 NAMEPLATE DATA
Model Type: Manufacturer:
Series or Serial # Power Device Type in Wrapper:
Rated Current: Power Fuse Size:
Rated Voltage:
MVA Short Circuit (kA)
Rated BIL:
Nameplate Data agrees with Single Line Drawing:
Reference Dwg #: Rev:
3.0 INSULATION RESISTANCE TEST RESULTS (If specified) (Results in Meg Ohms) Test Equipment Log:
(Poles Closed Means Breaker / Contactor Closed. Poles Open Means Breaker / Contactor Open)
PHASE – PHASE PHASE – GROUND LINE TO LOAD
Voltage
Device Type Time (Poles Closed) (Poles Closed) (Poles Open)
Level
A-B B-C C-A A-G B-G C-G A B C
60 sec
4.0 CONTACT RESISTANCE TEST RESULTS (If specified) Test Equipment Log #:
Device Type Phase A Phase B Phase C
5.0 INSPECTIONS
Cleanliness Paint Condition
Insulators Correctly connected to bus
Hardware Ground connection complete
Control Wiring Phase Barriers in place
Heaters Electrical Clearances
Alignment Termination Torqued
Door Interlocks Phase Markings
Lamacoids Control Fuses
Kirk Keys & Numbers Function Test Acceptable
Overloads Set / Programmed Point to Point checks complete
6.0 COMMENTS
Revision 3 December 20, 2005 QC-163 R3 LV Wrapper Inspection & Test Record.doc Page 1 of 1
Low Voltage Transfer
QC-164
Switch Inspection
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
NAMEPLATE DATA
Tag Number:
Manufacturer:
Series #
Rated Current:
Type:
Rated Voltage:
MVA Short Circuit (kA)
Rated BIL:
Reference Dwg #: Rev:
Nameplate Data agrees with Single Line Drawing
INSPECTIONS
Anchorage Paint Condition
Cleanliness Electrical Clearances
Phase Markings present Bus Supports
Hardware Bus barriers
Corrosion Bus Insulators
Heaters Cable lug terminations torqued
Alignment Bus Joint/Torque Checks
Lamacoids Lugs suitable for incoming cables
Control Wiring complete Grounding complete
Kirk Keys Kirk Key Numbers
All point to point checks of the control wiring complete
Cables from line side of normal breaker come from normal source
Cables from line side of emergency breaker come from emergency source
Cables from transfer switch load breaker go to the load
Phase rotation from normal source and emergency source both have A, B, C rotation
Cables from normal source and emergency source both connected A, B, C
Transfer Switch rated current and voltage agree with system current and voltage
COMMENTS
Note 1: Electrical and function tests on the Transfer Switch will be done by others.
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA:
Tag Number: Control Power (volts, AC or DC):
Model Number: Serial Number:
Manufacturer Date: Drawing & Revision Number:
Annunciator layout and window description agree with drawings:
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA:
Tag Number:
Location:
Manufacturer:
Type:
Series #
Rated HP:
Rated Current:
Rated Voltage:
MVA Short Circuit (kA)
Rated BIL:
Reference Dwg #: Rev:
Nameplate Data agrees with Single Line Drawing (Y/N)
INSPECTIONS
Anchorage Paint Condition
Cleanliness Electrical Clearances
Phase Markings present Bus Supports
Hardware Bus barriers
Corrosion Bus Insulators
Heaters Cable lug terminations torqued
Alignment Bus Joint/Torque Checks
Lamacoids correct and in place Lugs suitable for incoming cables
Control Wiring complete Grounding complete
Kirk Keys Kirk Key Numbers
VFD Installed to specs and codes Conduit System Complete
VFD Feed Complete and verified VFD Load complete and verified
Cable Insulation Readings Fuse sizes checked to drawings,
complete (See Meggar Sheets for specs and codes
results)
Motor Designation CSA or Equivalent
COMMENTS
Note 1: Electrical and function tests on the VFD will be done by others.
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable. Complete appropriate sections when specified.
Equipment Tag Number: Equipment Location:
CSA or Equivalent: Drawing and Rev # :
1.0 NAMEPLATE DATA:
Rectifier Inverter Static Transfer Panel
Designation
Type
Manufacturer
Serial Number
Manufacture Date
Model Number
Rated Input
Rated Output
Aux Equipment
2.0 VOLTAGE / FREQUENCY / PHASING VERIFICATION: Test Equipment Log:
Description Result Description Result
Input Voltage Bypass Frequency
Input Frequency Bypass Phasing
Input Phasing Inverter Output Voltage
Rectifier Output Voltage Inverter Output Frequency
Bypass Voltage Inverter Output Phasing
3.0 TRANSFER TEST: Test Equipment Log #:
Description Result Comments
Manual Transfer to Bypass
Reset to Inverter
Auto Transfer
4.0 INSPECTION:
Result Result
Grounding Polarity on terminals
Wire Terminations & Tagging Cables & Tagging
Status LED’s Alarm Operation
Air Filters Meters Zeroed
Vendor Startup Report Attached [ ] Inverter Fuse Coordination Verified
5.0 COMMENTS:
Revision 2 December 20, 2005 QC-167 R2 UPS Inspection & Test Record.doc Page 1 of 1
Batteries & Battery Charger QC-168
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
CHARGER NAMEPLATE DATA
Tag Number: Input: V A W Ph Hz
Manufacturer: Output: V A W
*For lead acid batteries, check & record specific gravity with hydrometer per manufacturer’s specs.
Cell No. Volts * Specific Gravity Cell No. Volts Specific Gravity
1 31
2 32
3 33
4 34
5 35
6 36
7 37
8 38
9 39
10 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
Test Equipment Log Nos.:
Comments:
At completion, provide rigid mechanical protection for batteries if system is not left in service. Do not use tarp
or cover with plastic.
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
BATTERY NAMEPLATE DATA
Tag Number: Volts / Cell: Manuf. Date:
Manufacturer: No. of Cells: Charge Before Date:
Cell Type: Total Volts: All Cells Torqued To: In-Lbs
BATTERY TESTS (Results in Volts) (Batteries Must Be Charged Before Load Test)
CLOCK TIME
MIN 0
CELL #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CLOCK TIME
MIN 0
CELL #
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
Total Volts
At completion, provide rigid mechanical protection for batteries if system is not left in service. Do not use tarp
or cover with plastic.
TESTED BY: CHEMCO CLIENT OTHER
NAME: NAME: NAME: NAME:
JOB# CWP
CLIENT REF:
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
1.0 TRACE DATA
Trace #: Panel Designation:
Process Line #: Circuit Designation:
Cable Part #: Controller Designation:
Zone Drawing: Rev:
2.0 PRE-INSULATION INSPECTION
Results Comments
2.1 E.H.T. cable tag matches above part # and zone drawing
2.2 RTDs are installed as per drawing and details ATC [ ] R1 ? R2 ?
2.3 RTD Tags installed and labeled correctly
2.4 E.H.T. Cable is routed per standards and details
2.5 E.H.T. Cable is secured as per details
2.6 Heat sink allowances are as per details
2.7 As-Builts are completed and splices are identified
2.8 Power connections and end seals are properly installed
2.9 Continuity test MI Ω
MI / SR @ 500 Vdc : mΩ Test Equipment Log #:
2.10 Pre-Insulation
SR @ 1000 Vdc: mΩ
Megger Readings: Calibration Due Date:
SR @ 2500 Vdc: mΩ
PRE-INSULATION INSPECTED AND TESTED BY:
(Crew) Print: Date: (Foreman) Print: Date:
Sign: Sign:
JOB# CWP
CLIENT REF:
JOB# CWP
CLIENT REF:
COMMENTS:
JOB# CWP
CLIENT REF:
JOB# CWP
CLIENT REF:
GENERAL INFORMATION
Plant ID Location:
Reference Drawing: Rev Number
Pipe Spool Number
INSPECTIONS:
Acceptance Result
Inspection Remarks
Criteria Accept Reject
1 Heat tube material A-106 SMLS
10
COMMENTS:
JOB# CWP
CLIENT REF:
Trace Designation:
INSPECTIONS:
All heat tube ends de-burred Heat Tube to box connection tight
Heat Tube strapped as per specs. Heat Tube in correct position
Heat Tube gaps are within specs Heat Transfer Cement Applied
Coupling welds clean Process Pipe clean of splatter
COMMENTS:
JOB# CWP
COMMENTS:
JOB# CWP
JOB# CWP
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0 March 11, 2004 QC-178 R0 Heat Trace RTD.doc Page 1 of 1
Electrical Heat Trace
QC-179
Release Form
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0 March 11, 2004 QC-179 R0 Heat Trace Release Page 1 of 1
Electrical Heat Trace
QC-179B
Removal and Re-Instatement
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Sign: Sign:
COMMENTS
(identify Damages or Concerns)
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Revision 0 January 11, 2006 QC-179B R0 EHT Removal-Reinstatement.doc Page 1 of 1
RTD Test Record QC-180
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
COMMENTS:
JOB# CWP
CLIENT REF:
ELECTRICAL INSPECTIONS:
INSPECTION RESULT COMMENTS
Material as per drawings and specifications:
Disconnect Switches (Primary and Secondary)
Transformers
Switchgear
Motor Control Center
Panelboards with directory
Grounding
Junction Boxes
Circuits verified
Fixtures / Receptacles / Switches
Fire Protection System
Emergency Power System
Telephone Rough In
Heat Tracing
Gas Detection System / With Test Forms
HVAC System / CW Tests
Equipment properly identified
COMMENTS:
JOB# CWP
CLIENT REF:
COMMENTS:
JOB# CWP
CLIENT REF:
NAMEPLATE DATA:
Tag Number Mounting Location:
Manufacturer: Model Number:
Serial Number: Type:
Voltage: Phase:
Amperage: Kilowatts:
Classification: CSA Certified (Y/N)
Drawing and Rev # Nameplate Agrees with Single Line:
INSPECTIONS
Feeder size and type Correctly connected to feeder
Control Wiring Ground connection complete
Hardware Thermostat Function check
Lamacoids Point to Point checks complete
Cleanliness Phase Markings in place
Termination Torqued Paint Condition
COMMENTS:
JOB# CWP
CLIENT REF:
JOB# CWP
Client Ref:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Ref. Drawing: Rev:
INSPECTION:
Final
Paint
Rust / Dirt Crimp Complete Weld Complete Installed Connect
Grid Point or Pile # Complete
Removed (When Specified) (When Specified) Per Details To
(When Specified)
Column
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
INSPECTIONS:
Inspection to be Performed
Result Comments:
Equipment Type
Electrical Equipment Transformer Case
Transformer Xo
Equipment Base / Supports
Bus Bars
AC Panels
DC Panels
Control Panels
Power Junction Boxes
Instrument Junction Boxes
Motors
Cable Tray
Cabinets & Racks
Other
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Designation: Drawing and Rev #:
INSPECTIONS:
Inspection to be Performed
Result Comments:
Type
Sleeves Installed Per Details
Ground Tail Fence Connections ( ) Bolted ( ) Crimped
Posts Grounded ( ) Bolted ( ) Crimped
Horizontal Rails Grounded ( ) Bolted ( ) Crimped
Top Rail Expansion Joints Grounded ( ) Bolted ( ) Crimped
Wire Mesh Grounded ( ) Bolted ( ) Crimped
Barbed Wire Grounded ( ) Bolted ( ) Crimped
Swing Gates Grounded ( ) Bolted ( ) Crimped
Anti Oxidant Applied
Conductor Sized Per Details
Ground Tail Resistance Test to Grid (Attach Drawing with recorded results)
Comments:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
CABLE NAME
Cable Termination Location (From)
Reference Drawing & Rev (From)
Cable Termination Location (To)
Reference Drawing & Rev (To)
CABLE DATA
Cable Type Cable Voltage Rating
Cable Size Length
Insulated or Bare Insulation Type
Insulation Color / Stripe Color
INSPECTIONS
Source End Field End
Cable Tag if Applicable Cable Isolated for Entire length
Terminations Complete
Cable Supported
Connectors Tight
COMMENTS:
JOB# CWP
CLIENT REF:
INSPECTIONS:
Inspection to be Performed Result Comments:
Primary Conductor is correct size and type in accordance
with drawings and details
Ground conductor burial depth and routing are as per
drawings and specifications
Compression connections checked
Ground rod locations installation according to drawings
COMMENTS:
Revision 0 March 11, 2004 QC-188 R0 Electrical Ground Grid Checklist Page 1 of 1
Miscellaneous Electrical Equipment
Inspection & Test Report
QC-189
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA:
Tag Number Mounting Location:
Manufacturer: Model Number:
Serial Number: Type:
Voltage: Phase:
Amperage: CSA Certified (Y/N)
Classification: Drawing and Rev #
Nameplate Agrees with Single Line:
ATTACHMENTS:
Testing Specs Available QC Forms
Vendor Manual
INSPECTIONS
Feeder size and type Correctly connected to feeder
Control Wiring Ground connection complete
Hardware Point to Point checks complete
Lamacoids Phase Markings in place
Cleanliness Paint Condition
Termination Torqued
COMMENTS:
JOB# CWP
CLIENT REF:
NAMEPLATE DATA:
Tag Number Mounting Location:
Voltage: Phase:
(Megger Phase to All Other Phases & Ground) Megger Across Main CB
Test A Line - B Line - C Line -
Device Type Phase A Phase B Phase C Neutral
Voltage Load Load Load
Duration of test is 60 sec unless otherwise specified by Project Specifications Megger readings in Gig Ohms
COMMENTS:
JOB# CWP
CLIENT REF:
LOG NO.:
1.0 MOTOR NAME PLATE DATA
Tag Number: Model # Duty:
SF: Frame:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
JOB# CWP
CLIENT REF:
1.0 DESIGNATION
Tag Number: Location:
Description:
3.0 COMMENTS:
CHEMCO CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
QC-192 R1 Anti-Condensate Heater Preservation
Revision 1 December 20, 2005 Page 1 of 1
Record.doc
Transformer Preservation Record QC-193
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
4.0 COMMENTS:
CHEMCO: CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Tag No.: Drawing and Rev :
Location: Co-Ordinates:
Manufacturer: Serial No.:
Model: CSA:
Input: V Ph A
Output: V Ph A
Inspected by
Item Rectifier Checks Result
Initial Date
1 Rectifier Identified / Tagged
2 Securely mounted
3 Accessibility
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Use this form for Junction Boxes, Junction Panels, Anode Splitter Panels
Tag No.: Drawing and Rev :
Location: Co-Ordinates:
Manufacturer: Serial No.:
Model: CSA:
Inspected by
Item JB Checks Result
Initial Date
1 JB Identified / Tagged
2 Securely mounted / supported
3 Accessibility
4 Area is well ventilated
5 Access door may be opened without obstruction
6 Conduits properly installed c/w L-nuts, bushings, seals, hubs
7 Teck cables properly installed c/w L-nuts, bushings, seals
8 Are explosion proof Teck connectors installed
9 Are explosion proof Teck connectors sealed
10 External cable connections properly installed and secure
11 Leads connected at proper locations
12 All terminations are identified and tight
General
20 Rectifier / Groundbed installation ready for energization
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Tag No.: [ ] Test Station [ ] Test Station / Bond Panel
Location: Drawing and Rev :
Manufacturer: Co-Ordinates:
Model: Serial No.:
CSA: Type: [ ] Box [ ] Panel [ ] Head
Inspected by
Item Test Station Checks Result
Initial Date
1 Test station identified / tagged
2 Test station post installed (if detailed)
3 Securely mounted / supported
4 Accessibility
5 Access door may be opened without obstruction
6 Conduits properly installed c/w L-nuts, bushings, seals, hubs
7 Teck cables properly installed c/w L-nuts, bushings, seals
8 Are explosion proof Teck connectors installed
9 Are explosion proof Teck connectors sealed
10 External cable connections properly installed and secure
11 Leads connected at proper locations
12 All terminations are identified and tight
COMMENTS:
JOB# CWP
CLIENT REF:
Inspected by
Item Checks Result
Initial Date
U/G INSTALLATION
1 Water table present
2 Water table depth
3 Confirm pipe is steel (magnet check if necessary)
Pipe surface preparation (cleaned, brushed & filed to bright
4
steel finish. No gouges allowed)
5 Graphite mold is in good condition & free of debris
6 Thermite weld charges are not expired
7 Separation of Thermite weld metal / powder
8 Copper sleeves crimped to lead wire (if applicable)
9 Thermite welds complete and securely attached to pipe
10 Primer applied
11 Coating materials or Moldable sealant properly applied
12 Sealant or tape wrap applied
13 Reference electrode installation c/w lead wire
14 Correct lead wire type & colors installed
15 Lead wires properly installed / routed
16 Insulated leads checked for nicks, damage
17 Insulated leads nicks, damage repaired
18 Lead wires identified / marked at test station
19 Inspect all installed Anode bar for damage (cracks, etc)
20 Anode bar installed properly and to design specs
21 Steel core of Anode bar exposed for crimp connections
22 Proper crimping tool and size of crimp used
23 Anode splices properly sealed with shrink sleeve
Backfilling Yes No
24 Sand Materials as per Shell Canada Standards
25 Any Cable Damage
TESTS
Item Checks Result
Soil Resistivity Tests Max. Reading 10,000 ohm-cm
26 Test Equipment ID:
27 Native soil resitvity (ohm-cm)
28 Backfill soil restivity (ohm-cm)
Note:1. All bonds should be disconnected after testing until backfill complete. 2. Connect each pipe separately.
Pipe to Soil Potential With Respect To Portable Reference Electrode (Edit list to suit project)
Pipe Before Backfill After Backfill
Spool #
Description (mV) (mV)
Before Bonds After Bonds Before Bonds After Bonds
30 Pipe Only
Designation:
Pipe to Soil Potential With Respect To Buried Reference Electrode (Edit list to suit project)
Pipe Before Backfill After Backfill
Spool #
Description (mV) (mV)
Before Bonds After Bonds Before Bonds After Bonds
Resistance of Test Leads to Pipe With Respect To Fluke Continuity / Diode Tester (Edit list to suit project)
Pipe
Test Equipment ID: Spool # Before Backfill After Backfill
Description
74 Test Lead # 1- Bond Lead # 1 Ω Ω
Designation:
Current Readings After Backfill ( Connect # 6 Bond Lead to Anode Lead/Leads ) (Edit list to suit project)
Pipe
Test Equipment ID: Spool #
Description mA
81 Anode Lead #
82 Anode Lead #
83 Anode Lead #
84 Anode Lead #
85 Anode Lead #
86 Anode Lead #
87 Anode Lead #
88 Anode Lead #
89 Anode Lead #
90 Anode Lead #
AS-BUILTS
91 As-Built complete
COMMENTS:
JOB# CWP
CLIENT REF:
Inspected by
Item Checks Result
Initial Date
INSTALLATION
1 Hole diameter
2 Hole depth
3 Is water present in hole?
4 Water depth
5 Anodes c/w adequate leads installed
6 Correct lead wire type & colors installed
7 Anode centralizers installed (hole centering)
8 Slotted PVC vent pipe installed
9 PVC vent pipe end cap installed
10 PVC Vent pipe Nilex filter sock installed & clamped
11 PVC Vent pipe down-turn screened cap installed (A/G)
12 Lead wires properly installed / routed
13 Lead wire crimps installed & shrink tube over
14 Insulated leads checked for nicks, damage
15 Insulated leads nicks, damage repaired
16 Lead wires identified / marked at splitter / JB
17 Calcined Coke backfill installed
18 Bentonite installed
19 Lead wires at proper depth
20 Trench backfill & red dye concrete complete
21 Complete Associated Anode Splitter/Junction Box Record
22 As-Built complete
Designation:
Inspected by
Item Checks Result
Initial Date
ANODE RESISTANCE TESTS
23 Anode #1 (top) Ω
24 Anode #2 Ω
25 Anode #3 Ω
26 Anode #4 Ω
27 Anode #5 Ω
28 Anode #6 (bottom) Ω
COMMENTS:
JOB# CWP
CLIENT REF:
Inspected by
Item Checks Result
Initial Date
INSTALLATION
1 Ribbon anodes installed
2 Anodes header cable installed
3 Header cable to anode C-Tap connections
4 C-Tap connections mastic sealant applied
Header cable to anode C-Tap connections shrink sleeves
5
applied
6 Corrosometer probes installed
7 Temperature probes installed
8 Temporary magnesium ribbon anodes installed
Slotted CPVC monitoring pipe nylon rope & end caps
9
installed
10 CPVC monitoring pipe Nilex filter sock installed
11 Tank weld on tab installed
12 Tank negative lead connection installed
13 PVC conduit system for anodes installed to junction panel
PVC conduit system for corrosometer probes / temperature
14 probes / electrodes / temporary anodes installed to junction
panel
15 Tank center & perimeter identified
16 Teck cable installed between rectifier & junction panel
17 Ribbon anode spacing
18 Remove plastic bags from cells
19 As-Built complete
20
Designation:
Inspected by
Checks Result
Initial Date
SOIL RESTIVITY TESTS
Test Equipment ID: Ω-cm
CORROSOMETER
Test Equipment ID:
Corrosometer P1 (Mag Connected)
Corrosometer P2 (Mag Connected)
Corrosometer P1 (Baseline Reading)
Corrosometer P2 (Baseline Reading)
Designation:
TANK TO GRID
Test Equipment ID:
Tank to grid circuit resistance Ω Ω
TEMPERATURE PROBE
Test Equipment ID:
Temperature Probe P1 (microvolts) µV µV
COMMENTS:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Drawing and Rev :
Valve / Inspected By
Bond/Jumper Bond/Jumper Continuity
Valve or Pipe Flange ID Installed Connected Check
Flange Left
Continuous Initial Date
COMMENTS:
Revision 0 July 6, 2006 QC-195G R0 Cathodic Protection Bonding & Release.doc Page 1 of 1
VESSEL THERMOCOUPLE
QC-196A
TEST RECORD
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
Client Ref:
Visual Inspection.
Continuity, Red to Non-Red.
Resistance, Red to Shield.
Inspected / Tested By:
Date of Test
Before Before After After
Tag # Test Insulation Shipping Delivery Installation
Noted Items
Visual Inspection.
Continuity, Red to Non-Red.
Resistance, Red to Shield.
Inspected / Tested By:
Date of Test
Before Before After After
Tag # Test Insulation Shipping Delivery Installation
Noted Items
Visual Inspection.
Continuity, Red to Non-Red.
Resistance, Red to Shield.
Inspected / Tested By:
Date of Test
Before Before After After
Tag # Test Insulation Shipping Delivery Installation
Noted Items
Visual Inspection.
Continuity, Red to Non-Red.
Resistance, Red to Shield.
Inspected / Tested By:
Date of Test
CHEMCO QC CLIENT
NAME: NAME:
SIGNATURE: SIGNATURE:
DATE: DATE:
Plant
Insert Power / Control / instrument or EHT Cable Types Here
Cable Pull Card
CWP/TOP # Pull Sheet #:
To Equipment:
Location Drawing From / To:
Cable Schedule #: Cable To Area:
System#:
Tray Routing:
JOB# CWP
Comments:
JOB# CWP
Client Ref:
Actual Flange
Bolt Size
Tag # Location (In or mm) Torque Size # Torqued By Date
(ft/lbs)
JOB# CWP
Client Ref:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
Applicable To Capillary Devices
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 1.14 Ref Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
2.1 Check against datasheet 2.15 Capillarys continuously supported
2.2 Calibration / Sticker 2.16 Excess capillary coiled at transmitter end
2.3 All materials correct 2.17 Capillary drum installed
2.4 Check for damage 2.18 Capillary winterization details
2.5 Mounting / Orientation / Elevation 2.19 Piping gaskets installed
2.6 Installed as per Details & P&ID 2.20 Check bolt material and length
2.7 Accessibility / Obstruction Free 2.21 Anti-Seize applied
2.8 Instrument Tags installed 2.22 Bolts torqued
2.9 Raceway (Tray) installation 2.23
2.10 2.24
2.11 2.25
2.12 2.26
2.13 2.27
2.14 2.28
JOB# CWP
Client Ref:
Location: P&ID
Service Description:
Test Equipment Log #:
PRESSURIZATION
Results Results
1 Installation Complete 5 Valve stroked properly
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
Applicable to Conductivity Flow Devices
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 1.14 Ref Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
2.1 Check against datasheet 2.15 Anti-Sieze applied to male pipe threads
2.2 Flow direction 2.16 Threaded connections are tight
2.3 Calibration / Sticker 2.17 Flow cell and housing are not cracked
2.4 All materials correct 2.18
2.5 Check for damage 2.19
2.6 Mounting / Orientation / Elevation` 2.20
2.7 Accessibility / Obstruction Free 2.21
2.8 Installed as per Details & P&ID 2.22
2.9 Instrument Tags installed 2.23
2.10 Installed on pressure side of pump 2.24
2.11 Flow exit is in “UP” direction 2.25
2.12 Flow chamber is always full of liquid 2.26
2.13 Ball valves installed 2.27
Teflon tape applied to sensor cell
2.14
threads (providing temperature will not melt 2.28
tape). Tighten cell only enough to
prevent leakage.
ATTACHMENTS Data Sheet [ ] Calibration Cert [ ] Other: [ ]
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 Model: Size: 1.14 Ref Dwg:
2.0 INSPECTION
# Item Results # Item Results
2.1 Flow direction 2.12 Pressure gauges
2.2 Check against datasheet 2.13 Air filter
2.3 Installation per details 2.14 Tag installed
2.4 Flange bolts torqued 2.15 Valve/Actuator Connected
2.5 Valve / handwheel accessibility 2.16 Tubing complete
2.6 Fail action 2.17 Air piping complete
2.7 Regulator pressure set 2.18 Actuator clearance
2.8 Canadian Registration Number 2.19 Valve stroke
2.9 (C ) glands tight
Packing Pneumatic test for Air supplies See Ref Doc. In
2.20
2.10 Mounting / Support / Orientation Comments Section QC-624 & file No.
3.0 ACCESSORIES
# Item Results # Item Results
3.1 Transducer 3.6 Limit switch
3.2 Positioner 3.7 Volume bottle
3.3 Solenoid 3.8 Air regulator
3.4 Solenoid cover tight 3.9 Booster / trip relays
3.5 3.10
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
Applicable to Flow Devices
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 1.14 Ref Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
2.1 Check against datasheet 2.15 Mag Flow Meters: grounding per Vendor
2.2 Check installation for flow direction 2.16 Coriolis Meters: full of liquid in operation
Rotameters: Plumb, float & follower
2.3 Calibration / Sticker 2.17
unobstructed over range
2.4 All materials correct 2.18
2.5 Check for damage 2.19
2.6 Mounting / Orientation / Elevation` 2.20
2.7 Accessibility / Obstruction Free 2.21
2.8 Installed as per Details & P&ID 2.22
2.9 Instrument Tags installed 2.23
2.10 Flanges line up 2.24
2.11 Gaskets installed 2.25
2.12 Anti-Seize applied 2.26
2.13 Bolts torqued 2.27
2.14
Device is suitable for line / vessel / 2.28
temp / press / area
ATTACHMENTS Data Sheet [ ] Calibration Cert [ ] Other: [ ]
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
Applicable to Gauge Glasses
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 1.14 Ref Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
2.1 Check against datasheet 2.15 Flanges line up
2.2 Gauge length 2.16 Float moves freely
2.3 All materials correct 2.17 Winterization details (Heat trace / jackets)
2.4 Check for damage 2.18 Gaskets installed
2.5 Mounting / Orientation / Elevation` 2.19 Anti-Seize applied
2.6 Accessibility / Obstruction Free 2.20 Check bolt material & length.
2.7 Installed as per Details & P&ID 2.21 Bolts torqued
2.8 Instrument Tags installed 2.22 Temporary protection
2.9 Screwed fittings are tight 2.23
2.10 Installation is plumb 2.24
2.11 Float installed 2.25
Gauge cocks / Isolation / Vent / Drain
2.12 2.26
valves installed
2.13
Magnetic gauge glasses have no steel 2.27
attached to interfere with magnetism
2.14 2.28
JOB# CWP
Client Ref:
INSPECTION
CALIBRATION:
0 %
25 %
50 %
75 %
100 %
COMMENTS:
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________ Cal By: ___________ S/N: _____________
Gauge Certificate Of Calibration QC-316
Date:
CERTIFICATE OF CALIBRATION
Customer: Service:
Tag Number: Range Max:
Serial Number: Units:
Manufacturer: F.S. Tolerance:
Tolerance PSI:
As Found Results
As Left Results
The above gauge was calibrated to a Fluke Model 700P29, Serial Number 96052912. This unit was
calibrated against a Mensor Model 15000, Serial Number 241195, which is traceable to NIST and
complies with the requirements of ANSI / NCSL Z540-1-1994.
CALIBRATED BY
SIGNATURE:
JOB# CWP
Client Ref:
Location: P&ID
Service Description:
ENERGIZATION / PRESSURIZATION
Electrical Results Mechanical Results
1 Loop / continuity verified 1 Process connection complete
2 Fuse size (if used) 2 Manifold gasket type
3 Knife switch closed 3 Configuration Sheet complete
4 Voltage reading 4 Datasheet checked
5 Location per P&ID 5 Unit of display etc. psi, %
6 Display mounted horizontal 6 Medium applied – etc. pressure
7 Commissioning DOT installed 7 All plugs & caps replaced
FUNCTION CHECKS (ANALOG INPUTS / OUTPUTS)
Input / Output Displayed Value
Actual Value Comments Results
% mA Instrument Graphic
0%
25%
50%
75%
100%
FUNCTION CHECKS (Alarm / Status)
Alarm / Actual PLC / DCS
Alarm / Status mA Current Alarm Display Description
Trip Value Graphic
Low / Low
Low
High
High / High
JOB# CWP
Client Ref:
Low
High
High / High
JOB# CWP
Client Ref:
1.0 DATA
Tag Designation: Line #:
Vessel: P&ID:
Location: Loop:
Service Description:
2.0 PERMIT
Permit Required [ ] Y [ ] N Permit Obtained:
3.0 INSPECTIONS
Tubing Results Piping Results Wiring Results
Disconnect Disconnect Source Deenergized / Locked
Removed Removed Confirm loss of voltage
Plugged / capped Plugged / capped Mark & Disconnect
Root Valve Closed Valve Closed Plugged / capped
JOB# CWP
Client Ref:
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
1.0 DATA
.1 Segment No.: .4 Ref Dwg:
.2 Controller No.: .5 No. of Devices:
.3 Port No.: .6 Service:
3.0 RESISTANCE TESTS Expected Result 4.0 CAPACITANCE TESTS Expected Result
.1 Terminating resistor 100 Ω / 1 µF Ω .1 + conductor to - conductor 0.80-1.2 µF µF
.2 + conductor to - conductor > 50 k Ω k Ω .2 + conductor to shield < 300 nF nF
.3 + conductor to shield > 20 M Ω M Ω .3 - conductor to shield < 300 nF nF
+ conductor – instrument ground
.4 - conductor to shield > 20 M Ω M Ω .4 < 300 nF nF
bar
- conductor - instrument ground
.5 + conductor to instrument gnd bar > 20 M Ω M Ω .5 < 300 nF nF
bar
.6 - conductor to instrument gnd bar > 20 M Ω M Ω .6
.7 Shield to instrument ground bar > 20 M Ω M Ω .7
5.0 VOLTAGE TESTS Expected Result 6.0 OTHER TESTS Expected Result
Record required and set macro
.1 + Cond to – cond at power supply 25-28 VDC VDC .1 Set>Req’d mS
cycle
+ Cond to – cond after power 18.6-19.4 Disable internal network
.2 VDC .2 [ ] Yes [ ] No
conditioner VDC diagnostic alarms
Measure & record signal & waveform Test Power Conditioner failure
.3 500-900 mV mV .3 [ ] Pass [ ] Fail/ [ ] N/A
after power conditioner (e.g. Fluke 196) alarms
Verify Link active scheduler status & Verify all Power Conditioner
.4 350-700 mV mV .4 [ ] Yes [ ] No
record signal level alarms are clear
Record segment avg. noise level Disable all diagnostic alarms for
.5 25-50 mV mV .5 [ ] Yes [ ] No [ ] N/A
(System Side) the network on the DCS
Place pre-commissioned tag on
Record signal level at field junction
.6 350-700 mV mV .6 DCS Fieldbus H1 module [ ] Yes [ ] No [ ] N/A
box
(If no punch items)
Voltage between + & - at field
.7 25-29 VDC VDC .7
junction box
Record segment avg. noise level at
.8 25-50 mV mV .8
field junction box
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
2.0 CONFIGURATION
TRANSMITTER As Found As Left
2.1 Type
2.2 Transmitter Address (Default =0)
2.3 Descriptor
2.4 Output Form (Lin, Sq Rt)
2.5 Damping Time (0-25.6 sec) (Default =0.4)
2.6 Span
2.7 PV Units
2.8 URL (Input)
2.9 URV (Output)
2.10 LRL (Input)
COMMENTS:
JOB# CWP
Client Ref:
For Use With Instruments Having Impulse Lines. Mark “N/A” where Not Applicable
1.0 DATA
1.1 Tag No.: 1.7 Line#:
1.2 Datasheet: Rev.: 1.8 P&ID:
1.3 Location: 1.9 Detail #:
1.4 Area: 1.10 Loop No.:
1.5 Classification: 1.11 Manuf:
1.6 Service Descr: 1.12 Serial #:
1.13 Ref / Locn Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
2.1 Check against datasheet 2.15 Tube welds logged / inspected
2.2 Manufacturer Calibration / Sticker 2.16 Tubing bundle heat trace installation
2.3 Check for damage 2.17 Tube bundle boots installation
2.4 Mounting / Orientation / Elevation 2.18 Heat trace left exposed (3 ft)
2.5 Accessibility / Obstruction Free 2.19 Holes plugged
Anti-Sieze applied to pipe threads (Check
2.6 Installed as per Details & P&ID 2.20
Specs)
2.7 Lines installation / support / slope 2.21 Tube bundle boot shrink
Ensure tracer is not “nicked” prior to
2.8 Tubing fittings 2.22
boot installation
2.9 Inline equipment installed / supported 2.23
2.10 Spare entries plugged 2.24
2.11 Instrument Tags installed 2.25
2.12 Stand Grouted 2.26
Instrument enclosure installation /
2.13 2.27
clean
2.14 Check tube reaming 2.28
3.0 PRESSURE TESTS (Test equipment must be: within the calibration date, and have the correct range)
Blown
Test Tested At Hold Leak Test Equip Temp
Line Type Clear / Test Medium Tested By Date
# (PSI) Time Rate Log # °C
Drained
Process/Impulse
Pneumatic
Air Supply
Air Sub Header /
Branch
Hydraulic
Main Header Valve #: All connections “snooped” for leaks: [
]
ATTACHMENTS Data Sheet [ ] Calibration Cert [ ] Other: [ ]
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 1.14 Ref Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
2.1 Check against datasheet 2.15
2.11 2.25
2.12 2.26
2.13 2.27
2.14 2.28
JOB# CWP
Client Ref:
Vessel: P&ID:
Location:
Service Description:
INSPECTIONS
Expansion
Support Material Hold down Slope As Verified By
Instrument Raceway / Tray Plates
As Per Type Clamps As Per Detail /
Designation Installed As
Detail Used Per Detail Specs Initial Date
Per Details
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
Applicable to Level Indicating Devices
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 1.14 Ref Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
Check all components (including float)
2.1 2.15 Flanges line up
against datasheet
2.2 Calibration / Sticker 2.16 Displacer / Float moves freely
2.3 All materials correct 2.17 Base spring is long enough
2.4 Check for damage 2.18 Winterization details (Heat trace / jackets)
2.5 Mounting / Orientation / Elevation` 2.19 Gaskets installed
2.6 Accessibility / Obstruction Free 2.20 Anti-Seize applied
2.7 Installed as per Details & P&ID 2.21 Check bolt material & length.
2.8 Instrument Tags installed 2.22 Bolts torqued
Pipe lubricant matches temp/press/area
2.9 Screwed fittings are tight 2.23
class
2.10 Installation is plumb / level 2.24
2.11 2.25 Flagging system working
2.12 Isolation / Vent / Drain valves installed 2.26 Temporary protection
2.13
Device is suitable for line / vessel / 2.27
Capacitance probes are of correct length
temp / press / area and do not touch adjacent materials
2.14 Stilling well is obstruction free 2.28
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 1.14 Ref Dwg:
2.0 INSPECTIONS
# Transmitter Results # Source Results
2.1 Check against datasheet 2.15 Check against datasheet
2.2 Calibration 2.16 Calibration
2.3 All materials correct 2.17 All materials correct
2.4 Check for damage 2.18 Check for damage
2.5 Mounting 2.19 Mounting
2.6 Orientation 2.20 Orientation
2.7 Elevation 2.21 Elevation
2.8 Accessibility / Obstruction Free 2.22 Accessibility / Obstruction Free
2.9 Installed as per Details & P&ID 2.23 Installed as per Details & P&ID
2.10 Instrument Tags installed 2.24 Instrument Tags installed
2.11 Piping gaskets installed 2.25 Piping gaskets installed
2.12 Anti-Seize applied (Check Specs) 2.26 Anti-Seize applied (Check Specs)
2.13 Check bolt material & length 2.27 Check bolt material & length
2.14 Bolts torqued 2.28 Bolts torqued
ATTACHMENTS Data Sheet [ ] Calibration Cert [ ] Other: [ ]
COMMENTS:
Revision 0 July 13, 2007 QC-335 R0 Density Transmitter & Source Page 1 of 1
Instrument Loop Check QC-336
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
Client Ref:
1
2
3
4
5
6
8.0 LOOP RESPONSES (Software) - Refer to loop components on Sheet 1
Rising % Falling % Trip setting Comments
0 25 50 75 100 75 50 25 0 Rising Falling
1
2
3
4
5
6
Valve Stroke: Time to open Time to close
9.0 TEST EQUIPMENT
Test Equipment Used Serial Number Certificate Number Dated
10.0 ATTACHMENTS
As-built drawings attached [ ]
Remarks:
10
11
12
13
14
15
16
17
18
JOB# CWP
Client Ref:
Vessel: P&ID:
Location:
Service Description:
ORIFICE INSTALLATION
Installed in correct direction
Installed per detail
Tap orientation correct Liquid Gas
COMMENTS:
JOB# CWP
Client Ref:
Dwg #: Line#:
Location: P&ID:
Area: Detail #:
Plant: Loop No.:
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
Applicable to Pressure Gauges, Pressure Switches, and Flange Mounted Devices
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 1.14 Ref Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
2.1 Check against datasheet 2.15 Piping gaskets installed
2.2 Check gauge / switch range 2.16 Anti-Seize applied (Check Specs)
2.3 Calibration / Sticker 2.17 Check bolt material & length
2.4 All materials correct 2.18 Bolts torqued
2.5 Check for damage 2.19
2.6 Mounting / Orientation / Elevation` 2.20
Pipe lubricant matches temp/press/area
2.7 Accessibility / Obstruction Free 2.21
class
2.8 Installed as per Details & P&ID 2.22 Liquid filled devices filled & no leaks
2.9 Instrument Tags installed 2.23
2.10 Screwed fittings are tight 2.24
2.11 Gauge valves properly installed 2.25
2.12 Snubbers installed per details 2.26
2.13
Diaphragm seal & flushing port 2.27
Device is suitable for line / vessel / temp
installed per details / press / area
2.14
Pressure switches have block & vent 2.28
connection for calibration
ATTACHMENTS Data Sheet [ ] Calibration Cert [ ] Other: [ ]
COMMENTS:
JOB# CWP
Client Ref:
TAG NO.:
SPECIFICATION SHEET NO.:
DATA SHEET NO.:
PURCHASE ORDER NO.: P.O. ITEM NO.:
MANUFACTURER:
MODEL:
SERIAL NO.:
LEAK TEST: [ ] Yes [ ] No
BLOWDOWN: [ ] Yes [ ] No
PRESSURE SETTING PER DATA SHEET: PSI
The above referenced Pressure Safety Valve has been calibrated to the
JOB# CWP
Client Ref:
TAG NO.:
SPECIFICATION SHEET NO.:
DATA SHEET NO.:
PURCHASE ORDER NO.: P.O. ITEM NO.:
MANUFACTURER:
MODEL NO.:
SERIAL NO.:
TEST EQUIPMENT LOG #:
Set #1
1
Reset #1
Set #2
2
Reset #2
Set #3
3
Reset #3
Set#4
4
Reset #4
COMMENTS:
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
Applicable to TWs / TEs / Temperature Gauges
1.0 DATA
1.1 Tag No.: 1.8 Line#:
1.2 Datasheet: Rev.: 1.9 P&ID:
1.3 Location: 1.10 Detail #:
1.4 Area: 1.11 Loop No.:
1.5 Classification: 1.12 Manuf:
1.6 Service Descr: 1.13 Serial #:
1.7 Screwed [ ] Flanged [ ] 1.14 Ref Dwg:
2.0 INSPECTIONS
# Item Results # Item Results
2.1 Check against datasheet 2.15 Anti-Seize applied (Check Specs)
2.2 Check gauge range 2.16
2.3 Calibration / Sticker 2.17
2.4 All materials correct 2.18
2.5 Check for damage 2.19
2.6 Mounting / Orientation / Elevation` 2.20
2.7 Accessibility / Obstruction Free 2.21
2.8 Installed as per Detail & P&ID 2.22
2.9 2.23
2.10 Instrument Tags installed 2.24
2.11 Screwed fittings are tight 2.25
2.12 Gasket complete 2.26
2.13 Flange mounted device is torqued 2.27
2.14 Plugged / capped 2.28
JOB# CWP
Client Ref:
Mark “N/A” where Not Applicable
1.0 DATA
1.1 Equip / Skid Tag No.: 1.5 P&ID:
1.2 Location: 1.6 Manuf:
1.3 Area: 1.7 Serial #:
1.4 Classification: 1.8 Ref / Locn Dwg:
2. ELECTRICAL INSPECTION
Checks Elect / Inst Tag No’s.? ?
2.1 Equipment tags are installed.
2.2 Cable is tagged at equipment JB and at Local Panel
2.3 Electrical equipment is CSA approved, or accepted equivalent.
2.4 Electrical equipment hazardous area classification is correct.
2.5 Electrical conduit / connector seals are marked.
2.6 All damaged or missing components are identified on Punchlist.
2.7 Accessible electrical terminations are landed and identified.
Equipment vendor’s drawings, data package and datasheets have
2.8
been issued to Chemco by Client.
2.9 Equipment mounting / support / orientation.
Vendor cables are supported and secured in tray, wire basket or
2.10
other raceway.
2.11 Unused entries are plugged.
2.12 Grounding / Bonding
2.13
2.14 COMMENTS:
3. INSTRUMENTATION INSPECTION
Checks Elect / Inst Tag No’s.? ?
3.1 Equipment tags are installed.
3.2 Instrument equipment is CSA approved, or accepted equivalent.
3.3 Instrument equipment hazardous area classification is correct.
3.4 All damaged or missing components are identified on Punchlist.
Equipment vendor’s drawings, data package and datasheets have
3.5
been issued to Chemco by Client.
3.6 Calibration units, range and span agree with datasheet.
When required by the project, calibrated instruments shall bear a
3.7
calibration sticker, placed on the instrument by the vendor.
3.8 Equipment mounting / support / orientation.
3.9 Unused entries are plugged.
Process lines and tubing: support, installation, connections and
3.10
elevation.
3.11 Tube bundle is supported and boot sealed at both ends.
3.12 Impulse lines size and connected to process.
3.13
3.14 COMMENTS:
4. ATTACHMENTS
Data Sheet [ ] Calibration Cert [ ] Punchlist [ ] Vendor Manual [ ] Other: [ ]
5. PRESERVATION REQUIRED:
JOB# CWP
Client Ref:
Vessel: P&ID:
Location: Detail #:
TUBING DATA
Service Comments Tubing Characteristics Comments
1 Process Nominal O.D.
2 Signal Wall thickness
3 Air Supply Material
Manufacturer
Type
Watts per foot
Length
Installed per details
Test Medium
Tubing tested @ ______PSI PSI
All plugs and caps are on
Housekeeping complete
Test Gauge Serial Numbers
Connectors tight
Connection complete
JOB# CWP
Client Ref.:
JOB# CWP
CLIENT REF:
Line #:
ISO #:
LDT:
Gauge #: Gauge #:
Pressure Pressure Clock time for
Recorded In: Clock time for Recorded In:
Holding Leak Test each Holding Leak Test
each pressure
[ ] psi Time [ ] psi pressure Time
increment
(min.) PASS or FAIL increment (min.) PASS or FAIL
[ ] kPa reached [ ] kPa reached
COMMENTS;
JOB# CWP
CLIENT
REF:
0 % MT 0 % VT 0 % RT
Module /
Weld # Date of Weld MT Report VT Report # VT Date
Plant / Tag Chemco ISO# ISO Rev Welder ID Pipe Size Pipe Sched. Mat. Type Weld Type Line Class MT# MT Date RT# RT Report# RT Date Test Pak#
(W or FW) Weld Process # (All Welds) (All Welds)
No.
(V) Volume Stored Energy Stored Energy Stored Energy Explosive Min Safe
Pipe Size / Schd ID (in) Length (ft) Length (m) 3 -6 3 -4 Min Safe Distance (ft)
(ft ) FT LBS FT LBS X 10 (psi x ft ) x 10 Equiv.(lb TNT) Distance (m)
1/2" 80 0.546 0.0000 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
3/4" 80 0.742 0.0000 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
1" 80 0.957 0.0000 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
1 1/2" 80 1.5 0.0000 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
2" 80 1.939 0.0000 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
3" 80 2.9 0.0000 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
4" STD 4.026 0.0000 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Totals 0 0 0.0000 0.00 0.0000 0.0000 0.0000 0.0000 0.0000
Note: Maximum Stored Energy To Be Less Than 2.006E+7 FT LBS (=13 Lbs TNT)
Pneumatic Testing Conversion to Explosives: 1 Lb TNT = 1542722 FT LBS
Minimum safe distance from explosion (using scaled distance method)= 50 Ft * Sqrt(Lb TNT)
1.2
Stored Energy (ft*lbs)x10-6
1.0
0.8
0.6
0.4
0.2
0.0
0 25
Test Pressure (psig)
JOB# CWP
Client Ref:
For Results Mark: “Pass”. “Fail”, “N/A” where Not Applicable, or read test result. Checks may be used in [ ]
1.0 DATA Instrument Heater Disconnect Switch
Tag No.:
Manuf:
Model#:
Serial #:
Datasheet: Rev: Rev: Rev:
Area Class:
CSA [ ] Yes [ ] No [ ] Yes [ ] No [ ] Yes [ ] No
Ref Dwgs:
Encl Area Class: INTERIOR: EXTERIOR:
1.0 WIRING Instrument Heater Disconnect Sw JB
Wiring Continuity To: Ω
Wiring Insulation Resistance To: MΩ MΩ
Test Equip ID:
:
Tested By:
Name Signature Test Date
2.0 INSPECTIONS Instrument Heater Disconnect Sw JB
Check materials against BOM
Check for damage
Tag Installed
Terminations / Polarity
Shield Isolated at field end
Terminals Labeled
Wire Tags / Shrinks
Grounded / Bonded
Elect fittings not over-tightened/split
Conduit seals installed
4.0 ENCLOSURE ASSEMBLY Result Result
Door opening / closing clearance Tube bundle boots supplied
Accessibility for parts removal Thread lubricant applied
Temp indicator installation Manifold & Tubing Hi / Lo marked
Tube fittings made up correctly (gauge check) Pressure components per BOM/Detail
Check tube reaming Heater jam nuts installed
Torqued futbol connections @ 650 InLbs Installation / support
Enclosure clean Assembly labeled CSA / ETL or Other
Spare entries plugged Enclosure Nameplate / Tag / Warning
Blowdown Valves are [ ] NACE compliant with [ ] Grafoil packing or [ ] PTFE packing [ ] N/A
5.0 PRESSURE TEST
Pressure Test Complete [ ] Y [ . ] N/A Document on Pressure Test Record QC-624 Blown Down [ ]
6.0 ON FILE: Datasheet [ ] Cal Cert [ ] MTRs [ ] CRN [ ] ISO [ ] Weld Map [ ]
7.0 NDE COMPLETED: VT: [ ] RT: [ ] MT: [ ] PMI: [ ] [...] N/A
8.0 COMMENTS: Electrical fittings are steel or alum:
Rev Date
COMMUNICATIONS
JOB# CWP
Client Ref:
JOB# CWP
Client Ref:
Cable Designation:
To: From:
Atten. Loss Return Loss Fiber Tested By
Fibre # of # of
MM 850nm( dbm) MM 1300nm( dbm) MM 850nm( dbm) MM 1300nm( dbm) Length
Number Splices Connect. Initial Date
SM 1310nm( dbm) SM 1550nm ( dbm) SM 1310nm( dbm) SM 1550nm ( dbm) (meters)
JOB# CWP
Client Ref:
INSPECTIONS
Results Comments
Reel Integrity
Cable Ends Re-Sealed
Cable Ends Secured
Reel Identified
Comments:
JOB# CWP
Client Ref:
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
* PLEASE RECORD THE WORST CASE FOR REFLECTANCE VALUES.
JOB# CWP
Client Ref:
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
* PLEASE RECORD THE WORST CASE FOR REFLECTANCE VALUES.
JOB# CWP
CLIENT REF:
CABLE DATA:
Cable Designation:
From: To:
Reference Drawing:
Cable Manufacturer: Draka Comteq [ ] Corning [ ] Other [ ]
Cable Type:
Service Type:
Strand Count:
Virtual Count:
TEST DATA
Total Length: Source: Detector:
Type: LED: LZ: Wavelength: MM: SM:
Fibre Specification:
Comments:
INSPECTIONS:
Source End Field End Source End Field End
INSPECTED BY:
Print
DATE:
JOB# CWP
CLIENT REF:
CABLE DATA:
Cable Designation:
From: To:
Reference Drawing:
INSPECTIONS:
Results Comments
Cable type and size verified against cable schedule.
Cable is placed in the specified tray (as per Cable Schedule)
Cable is ty-wrapped and secured (as per specs and details)
JOB# CWP
CLIENT REF:
CABLE DATA:
Cable Designation:
From: To:
Reference Drawing:
Cable Type:
Cable Size:
Voltage
Insulation Type:
Length: Feet Meters
Conductor to Conductor
Conductor to Ground
Conductor to Shield
Shield to Ground
TESTED BY:
Print
DATE:
INSPECTIONS:
Source End Field End Source End Field End
Cable Clamps Correct Cable Secured
Terminations Complete Bending Radius Verified
Cable Identified Termination Identified
INSPECTED BY:
Print
DATE:
JOB# CWP
Client Ref.:
Mark “N/A” where Not Applicable
Cabinet Number: Reference Drawing :
JOB# CWP
Client Ref:
JOB# CWP
Client Ref:
JOB# CWP
CLIENT REF:
CABLE DATA:
Cable Designation:
From: To:
Reference Drawing:
INSPECTIONS:
Results Comments
Cable type and size verified against cable schedule.
Cable is placed in the specified tray (as per Cable Schedule)
Cable is ty-wrapped and secured (as per specs and details)
NOTES:
Revision 0 June 8, 2005 QC-426 R0 CTEL Cable Post Placement Walkdown.doc Page 1 of 1
Communication Equipment
QC-428
Inspection Record
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
INSPECTIONS:
Results Results Comments
Pre-cast base mounted as per
Sized as per drawings / details
details
Conduit stubs in place as per
Located as per drawings
details
Splice closure installed as per
Equip. Mounted as per details
details
Splice closure entry ports
Designation tag applied
sealed
Backfilled & graded (Outdoor
Finish / paint repaired
cabinet)
Internal equipment mounted as
Spare knock-outs filled
per details
ATTACHMENTS:
Vendors Manual [ ] Other [ ]
NOTES:
JOB# CWP
Client Ref:
JOB# CWP
Client Ref:
JOB# CWP
Client Ref:
Revision 0 May 30, 2005 QC-442 R0 Security Systems.doc Page ___ of ___
CCTV Systems QC-444
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
Client Ref:
Revision 0 May 30, 2005 QC-444 R0 CCTV Systems.doc Page ___ of ___
QC-005
Revision 0 July 21, 2006 QC-005 R0 Maintenance Test Sheet Index.doc Page 1 of 1
Printed on 7/21/2006
THIS DOCUMENT IS UNCONTROLLED WHEN COPIED
Maintenance Job Check List QC-501
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
SCOPE DESCRIPTION:
JOB# CWP
CLIENT REF:
Mark “N/A” where Not Applicable
Cable/Conductor Verification Identification
From (Source) To (Equipment)
Designation Continuity *Megger Conductor Cable
Cable Rating 120v – 300v 600v – 1000v > 1000v – < 5000v 5000v +
Test Voltage 500 volts 1000 volts 5000 volts Requires Hy-Pot
*Acceptance Criteria 25 Megohms 100 Megohms 500 Megohms 1000 Megohms
NOTES: