Cover Sheet: - To Record Overall Project and Assessment Details
Cover Sheet: - To Record Overall Project and Assessment Details
Project name
Client details
Client name:
Client email:
Client telephone number:
Assessor details (if appointed)
Assessor name:
Assessor email:
Assessor telephone number:
Document info
Signed:
Contents
How to use this document
1. Statement of Applicability
2. Objectives
3. Performance Targets
4. Evidence pack
5. Stage sign-off sheets
6. Overall project summary
Main contacts
More detailed guidance on how to use the Client Checklists can be found in the publication CP1a - Client checklists: Guidan
This should be read in conjunction with CP1 - Heat networks: Code of Practice for the UK.
General approach
These checklists can be used by Clients as a tool to monitor and enforce use of CP1. This could be done for individual stage
1. The Client decides to apply CP1 across a heat network project. At the outset a clear brief and performance targets are a
2. Optionally at this stage the Client could employ a Heat Network Assessor (or other third party) to complete these check
performance at Stages 5 and 6.
3. At key milestones (notably at the end of each Stage), performance targets are assessed confirmed/updated/measured a
evidence pack. Where the Code has not been successfully applied or performance targets met, this should be explained an
choose to accept the justifications and sign-off the Stage as completed, or take other appropriate action.
4. Where possible, all aspects of the Checklists should be assessed. However, on very large projects or where there are tim
should be checked first. Priority is indicated in each sheet.
2. Objectives checklist - For each Stage of the project this is used to record whether the CP1 objectives have been met. Sup
where suggestions can be made for future improvements.
3. Performance targets checklist - For each Stage of the project this is used to record whether performance targets have b
(These are set by the Client at Stage 1; updated if necessary during Stages 2, 3 and 4; and actual performance is measured
4. Evidence pack checklist - For each Stage of the project this is used to record whether the required documentation has b
handed to the next Stage.
5. Stage sign-off forms - At the end of each stage, the Client should sign off the stage as completed, along with the main su
independent assessor has been appointed to oversee the project according to the Code of Practice, they should also sign-o
met, or aspects of the Code of Practice have not been adhered to, the Client may still choose sign-off the Stage if acceptab
remedial action must be taken as appropriate.
6. Overall summary checklists - These can be can be filled in once the individual stages have been completed, and will pro
the Code of Practice objectives and the client’s performance targets.
In sheets 2 and 4 guidance is given as to priorities for assessment, in cases where time/resource is limited. However, in mo
VERSION
Checklist version number: V1.4
Issue date: 04 July 2016
Issued by: CIBSE
Filename: CP1 Checklists v1.4.xlsx
4.4 To reduce adverse environmental impacts on construction 4.4.1 Considerate Contractor Scheme
n/a
Notes
For Stages 5 and 6, use the colour coding as indicated in the key to specify
whether the measured performance meets the agreed targets, and if not,
whether acceptable justification has been made to the client.
N
n/a
* The assessor should take an average across all dwellings, but also review the best and worst performing dwellings.
Not set/agreed/met
Not set/agreed/met
Stage 2:
[Add text here and colour [Add text here and Stage 3:
colour code
code according to key]
according to key] Stage 4:
Stage 5:
Stage 6:
Stage 2:
[Add text here and colour [Add text here and Stage 3:
colour code
code according to key]
according to key] Stage 4:
Stage 5:
Stage 6:
Stage 2:
[Add text here and colour [Add text here and Stage 3:
colour code
code according to key] according to key] Stage 4:
Stage 5:
Stage 6:
n/a
2.6 To determine building connection costs including heat 2 Breakdown of capital costs
metering
2.10 To minimise the negative impacts of phasing the 1
development Proposed development programme
2.11 To assess operation and maintenance needs and costs 2 Operation and maintenance
assessment
2.12 To conduct a consistent economic analysis and options 2
appraisal Business case and economic analysis
3.13 To assess environmental impacts and benefits 2 Risk register and sensitivity analysis
Construction and Installation
4.1 To reduce health and safety risks to staff, customers 1
and the general public Risk register
5.5 To provide a smooth handover and sufficient 1 Health and safety file including O&M
information for the operations team manual
Operation and Maintenance
6.1 To reduce health and safety risks to staff, customers 1 Operational risk register
and the general public Disaster recovery plan
6.2 To achieve cost-effective, accurate and reliable heat 3 Metering and billing procedures
metering, pre-payment and billing systems Sample bill
6.3 To maintain a high level of reliability and a long life for 1
the heat network
Ongoing performance management
procedures
Records of water quality tests, make up
water records and temperatures,and
pressure monitoring data
Annual check on surveillance system
Not supplied
Evidence supplied?
Summary
Have the agreed performance targets
Has CP1 been followed?:
been set?:
Delete as appropriate Delete as appropriate
· Yes · Yes
· No · No
· Not met, but with acceptable justifications provided
· Not met, with remedial action required
Sign off
Client
Name:
Signature:
Date:
Summary
Have the agreed performance targets
Has CP1 been followed?:
been reviewed?:
Delete as appropriate Delete as appropriate
· Yes · Yes
· No · No
· Not met, but with acceptable justifications provided
· Not met, with remedial action required
Sign off
Client
Name:
Signature:
Date:
Summary
Have the agreed performance targets
Has CP1 been followed?:
been reviewed?:
Delete as appropriate Delete as appropriate
· Yes · Yes
· No · No
· Not met, but with acceptable justifications provided
· Not met, with remedial action required
Sign off
Client
Name:
Signature:
Date:
Summary
Have the agreed performance targets
Has CP1 been followed?:
been reviewed?:
Delete as appropriate Delete as appropriate
· Yes · Yes
· No · No
· Not met, but with acceptable justifications provided
· Not met, with remedial action required
Sign off
Client
Name:
Signature:
Date:
Summary
Have the agreed performance targets
Has CP1 been followed?:
been met?:
Delete as appropriate Delete as appropriate
· Yes · Yes
· No · No
· Not met, but with
acceptable · Not met, but with acceptable justifications provided
justifications provided
· Not met, with
remedial action · Not met, with remedial action required
required
Sign off
Client
Name:
Signature:
Date:
Summary
Have the agreed performance targets
Has CP1 been followed?:
been met?:
Delete as appropriate Delete as appropriate
· Yes · Yes
· No · No
· Not met, but with
acceptable · Not met, but with acceptable justifications provided
justifications provided
· Not met, with
remedial action · Not met, with remedial action required
required
Sign off
Client
Name:
Signature:
Date:
Summary
Has CP1 been followed?: Has all required documentation been supplied for the evidence pack:
Delete as appropriate Delete as appropriate
· Yes · Yes
· No · No
· Not met, but with
acceptable
justifications provided
· Not met, with
remedial action
required
Sign off
Client
Name:
Signature:
Date:
Client advisor
Contractor
(if appointed)
Client advisor
Feasibility consultant
(if appointed)
Client advisor
Principal designer
(if appointed)
Client advisor
Principal Contractor
(if appointed)
Client advisor
Commissioning team leader
(if appointed)
Client advisor
Building operator
(if appointed)
ü/ û
Have the performance
targets been
set/reviewed/met?
[See Sheet 3] [See Sheet 3] [See Sheet 3] [See Sheet 3]
ü/ û
Has the required
documentation been
supplied for the
evidence pack? [See Sheet 4] [See Sheet 4] [See Sheet 4] [See Sheet 4]
ü/ û
Overall
ü/ û