0% found this document useful (0 votes)
349 views2 pages

C.02 Final Bridge Construction Report

This document is a final bridge construction report that provides details on a bridge project. It includes sections on general bridge details, contract information including completion dates, substructure details for the abutments and piers including construction methods and materials used, superstructure details on the deck and barriers, and concrete test data. The report summarizes all relevant information on the construction of the bridge.

Uploaded by

Sami Aj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
349 views2 pages

C.02 Final Bridge Construction Report

This document is a final bridge construction report that provides details on a bridge project. It includes sections on general bridge details, contract information including completion dates, substructure details for the abutments and piers including construction methods and materials used, superstructure details on the deck and barriers, and concrete test data. The report summarizes all relevant information on the construction of the bridge.

Uploaded by

Sami Aj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

FINAL BRIDGE CONSTRUCTION REPORT

Date:
Project: Contract #:
Contractor: Bridge File #:
Project Sponsor: Consultant:

A. General
Bridge Name:
Highway No./Stream:
Location:
Span Lengths:
Girder Type:
Number of Piers:
Vertical Clearance:
Horizontal Clearance:

B. Contract
Contract No.:
Contract Tendering Date:
Contract Closing Date:
Contractor:
Site Occupancy Days Bid:
Site Occupancy Days Used:
Specified Completion Date:
Actual Completion Date:

Girder Supplier & Erector:


Date Girder Erected:
Date Grouting Completed:
Type of Grout/Product Name:

C. Substructure
I. Abutment #1
Hammer Type & Size:
Pile Type:
Max/Min Penetration:
Date Completed Seat & Wingwall Pours:
Type of Concrete Finishing & Product Name:

Page 1/2
Revised December 2013 Appendix C.02
FINAL BRIDGE CONSTRUCTION REPORT

II. Abutment #2
Hammer Type & Size:
Pile Type:
Max/Min Penetration:
Date Completed Seat & Wingwall Pours:
Type of Concrete Finishing & Product Name:

III. Piers
(i) Type of Foundation:
Spread Footing:
Piles:
Berm or Cofferdam & Description:
Type of Piles:
Max/Min Penetration:
Completion Date:
Type of Concrete Finishing & Product Name:
(ii)
(iii)
(iv)

D. Superstructure
I. Deck
Date Poured:
Type of Wearing Surface:
Type of Waterproofing/Product Name:
Date Installed:
II. Curbs/Barriers:
Date Completed:
Type of Sealers/Product Name:

E. Concrete Data
For each Class of Concrete Provide: a) Concrete Mix Design, b) Concrete Supplier, c) Summary of Test Results

F. General Comments

Revised December 2013 Appendix C.02 Page 2/2

You might also like