Advanced Oilfield Technology Company LLC: Work Procedure
Advanced Oilfield Technology Company LLC: Work Procedure
WORK PROCEDURE
AOTC/ FORMAT 0/ REV-0
1. SCOPE:
2. Reference Standards:
3. Abbreviations:
4. Responsibilities:
Test Engineer:
Maintains the status of the control valve. Coordinates with the client.
Supervises the over all activities. Allocating time for each job and
maintaining the delivery time.
Supervisor:
QC Engineer :
5. Test standards:
ADVANCED OILFIELD DOCUMENT N0.
TECHNOLOGY COMPANY AOTC/WP- 040 PAGE No: 2 of 6
LLC.
WORK PROCEDURE DATE : 07th March-2011 REVISION No. : 0
API -6D
API -598
ANSI/FCI 70.2
ASME B16.5
6. Equipments:
1. Control valve test benches.
2. Loop calibrator
3. Multimeter
4. Hart Communicator.
8. Types of actuator
9. Sequence of activities
ADVANCED OILFIELD DOCUMENT N0.
TECHNOLOGY COMPANY AOTC/WP- 040 PAGE No: 2 of 6
LLC.
WORK PROCEDURE DATE : 07th March-2011 REVISION No. : 0
Collection of valves:
Valves are brought to the facility. Job card is opened for the concerned
valve.
Inspection :
Dismantling :
Overhauling stages:
• All the parts will be carefully inspected and the inspection findings
will be entered in the AOTC report . Necessary repair work will be
carried out.
Body inspection:
Actuator inspection:
Overhauling Stages:
All parts will be placed in separate trays . Trays will be tagged by the
valve tag No or serial number for identification.
Heavy valve body will be placed in separate stand in upright position.
1. Cleaning
2.
ADVANCED OILFIELD DOCUMENT N0.
TECHNOLOGY COMPANY AOTC/WP- 040 PAGE No: 2 of 6
LLC.
WORK PROCEDURE DATE : 07th March-2011 REVISION No. : 0
Assembly:
Final Testing:
Dispatch:
**********