MOLE SIEVE DEHYDRATION SELECTION, SIZING AND TROUBLESHOOTING ,


Kolmetz Handbook of Process Equipment Design

Article · March 2020

CITATIONS READS

0 264

2 authors, including:

Karl Kolmetz
Universiti Malaysia Pahang
123 PUBLICATIONS   46 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Ethylene Plant Optimization View project

Process Safety View project

All content following this page was uploaded by Karl Kolmetz on 25 March 2020.

The user has requested enhancement of the downloaded file.


Page : 1 of 85

KLM Technology
Rev: 01
Group
Practical Engineering Engineering Solutions
Guidelines for Processing
Plant Solutions Rev 01 Sept 2015
www.klmtechgroup.com

Co Author
KLM Technology Group Kolmetz Handbook Rev 01 - Ayu Zaki Lestari
P. O. Box 281 of Process Equipment Design
Bandar Johor Bahru,
80000 Johor Bahru,
Editor / Author
Johor, West Malaysia MOLE SIEVE DEHYDRATION
SELECTION, SIZING AND Karl Kolmetz

TROUBLESHOOTING

(ENGINEERING DESIGN GUIDELINE)

TABLE OF CONTENT

INTRODUCTION 4

Scope 4

General Design Consideration 4

DEFINITIONS 26

NOMENCLATURE 28

THEORY OF DESIGN 30

Adsorption Principles 30

Adsorption Process 36

Desiccant Capacity 43

MTZ Length 45

Adsorber Design 46
Page 2 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Regeneration Design 53

Molecular Sieve Dehydration Unit Design Considerations 57

Operational Problems 60

Savety and Environmental Considerations 66

APPLICATION

Example 1: Calculated Size a Molecular Sieve Dehydrator 66

Example 2: Increased Gas Flow and Regenerate Unit Dehydrator 70

REFEREENCES 77

LIST OF TABLE

Table 1: Physical Properties of MEG, DEG, TEG and TREG 6

Table 2: Representative properties of Commercial Silica Gels, Activated Alumina,


and Molecular Sieve 4A 13

Table 3: Most Common Types of Molecular Sieves (Angstrom = 10-10 m) 20

Table 4: Basic Characteristics of Molecular Sieves 22

Table 5: Typical Operating Conditions for Molecular Sieve Dehydration Units 42

Table 6: Dessicant Constant 48

Table 7: Screening Opening for Molecular Sieve 49

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 3 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

LIST OF FIGURE

Figure 1: Process flow diagram of glycol dehydration unit 9

Figure 2: Example Solid Desiccant Dehydrator Twin Tower System 15

Figure 3: Molecular Sieve Types A and X Structures 20

Figure 4: Molecular Sieves Selection Chart 24

Figure 5: The Equilibrium Conditions for Water on a Commercial Molecular Sieve 31

Figure 6: Schematic of The adsorption Zones in An adsorber Vessel 33

Figure 7: Vapor-Phase Concentration Profile of an Adsorbate in The Three Zones


of an Adsorption Bed 34

Figure 8: Schematic of a two-bed adsorption unit. Valving is set to have absorber


#1 in drying cycle and absorber #2 in regeneration cycle 38

Figure 9: Flow Schematic of a Typical Molecular Sieve Dehydration for large Gas
Processing Plant 41

Figure 10: Molecular-sieve capacity corection for unsaturated inlet gas 52

Figure 11: Correction for Decrease in Adsorption Capacity Caused by inlet gas
temperature in molecular sieve. 52

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 4 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

INTRODUCTION

Scope

Natural gas may be the most energy efficient fossil fuel, it offers important energy
saving benefits when it is used instead of oil or coal. Natural gas may need to be
dehydrated because it contains water vapor.

This guideline provides knowledge to design a gas dehydration system; especially


adsorption treating using molecular sieves. This guideline gives methods to understand
basic design of gas dehydration and sizing the molecular sieve dehydrator bed.

This guideline will help reader to understand about gas dehydration methods, desiccant
selection, bed sizing, regeneration design, operational problem, etc. Additional details of
selecting molecular sieve will be presented. The application of the molecular sieve
dehydration theory with examples will make the design easier to understand for a
molecular sieve dehydration unit.

General Design Consideration

Natural gas either from natural production or storage reservoirs is saturated with water
vapor, which will condense and form gas hydrates if the gas is cooled below its hydrate
formation temperature. Gas hydrates are solids that can agglomerate and plug pipelines
and equipment, interrupting operations and stopping gas production. This may create
an unsafe condition. Water vapor may condense in pipelines, resulting in erosion and
corrosion. When accumulated in the pipelines, it might form a liquid plug, reducing the
pipeline flow capacity. Natural gas in transit to market should be dehydrated to a
controlled water content to avoid these potential problems.

Dehydration of natural gas is the removal of the water that is associated with natural
gases in vapor form. The natural gas industry has recognized that dehydration is
necessary to ensure smooth operation of gas transmission lines. Dehydration prevents
the formation of gas hydrates and reduces corrosion. Unless gases are dehydrated,
liquid water may condense in pipelines and accumulate at low points along the line,
reducing its flow capacity. Water is also removed to meet a water dew point requirement

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 5 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

of a sales gas contract specification range from 32.8 to 117 kg/106 std m3. Several
methods have been developed to dehydrate gases on an industrial scale.

Below is discussed the methods of dehydration

Direct Cooling
The saturated water vapor content of natural gas decreases with increased pressure or
decreased temperature. Thus, hot gases saturated with water may be partially
dehydrated by direct cooling. Gases subjected to compression are normally "after
cooled", and this cooling may well remove water from the gas. The cooling process
must reduce the temperature to the lowest value that the gas will encounter at the
prevailing pressure to prevent further condensation of water.

The direct cooling method by expansion or refrigeration, with injection of hydrate


inhibitors, is common for less dew point depression in production of pipeline in mild
weather regions.

Absorption
Absorption dehydration involves the use of a liquid desiccant to remove water vapor
from the gas. The most frequently used desiccants in absorption processes are di-
ethylene and tri-ethylene glycols. Usually, the absorption/stripping cycle is used for
removing large amounts of water, and adsorption is used for cryogenic systems to
reach low moisture contents. Although many liquids possess the ability to absorb water
from gas, the liquid that is most desirable to use for commercial dehydration purposes
should possess the following properties:

1. High absorption efficiency.


2. Easy and economic regeneration.
3. Non-corrosive and non-toxic.
4. No operational problems when used in high concentrations.
5. Minimum absorption of hydrocarbon portion of the gas, and no contamination by
acid gases.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 6 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Glycols are the most widely used absorption liquids as they approximate the properties
that meet the commercial application criteria. Glycol dehydration is the most common
dehydration used to meet pipeline sales specification and field requirements. Adsorption
processes are used to obtain very low water contents (0.1 ppm or less) required in low
temperature processing such as deep NGL extraction and LNG plants. Several glycols
have been found suitable for commercial application.

1. Monoethylene glycol is used as hydrate inhibitor where it can be recovered from


gas by separation at below ambient temperatures. It is used in glycol injection
exchanger operating at -20 oF to minimize losses.

2. Di-ethylene glycol (DEG) is sometimes used for dehydration for uniformity when
hydrate inhibition is required upstream of dehydration.

3. Tri-ethylene glycol (TEG) is the most commonly used dehydration liquid and is the
assumed glycol type in this process description.

4. Tetra-ethylene glycol (TREG) is more viscous and more expensive than the other
glycols. The only real advantage is its lower vapor pressure which reduces absorber
vapor loss. It should only be considered for rare cases where glycol dehydration will
be employed on a gas whose temperature exceeds about 50 °C, such as when
extreme ambient conditions prevent cooling to a lower temperature.
In process design of the TEG dehydration unit, the upstream unit operation must be
considered, as the TEG inlet temperature and water saturation will significantly impact
the unit performance. For regions with hot climate, the feed gas should be cooled to the
lowest possible temperature with cooling water (or chilled water). This is necessary to
ensure that the feed gas temperature meets the TEG unit’s inlet maximum temperature.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 7 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Table 1 – Physical Properties of MEG, DEG, TEG and TREG

Glycol MEG DEG TEG TREG


Formula HOC2H4OH HO(C2H4O)2H HO(C2H4O)3H HO(C2H4O)4H
Molecular mass 62.07 106.12 150.17 194.32
Boiling point 101.3 kPa (F) 386.6 473 548.6 620.6
Freezing point (F) 8.6 17.6 19.04 20.84
3
Density 68 F (lb/ft ) 69.45 69.64 70 77.75
Viscosity 68 F (mPa.s) 20.9 35.7 47.9 60
Degradation temperature (F) 325.4 323.6 402.8 438.8

Liquid desiccant dehydration equipment is simple to operate and maintain. It can easily
be automated for unattended operation; for example, glycol dehydration at a remote
production well. Liquid desiccants can be used for sour gases, but additional
precautions in the design are needed due to the solubility of the acid gases in the
desiccant solution. At very high acid gas content and relatively higher pressures the
glycols can also be “soluble” in the gas.

For the process, the regenerated glycol is fed to the top of an absorber (contactor)
where it is contacted with the wet natural gas stream The glycol absorbs water from the
natural gas as it flows down through the contactor countercurrent by physical absorption
to the gas flow. Water-rich glycol is removed from the bottom of the contactor while the
dry natural gas leaves the top of the absorption column and is fed either to a pipeline
system or to a gas plant.

After leaving the absorber, the water-rich glycol is passes through the reflux condenser
coil, flashes off most of the soluble gas in the flash tank (vessel) where hydrocarbon
vapors are removed and any liquid hydrocarbons are skimmed from the glycol. This
step is necessary as the absorber is typically operated at high pressure and the
pressure must be reduced before the regeneration step. Due to the composition of the
rich glycol, a vapor phase will form when the pressure is lowered having a high
hydrocarbon content.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 8 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

After leaving the flash vessel, the rich glycol is heated in a cross-exchanger and fed to
the regenerator. The glycol regenerator consists of a column, an overhead condenser,
and a reboiler. In the regenerator, absorbed water is distilled from the glycol at near
atmospheric pressure by application of heat. The glycol is thermally regenerated to
remove excess water and regain the high glycol purity.

The hot lean glycol is cooled by cross-exchange with rich glycol entering the
regenerator. It is then fed to a lean pump where its pressure is elevated to that of the
glycol absorber. After raising the pressure, the lean solvent is cooled again with a trim
cooler before being recirculated into the absorber. This trim cooler can either be a
cross-exchanger with the dry gas leaving the absorber.

However, there are several operating problems with glycol dehydrators. Suspended
foreign matter, such as dirt, scale and iron oxide, may contaminate glycol solutions.
Also, overheating of the solutions may produce both low and high boiling decomposition
products. The resultant sludge may collect on heating surfaces, causing some loss in
efficiency or, in severe cases, complete flow stoppage. Liquids in inlet gas may require
installation of an efficient separator ahead of the absorber. Foaming of solution may
occur with resultant carry-over of liquid

The design of glycol dehydration systems is developed as the project progresses from
concept selection, through project specification and detailed design. It is important not
to leave decisions to too late a point in the design development. The design shall be
consistent with the rest of the plant’s design, for instance:

1. It shall encompass all the anticipated operating conditions and operating scenarios,
including start up from cold.
2. Its sparing, availability, start-up times etc shall be as per the requirements of the
project’s operating and maintenance philosophy and the project’s reliability,
availability, maintainability study.
3. Its materials of construction shall be determined by the project’s material selection
study.
4. The controls and shutdown functions shall be consistent with those of the rest of the
project and subject to the same process controllability reviews, Hazops.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 9 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

5. Its environmental impact shall be assessed, justified and included in the project’s
overall environmental impact.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 10 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Dry gas
Water
Flash gas
vapor
Still
Lean
glycol
Flash
tank

Glycol
contactor Reboiler

Surge drum
Rich
glycol

Wet Inlet
gas scrubber Filter

Free
liquid

Figure 1: Process flow diagram of glycol dehydration unit

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 11 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

The overall design of a glycol system requires components optimization that interacts
with each other and also allow for anticipated variations in operating conditions over the
life of the plant. The optimization include of glycol circulation rate, dewpoint,
temperature pressure, etc. In general, the total circulation rate is determined by the
amount of water removal required. The water dewpoint depression, expressed as inlet
dewpoint minus outlet dewpoint, is dependent on glycol circulation rate (in gall TEG/lb of
water removed), the lean glycol concentration, the number of trays or depth of packing
in the contactor and the contact temperature.

Adsorption
Adsorption (or solid bed) dehydration is the process where a solid desiccant is used for
the removal of water vapor from a gas stream to meet water dew points less than -40
oF. The desiccant material becomes saturated as moisture is adsorbed onto its surface.

A good desiccant should therefore have the greatest surface area available for
adsorption.

The solid desiccants commonly used for gas dehydration are those that can be
regenerated and, consequently, used over several adsorption-desorption cycles. The
mechanisms of adsorption on a surface are of two types; physical and chemical. The
latter process, involving a chemical reaction, is termed "chemisorption", a much
stronger chemical bonding occurs between the surface and the adsorbed molecules.
Chemical adsorbents find very limited application in gas processing. Adsorbents that
allow physical adsorption hold the adsorbate on their surface by surface forces. For
physical adsorbents used in gas dehydration, the following properties are desirable.

1. Large surface area for high capacity. Commercial adsorbents have a surface area
of 500-800 m2/g.
2. Good "activity" for the components to be removed and good activity retention with
time/use.
3. High mass transfer rate, i.e., a high rate of removal.
4. Easy, economic regeneration.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 12 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

5. Small resistance to gas flow, so that the pressure drop through the dehydration
system is small.
6. High mechanical strength to resist crushing and dust formation. The adsorbent
also must retain strength when "wet".
7. Cheap, non-corrosive, non-toxic, chemically inert, high bulk density and small
volume changes upon adsorption and desorption of water.

Adsorbents used for removing water from a fluid stream are known as "solid desiccant".
The characteristics of solid desiccants vary significantly depending on their physical and
chemical properties. Many known solids have some ability to adsorb, but relatively few
are commercially important. Some of the qualities that make a solid adsorbent
commercially important are:

1. Available in large quantity;


2. High adsorption capacity: this reduces the adsorbent volume, requiring smaller
vessels, resulting in lower capital and operating costs;
3. High selectivity, this permits removal of only the undesirable components and
reduces operating expenses;
4. Easy regeneration: low regeneration temperature reduces the heating requirement
for solid desiccant regeneration;
5. Ability to reduce the materials to be adsorbed to a low concentration;
6. Ability to be regenerated and used again;
7. Low-pressure-drop design: this makes more pressure available for the
turboexpander operation in an NGL recovery process;
8. Good mechanical integrity: high crush strength, low attrition, low dust formation,
and high stability against aging reduces the frequency of adsorbent change-out
and downtime-related losses in production;
9. Environment-friendly properties: the materials should be noncorrosive, nontoxic,,
and chemically inert to permit safe handling;

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 13 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

10. Chemical inertness;


11. Reasonable adsorbent price.

Some materials that satisfy these criteria, in the order of increasing cost are; bauxite;
alumina; silica gels and silica-alumina gels; molecular sieves; and carbon.

 Bauxite – naturally occuring mineral composed primarily of alumina (Al2O3. x H2O).


 Gels – alumina or silica gels manufactured and conditioned to have an affinity for
water. Silica Gel is a generic name for a gel manufactured from sulfuric acid and
sodium silicate. It is essentially pure silicon dioxide, SiO2. When used for
dehydration, silica gel will give outlet dewpoints of approximately –60°F.
 Alumina – a manufactured or natural occurring form of aluminum oxide that is
activated by heating. Alumina is a hydrated form of alumina oxide (Al2O3). It is
used for gas and liquid dehydration and will give outlet dewpoints of about –90°F.
Less heat is required to regenerate alumina and silica gel than for molecular sieve,
and the regeneration temperature is lower.
 Molecular Sieves – manufactured or naturally occurring aluminosilicates exhibiting
a degree of selectivity based on crystalline structure in their adsorption of natural
gas constituents. Molecular sieves are a class of aluminosilicates. They produce
the lowest water dewpoints, and can be used to simultaneously sweeten and dry
gases and liquids. Their equilibrium water capacity is much less dependent on
adsorption temperature and relative humidity. Dehydration to a –150°F dewpoint is
possible with molecular sieves.
 Carbon (charcoal) – a carbon product treated and activated to have adsorptive
capacity.

All, except carbon, are used for dehydration. Carbon has desirable properties for
hydrocarbon removal and adsorption of certain impurities but possesses negligible
water capacity.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 14 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Table 2 – Representative properties of Commercial Silica Gels, Activated Alumina, and


Molecular Sieve 4A

Silica Gel Activated Alumina Molecular Sieve 4A


Shape Spherical Spherical Pellets (extruded
cylinders) and
beads
Bulk density 49 (785) 48 (769) 40 -45 (640 – 720)
Lb/ft3 (kg/m3)
Particle size 4 – 8 mesh 7 – 14 mesh, 1/8 1/16 inch, 1/8 inch, ¼
5 – 2 mm inch, 3/16 inch, ¼ inch diameter
inch diameter (3 cylinders (1.6 mm,
mm, 5 mm, 6 mm) 3.2 mm, 6 mm)
Packed bed % voids 35 35 35
Specific heat 0.25 (1.05) 0.24 (1.00) 0.24 (1.00)
Btu/lb oF (kJ/kg K)
Surface area m2/g 650 – 750 325 – 360 600 – 800
Pore volume cm3/g 0.36 0.5 0.28
Regeneration 375 (190) 320 to 430 (160 to 400 to 600 (200 to
temperature, oF (oC) 220) 315)
Average pore diameter 22 NA 3, 4, 5, 10
(Å)
Minimum dew point -80 (-60) -100 (-75) -150 (-100)
temperature of
effluent, oF (oC)
Average minimum 5 – 10 10 - 20 0.1
moisture content of
effluent gas, ppmv

Adsorption unit is equipped with two or more identical adsorbers which are filled with
activated carbon and associated regeneration equipment associated regeneration
equipment. One adsorber vessel is on-stream adsorbing water from the gas while the
other is tower is being regenerated and cooled. One adsorber is always on-stream to
assure uninterrupted vapor processing capability. Switching valves automatically
alternate the adsorbers between adsorption and regeneration.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 15 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Hot gas is used to drive off the adsorbed water from the desiccant, after which the tower
is cooled with an unheated gas stream. The towers are switched before the on-stream
tower becomes water saturated. In this configuration, part of the dried gas is used for
regeneration and cooling, and is recycled to the inlet separator. Other streams may be
used if they are dry enough, such as part of the residue gas.

To process adsorption of water from the hydrocarbon vapor-air mixture, the mixture first
flows up through the on-stream adsorber vessel. In the adsorber vessel, the activated
carbon adsorbs the hydrocarbon vapor, thus clean air vents from the bed with minimal
hydrocarbon content. The second adsorber is being regenerated off-line. A combination
of high vacuum and purge air stripping are used for the carbon bed regeneration to
remove previously adsorbed hydrocarbon vapor from the carbon and restore the
carbon's ability to adsorb vapor during the next cycle.

The liquid ring vacuum pump extracts concentrated hydrocarbon vapor from the carbon
bed and discharges it into a three phase separator that separates the vacuum pump
seal fluid, the hydrocarbon condensate and the non-condensed hydrocarbon/air vapors.

The seal fluid is pumped from the separator through a seal fluid cooler to remove the
heat of compression from the seal fluid. Then the seal fluid is returned to the liquid ring
pump. Other types of vacuum generators can be substituted for the standard liquid ring
pump in chlorinated hydrocarbon vapor recovery to avoid incompatibility of the vapor
with the seal fluid required by the liquid ring pump.

Furthermore hydrocarbon vapor and condensate flow from the separator to an absorber
column section as the final recovery device where it is subsequently recovered by
absorption into a liquid hydrocarbon absorbent. The circulating absorbent supplied from
storage serves the dual purpose of absorbing the recovered hydrocarbon vapor and
cooling the vacuum pump seal fluid. This absorbent is normally the same hydrocarbon
liquid that was the original source of the vapor generation. A lean absorbent supply
pump and a rich absorbent return pump are provided to circulate the required
absorbent. A small stream of air and residual vapor exits the top of the absorber column
and is recycled to the on stream carbon bed where the residual hydrocarbon vapor is
re-adsorbed.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 16 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Regeneration Gas FRC

Regen gas
compressor
Water
450 - 600 F knock out

Regen gas
cooler
Inlet Water
separator
Wet feed Regenerating
gas cooling

Adsorbing

Regeneration
Gas
600 F
Valve open
Valve closed Regen gas Dry Dust filter
heater gas

Figure 2: Example Solid Desiccant Dehydrator Twin Tower System

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 17 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

During the adsorption period, the bed can be thought of as operating with three zones.
The top zone is called the saturation or equilibrium zone. The desiccant in this zone is in
equilibrium with the wet inlet gas. The middle or mass transfer zone (MTZ) is where the
water content of the gas is reduced from its inlet concentration to < 1 ppm. The bottom
zone is unused desiccant and is often called the active zone. If the bed operates too
long in adsorption, the mass transfer zone begins to move out the bottom of the bed
causing a “breakthrough.” At breakthrough, the water content of the outlet gas begins to
increase and will eventually reach feed gas water content when the MTZ is completely
displaced. Some matters should be considered while using adsorption method.

1. The continuous process requires two (or more) vessels with one on-line removing
water while the other is being regenerated.
2. Generally a bed is designed to be on-line in adsorption for 8 to 24 hours. When the
bed is taken off-line, the water is removed by heating to 375°F-600°F
3. The regeneration gas used to heat the bed is usually a slipstream of dry process
gas.
4. Any heat source can be used including waste heat from engines and turbines.
5. Gas flow during adsorption is typically downflow. This allows higher gas velocities
(thus smaller diameter towers) since bed fluidization is avoided.
6. Regeneration gas flow is upflow during the heating period. In this way, any residual
water left on the desiccant will be at the top of the bed and will not affect the
effluent dewpoint when adsorption is resumed. Upflow heating helps to strip any
contaminants from the top of the bed extending desiccant life.
7. Regeneration gas flow during the cooling period may be upflow if the gas is
completely free of water, which saves two switching valves per tower.
8. If the cooling gas contains water, cooling flow should be downflow to avoid
preloading of the desiccant at the bottom of the bed with water.
9. The design pressure drop through the bed should be about 5 – 8 psi. A design
pressure drop higher than 8 psi is not recommended as the desiccant is fragile and
can be crushed by the total bed weight and pressure drop forces.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 18 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

10. In the saturation zone, molecular sieve is expected to hold approximately 13


pounds of water per 100 pounds of sieve.
11. The total bed height is the summation of the saturation zone and the mass transfer
zone heights. It should be no less than the vessel inside diameter, or 6 feet
whichever is greater.
Solid desiccant towers are insulated externally or possibly internally. Internal refractory
requires careful installation and curing, usually before the desiccant is installed. It saves
energy but the greatest benefit is it can dramatically reduce the required heating and
cooling times. This is often an important benefit for systems where regeneration times
are limited. The primary disadvantage is the potential for wet gas bypassing the
desiccant through cracks and defects in the insulation during the adsorption cycle.

Solid bed dehydration is often the superior alternative in applications such as:

1. Dehydration to water dewpoints less than –40 to –50 oC, such as those required
upstream of NGL extraction plants utilizing expanders and LNG plants.
2. Hydrocarbon dewpoint control units where simultaneous extraction of water and
hydrocarbon is required to meet both of the respective sales specifications — well
suited for hydrocarbon dewpoint control on lean, high pressure gas streams.
3. Simultaneous dehydration and sweetening of natural gas.
4. Dehydration of gases containing H2S where H2S solubility in glycol can cause
emission problems at the regenerator.
5. Dehydration and trace sulfur compound (H2S, COS, CS2, mercaptan) removal for
LPG and NGL streams.

The selection of a desiccant for a particular application depends on several factors –


water dewpoint specification, presence of contaminants (especially sulfur compounds),
coadsorption of heavy hydrocarbons and cost.

All commercial desiccants are capable of producing water dewpoints below –60oC.

In a well designed and properly operated unit, the following dewpoints are achievable:

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 19 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Desiccant Outlet Dewpoint


Alumina -73oC [-100oF]
Silica Gel -60oC [-76oF]
Molecular Sieves -100oC [-150oF]

For most gas drying applications upstream of low temperature NGL extraction plants
and LNG plants, molecular sieve will be the first choice due to the very low outlet water
dewpoints and higher effective capacity. Molecular sieves are also used in applications
requiring removal of sulfur compounds. Molecular sieves are more expensive than gels
or alumina and require higher regeneration heat loads.

In the presence of a gas stream saturated with water, aluminas have a higher
equilibrium capacity for water than sieves, but the water loading declines rapidly as the
relative saturation of the gas stream decreases. Alumina’s also have a lower heat of
regeneration than sieves. However, the limited outlet water dewpoints achievable with
alumina preclude their use in very low temperature gas processing applications.
Alumina’s are sometimes used in conjunction with sieves in a compound bed
application – alumina on top and sieves on the bottom. This scheme takes advantage of
alumina’s higher equilibrium water loading, but also uses the sieve to achieve lower
outlet water dewpoints.

Silica gel is sometimes used when both water and hydrocarbon dewpoint must be met.
Some silica gels have an appreciable capacity for C5+ hydrocarbons as well as for
water. This allows both dewpoints to be achieved in a single unit. The equilibrium
capacity of gel for hydrocarbons is lower than for water, consequently the bed saturates
with hydrocarbons much more quickly than the water. This results in short adsorption
cycle times – sometimes less than 1 hour – hence the name Short Cycle Units is often
applied to these installations.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 20 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Other Gas Dehydration Processes

Other less frequently used dehydration methods can be applicable to some operations
listed below.

Calcium chloride: calcium chloride can be used as a consumable desiccant to dry


natural gas. Anhydrous calcium chloride combines with water to form various calcium
chloride hydrates. As water absorption continues, calcium chloride is converted to
successively higher states of hydration, eventually forming a calcium chloride brine
solution. Outlet water contents of 1 lb/MMscf can be achieved with calcium chloride
dehydrators.

Calcium chloride dehydrators may offer a viable alternative to glycol units on small-feed-
rate, remote dry gas wells. The calcium chloride must be changed out periodically. Brine
disposal is an environmental issue.

Methanol refrigeration: dehydration of natural gas to –150 oF using methanol as the


hydrate inhibitor has been used for ethane recovery in the Empress plant. The
condensed water and methanol streams can be decanted in the cryonegic unit and can
be separated by distillation.

The difficulty in the methanol refrigeration process is the high methanol losses
associated with the high vapor pressure. The process must work with cryogenic
temperature refrigeration to minimize losses. The methanol process is more complex in
terms of operation than the molecular sieves process, and is seldom used in NGL
recovery processes today.

Membrane and twister: membranes and twister technology can be used to remove
water and hydrocarbons to meet pipeline water and hydrocarbon dew point. Membrane
offer an attractive option for cases in which drying is required to meet pipeline
specifications. Their modular nature, light weight, large turndown ratio, and low
maintenance make them competitive with glycol units in some situations.

Feed pretreatment is a critical component of a membrane process. The inlet gas must
be free of solids and droplets larger than 3 microns. Inlet temperature should be at leats

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 21 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

20 oF above the dew point of water to avoid condensation in the membrane.


Membranes are economically attractive for dehydration of gas when flow rates are less
than 10 MMscfd.

DEFINITIONS

Absorption - A separation process involving the transfer of a substance from a


gaseous phase to liquid phase through the phase boundary.

Activated Alumina – An adsorbent made of alumunium oxide (Al2O3). It is used as a


desiccant for drying gases and air and as a fluoride filter for drinking water

Adsorbent – Chemicals or materials that can capture liquids or gases.

Adsorption - Process in which a gas, liquid, or solid adheres to the surface of a solid or
(less frequently) a liquid but does not penetrate it.

Coadsorption - The adsorption of multiple substances at the same time

Coking - the solid product resulting from the destructive distillation of coal in an oven or
closed chamber or by imperfect combustion, consisting principally of carbon.

Condensate - Light hydrocarbon liquids.

Contaminant (Impurity) - The presence of an unwanted constituent

Dehydration - Removal of water vapor from a gas.

Desiccant - An adsorbent that shows primary selectivity for the removal of water.

Design pressure - The pressure used in the design of a vessel for the purpose of
determining the minimum permissible wall thickness or physical characteristics of the
different parts of the vessel.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 22 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Dewpoint - The temperature at which vapor begins to condense into a liquid at a


particular system pressure. A natural gas stream exhibits both hydrocarbon and water
dewpoints. Sometimes the dewpoint is only a meta-stable condition – in the stable
condition the condensed material is a solid (ice/hydrate) occurring at a higher
temperature.

Fouling - the accumulation of unwanted material on solid surfaces to the detriment of


function
Free water - Liquid water which is not dissolved in any other substance.

Glycol - A hygroscopic liquid. Mono-ethylene Glycol (MEG) and Di-ethylene Glycol


(DEG) are commonly used in hydrate inhibition service and Tri-ethylene Glycol (TEG) is
most common in gas dehydration service.

Heat duty - The rate of heat absorption by the process.

Hydrate - A clathrate compound formed by a combination of methane, ethane, propane,


iso-butane, H2S or CO2 and water at elevated pressure and low temperature.

Isotherm - A line on a map connecting points having the same temperature at a given
time or on average over a given period.

Molecular sieves – Naturally occuring adsorbents with uniform pore size that can be
tuned to be highly selective.

Pressure drop - The difference in pressure between two points of a fluid carrying
network

Polarity - a separation of electric charge leading to a molecule or its chemical groups


having an electric dipole or multipole moment. Polar molecules interact through dipole–
dipole intermolecular forces and hydrogen bonds.

pH - Measure of the acidity of a liquid on a scale of 0 to 14 with 7 being neutral. 0 to 7 is


acidic and 7 to 14 is alkaline.

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 23 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Regenerator - A unit including reboiler, still column and other related facilities to
regenerate (or re-concentrate) rich glycol to lean glycol.

Reflux - Condensed liquid which flows back down a column to maximize separation
efficiency.

Relative humidity - the amount of water vapor present in air expressed as a


percentage of the amount needed for saturation at the same temperature.

Saturated gas (with respect to water) - A gas stream which contains the maximum
amount of water vapor at a given temperature and pressure without condensing the
water.

Standard (pressure and temperature) - Unit of ideal gas volume at reference


conditions of 101.325 kPa and 15 °C. Abbreviated: m3(st).

Transfer unit - The dimensionless distance within which every solute molecule has
"unit opportunity" to transfer to the gas phase. A transfer unit can be calculated for a
theoretical stage.

Van der Waals forces - the sum of the attractive or repulsive forces
betweenmolecules (or between parts of the same molecule) other than those due
to covalent bonds, or the electrostatic interactionof ions with one another, with neutral
molecules, or with charged molecules.

NOMENCLATURES

A Constant of desiccant
AMTZ Constant for MTZ length
B Constant of desiccant
C Constant of desiccant
CA Capacity adsorbent, lb/100 lb desiccant
CB Bed capacity, lb of water
CMTZ MTZ holds

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 24 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Cp Heat capacity, Btu/lb oF


CS Standard capacity adsorbent, lb/100 lb desiccant
Cy Cycle, hour
d Diameter, ft
hB Bed height, ft
hZ MTZ length, ft
M Total molecular mass of air, kg/kmol
MA Mass of adsorbent, lb
MV Mass of vessel, lb
mW Water loading/cycle, kg, lbm
PS Standard pressure, psia
Q Total heat requirement, Btu
q Gas flow, m3/d, MMscfd
qA Actual flow rate, m3/min, ft3/min
q2 Increased gas flow, m3/min, ft3/min
qS Standard gas flow, m3/d, MMscfd
qSi Heat the adsorbent, Btu
qSt Heat the vessel, Btu
qW Heat required to desorb the water, Btu
R Gas constant, J/mol K, psi-ft3/lbmol R
TS Standard temperature, oF
TR Regeneration temperature, oF
TGR Gas leave regeneration temperature, oF
Vg Supervicial gas velocity, ft/min
W Saturated water content of gas, lbm/MMscf, %
x Maximum desiccant useful capacity, %
xS Dynamic capacity, %
z Gas compressibility factor

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,
reproduced or in any way communicated or made accessible to third parties without our written consent.
Page 25 of 85
KOLMETZ HANDBOOK
KLM Technology OF PROCESS EQUIPMENT DESIGN Rev: 01
Group
Practical Engineering
MOLE SIEVE DEHYDRATION
Guidelines for Processing Plant SELECTION, SIZING AND
Solutions
TROUBLESHOOTING Sept 2015
www.klmtechgroup.com
(ENGINEERING DESIGN GUIDELINES)

Greek Leters

ρB Bulk density of desiccant, kg/m3, lbm/ft3


ρg Gas density, kg/m3, lbm/ft3
γ Relative density of gas
µ Gas viscosity, cp
π Pi
ΔP Pressure drop, psia
Θ Time allocated for heating, hour
ṁ Regeneration gas flow rate, lb/h

Superscript

A Area, ft2
P Pressure, psia
RH Relative humidity, %
T Temperature, oF
V Volume of adsorbent, ft3

These design guideline are believed to be as accurate as possible, but are very general and not for specific design
cases. They were designed for engineers to do preliminary designs and process specification sheets. The final
design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will
greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines
are a training tool for young engineers or a resource for engineers with experience.

This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied,