The document provides audit criteria for forging processes seeking accreditation by Nadcap. It outlines requirements and procedures to verify control systems and compliance with process procedures.

The audit criteria is intended to provide a means to verify and document that systems are in place to control the forging process, and that process procedures are being followed.

30 days prior to the audit, the auditee must send a list of forging processes, units, equipment, customers, specifications, procedures index and organization chart to the auditor.

AC7140 REV.

C
Issue Date 05-Jun-2016
161Thorn Hill Road AUDIT CRITERIA
Warrendale, PA 15086-7527
Revision Date 10-Jul-2019

Superseding AC7140 Rev B

Nadcap
AUDIT CRITERIA FOR Metallic Materials Manufacturing
For FORGINGS
*TO BE USED ON AUDITS STARTING ON OR AFTER 13-OCT-2019*

1. SCOPE

AC7140 is intended for use to survey all facilities seeking accreditation


by Nadcap for forging processes.

The purpose of the Audit Criteria is to provide a means to verify and


document that systems are in place to control the process, and that the
process procedures are being followed.

2. GENERAL INSTRUCTIONS

2.1 Prior to the Audit

2.1.1 Did the Auditee upload a copy of their completed self-audit to eAuditNet YES NO
at least 30 days prior to the audit- utilizing the version of the checklist(s)
applicable to this audit?
Guidance: Nadcap recommends the self-audit be performed 90- 120
days prior to the scheduled audit. In the event of checklist revisions,
Nadcap publishes the checklist(s) and sends out a notification 90 days
prior to the checklist(s) becoming effective. In this case, an audit
against the changes is acceptable if it supplements the existing self-
audit performed prior to the release of the revised checklist.

2.1.2 For each question in the checklist, has the auditee identified where the YES NO
means of compliance or evidence* of compliance may be found. (*=
procedure, checklist, physical location of evidence, etc.)

2.1.3 Does the self-audit include job audits as required by the TG? YES NO
Guidance: Number of job audits will be the same as for the audit, see
MMM Task Group Audit Handbook for guidance.

2.2 All nonconformances should be corrected prior to the actual audit.


Nonconformances of a technical nature found during the actual audit
may, at the Task Group's discretion, require a follow-up audit at the
auditee's expense.

PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent
infringement arising there from, is the sole responsibility of the user."

PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer.
(Contact information is located at http://www.eauditnet.com under “Contact Us”.)

Copyright 2019 Performance Review Institute. All rights reserved.

t-frm-15 08-Oct-2019
Nadcap AC7140 Revision C -2-

2.2.1 The Auditee shall send the following to the auditor 30 days prior to the
scheduled audit (in English, unless otherwise agreed between auditor
and auditee):

List of forging processes, forging units and heating equipment


(within scope of audit)

List of customers and end user/subscriber

List of auditee’s procedures (index/table of contents only)

List of specifications and approvals

Organization chart

2.3 During the Audit

2.3.1 The auditee should provide for an in-briefing for the auditor and arrange
for a brief plant tour prior to the start of the audit. Key members of the
auditee’s staff should attend the in-briefing so the audit purpose,
methods and assessment processes, can be discussed.

2.3.2 The auditor shall verify the scope of accreditation and modify it in
eAuditNet as required in agreement with the Auditee.

2.3.3 Working space for the auditor with desks or tables, chairs, telephones,
etc. and reproduction services are to be provided as required. This is
not a full-time assignment.

2.3.4 An out-briefing will be conducted at the end of each audit day to


discuss the status of the audit and any non-conformances found that
day.

2.3.5 A final out-briefing will be conducted at the completion of the audit.


Each nonconformance report (NCR) will be reviewed and the auditee
will be given the opportunity to discuss proposed corrective action or to
provide any additional information. Drafts of each NCR will be provided
to the auditee. NOTE: The Metallic Materials Manufacturing (MMM)
Task Group may, upon review, change the auditor's determination of
finding or observation. Responses must be provided for all NCRs.

2.3.6 Responses shall be submitted according to Nadcap procedures.

2.4 Review of the Audit Report

2.4.1 The auditor will advise the auditee when their audit report will be
submitted and when corrective action will be due. Responsibility for
meeting this date rests with the auditee. Failure to comply with
specified dates will result in significant delays in accreditation.

2.4.2 PRI staff or the Task Group may, after review of the audit report,
require additional information or may elect to issue additional findings.
NOTE: Final authority over the audit report, acceptability of corrective
Nadcap AC7140 Revision C -3-

actions, and accreditation recommendation rests with the Task Group.

2.4.3 The Auditee needs to clearly identify the Export Control status of all
parts being used in the audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot be input into eAuditNet.

2.5 Auditee Information

Total Employees:
Forging Personnel:
Forging
Area(s) (sq. feet/sq
meters):
No. of Shifts Worked:
Additional Contact Position
Email:

2.6 Comments _______________


Cover letter/notes attached.

2.7 Quality System Approval/Certificate - verified


(AC7004/AS/EN/JISQ 9100)

2.7.1 Enter data below from actual certificate to identify the quality system
approvals:
Guidance: Review OP 1104 Audit Scheduling, as failure to provide a
valid quality system certificate may result in failure of the audit and/or
suspension/withdrawal of accreditation.
_______________
2.7.1.1 Auditing/Certifying Agency:
_______________
2.7.1.2 Audit Criteria or Standard:
_______________
2.7.1.3 Certificate Issue Date:
_______________
2.7.1.4 Certificate Expiration Date:

2.7.1.5 Does the name and address of the facility match the information on the YES NO
certificate?

2.7.1.6 The above certificate/information has been reviewed, recorded in this


checklist, and verified by the auditor.

2.8 Staff Report Attached.


Ensure that the scope has been reviewed and signed off in eAuditNet
with the Auditee.

2.9
Nadcap AC7140 Revision C -4-

Plant Location Changed Yes/No


QC Manager Changed Yes/No
Equipment Moved Yes/No
Common Findings to Previous Audit Yes/No

3. GENERAL REQUIREMENTS

3.1 Preventive Maintenance

3.1.1 Is there a supplier document for preventive maintenance of equipment YES NO


used in the forging process (e.g. forging units, handling equipment and
heating equipment etc. (within scope of audit))?

3.1.2 Has preventive maintenance been carried out at the specified interval? YES NO
e.g. Shift, Daily, Weekly checks

3.2 Training and Evaluation of Personnel

3.2.1 Can the auditee demonstrate that personnel performing key activities, YES NO
are trained to perform assigned tasks?

3.2.2 Do records indicate that training is scheduled and completed in YES NO


accordance with requirements and is documented?

3.2.3 Where periodic evaluation is required, do records indicate that the YES NO NA
evaluations are performed at required frequencies and the results
reviewed with employees?

3.3 Quality System

3.3.1 When required, is there a process to identify and control critical and/or YES NO NA
fixed processes?

3.3.2 When required, are process changes controlled and validated in YES NO
accordance with customer requirements?

3.3.3 When required by the customer, is there a system to ensure re- YES NO NA
qualification when necessary (e.g. time since last production)?

3.3.4 When required by the customer, is there a system to ensure re- YES NO NA
approval when necessary (e.g. quantity of parts produced)?
Note: customer requirements may be directly on the PO or in sub-tier
specifications referenced from the PO

3.3.5 Where a non conforming situation (process or product) is found during YES NO NA
the audit, was the control of non conforming product in accordance with
supplier procedure?

3.3.5.1 Does this meet customer requirements? YES NO NA

3.4 Documentation
Nadcap AC7140 Revision C -5-

3.4.1 Are the applicable documents available to the operator and at the YES NO
correct revision?

3.4.2 Where any changes to issued documentation are found during the audit YES NO NA
is this authorised by approved personnel?

3.5 Tool and Die

3.5.1 Are tools / dies procured and or manufactured in accordance with the YES NO
supplier document?

3.5.2 Are tools/dies stored and maintained in accordance with the supplier YES NO
document?

4. RECEIVE CUSTOMER PURCHASE ORDER

4.1 Are contracts and incoming purchase orders reviewed to ensure that:

4.1.1 Deviation from proposal/contract are resolved in writing by authorized YES NO


personnel (customer or prime)?

4.1.2 The auditee flows contractual requirements down internally and to YES NO
subcontractors?

4.1.3 The scope of approval required by the Customer/ Prime is held? YES NO NA

4.1.4 Where required the forging qualification status is identified? YES NO NA

4.1.5 The frequency of batch release and periodic testing are planned for? YES NO NA

4.1.6 Any additional customer requirements for testing are planned for? YES NO NA

4.1.7 The need to provide test material to the customer, where required is YES NO NA
captured?

4.1.8 Retention of remnant material and/or test samples is planned for, if YES NO NA
required?

5. PURCHASING AND VERIFICATION OF PURCHASED PRODUCT

5.1 Forging Stock

5.1.1 Does the auditee control the purchasing of forging stock? YES NO

5.1.2 Does the auditee ensure that forging stock is procured from an YES NO
internally approved forging stock source?

5.1.3 If the customer requires that the forging stock is purchased from a YES NO NA
customer approved source, are there controls in place to ensure that
this has been complied with?

5.1.4 If the customer requires that the forging stock has been manufactured YES NO NA
to a fixed method of process, are there controls in place to ensure that
Nadcap AC7140 Revision C -6-

the correct forging stock has been purchased?

5.1.5 Does the auditee define what receiving inspection is performed on the YES NO
forging stock?

5.1.6 Does this meet customer requirements? YES NO NA

5.1.7 Does the auditee verify purchased product for compliance with the YES NO
purchase order and customer requirements?

5.1.8 Does the auditee perform over-check of the forging stock upon receipt? YES NO NA

5.1.9 Does the auditee control the release of conforming forging stock to YES NO
manufacturing?

5.1.10 Does the auditee control the quarantine of non-conforming forging YES NO
stock?

5.1.11 Where the auditee changes forging stock dimensions (e.g. diameter, YES NO NA
shape, or thickness) by machining or forging, is this agreed by the
customer?

5.2 Consumables

5.2.1 Does the auditee control the purchase, receipt and on-site YES NO
management of consumables used during the forging process (e.g.
canning, wrapping, paints, coatings, lubrication, insulation; including
storage, shelf life as applicable, etc.)

6. FORGING STOCK PREPARATION

6.1 Does the auditee control the storage and protection of the forging YES NO
stock?

6.1.1 Does this meet Customer requirements? YES NO NA

6.2 Does the auditee control the issue of forging stock to a specific YES NO
production order?

6.3 Cutting to size and maintaining traceability

6.3.1 Where cutting to size is sub-contracted does the auditees system YES NO NA
ensure that the subcontractor and the cutting process meets the
auditees Purchase Order requirements?

6.3.2 Is there a supplier document that controls the length/weight of billet to YES NO
be cut?

6.3.3 Is the cutting method (technique) stated on a supplier document? YES NO

6.3.3.1 Does this meet customer requirements? YES NO NA

6.3.4 Where there is an auditee requirement is the cut piece size and/or YES NO NA
weight measured using calibrated or verified equipment (scales, rules
Nadcap AC7140 Revision C -7-

etc)?

6.3.5 Does the auditee have a system to verify the size of cut pieces? YES NO NA

6.3.6 Is there a defined frequency for measuring the cut piece size and/or YES NO
weight?

6.3.7 If sampling is used, does it meet supplier document requirements? YES NO NA

6.3.8 Does the auditee control the cut pieces to ensure they meet customer YES NO NA
traceability requirements?

6.3.9 Where full traceability is required, is there a supplier document that YES NO NA
controls the recording of the billet position (e.g. billet maps)?

6.4 Traceability and Control of Excess Material

6.4.1 Does the auditee control excess material after all required pieces are YES NO
cut (re-allocation or scrap)?

6.4.2 Where required, is billet (cast) identity maintained? YES NO NA

6.4.3 Where required, is billet location and piece orientation maintained? YES NO NA

6.5 Preparation of cut pieces SECTION NA

6.5.1 Does the auditee control cut piece preparation (e.g. chamfers, YES NO
machining, surface conditioning, coating)?

6.6 Etching of cut pieces prior to heating for forging SECTION NA


This section NA if Nadcap CP etch approval held.

6.6.1 Does the auditee control the process for etching cut pieces? YES NO

6.7 Coating of cut pieces prior to heating for forging SECTION NA

6.7.1 Does the auditee control the application of the billet coating(s)? YES NO

6.8 Metal Wrapping/Canning SECTION NA

6.8.1 Does the auditee control metal wrapping and canning? YES NO

7. HEATING PROCESS

7.1 Pyrometry
If the auditee is Nadcap accredited to Nadcap Heat Treating covering
all forge furnaces, the requirements 7.1.1 and 7.1.2 do not need to be
verified and can be marked not applicable

7.1.1 Is there a supplier document for the control of Forge Furnaces? YES NO NA

7.1.2 Does the supplier document address the following aspects? YES NO NA
Number, use and location of temperature sensors
Control of temperature sensors
Nadcap AC7140 Revision C -8-

Required furnace instrumentation


Control of furnace overtemperature (where required)
Instrument calibration (including interval)
Test equipment traceability (to National Standards)
Furnace temperature uniformity verification (including interval)
Definition of the allowable working area/volume within the furnace
(or heating equipment)
Control of atmosphere (when specific atmosphere is required)
Requalification requirements after maintenance activity

7.1.3 Does this meet customer requirements? YES NO NA

7.1.4 Does the supplier document address Dynamic Recovery Check? YES NO NA

7.1.5 Does this meet customer requirements? YES NO NA

7.1.6 Is this being complied with? YES NO

7.2 Forge furnace Loading and preparation

7.2.1 Is there a supplier document(s) that defines how to load the forge YES NO
furnace?
GUIDE – includes arrangement of pieces in forge furnace, separation,
stacking, within working area/volume, etc.

7.2.2 Is this being complied with? YES NO

7.2.3 Where assessment of billet coating condition prior to loading into the YES NO NA
forge furnace is required by the supplier document, is this assessment
being carried out?

7.2.4 Where required, does the auditee control/maintain piece traceability YES NO NA
throughout the heating and forging operations?

7.2.5 Is there a supplier document or system that defines the required forge YES NO
furnace temperature set point or temperature range?

7.2.6 Do these comply with customer requirements? YES NO NA

7.2.7 Is this being complied with? YES NO

7.2.8 Is the furnace temperature recorded when required? YES NO NA

7.2.9 Does this comply with customer requirements? YES NO NA

7.2.10 If over-temperature control is required, are there supplier documents or YES NO NA


systems that state the forge furnace over-temperature set point?

7.2.11 Do these comply with customer requirements? YES NO NA

7.2.12 Is this being complied with? YES NO NA

7.2.13 Are there supplier documents that state the heating process YES NO
Nadcap AC7140 Revision C -9-

parameters?

7.2.14 Do these comply with customer requirement? YES NO NA

7.2.15 Are these being complied with? YES NO

7.2.16 Is there a supplier document which defines how start of soak (or cycle) YES NO
is defined (e.g. may be when doors close, when forge furnace sensor
recovers, based on optical pyrometer reading of surface)?

7.2.17 Does this comply with customer requirements? YES NO NA

7.2.18 Is this being complied with? YES NO

7.2.19 Is there a supplier document for controlling pieces that are in the YES NO
furnace, in the event of equipment breakdowns and unplanned delays?

7.2.20 Does this comply with customer requirements? YES NO NA

7.2.21 Is this complied with? YES NO

7.2.22 Where a specific forge furnace atmosphere is required, are there YES NO NA
supplier documents that state the required process parameters (e.g.
gas ratio, pressure, flow, gas type, etc)?

7.2.23 Does this comply with customer requirements? YES NO NA

7.2.24 Is this being complied with? YES NO NA

8. FORGING PROCESS

8.1 Are there supplier documents controlling the forging process? YES NO

8.2 Are supplier documents and process controls, including limits as YES NO
applicable, established for the forging process parameters?

8.2.1 Tool/die setup and release method SECTION NA


Section NA may only be used when single set of dies are used.

8.2.1.1 Is there a supplier document that defines the requirements? YES NO

8.2.1.2 Does this meet Customer requirements? YES NO NA

8.2.1.3 Is this instructed on shop ‘paperwork’? YES NO

8.2.1.4 Is this being complied with? YES NO

8.2.2 Tool / die heating method SECTION NA

8.2.2.1 Is there a supplier document that defines the requirements? YES NO

8.2.2.2 Does this meet Customer requirements? YES NO NA

8.2.2.3 Is this instructed on shop ‘paperwork’? YES NO


Nadcap AC7140 Revision C - 10 -

8.2.2.4 Is this being complied with? YES NO

8.2.3 Tool/die temperature SECTION NA

8.2.3.1 Is there a supplier document that defines the required tool/die YES NO
temperature (or range)?

8.2.3.2 Does the supplier document define the practice/system for confirming YES NO
that temperature?

8.2.3.3 Does this meet customer requirements? YES NO NA

8.2.3.4 Is this instructed on shop ‘paperwork’? YES NO

8.2.3.5 Is this being complied with? YES NO

8.2.3.6 When required is the die temperature measurement system calibrated? YES NO NA

8.2.4 Forging temperature

8.2.4.1 Is there a supplier document that defines the required forging YES NO
temperature (or range)?

8.2.4.2 Does the supplier document define how the temperature (or range) is YES NO
confirmed?

8.2.4.3 Does this meet customer requirements? YES NO NA

8.2.4.4 Is this instructed on shop ‘paperwork’? YES NO

8.2.4.5 Is this being complied with? YES NO

8.2.4.6 When required is the temperature measurement system calibrated? YES NO NA

8.2.5 Transfer time (forge furnace to tools/dies) SECTION NA

8.2.5.1 Is there a supplier document that defines transfer time? YES NO

8.2.5.2 Does the supplier document define how the transfer time is confirmed? YES NO

8.2.5.3 Does this meet customer requirements? YES NO NA

8.2.5.4 Is this instructed on shop ‘paperwork’? YES NO

8.2.5.5 Is this being complied with? YES NO

8.2.6 Slide movement / Multi-cavity tools/die transfer controls SECTION NA

8.2.6.1 Is there a supplier document that defines the controls for slide YES NO
movement and/or multi-cavity tools/die transfer?

8.2.6.2 Does the supplier document define how the slide movement and/or YES NO
tool/die transfer is confirmed?
Nadcap AC7140 Revision C - 11 -

8.2.6.3 Does this meet customer requirements? YES NO NA

8.2.6.4 Is this instructed on shop ‘paperwork’? YES NO

8.2.6.5 Is this being complied with? YES NO

8.2.7 In-process Lubrication (method and type) SECTION NA

8.2.7.1 Is the type of in-process lubrication defined in supplier document? YES NO

8.2.7.2 Is the lubrication application method defined? YES NO

8.2.7.3 Does this meet customer requirements? YES NO NA

8.2.7.4 Is this instructed on shop ‘paperwork’ or supplier document? YES NO

8.2.7.5 Is this being complied with? YES NO

8.2.8 In process application of Glass/paper (e.g. temperature barrier, etc.) SECTION NA

8.2.8.1 Is the type of inprocess application of Glass/Paper defined in supplier YES NO


document, including method of application?

8.2.8.2 Does this meet customer requirements? YES NO NA

8.2.8.3 Is this instructed on shop ‘paperwork’? YES NO

8.2.8.4 Is this being complied with? YES NO

8.2.9 Metal Wrapping/Canning SECTION NA

8.2.9.1 Is there a supplier document that defines the method for applying metal YES NO
wrapping/canning?

8.2.9.2 Does the supplier document define the method to confirm that the YES NO
canning/wrapping is applied correctly?

8.2.9.3 Does this meet customer requirements? YES NO NA

8.2.9.4 Is this instructed on shop ‘paperwork’? YES NO

8.2.9.5 Is this being complied with? YES NO

8.2.10 Forging Process parameters

8.2.10.1 Is there a supplier document that defines the key forging parameters YES NO
(e.g. load, stroke, velocity, Press pressure, Energy, Dwell time/Total
Deformation Time/Total Forging Time/Time on Dies, Number of
blows/strikes, Time between blows, Ring growth speed/Roll Speed/Roll
Pressure/Rolling Time, hot sizing)?

8.2.10.2 Does the supplier document define how these parameters are to be YES NO NA
monitored (e.g. SPC, control plans, key characteristics etc)?
Nadcap AC7140 Revision C - 12 -

8.2.10.3 Does this meet customer requirements? YES NO NA

8.2.10.4 Is there a process in place to ensure that the parameters are YES NO
monitored?

8.2.10.5 Is this being complied with? YES NO

8.2.10.6 When required by the customer's approved fixed process, are the YES NO NA
forging equipment operating parameters verified by the auditee (e.g.
ram speed, tonnage, etc.)?

8.2.11 Identification of forge equipment

8.2.11.1 Has the forge equipment been identified on the shop ‘paperwork’? YES NO

8.2.11.2 Is this the correct equipment as defined by supplier document or YES NO


customer requirement?

8.2.11.3 Has the identified forge equipment been used? YES NO

8.2.12 Multiple Forging operations/stages

8.2.12.1 Where there is more than one forging stage, has the approved process YES NO NA
sequence been complied with?

8.2.13 Number of heating cycles/reheats

8.2.13.1 Where planned heats/re-heats/wash heats (etc) are carried out, is this YES NO NA
instructed on shop paperwork?

8.2.13.2 Does this meet customer requirements? YES NO NA

8.2.13.3 Is this being complied with? YES NO

8.2.14 Tools/die Identity (geometry)

8.2.14.1 Where the use of specific tools/dies is required, is this stated on shop YES NO NA
‘paperwork’?

8.2.14.2 Is this being complied with? YES NO NA

8.2.15 Hot inspection SECTION NA

8.2.15.1 Is there a supplier document that defines the requirements for hot YES NO
inspections (e.g dimensional, visual etc)?

8.2.15.2 Does this meet customer requirements? YES NO NA

8.2.15.3 Is this being complied with? YES NO

8.2.16 Cooling method after forging

8.2.16.1 Are the practices for staging and cooling after forging covered in a YES NO NA
Nadcap AC7140 Revision C - 13 -

supplier document?

8.2.16.2 Does this meet customer requirements? YES NO NA

8.2.16.3 Is this being complied with? YES NO

8.2.17 Trimming/Flash Removal/Hole Punching SECTION NA

8.2.17.1 Are the practices for trimming, flash removal, and/or hole punching YES NO
covered in a supplier document?

8.2.17.2 Does this meet customer requirements? YES NO NA

8.2.17.3 Is this being complied with? YES NO

8.2.18 Hot sizing/hot straightening/hot coining/re-strikes SECTION NA

8.2.18.1 Are the practices for Hot sizing/hot straightening/hot coining/re-strikes YES NO
covered in a supplier document?

8.2.18.2 Does this meet customer requirements? YES NO NA

8.2.18.3 Is this being complied with? YES NO

8.3 Is there a supplier document that describes what action is to be taken YES NO
to minimise product impact when there is an equipment
breakdown/malfunction during the forging process?

9. POST FORGING PROCESS


Processes applied to forging after it has cooled down but not covered
by other Nadcap commodities (May be “intermediate” – between
significant forging steps, or after all forging steps completed)

9.1 Removal of flash and/or excess bore material SECTION NA

9.1.1 Is there a supplier document defining how and when removal of flash YES NO
and/or excess bore material is performed?

9.1.2 Does this meet customer requirements? YES NO NA

9.1.3 Is this being complied with? YES NO

9.2 Cold intermediate inspection (e.g. dimensional, visual etc) SECTION NA

9.2.1 Are cold inspections stated on shop ‘paperwork’? YES NO

9.2.2 Does this meet customer requirements? YES NO NA

9.2.3 Is this being complied with? YES NO

9.3 Chemical processing – Removal of Alpha Case SECTION NA


If auditee has Nadcap CP accreditation for the processing line used for
alpha case removal, then proceed to section 9.4, if auditee does not
have Nadcap CP accreditation for alpha case removal then answer
Nadcap AC7140 Revision C - 14 -

remaining 9.3 questions.

9.3.1 Is there a supplier document that controls the chemical processing of YES NO
titanium to remove alpha case?

9.3.2 Does this meet customer requirements? YES NO NA

9.3.3 Is this being complied with? YES NO

9.4 Chemical Cleaning – Removal of Scale/ Coatings/Lubricant SECTION NA


If auditee has Nadcap CP accreditation, then proceed to section 9.5, if
auditee does not have Nadcap CP accreditation then answer remaining
9.4 questions.

9.4.1 Does the auditee control chemical cleaning to remove YES NO


scale/lubricant/coatings?

9.4.2 Does this meet customer requirements? YES NO NA

9.5 Mechanical Cleaning (e.g. Grit Blasting, Shot blasting, Barrelling) SECTION NA

9.5.1 Is there a supplier document for Mechanical cleaning? YES NO

9.5.2 Does this meet customer requirements? YES NO NA

9.5.3 Is this being complied with? YES NO

9.6 Conditioning (Grinding)

9.6.1 Is there a supplier document for conditioning? YES NO

9.6.2 Does this meet customer requirements? YES NO

9.6.3 Is this being complied with? YES NO

9.7 Bending, twisting and/or straightening SECTION NA

9.7.1 Is there a supplier document for bending, twisting, straightening etc.? YES NO

9.7.2 Does this meet customer requirements? YES NO NA

9.7.3 Is this being complied with? YES NO

9.8 Cold Coining SECTION NA

9.8.1 Is there a supplier document for Coining? YES NO

9.8.2 Does this meet customer requirements? YES NO NA

9.8.3 Is this being complied with? YES NO

9.9 Compression/Tension Stress Relief between heat treat operations SECTION NA

9.9.1 Is there a supplier document for Compression/Tension Stress Relief YES NO


Nadcap AC7140 Revision C - 15 -

between heat treat operations?

9.9.2 Does this meet customer requirements? YES NO NA

9.9.3 Is this being complied with? YES NO

9.10 Pre-Heat Treat Dimensional Inspection SECTION NA

9.10.1 Is there a supplier document that controls the dimensional inspection of YES NO
forgings prior to heat treatment (including sampling, where applicable)?

9.10.2 Does this comply with customer requirements? YES NO

9.10.3 Is this being complied with? YES NO

10. TEST MATERIAL REMOVAL AND VISUAL INSPECTION SECTION NA

10.1 Visual Inspection of Condition of Supply (COS) Forging

10.1.1 Is there a supplier document that controls visual inspection? YES NO

10.1.2 Does this include all visual Inspection requirements, including YES NO
detrimental attributes (e.g. cracks, laps, lack of fill, etc.)?

10.1.3 Does this meet customer requirements? YES NO NA

10.1.4 Is this being complied with? YES NO NA

10.1.5 Is the lighting in accordance with internal and/or customer YES NO


requirements?

10.2 Forging Macro and Micro Metallurgical Evaluation (non destructive) SECTION NA
NA if neither macro or micro evaluation required

10.2.1 If performed by the auditee, is the auditee approved by Nadcap and/or YES NO NA
customer for the appropriate process (e.g. CP, MTL, HT etc.)

10.2.2 Testing performed by subcontractor SECTION NA

10.2.2.1 If testing is performed by a subcontractor, is the subcontractor YES NO NA


approved by Nadcap and/or customer for any testing performed?

10.3 Mechanical testing – specimen selection and sampling SECTION NA


Section NA if no mechanical property testing

10.3.1 Is there a supplier document for specimen selection? YES NO

10.3.1.1 Does the supplier document specify where to extract specimen from YES NO
product or other test material?

10.3.1.2 Is the specimen location explicit – defining geometric location and YES NO
orientation?

10.3.1.3 Does the supplier document ensure the thermo mechanical condition of YES NO
Nadcap AC7140 Revision C - 16 -

the test material meets requirements?

10.3.1.4 Is the specimen location in accordance with specifications or customer YES NO NA


instructions?

10.3.2 Is there a supplier document for Sample marking and identification? YES NO

10.3.2.1 Does the supplier document define information to be maintained with YES NO
the sample to ensure traceability?

10.3.2.2 Is this being complied with? YES NO

10.3.3 Is there a supplier document that controls part selection and sampling YES NO
requirements for mechanical testing?

10.3.3.1 Does this meet customer requirements? YES NO NA

10.3.3.2 Is this being complied with? YES NO

10.3.4 If testing is performed by a subcontractor, is the subcontractor YES NO NA


approved by Nadcap and/or customer requirements for any required
mechanical property testing techniques?
NA where no mechanical property testing is subcontracted.

10.3.5 Is there a supplier document to review results from either supplier YES NO
and/or subcontractor and manage any non-conforming results?

10.3.6 Does this meet customer requirements? YES NO NA

10.3.7 Is this being complied with? YES NO

10.4 Mechanical Property Testing SECTION NA


Section NA if no mechanical property testing required.

10.4.1 If performed by the auditee, is the auditee approved by Nadcap and/or YES NO NA
customer for any required mechanical property testing techniques?
NA where all mechanical property testing is subcontracted.

10.5 NDE SECTION NA


Section NA if no NDE required.

10.5.1 If performed by the auditee, is the auditee approved by Nadcap and/or YES NO NA
customer for any required NDE inspection techniques?

10.5.1.1 If NDE is performed by a subcontractor, is the subcontractor approved YES NO NA


by Nadcap and/or customer for any NDE performed?

10.6 Release note/Certificate of Conformity

10.6.1 Is there a supplier document that establishes the required information YES NO
to be included in a Release Note/Certificate of Conformity?

10.6.2 Is this being complied with? YES NO


Nadcap AC7140 Revision C - 17 -

11. PAPER JOB AUDIT


The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

11.1 Job Audit #1 Identity (Historical or In-Process): _______________

11.1.1 Purchase order number (for Independent forgers only): _______________

11.1.2 Customer: _______________

11.1.3 Subscriber: _______________

11.1.4 Internal Job number/Internal Part number: _______________

11.1.5 Customer Part number (if known): _______________

11.1.6 Part description (optional): _______________

11.1.7 Number of parts on job being audited (optional): _______________

11.1.8 (EC) Material alloy: _______________

11.1.9 (EC) Material specification (if available): _______________

11.1.10 (EC) Forge specification (as applicable): _______________

11.1.11 Forging and other process requirements specified by customer _______________


requirements (i.e. fixed process approval):

11.2 Contract Review

11.2.1 Does the Purchase Order review comply to the auditee’s contract YES NO
review procedure?

11.2.2 Does the auditee have evidence of scope of approval to supply the YES NO NA
ordered forging to the identified prime end user, where required?

11.2.3 Does the identified forging fixed process conform to the ordered part YES NO
drawing revision?
Nadcap AC7140 Revision C - 18 -

11.2.4 Have any changes to the fixed process been accepted by customer? YES NO NA

11.2.5 Is the manufacturing process of the specific forging qualified and is the YES NO NA
qualification current including, where required, customer approval?

11.2.6 Does the auditee have all the relevant specifications and documents YES NO
required to manufacture the forging?

11.2.7 Is there flow down of the required delivery condition? YES NO

11.2.8 Has an allowance been made to provide test material to the customer, YES NO NA
when required?

11.2.9 Is there flow down of the required product release testing and any YES NO
repeat cut-up testing?

11.2.10 Is there flow down of any part identification, serialization and traceability YES NO NA
requirements?

11.3 Design of Manufacturing Process

11.3.1 For the job being audited, was the person responsible for designing the YES NO
process trained or has demonstrated competency in accordance with
internal practice/procedure?

11.3.2 Does the issued shop floor paperwork comply with the fixed process? YES NO

11.3.3 Have forge furnace process/equipment parameters been set in YES NO


accordance with defined procedure?

11.3.4 Does this meet customer requirements? YES NO NA

11.4 Purchasing and Verification of Purchased Product

11.4.1 Can the auditee demonstrate that their Purchase Order to the raw YES NO
material source flows down both their own and Customer
requirements?

11.4.2 Can the auditee demonstrate that material has been purchased from YES NO
their own approved source list, and where required from the Customer
approved source list?

11.4.3 Can the auditee demonstrate that the material purchased has been YES NO
checked for compliance to the purchase order and customer
requirements?

11.4.4 Does the raw material certificate of conformity comply with purchase YES NO
order and Customer requirements?

11.4.5 Can the auditee demonstrate that, when required, an over-check of the YES NO NA
material properties is performed?

11.4.6 Can auditee demonstrate training of forging stock receipt personnel? YES NO
Nadcap AC7140 Revision C - 19 -

11.4.7 Does received material storage, identification, location and protection YES NO
comply with supplier document requirements?

11.5 Forging Stock Allocation

11.5.1 Does allocated material comply with shop paperwork requirements? YES NO

11.5.2 Is there a record of traceability on shop paperwork or system? YES NO

11.5.3 Does this meet traceability requirements? YES NO

11.6 Forging Stock Cutting

11.6.1 Is cutting method correct to shop paperwork? YES NO

11.6.2 Where recorded, do the cut piece measurements meet requirements? YES NO NA

11.6.3 If a sample plan has been used, has this been complied with? YES NO NA

11.6.4 Are all internal and customer traceability requirements complied with? YES NO NA

11.6.5 Where billet position traceability required, is a “billet map” – or method YES NO NA
of generating this – available?

11.6.6 Does the cut piece marking technique or identification comply with shop YES NO
paperwork?

11.6.7 Is excess material controlled to shop paperwork? YES NO NA

11.6.8 If cutting is sub contracted has purchase order been complied with? YES NO NA

11.7 Forging Stock Cut Piece Preparation

11.7.1 Are the supplier documents complied with for:

11.7.1.1 Machining? YES NO NA

11.7.1.2 Chamfer/radius corners? YES NO NA

11.7.1.3 Coating? YES NO NA

11.7.1.4 Metal wrapping / canning? YES NO NA

11.7.1.5 Etching? YES NO NA

11.7.2 If preparation is sub contracted has purchase order been complied YES NO NA
with?

11.8 Heating for Forging

11.8.1 Do the following comply with supplier documents and/or any Customer
requirements:
Nadcap AC7140 Revision C - 20 -

11.8.1.1 Furnace used? YES NO

11.8.1.2 Pyrometry control? YES NO

11.8.1.3 Furnace atmosphere and control parameters (e.g. gas ratio, pressure, YES NO
flow, gas type, etc)?

11.8.1.4 The Forge furnace temperature (either directly or by reference to YES NO


procedures or programs)?

11.8.1.5 Over temperature setting to protect product – where this is a Customer YES NO NA
requirement?

11.8.1.6 Rotational speed, belt speed (for rotary or continuous furnaces)? YES NO NA

11.8.1.7 Traceability throughout the heating and forging operation (e.g. may be YES NO
lot traceable, piece traceable, location traceable)?

11.8.1.8 Loading procedures/practices (e.g. arrangement of pieces in furnace, YES NO


separation, stacking, within working zone, mass, verification of coating
condition etc)?

11.8.2 Where there is an instruction to record the forge temperature, has this YES NO NA
been complied with?

11.8.3 Where there is an instruction to record the (min and max) ‘’soak time’’, YES NO NA
has this been complied with?

11.9 Forging Process

11.9.1 Do the following comply with supplier documents and/or any Customer
requirements:

11.9.1.1 Forge equipment? _______________

11.9.1.1.1 Equipment Id: _______________

11.9.1.2 Die setup? YES NO NA

11.9.1.3 Die heating YES NO NA

11.9.1.4 Die temperature (or range)? YES NO NA

11.9.1.5 Forging temperature (or range)? YES NO

11.9.1.6 Transfer time (furnace to dies)? YES NO NA

11.9.1.7 Slide movement and/or tool/die transfer? YES NO NA

11.9.1.8 In-process lubrication (method and type) and/or insulation YES NO NA


(glass/paper)?

11.9.1.9 Additional Forging process parameters (e.g. Load, Stroke, Velocity, YES NO NA
Nadcap AC7140 Revision C - 21 -

Pressure, Energy, Dwell, Deformation, Forge Time, Time on Dies, Ring


roll parameters etc?) (document reference only required)

11.9.1.10 Use of specific Tools? YES NO NA

11.9.1.11 Trimming/Flash removal? YES NO NA

11.9.1.12 Hole Punching/Bore removal? YES NO NA

11.9.1.13 Hot inspections? YES NO NA

11.9.1.14 Hot sizing/straightening /coining? YES NO NA

11.9.1.15 Staging/set out after forging? YES NO NA

11.9.1.16 Cooling method after forging? YES NO NA

11.9.2 Have the number of Heats/reHeats /Wash Heats been complied with? YES NO NA

11.9.3 Has required identification and traceability been maintained? YES NO

11.9.4 Is there evidence of competency for Forging personnel involved? YES NO

11.10 Post Forging Processes

11.10.1 Do the following comply with auditee work instructions and any
customer requirements:

11.10.1.1 Cold inspection? YES NO NA

11.10.1.2 Removal of coatings? YES NO NA

11.10.1.3 Bending/twist/straightening, coining, sizing? YES NO NA

11.10.1.4 Chemical cleaning or etching (removal of alpha case/scale/lubricants)? YES NO NA

11.10.1.5 Mechanical Cleaning (e.g. Shot/Grit/Sand blasting etc)? YES NO NA

11.10.1.6 Conditioning/grinding and recheck? YES NO NA

11.11 Pre-Heat Treatment Operations

11.11.1 Is material removed to ensure correct Limited Ruling Section? YES NO NA

11.11.2 Is the material removal method correct to shop paperwork and YES NO NA
customer requirements?

11.11.3 Are dimensions correct post material removal? YES NO NA

11.11.4 If a coating is applied prior to being sent to heat treat shop, is the YES NO NA
coating correct to shop paperwork?

11.11.5 Have the required test samples been provided with the forgings to be YES NO NA
heat treated?
Nadcap AC7140 Revision C - 22 -

11.12 Compression Stress Relief

11.12.1 If applicable, between Heat Treatment operations, did Compression YES NO NA


Stress Relieve comply with Working instruction/customer
requirements?

11.13 Post Heat Treatment Operations

11.13.1 Has shop paperwork been followed for the removal of:

11.13.1.1 Coatings? YES NO NA

11.13.1.2 Scale? YES NO NA

11.13.1.3 Alpha Case? YES NO NA

11.13.2 Is Integral Test material extracted in compliance with shop paperwork YES NO NA
and/or customer requirements?

11.14 Inspection

11.14.1 Dimensional

11.14.1.1 For the Audited Product do the following comply with shop paperwork
and any Customer requirements for Dimensional Inspection:

11.14.1.1.1 Characteristics measured? YES NO

11.14.1.1.2 Frequency of measurement (sampling plans)? YES NO

11.14.1.1.3 Measurement technique/method/equipment? YES NO

11.14.2 Visual

11.14.2.1 For the Audited Product do the following comply with shop paperwork
and/or any Customer requirements for Visual Inspection:

11.14.2.1.1 Surfaces/areas inspected? YES NO

11.14.2.1.2 Acceptance criteria (e.g. cracks, laps, lack of fill etc)? YES NO

11.14.2.1.3 Inspection conditions (location, lighting)? YES NO

11.14.3 Non Destructive Testing (NDT) SECTION NA

11.14.3.1 For the Audited Product do the following comply with shop paperwork
and/or any Customer requirements for NDT Inspection:

11.14.3.1.1 Specification? YES NO

11.14.3.1.2 Approved Technique? YES NO

11.14.3.1.3 Qualified Personnel? YES NO


Nadcap AC7140 Revision C - 23 -

11.14.4 Mechanical Testing, Macro and Micro Metallurgical Evaluation SECTION NA

11.14.4.1 If in house testing, is the auditee’s customer qualified for the tests YES NO NA
performed?

11.14.4.2 For non qualified tests, have these been subcontracted to the Auditee YES NO NA
and Customer approved Test Laboratory?

11.14.4.3 Are all test results compliant to Auditee and Customer requirements? YES NO

11.15 Final Release

11.15.1 Can the auditee demonstrate that release of forging to the Customer YES NO
was done after all required tests were confirmed to be acceptable?

11.15.2 If not was Customer authorisation received to ship Forging ahead of YES NO NA
receipt and verification of results (or with non conforming results)?

11.15.3 Does the release paperwork conform to purchase order requirements? YES NO

11.15.4 Has the release paperwork been signed by an authorised signatory? YES NO

11.15.5 Is there evidence of any required test samples accompanying the YES NO NA
released forging?

11.15.6 Has the forging been part marked to customer requirements? YES NO NA

11.15.7 Was the forging packed and preserved in accordance with Auditee and YES NO
Customer requirements?

11.15.8 Is there evidence of forging identity and required traceability on forging YES NO
and accompanying packaging?
Nadcap AC7140 Revision C - 24 -

12. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (BILLET/MULT PREPARATION STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

12.1 Job #2 Identity (Historical or In-Process) _______________

12.1.1 Purchase order number (for Independent forgers only): _______________

12.1.2 Customer: _______________

12.1.3 Subscriber: _______________

12.1.4 Job number, Part number: _______________

12.1.5 Part description (optional): _______________

12.1.6 Number of parts (optional): _______________

12.1.7 (EC) Material alloy: _______________

12.1.8 (EC) Material specification (if available): _______________

12.1.9 (EC) Controlling Specifications (for forge and heating): _______________

12.1.10 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)

12.1.11 (EC) Forging Stock Requirements (e.g. diameter/profile, length/weight, _______________


traceability, piece preparation, coating etc. etc.)

12.1.12 (EC) Forging Stock requirements on the shop paper - See section 6: _______________

12.1.13 (EC) Forging Stock requirements actually performed - See section 6: _______________

12.1.14 Does the supplier document contain all of the applicable items
described below:

12.1.14.1 Part number? YES NO


Nadcap AC7140 Revision C - 25 -

12.1.14.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

12.1.14.3 Adequate definition of the work statement to identify the specific YES NO
process(es) to be performed including specification number(s),
applicable equipment/cells, etc.?

12.1.14.4 Any changes, additions, and deletions are made by authorized YES NO NA
personnel?

12.1.14.5 Place to record status/completion of Process Step / Operation? YES NO

12.1.14.6 Place to record measurement requirements and results? YES NO

12.1.14.7 Place to record identification of person(s) doing the work? YES NO

12.1.14.7.1 List Operators: _______________

12.2 Forging Stock Allocation/Traceability

12.2.1 Are the requirements for allocation of forging stock to a specific job YES NO NA
defined in “shop paperwork”?

12.2.2 Have the allocation requirements been complied with? YES NO NA

12.2.3 Are the traceability requirements defined in ‘shop paperwork’? YES NO NA

12.2.4 Are the traceability requirements in compliance with customer YES NO NA


requirements?

12.2.5 Have the traceability requirements been complied with? YES NO NA

12.3 Cutting Forging Stock

12.3.1 Is the cutting technique/equipment defined in “shop paperwork”? YES NO

12.3.2 Have the cutting technique/equipment requirements been complied YES NO


with?

12.3.2.1 Equipment Id: _______________

12.3.3 Is the cut piece size (diameter/profile; length/weight) defined in ‘shop YES NO
paperwork’?

12.3.4 Has the cut piece size been complied with? YES NO

12.3.5 Are the controls for excess material (e.g. bar ends for scrap or return to YES NO
stock) defined in “shop paperwork”?

12.3.6 Have the controls for excess material been complied with? YES NO

12.4 Preparation of Cut Pieces


Nadcap AC7140 Revision C - 26 -

12.4.1 Is the preparation of cut pieces defined in “shop paperwork” (e.g. YES NO NA
machining)?

12.4.2 Have the cut piece preparation requirements been complied with? YES NO NA

12.4.3 Is the application of coating of cut pieces defined in “shop paperwork” YES NO NA
(e.g. type of coating, application method)?

12.4.4 Have the cut piece coating requirements been complied with? YES NO NA

12.5 Job Acceptance

12.5.1 Is the operation signed off or data recorded only after completion? YES NO

12.5.2 Did the processing of the cut pieces conform to defined requirements? YES NO
Nadcap AC7140 Revision C - 27 -

13. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

13.1 Job #3 Identity (Historical or In-Process): _______________

13.1.1 Purchase order number (for Independent forgers only): _______________

13.1.2 Customer: _______________

13.1.3 Subscriber: _______________

13.1.4 Job number, Part number: _______________

13.1.5 Part description (optional): _______________

13.1.6 Number of parts (optional): _______________

13.1.7 (EC) Material alloy: _______________

13.1.8 (EC) Material specification (if available): _______________

13.1.9 (EC) Controlling Specifications (for forge and heating): _______________

13.1.10 Equipment Type: _______________

13.1.11 Equipment Id: _______________

13.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)

13.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

13.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

13.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 28 -

13.1.16 Does the supplier document contain all of the applicable items
described below:

13.1.16.1 Part number? YES NO

13.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

13.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

13.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

13.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

13.1.16.6 Place to record identification of person(s) doing the work? YES NO

13.1.16.6.1 List Operators: _______________

13.2 Heating for Forging and Forge Processing

13.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

13.2.2 Has the defined heating equipment been used? YES NO

13.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

13.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

13.2.5 Has the defined furnace temperature set point been used? YES NO

13.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

13.2.7 Has the defined over-temperature set point been used? YES NO NA

13.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

13.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

13.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

13.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

13.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

13.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 29 -

13.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

13.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

13.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

13.2.17 Was the transfer time complied with? YES NO NA

13.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

13.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

13.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

13.2.21 Are these parameters complied with? YES NO

13.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?

13.2.23 Are the requirements for cooling the pieces after forging defined in shop YES NO
paperwork?

13.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO

13.3 Job Acceptance

13.3.1 Is the operation signed off or data recorded only after completion? YES NO

13.3.2 Did the processing of the forgings conform to defined requirements? YES NO

13.4 Job Acceptance

13.4.1 Step One:

13.4.1.1 Furnace used: _______________

13.4.1.2 Date part(s) processed: _______________

13.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 30 -

13.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

13.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

13.5 Forge Heating (Step Two) SECTION NA

13.5.1 Step Two:

13.5.1.1 Furnace used: ______________

13.5.1.2 Date part(s) processed: ______________

13.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 31 -

13.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

13.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 32 -

14. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

14.1 Job #4 Identity (Historical or In-Process): _______________

14.1.1 Purchase order number:(for Independent forgers only): _______________

14.1.2 Customer: _______________

14.1.3 Subscriber: _______________

14.1.4 Job number, Part number: _______________

14.1.5 Part description (optional): _______________

14.1.6 Number of parts (optional): _______________

14.1.7 (EC) Material alloy: _______________

14.1.8 (EC) Material specification (if available): _______________

14.1.9 (EC) Controlling Specifications (for forge and heating): _______________

14.1.10 Equipment Type: _______________

14.1.11 Equipment Id: _______________

14.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)

14.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

14.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

14.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 33 -

14.1.16 Does the supplier document contain all of the applicable items
described below:

14.1.16.1 Part number? YES NO

14.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

14.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

14.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

14.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

14.1.16.6 Place to record identification of person(s) doing the work? YES NO

14.1.16.6.1 List Operators: _______________

14.2 Heating for Forging and Forge Processing

14.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

14.2.2 Has the defined heating equipment been used? YES NO

14.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

14.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

14.2.5 Has the defined furnace temperature set point been used? YES NO

14.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

14.2.7 Has the defined over-temperature set point been used? YES NO NA

14.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

14.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

14.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

14.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

14.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

14.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 34 -

14.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

14.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

14.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

14.2.17 Was the transfer time complied with? YES NO NA

14.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

14.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

14.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

14.2.21 Are these parameters complied with? YES NO

14.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?

14.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?

14.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO

14.3 Job Acceptance

14.3.1 Is the operation signed off or data recorded only after completion? YES NO

14.3.2 Did the processing of the forgings conform to defined requirements? YES NO

14.4 Job Acceptance

14.4.1 Step One:

14.4.1.1 Furnace used: _______________

14.4.1.2 Date part(s) processed: _______________

14.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 35 -

14.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

14.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

14.5 Forge Heating (Step Two) SECTION NA

14.5.1 Step Two:

14.5.1.1 Furnace used: _______________

14.5.1.2 Date part(s) processed: _______________

14.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 36 -

14.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

14.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 37 -

15. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

15.1 Job #5 Identity (Historical or In-Process): _______________

15.1.1 Purchase order number (for Independent forgers only): _______________

15.1.2 Customer: _______________

15.1.3 Subscriber: _______________

15.1.4 Job number, Part number: _______________

15.1.5 Part description (optional): _______________

15.1.6 Number of parts (optional): _______________

15.1.7 (EC) Material alloy: _______________

15.1.8 (EC) Material specification (if available): _______________

15.1.9 (EC) Controlling Specifications (for forge and heating): _______________

15.1.10 Equipment Type: _______________

15.1.11 Equipment Id: _______________

15.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)

15.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

15.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

15.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 38 -

15.1.16 Does the supplier document contain all of the applicable items
described below:

15.1.16.1 Part number? YES NO

15.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

15.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

15.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

15.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

15.1.16.6 Place to record identification of person(s) doing the work? YES NO

15.1.16.6.1 List Operators: _______________

15.2 Heating for Forging and Forge Processing

15.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

15.2.2 Has the defined heating equipment been used? YES NO

15.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

15.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

15.2.5 Has the defined furnace temperature set point been used? YES NO

15.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

15.2.7 Has the defined over-temperature set point been used? YES NO NA

15.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

15.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

15.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

15.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

15.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

15.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 39 -

15.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

15.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

15.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

15.2.17 Was the transfer time complied with? YES NO NA

15.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

15.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

15.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

15.2.21 Are these parameters complied with? YES NO

15.2.22 If required was hot inspection completed in accordance with the YES NO NA
requirements?

15.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?

15.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO

15.3 Job Acceptance

15.3.1 Is the operation signed off or data recorded only after completion? YES NO

15.3.2 Did the processing of the forgings conform to defined requirements? YES NO

15.4 Job Acceptance

15.4.1 Step One:

15.4.1.1 Furnace used: _______________

15.4.1.2 Date part(s) processed: _______________

15.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 40 -

15.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

15.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

15.5 Forge Heating (Step Two) SECTION NA

15.5.1 Step Two:

15.5.1.1 Furnace used: _______________

15.5.1.2 Date part(s) processed: _______________

15.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 41 -

15.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

15.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 42 -

16. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

16.1 Job #6 Identity (Historical or In-Process): _______________

16.1.1 Purchase order number:(for Independent forgers only): _______________

16.1.2 Customer: _______________

16.1.3 Subscriber: _______________

16.1.4 Job number, Part number: _______________

16.1.5 Part description (optional): _______________

16.1.6 Number of parts (optional): _______________

16.1.7 (EC) Material alloy: _______________

16.1.8 (EC) Material specification (if available): _______________

16.1.9 (EC) Controlling Specifications (for forge and heating): _______________

16.1.10 Equipment Type: _______________

16.1.11 Equipment Id: _______________

16.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)

16.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

16.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

16.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 43 -

16.1.16 Does the supplier document contain all of the applicable items
described below:

16.1.16.1 Part number? YES NO

16.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

16.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

16.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

16.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

16.1.16.6 Place to record identification of person(s) doing the work? YES NO

16.1.16.6.1 List Operators: _______________

16.2 Heating for Forging and Forge Processing

16.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

16.2.2 Has the defined heating equipment been used? YES NO

16.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

16.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

16.2.5 Has the defined furnace temperature set point been used? YES NO

16.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

16.2.7 Has the defined over-temperature set point been used? YES NO NA

16.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

16.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

16.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

16.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

16.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

16.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 44 -

16.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

16.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

16.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

16.2.17 Was the transfer time complied with? YES NO NA

16.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

16.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

16.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

16.2.21 Are these parameters complied with? YES NO

16.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?

16.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?

16.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO

16.3 Job Acceptance

16.3.1 Is the operation signed off or data recorded only after completion? YES NO

16.3.2 Did the processing of the forgings conform to defined requirements? YES NO

16.4 Job Acceptance

16.4.1 Step One:

16.4.1.1 Furnace used: _______________

16.4.1.2 Date part(s) processed: _______________

16.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 45 -

16.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

16.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

16.5 Forge Heating (Step Two) SECTION NA

16.5.1 Step Two:

16.5.1.1 Furnace used: _______________

16.5.1.2 Date part(s) processed: _______________

16.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 46 -

16.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

16.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 47 -

17. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

17.1 Job #7 Identity (Historical or In-Process): _______________

17.1.1 Purchase order number:(for Independent forgers only): _______________

17.1.2 Customer: _______________

17.1.3 Subscriber: _______________

17.1.4 Job number, Part number: _______________

17.1.5 Part description (optional): _______________

17.1.6 Number of parts (optional): _______________

17.1.7 (EC) Material alloy: _______________

17.1.8 (EC) Material specification (if available): _______________

17.1.9 (EC) Controlling Specifications (for forge and heating): _______________

17.1.10 Equipment Type: _______________

17.1.11 Equipment Id: _______________

17.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)

17.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

17.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

17.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 48 -

17.1.16 Does the supplier document contain all of the applicable items
described below:

17.1.16.1 Part number? YES NO

17.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

17.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

17.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

17.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

17.1.16.6 Place to record identification of person(s) doing the work? YES NO

17.1.16.6.1 List Operators: _______________

17.2 Heating for Forging and Forge Processing

17.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

17.2.2 Has the defined heating equipment been used? YES NO

17.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

17.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

17.2.5 Has the defined furnace temperature set point been used? YES NO

17.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

17.2.7 Has the defined over-temperature set point been used? YES NO NA

17.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

17.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

17.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

17.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

17.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

17.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 49 -

17.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

17.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

17.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

17.2.17 Was the transfer time complied with? YES NO NA

17.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

17.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

17.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

17.2.21 Are these parameters complied with? YES NO

17.2.22 YES NO NA

17.2.23 If required, was hot inspection completed in accordance with the YES NO NA
requirements?

17.2.24 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?

17.2.25 Were the cooling requirements in compliance with the shop paperwork? YES NO

17.3 Job Acceptance

17.3.1 Is the operation signed off or data recorded only after completion? YES NO

17.3.2 Did the processing of the forgings conform to defined requirements? YES NO

17.4 Job Acceptance

17.4.1 Step One:

17.4.1.1 Furnace used: _______________

17.4.1.2 Date part(s) processed: _______________

17.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 50 -

17.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

17.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

17.5 Forge Heating (Step Two) SECTION NA

17.5.1 Step Two:

17.5.1.1 Furnace used: _______________

17.5.1.2 Date part(s) processed: _______________

17.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 51 -

17.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

17.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 52 -

18. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

18.1 Job #8 Identity (Historical or In-Process): _______________

18.1.1 Purchase order number:(for Independent forgers only): _______________

18.1.2 Customer: _______________

18.1.3 Subscriber: _______________

18.1.4 Job number, Part number: _______________

18.1.5 Part description (optional): _______________

18.1.6 Number of parts (optional): _______________

18.1.7 (EC) Material alloy: _______________

18.1.8 (EC) Material specification (if available): _______________

18.1.9 (EC) Controlling Specifications (for forge and heating): _______________

18.1.10 Equipment Type: _______________

18.1.11 Equipment Id: _______________

18.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval

18.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

18.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

18.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 53 -

18.1.16 Does the supplier document contain all of the applicable items
described below:

18.1.16.1 Part number? YES NO

18.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

18.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

18.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

18.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

18.1.16.6 Place to record identification of person(s) doing the work? YES NO

18.1.16.6.1 List Operators: _______________

18.2 Heating for Forging and Forge Processing

18.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

18.2.2 Has the defined heating equipment been used? YES NO

18.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

18.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

18.2.5 Has the defined furnace temperature set point been used? YES NO

18.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

18.2.7 Has the defined over-temperature set point been used? YES NO NA

18.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

18.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

18.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

18.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

18.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

18.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 54 -

18.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

18.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

18.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

18.2.17 Was the transfer time complied with? YES NO NA

18.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

18.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

18.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

18.2.21 Are these parameters complied with? YES NO

18.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?

18.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?

18.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO

18.3 Job Acceptance

18.3.1 Is the operation signed off or data recorded only after completion? YES NO

18.3.2 Did the processing of the forgings conform to defined requirements? YES NO

18.4 Job Acceptance

18.4.1 Step One:

18.4.1.1 Furnace used: _______________

18.4.1.2 Date part(s) processed: _______________

18.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 55 -

18.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

18.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

18.5 Forge Heating (Step Two) SECTION NA

18.5.1 Step Two:

18.5.1.1 Furnace used: _______________

18.5.1.2 Date part(s) processed: _______________

18.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 56 -

18.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

18.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 57 -

19. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

19.1 Job #9 Identity (Historical or In-Process): _______________

19.1.1 Purchase order number:(for Independent forgers only): _______________

19.1.2 Customer: _______________

19.1.3 Subscriber: _______________

19.1.4 Job number, Part number: _______________

19.1.5 Part description (optional): _______________

19.1.6 Number of parts (optional): _______________

19.1.7 (EC) Material alloy: _______________

19.1.8 (EC) Material specification (if available): _______________

19.1.9 (EC) Controlling Specifications (for forge and heating): _______________

19.1.10 Equipment Type: _______________

19.1.11 Equipment Id: _______________

19.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval

19.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

19.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

19.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 58 -

19.1.16 Does the supplier document contain all of the applicable items
described below:

19.1.16.1 Part number? YES NO

19.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

19.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

19.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

19.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

19.1.16.6 Place to record identification of person(s) doing the work? YES NO

19.1.16.6.1 List Operators: _______________

19.2 Heating for Forging and Forge Processing

19.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

19.2.2 Has the defined heating equipment been used? YES NO

19.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

19.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

19.2.5 Has the defined furnace temperature set point been used? YES NO

19.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

19.2.7 Has the defined over-temperature set point been used? YES NO NA

19.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

19.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

19.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

19.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

19.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

19.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 59 -

19.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

19.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

19.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

19.2.17 Was the transfer time complied with? YES NO NA

19.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

19.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

19.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

19.2.21 Are these parameters complied with? YES NO

19.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?

19.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?

19.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO

19.3 Job Acceptance

19.3.1 Is the operation signed off or data recorded only after completion? YES NO

19.3.2 Did the processing of the forgings conform to defined requirements? YES NO

19.4 Job Acceptance

19.4.1 Step One:

19.4.1.1 Furnace used: _______________

19.4.1.2 Date part(s) processed: _______________

19.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 60 -

19.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

19.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

19.5 Forge Heating (Step Two) SECTION NA

19.5.1 Step Two:

19.5.1.1 Furnace used: _______________

19.5.1.2 Date part(s) processed: _______________

19.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 61 -

19.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

19.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 62 -

20. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

20.1 Job #10 Identity (Historical or In-Process): _______________

20.1.1 Purchase order number:(for Independent forgers only): _______________

20.1.2 Customer: _______________

20.1.3 Subscriber: _______________

20.1.4 Job number, Part number: _______________

20.1.5 Part description (optional): _______________

20.1.6 Number of parts (optional): _______________

20.1.7 (EC) Material alloy: _______________

20.1.8 (EC) Material specification (if available): _______________

20.1.9 (EC) Controlling Specifications (for forge and heating): _______________

20.1.10 Equipment Type: _______________

20.1.11 Equipment Id: _______________

20.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval

20.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

20.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

20.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 63 -

20.1.16 Does the supplier document contain all of the applicable items
described below:

20.1.16.1 Part number? YES NO

20.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

20.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

20.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

20.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

20.1.16.6 Place to record identification of person(s) doing the work? YES NO

20.1.16.6.1 List Operators: _______________

20.2 Heating for Forging and Forge Processing

20.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

20.2.2 Has the defined heating equipment been used? YES NO

20.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

20.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

20.2.5 Has the defined furnace temperature set point been used? YES NO

20.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

20.2.7 Has the defined over-temperature set point been used? YES NO NA

20.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

20.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

20.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

20.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

20.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

20.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 64 -

20.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

20.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

20.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

20.2.17 Was the transfer time complied with? YES NO NA

20.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

20.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

20.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

20.2.21 Are these parameters complied with? YES NO

20.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?

20.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?

20.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO

20.3 Job Acceptance

20.3.1 Is the operation signed off or data recorded only after completion? YES NO

20.3.2 Did the processing of the forgings conform to defined requirements? YES NO

20.4 Job Acceptance

20.4.1 Step One:

20.4.1.1 Furnace used: _______________

20.4.1.2 Date part(s) processed: _______________

20.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 65 -

20.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

20.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

20.5 Forge Heating (Step Two) SECTION NA

20.5.1 Step Two:

20.5.1.1 Furnace used: _______________

20.5.1.2 Date part(s) processed: _______________

20.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 66 -

20.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

20.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 67 -

21. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (HEATING AND FORGING STEPS)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

21.1 Job #11 Identity (Historical or In-Process): _______________

21.1.1 Purchase order number:(for Independent forgers only): _______________

21.1.2 Customer: _______________

21.1.3 Subscriber: _______________

21.1.4 Job number, Part number: _______________

21.1.5 Part description (optional): _______________

21.1.6 Number of parts (optional): _______________

21.1.7 (EC) Material alloy: _______________

21.1.8 (EC) Material specification (if available): _______________

21.1.9 (EC) Controlling Specifications (for forge and heating): _______________

21.1.10 Equipment Type: _______________

21.1.11 Equipment Id: _______________

21.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval

21.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)

21.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:

21.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 68 -

21.1.16 Does the supplier document contain all of the applicable items
described below:

21.1.16.1 Part number? YES NO

21.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?

21.1.16.3 Adequate work instructions to identify the specific process(es) to be YES NO


performed including procedure references, applicable equipment/cells,
etc.?

21.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

21.1.16.5 Place to record status/completion of Process Step / Operation? YES NO

21.1.16.6 Place to record identification of person(s) doing the work? YES NO

21.1.16.6.1 List Operators: _______________

21.2 Heating for Forging and Forge Processing

21.2.1 Is the heating equipment defined in “shop paperwork”? YES NO

21.2.2 Has the defined heating equipment been used? YES NO

21.2.3 Are all the required pyrometry controls and calibrations valid? YES NO

21.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO

21.2.5 Has the defined furnace temperature set point been used? YES NO

21.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA

21.2.7 Has the defined over-temperature set point been used? YES NO NA

21.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?

21.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?

21.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO

21.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?

21.2.12 Is the die/tooling number or description defined in “shop paperwork”? YES NO

21.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 69 -

21.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?

21.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?

21.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?

21.2.17 Was the transfer time complied with? YES NO NA

21.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?

21.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?

21.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?

21.2.21 Are these parameters complied with? YES NO

21.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?

21.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?

21.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO

21.3 Job Acceptance

21.3.1 Is the operation signed off or data recorded only after completion? YES NO

21.3.2 Did the processing of the forgings conform to defined requirements? YES NO

21.4 Job Acceptance

21.4.1 Step One:

21.4.1.1 Furnace used: _______________

21.4.1.2 Date part(s) processed: _______________

21.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 70 -

21.4.3 (EC) Step One – Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

21.4.4 (EC) Step One – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)

21.5 Forge Heating (Step Two) SECTION NA

21.5.1 Step Two:

21.5.1.1 Furnace used: _______________

21.5.1.2 Date part(s) processed: _______________

21.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 71 -

21.5.3 (EC) Step Two– Temperature

(EC) SHOP PAPER (EC) SET (EC) ACTUAL


(EC) REQUIREMENT
REQUIREMENT TEMPERATURE TEMPERATURE

Temperature

Check if used:

Control

Recorder

21.5.4 (EC) Step Two – Time

(EC) REQUIREMENT (EC) SHOP PAPER (EC) ACTUAL

Atmosphere

Time and Tolerance


(or time range)

Time loaded into furnace

Time start of soak

Time end of soak

Media for Cooling (if not


shop cool/still air)
Nadcap AC7140 Revision C - 72 -

22. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS FORGING SECTION NA


JOB (POST FORGING STEPS INCLUDING TESTING)
The Auditee needs to clearly identify the Export Control status of all
parts being used in the Audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot ne input into eAuditNet.
Throughout the compliance section of the Audit specific questions/data
entry points are marked with an (EC). These are questions which have
been designated by the Task Group as those which cannot be
answered in eAuditNet if the part is (EC-LR). Do not enter technical
data, add the comment “EC Technical Data Restricted”. If Auditors
have any questions about this, they should contact the Staff Engineer
for directions.

(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?

22.1 Job #12 Identity (Historical or In-Process) _______________

22.1.1 Customer: _______________

22.1.2 Subscriber: _______________

22.1.3 Job number, Part number: _______________

22.1.4 (EC) Material alloy: _______________

22.1.5 (EC) Material Specification: _______________

22.1.6 For all of the jobs reviewed in 22.2 thru 22.7 does the supplier
document contain all of the applicable items described below:

22.1.6.1 Part number and/or adequate description of the material? YES NO

22.1.6.2 Identification of quantity, material type, condition, form, and any YES NO
required test material as applicable?

22.1.6.3 Adequate definition of the work statement to identify the specific YES NO
process(es) to be performed including specification number(s),
applicable equipment/cells, etc.?

22.1.6.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?

22.1.6.5 Place to record status/completion of Process Step / Operation? YES NO

22.1.6.6 Place to record test requirements and results? YES NO

22.1.6.7 Place to record identification of person(s) doing the work? YES NO

22.2 Intermediate Conditioning


Nadcap AC7140 Revision C - 73 -

22.2.1 Are the requirements for intermediate conditioning defined in “shop YES NO
paperwork”?

22.2.2 Was the flash/bore material removal completed in accordance with YES NO
shop paperwork?

22.2.3 Have the shop paperwork requirements been complied with? YES NO

22.3 Chemical and/or mechanical cleaning

22.3.1 Are the requirements for chemical and/or mechanical cleaning defined YES NO
in “shop paperwork”?

22.3.2 Have the cleaning requirements been complied with? YES NO

22.4 Visual Inspection

22.4.1 Are the requirements for visual inspection defined in “shop paperwork”? YES NO

22.4.2 Have the visual inspection requirements been complied with? YES NO

22.5 Dimensional Inspection

22.5.1 Are the requirements for dimensional inspection defined in “shop YES NO
paperwork”, including any reduced/sample inspection?

22.5.2 Have the dimensional inspection requirements been complied with? YES NO

22.5.3 Have the reduced/sample inspection requirements been complied with? YES NO

22.6 Test Sample / Test Material Selection & Sampling

22.6.1 Are the requirements for sampling (for metallurgical and mechanical YES NO NA
testing) detailed in “shop paperwork”?

22.6.2 Are the requirements for the provision of test samples/material defined YES NO NA
in “shop paperwork”, including location and orientation of test pieces
within test sample/material?

22.6.3 Have the test samples/material requirements been complied with? YES NO NA

22.7 Job Acceptance

22.7.1 Is the operation signed off or data recorded only after completion? YES NO

22.7.2 Did the processing of the forgings conform to defined requirements? YES NO