AC7140 Rev C
AC7140 Rev C
AC7140 Rev C
C
Issue Date 05-Jun-2016
161Thorn Hill Road AUDIT CRITERIA
Warrendale, PA 15086-7527
Revision Date 10-Jul-2019
Nadcap
AUDIT CRITERIA FOR Metallic Materials Manufacturing
For FORGINGS
*TO BE USED ON AUDITS STARTING ON OR AFTER 13-OCT-2019*
1. SCOPE
2. GENERAL INSTRUCTIONS
2.1.1 Did the Auditee upload a copy of their completed self-audit to eAuditNet YES NO
at least 30 days prior to the audit- utilizing the version of the checklist(s)
applicable to this audit?
Guidance: Nadcap recommends the self-audit be performed 90- 120
days prior to the scheduled audit. In the event of checklist revisions,
Nadcap publishes the checklist(s) and sends out a notification 90 days
prior to the checklist(s) becoming effective. In this case, an audit
against the changes is acceptable if it supplements the existing self-
audit performed prior to the release of the revised checklist.
2.1.2 For each question in the checklist, has the auditee identified where the YES NO
means of compliance or evidence* of compliance may be found. (*=
procedure, checklist, physical location of evidence, etc.)
2.1.3 Does the self-audit include job audits as required by the TG? YES NO
Guidance: Number of job audits will be the same as for the audit, see
MMM Task Group Audit Handbook for guidance.
PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent
infringement arising there from, is the sole responsibility of the user."
PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer.
(Contact information is located at http://www.eauditnet.com under “Contact Us”.)
t-frm-15 08-Oct-2019
Nadcap AC7140 Revision C -2-
2.2.1 The Auditee shall send the following to the auditor 30 days prior to the
scheduled audit (in English, unless otherwise agreed between auditor
and auditee):
Organization chart
2.3.1 The auditee should provide for an in-briefing for the auditor and arrange
for a brief plant tour prior to the start of the audit. Key members of the
auditee’s staff should attend the in-briefing so the audit purpose,
methods and assessment processes, can be discussed.
2.3.2 The auditor shall verify the scope of accreditation and modify it in
eAuditNet as required in agreement with the Auditee.
2.3.3 Working space for the auditor with desks or tables, chairs, telephones,
etc. and reproduction services are to be provided as required. This is
not a full-time assignment.
2.4.1 The auditor will advise the auditee when their audit report will be
submitted and when corrective action will be due. Responsibility for
meeting this date rests with the auditee. Failure to comply with
specified dates will result in significant delays in accreditation.
2.4.2 PRI staff or the Task Group may, after review of the audit report,
require additional information or may elect to issue additional findings.
NOTE: Final authority over the audit report, acceptability of corrective
Nadcap AC7140 Revision C -3-
2.4.3 The Auditee needs to clearly identify the Export Control status of all
parts being used in the audit. Technical information on parts which
have been designated “Export Controlled – License Required” (EC-LR)
cannot be input into eAuditNet.
Total Employees:
Forging Personnel:
Forging
Area(s) (sq. feet/sq
meters):
No. of Shifts Worked:
Additional Contact Position
Email:
2.7.1 Enter data below from actual certificate to identify the quality system
approvals:
Guidance: Review OP 1104 Audit Scheduling, as failure to provide a
valid quality system certificate may result in failure of the audit and/or
suspension/withdrawal of accreditation.
_______________
2.7.1.1 Auditing/Certifying Agency:
_______________
2.7.1.2 Audit Criteria or Standard:
_______________
2.7.1.3 Certificate Issue Date:
_______________
2.7.1.4 Certificate Expiration Date:
2.7.1.5 Does the name and address of the facility match the information on the YES NO
certificate?
2.9
Nadcap AC7140 Revision C -4-
3. GENERAL REQUIREMENTS
3.1.2 Has preventive maintenance been carried out at the specified interval? YES NO
e.g. Shift, Daily, Weekly checks
3.2.1 Can the auditee demonstrate that personnel performing key activities, YES NO
are trained to perform assigned tasks?
3.2.3 Where periodic evaluation is required, do records indicate that the YES NO NA
evaluations are performed at required frequencies and the results
reviewed with employees?
3.3.1 When required, is there a process to identify and control critical and/or YES NO NA
fixed processes?
3.3.2 When required, are process changes controlled and validated in YES NO
accordance with customer requirements?
3.3.3 When required by the customer, is there a system to ensure re- YES NO NA
qualification when necessary (e.g. time since last production)?
3.3.4 When required by the customer, is there a system to ensure re- YES NO NA
approval when necessary (e.g. quantity of parts produced)?
Note: customer requirements may be directly on the PO or in sub-tier
specifications referenced from the PO
3.3.5 Where a non conforming situation (process or product) is found during YES NO NA
the audit, was the control of non conforming product in accordance with
supplier procedure?
3.4 Documentation
Nadcap AC7140 Revision C -5-
3.4.1 Are the applicable documents available to the operator and at the YES NO
correct revision?
3.4.2 Where any changes to issued documentation are found during the audit YES NO NA
is this authorised by approved personnel?
3.5.1 Are tools / dies procured and or manufactured in accordance with the YES NO
supplier document?
3.5.2 Are tools/dies stored and maintained in accordance with the supplier YES NO
document?
4.1 Are contracts and incoming purchase orders reviewed to ensure that:
4.1.2 The auditee flows contractual requirements down internally and to YES NO
subcontractors?
4.1.3 The scope of approval required by the Customer/ Prime is held? YES NO NA
4.1.5 The frequency of batch release and periodic testing are planned for? YES NO NA
4.1.6 Any additional customer requirements for testing are planned for? YES NO NA
4.1.7 The need to provide test material to the customer, where required is YES NO NA
captured?
4.1.8 Retention of remnant material and/or test samples is planned for, if YES NO NA
required?
5.1.1 Does the auditee control the purchasing of forging stock? YES NO
5.1.2 Does the auditee ensure that forging stock is procured from an YES NO
internally approved forging stock source?
5.1.3 If the customer requires that the forging stock is purchased from a YES NO NA
customer approved source, are there controls in place to ensure that
this has been complied with?
5.1.4 If the customer requires that the forging stock has been manufactured YES NO NA
to a fixed method of process, are there controls in place to ensure that
Nadcap AC7140 Revision C -6-
5.1.5 Does the auditee define what receiving inspection is performed on the YES NO
forging stock?
5.1.7 Does the auditee verify purchased product for compliance with the YES NO
purchase order and customer requirements?
5.1.8 Does the auditee perform over-check of the forging stock upon receipt? YES NO NA
5.1.9 Does the auditee control the release of conforming forging stock to YES NO
manufacturing?
5.1.10 Does the auditee control the quarantine of non-conforming forging YES NO
stock?
5.1.11 Where the auditee changes forging stock dimensions (e.g. diameter, YES NO NA
shape, or thickness) by machining or forging, is this agreed by the
customer?
5.2 Consumables
5.2.1 Does the auditee control the purchase, receipt and on-site YES NO
management of consumables used during the forging process (e.g.
canning, wrapping, paints, coatings, lubrication, insulation; including
storage, shelf life as applicable, etc.)
6.1 Does the auditee control the storage and protection of the forging YES NO
stock?
6.2 Does the auditee control the issue of forging stock to a specific YES NO
production order?
6.3.1 Where cutting to size is sub-contracted does the auditees system YES NO NA
ensure that the subcontractor and the cutting process meets the
auditees Purchase Order requirements?
6.3.2 Is there a supplier document that controls the length/weight of billet to YES NO
be cut?
6.3.4 Where there is an auditee requirement is the cut piece size and/or YES NO NA
weight measured using calibrated or verified equipment (scales, rules
Nadcap AC7140 Revision C -7-
etc)?
6.3.5 Does the auditee have a system to verify the size of cut pieces? YES NO NA
6.3.6 Is there a defined frequency for measuring the cut piece size and/or YES NO
weight?
6.3.8 Does the auditee control the cut pieces to ensure they meet customer YES NO NA
traceability requirements?
6.3.9 Where full traceability is required, is there a supplier document that YES NO NA
controls the recording of the billet position (e.g. billet maps)?
6.4.1 Does the auditee control excess material after all required pieces are YES NO
cut (re-allocation or scrap)?
6.4.3 Where required, is billet location and piece orientation maintained? YES NO NA
6.5.1 Does the auditee control cut piece preparation (e.g. chamfers, YES NO
machining, surface conditioning, coating)?
6.6.1 Does the auditee control the process for etching cut pieces? YES NO
6.7.1 Does the auditee control the application of the billet coating(s)? YES NO
6.8.1 Does the auditee control metal wrapping and canning? YES NO
7. HEATING PROCESS
7.1 Pyrometry
If the auditee is Nadcap accredited to Nadcap Heat Treating covering
all forge furnaces, the requirements 7.1.1 and 7.1.2 do not need to be
verified and can be marked not applicable
7.1.1 Is there a supplier document for the control of Forge Furnaces? YES NO NA
7.1.2 Does the supplier document address the following aspects? YES NO NA
Number, use and location of temperature sensors
Control of temperature sensors
Nadcap AC7140 Revision C -8-
7.1.4 Does the supplier document address Dynamic Recovery Check? YES NO NA
7.2.1 Is there a supplier document(s) that defines how to load the forge YES NO
furnace?
GUIDE – includes arrangement of pieces in forge furnace, separation,
stacking, within working area/volume, etc.
7.2.3 Where assessment of billet coating condition prior to loading into the YES NO NA
forge furnace is required by the supplier document, is this assessment
being carried out?
7.2.4 Where required, does the auditee control/maintain piece traceability YES NO NA
throughout the heating and forging operations?
7.2.5 Is there a supplier document or system that defines the required forge YES NO
furnace temperature set point or temperature range?
7.2.13 Are there supplier documents that state the heating process YES NO
Nadcap AC7140 Revision C -9-
parameters?
7.2.16 Is there a supplier document which defines how start of soak (or cycle) YES NO
is defined (e.g. may be when doors close, when forge furnace sensor
recovers, based on optical pyrometer reading of surface)?
7.2.19 Is there a supplier document for controlling pieces that are in the YES NO
furnace, in the event of equipment breakdowns and unplanned delays?
7.2.22 Where a specific forge furnace atmosphere is required, are there YES NO NA
supplier documents that state the required process parameters (e.g.
gas ratio, pressure, flow, gas type, etc)?
8. FORGING PROCESS
8.1 Are there supplier documents controlling the forging process? YES NO
8.2 Are supplier documents and process controls, including limits as YES NO
applicable, established for the forging process parameters?
8.2.3.1 Is there a supplier document that defines the required tool/die YES NO
temperature (or range)?
8.2.3.2 Does the supplier document define the practice/system for confirming YES NO
that temperature?
8.2.3.6 When required is the die temperature measurement system calibrated? YES NO NA
8.2.4.1 Is there a supplier document that defines the required forging YES NO
temperature (or range)?
8.2.4.2 Does the supplier document define how the temperature (or range) is YES NO
confirmed?
8.2.5.2 Does the supplier document define how the transfer time is confirmed? YES NO
8.2.6.1 Is there a supplier document that defines the controls for slide YES NO
movement and/or multi-cavity tools/die transfer?
8.2.6.2 Does the supplier document define how the slide movement and/or YES NO
tool/die transfer is confirmed?
Nadcap AC7140 Revision C - 11 -
8.2.9.1 Is there a supplier document that defines the method for applying metal YES NO
wrapping/canning?
8.2.9.2 Does the supplier document define the method to confirm that the YES NO
canning/wrapping is applied correctly?
8.2.10.1 Is there a supplier document that defines the key forging parameters YES NO
(e.g. load, stroke, velocity, Press pressure, Energy, Dwell time/Total
Deformation Time/Total Forging Time/Time on Dies, Number of
blows/strikes, Time between blows, Ring growth speed/Roll Speed/Roll
Pressure/Rolling Time, hot sizing)?
8.2.10.2 Does the supplier document define how these parameters are to be YES NO NA
monitored (e.g. SPC, control plans, key characteristics etc)?
Nadcap AC7140 Revision C - 12 -
8.2.10.4 Is there a process in place to ensure that the parameters are YES NO
monitored?
8.2.10.6 When required by the customer's approved fixed process, are the YES NO NA
forging equipment operating parameters verified by the auditee (e.g.
ram speed, tonnage, etc.)?
8.2.11.1 Has the forge equipment been identified on the shop ‘paperwork’? YES NO
8.2.12.1 Where there is more than one forging stage, has the approved process YES NO NA
sequence been complied with?
8.2.13.1 Where planned heats/re-heats/wash heats (etc) are carried out, is this YES NO NA
instructed on shop paperwork?
8.2.14.1 Where the use of specific tools/dies is required, is this stated on shop YES NO NA
‘paperwork’?
8.2.15.1 Is there a supplier document that defines the requirements for hot YES NO
inspections (e.g dimensional, visual etc)?
8.2.16.1 Are the practices for staging and cooling after forging covered in a YES NO NA
Nadcap AC7140 Revision C - 13 -
supplier document?
8.2.17.1 Are the practices for trimming, flash removal, and/or hole punching YES NO
covered in a supplier document?
8.2.18.1 Are the practices for Hot sizing/hot straightening/hot coining/re-strikes YES NO
covered in a supplier document?
8.3 Is there a supplier document that describes what action is to be taken YES NO
to minimise product impact when there is an equipment
breakdown/malfunction during the forging process?
9.1.1 Is there a supplier document defining how and when removal of flash YES NO
and/or excess bore material is performed?
9.3.1 Is there a supplier document that controls the chemical processing of YES NO
titanium to remove alpha case?
9.5 Mechanical Cleaning (e.g. Grit Blasting, Shot blasting, Barrelling) SECTION NA
9.7.1 Is there a supplier document for bending, twisting, straightening etc.? YES NO
9.10.1 Is there a supplier document that controls the dimensional inspection of YES NO
forgings prior to heat treatment (including sampling, where applicable)?
10.1.2 Does this include all visual Inspection requirements, including YES NO
detrimental attributes (e.g. cracks, laps, lack of fill, etc.)?
10.2 Forging Macro and Micro Metallurgical Evaluation (non destructive) SECTION NA
NA if neither macro or micro evaluation required
10.2.1 If performed by the auditee, is the auditee approved by Nadcap and/or YES NO NA
customer for the appropriate process (e.g. CP, MTL, HT etc.)
10.3.1.1 Does the supplier document specify where to extract specimen from YES NO
product or other test material?
10.3.1.2 Is the specimen location explicit – defining geometric location and YES NO
orientation?
10.3.1.3 Does the supplier document ensure the thermo mechanical condition of YES NO
Nadcap AC7140 Revision C - 16 -
10.3.2 Is there a supplier document for Sample marking and identification? YES NO
10.3.2.1 Does the supplier document define information to be maintained with YES NO
the sample to ensure traceability?
10.3.3 Is there a supplier document that controls part selection and sampling YES NO
requirements for mechanical testing?
10.3.5 Is there a supplier document to review results from either supplier YES NO
and/or subcontractor and manage any non-conforming results?
10.4.1 If performed by the auditee, is the auditee approved by Nadcap and/or YES NO NA
customer for any required mechanical property testing techniques?
NA where all mechanical property testing is subcontracted.
10.5.1 If performed by the auditee, is the auditee approved by Nadcap and/or YES NO NA
customer for any required NDE inspection techniques?
10.6.1 Is there a supplier document that establishes the required information YES NO
to be included in a Release Note/Certificate of Conformity?
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
11.2.1 Does the Purchase Order review comply to the auditee’s contract YES NO
review procedure?
11.2.2 Does the auditee have evidence of scope of approval to supply the YES NO NA
ordered forging to the identified prime end user, where required?
11.2.3 Does the identified forging fixed process conform to the ordered part YES NO
drawing revision?
Nadcap AC7140 Revision C - 18 -
11.2.4 Have any changes to the fixed process been accepted by customer? YES NO NA
11.2.5 Is the manufacturing process of the specific forging qualified and is the YES NO NA
qualification current including, where required, customer approval?
11.2.6 Does the auditee have all the relevant specifications and documents YES NO
required to manufacture the forging?
11.2.8 Has an allowance been made to provide test material to the customer, YES NO NA
when required?
11.2.9 Is there flow down of the required product release testing and any YES NO
repeat cut-up testing?
11.2.10 Is there flow down of any part identification, serialization and traceability YES NO NA
requirements?
11.3.1 For the job being audited, was the person responsible for designing the YES NO
process trained or has demonstrated competency in accordance with
internal practice/procedure?
11.3.2 Does the issued shop floor paperwork comply with the fixed process? YES NO
11.4.1 Can the auditee demonstrate that their Purchase Order to the raw YES NO
material source flows down both their own and Customer
requirements?
11.4.2 Can the auditee demonstrate that material has been purchased from YES NO
their own approved source list, and where required from the Customer
approved source list?
11.4.3 Can the auditee demonstrate that the material purchased has been YES NO
checked for compliance to the purchase order and customer
requirements?
11.4.4 Does the raw material certificate of conformity comply with purchase YES NO
order and Customer requirements?
11.4.5 Can the auditee demonstrate that, when required, an over-check of the YES NO NA
material properties is performed?
11.4.6 Can auditee demonstrate training of forging stock receipt personnel? YES NO
Nadcap AC7140 Revision C - 19 -
11.4.7 Does received material storage, identification, location and protection YES NO
comply with supplier document requirements?
11.5.1 Does allocated material comply with shop paperwork requirements? YES NO
11.6.2 Where recorded, do the cut piece measurements meet requirements? YES NO NA
11.6.3 If a sample plan has been used, has this been complied with? YES NO NA
11.6.4 Are all internal and customer traceability requirements complied with? YES NO NA
11.6.5 Where billet position traceability required, is a “billet map” – or method YES NO NA
of generating this – available?
11.6.6 Does the cut piece marking technique or identification comply with shop YES NO
paperwork?
11.6.8 If cutting is sub contracted has purchase order been complied with? YES NO NA
11.7.2 If preparation is sub contracted has purchase order been complied YES NO NA
with?
11.8.1 Do the following comply with supplier documents and/or any Customer
requirements:
Nadcap AC7140 Revision C - 20 -
11.8.1.3 Furnace atmosphere and control parameters (e.g. gas ratio, pressure, YES NO
flow, gas type, etc)?
11.8.1.5 Over temperature setting to protect product – where this is a Customer YES NO NA
requirement?
11.8.1.6 Rotational speed, belt speed (for rotary or continuous furnaces)? YES NO NA
11.8.1.7 Traceability throughout the heating and forging operation (e.g. may be YES NO
lot traceable, piece traceable, location traceable)?
11.8.2 Where there is an instruction to record the forge temperature, has this YES NO NA
been complied with?
11.8.3 Where there is an instruction to record the (min and max) ‘’soak time’’, YES NO NA
has this been complied with?
11.9.1 Do the following comply with supplier documents and/or any Customer
requirements:
11.9.1.9 Additional Forging process parameters (e.g. Load, Stroke, Velocity, YES NO NA
Nadcap AC7140 Revision C - 21 -
11.9.2 Have the number of Heats/reHeats /Wash Heats been complied with? YES NO NA
11.10.1 Do the following comply with auditee work instructions and any
customer requirements:
11.11.2 Is the material removal method correct to shop paperwork and YES NO NA
customer requirements?
11.11.4 If a coating is applied prior to being sent to heat treat shop, is the YES NO NA
coating correct to shop paperwork?
11.11.5 Have the required test samples been provided with the forgings to be YES NO NA
heat treated?
Nadcap AC7140 Revision C - 22 -
11.13.1 Has shop paperwork been followed for the removal of:
11.13.2 Is Integral Test material extracted in compliance with shop paperwork YES NO NA
and/or customer requirements?
11.14 Inspection
11.14.1 Dimensional
11.14.1.1 For the Audited Product do the following comply with shop paperwork
and any Customer requirements for Dimensional Inspection:
11.14.2 Visual
11.14.2.1 For the Audited Product do the following comply with shop paperwork
and/or any Customer requirements for Visual Inspection:
11.14.2.1.2 Acceptance criteria (e.g. cracks, laps, lack of fill etc)? YES NO
11.14.3.1 For the Audited Product do the following comply with shop paperwork
and/or any Customer requirements for NDT Inspection:
11.14.4.1 If in house testing, is the auditee’s customer qualified for the tests YES NO NA
performed?
11.14.4.2 For non qualified tests, have these been subcontracted to the Auditee YES NO NA
and Customer approved Test Laboratory?
11.14.4.3 Are all test results compliant to Auditee and Customer requirements? YES NO
11.15.1 Can the auditee demonstrate that release of forging to the Customer YES NO
was done after all required tests were confirmed to be acceptable?
11.15.2 If not was Customer authorisation received to ship Forging ahead of YES NO NA
receipt and verification of results (or with non conforming results)?
11.15.3 Does the release paperwork conform to purchase order requirements? YES NO
11.15.4 Has the release paperwork been signed by an authorised signatory? YES NO
11.15.5 Is there evidence of any required test samples accompanying the YES NO NA
released forging?
11.15.6 Has the forging been part marked to customer requirements? YES NO NA
11.15.7 Was the forging packed and preserved in accordance with Auditee and YES NO
Customer requirements?
11.15.8 Is there evidence of forging identity and required traceability on forging YES NO
and accompanying packaging?
Nadcap AC7140 Revision C - 24 -
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
12.1.10 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)
12.1.12 (EC) Forging Stock requirements on the shop paper - See section 6: _______________
12.1.13 (EC) Forging Stock requirements actually performed - See section 6: _______________
12.1.14 Does the supplier document contain all of the applicable items
described below:
12.1.14.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
12.1.14.3 Adequate definition of the work statement to identify the specific YES NO
process(es) to be performed including specification number(s),
applicable equipment/cells, etc.?
12.1.14.4 Any changes, additions, and deletions are made by authorized YES NO NA
personnel?
12.2.1 Are the requirements for allocation of forging stock to a specific job YES NO NA
defined in “shop paperwork”?
12.3.3 Is the cut piece size (diameter/profile; length/weight) defined in ‘shop YES NO
paperwork’?
12.3.4 Has the cut piece size been complied with? YES NO
12.3.5 Are the controls for excess material (e.g. bar ends for scrap or return to YES NO
stock) defined in “shop paperwork”?
12.3.6 Have the controls for excess material been complied with? YES NO
12.4.1 Is the preparation of cut pieces defined in “shop paperwork” (e.g. YES NO NA
machining)?
12.4.2 Have the cut piece preparation requirements been complied with? YES NO NA
12.4.3 Is the application of coating of cut pieces defined in “shop paperwork” YES NO NA
(e.g. type of coating, application method)?
12.4.4 Have the cut piece coating requirements been complied with? YES NO NA
12.5.1 Is the operation signed off or data recorded only after completion? YES NO
12.5.2 Did the processing of the cut pieces conform to defined requirements? YES NO
Nadcap AC7140 Revision C - 27 -
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
13.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)
13.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
13.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
13.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 28 -
13.1.16 Does the supplier document contain all of the applicable items
described below:
13.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
13.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
13.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
13.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
13.2.5 Has the defined furnace temperature set point been used? YES NO
13.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
13.2.7 Has the defined over-temperature set point been used? YES NO NA
13.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
13.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
13.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
13.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
13.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 29 -
13.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
13.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
13.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
13.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
13.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
13.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
13.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?
13.2.23 Are the requirements for cooling the pieces after forging defined in shop YES NO
paperwork?
13.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO
13.3.1 Is the operation signed off or data recorded only after completion? YES NO
13.3.2 Did the processing of the forgings conform to defined requirements? YES NO
13.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 30 -
Temperature
Check if used:
Control
Recorder
Atmosphere
13.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 31 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
14.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)
14.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
14.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
14.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 33 -
14.1.16 Does the supplier document contain all of the applicable items
described below:
14.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
14.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
14.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
14.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
14.2.5 Has the defined furnace temperature set point been used? YES NO
14.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
14.2.7 Has the defined over-temperature set point been used? YES NO NA
14.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
14.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
14.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
14.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
14.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 34 -
14.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
14.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
14.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
14.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
14.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
14.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
14.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?
14.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?
14.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO
14.3.1 Is the operation signed off or data recorded only after completion? YES NO
14.3.2 Did the processing of the forgings conform to defined requirements? YES NO
14.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 35 -
Temperature
Check if used:
Control
Recorder
Atmosphere
14.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 36 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
15.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)
15.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
15.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
15.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 38 -
15.1.16 Does the supplier document contain all of the applicable items
described below:
15.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
15.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
15.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
15.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
15.2.5 Has the defined furnace temperature set point been used? YES NO
15.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
15.2.7 Has the defined over-temperature set point been used? YES NO NA
15.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
15.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
15.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
15.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
15.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 39 -
15.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
15.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
15.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
15.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
15.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
15.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
15.2.22 If required was hot inspection completed in accordance with the YES NO NA
requirements?
15.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?
15.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO
15.3.1 Is the operation signed off or data recorded only after completion? YES NO
15.3.2 Did the processing of the forgings conform to defined requirements? YES NO
15.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 40 -
Temperature
Check if used:
Control
Recorder
Atmosphere
15.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 41 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
16.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)
16.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
16.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
16.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 43 -
16.1.16 Does the supplier document contain all of the applicable items
described below:
16.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
16.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
16.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
16.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
16.2.5 Has the defined furnace temperature set point been used? YES NO
16.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
16.2.7 Has the defined over-temperature set point been used? YES NO NA
16.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
16.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
16.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
16.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
16.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 44 -
16.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
16.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
16.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
16.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
16.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
16.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
16.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?
16.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?
16.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO
16.3.1 Is the operation signed off or data recorded only after completion? YES NO
16.3.2 Did the processing of the forgings conform to defined requirements? YES NO
16.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 45 -
Temperature
Check if used:
Control
Recorder
Atmosphere
16.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 46 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
17.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval)
17.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
17.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
17.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 48 -
17.1.16 Does the supplier document contain all of the applicable items
described below:
17.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
17.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
17.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
17.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
17.2.5 Has the defined furnace temperature set point been used? YES NO
17.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
17.2.7 Has the defined over-temperature set point been used? YES NO NA
17.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
17.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
17.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
17.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
17.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 49 -
17.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
17.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
17.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
17.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
17.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
17.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
17.2.22 YES NO NA
17.2.23 If required, was hot inspection completed in accordance with the YES NO NA
requirements?
17.2.24 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?
17.2.25 Were the cooling requirements in compliance with the shop paperwork? YES NO
17.3.1 Is the operation signed off or data recorded only after completion? YES NO
17.3.2 Did the processing of the forgings conform to defined requirements? YES NO
17.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 50 -
Temperature
Check if used:
Control
Recorder
Atmosphere
17.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 51 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
18.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval
18.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
18.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
18.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 53 -
18.1.16 Does the supplier document contain all of the applicable items
described below:
18.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
18.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
18.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
18.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
18.2.5 Has the defined furnace temperature set point been used? YES NO
18.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
18.2.7 Has the defined over-temperature set point been used? YES NO NA
18.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
18.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
18.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
18.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
18.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 54 -
18.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
18.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
18.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
18.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
18.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
18.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
18.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?
18.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?
18.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO
18.3.1 Is the operation signed off or data recorded only after completion? YES NO
18.3.2 Did the processing of the forgings conform to defined requirements? YES NO
18.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 55 -
Temperature
Check if used:
Control
Recorder
Atmosphere
18.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 56 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
19.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval
19.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
19.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
19.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 58 -
19.1.16 Does the supplier document contain all of the applicable items
described below:
19.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
19.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
19.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
19.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
19.2.5 Has the defined furnace temperature set point been used? YES NO
19.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
19.2.7 Has the defined over-temperature set point been used? YES NO NA
19.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
19.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
19.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
19.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
19.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 59 -
19.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
19.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
19.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
19.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
19.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
19.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
19.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?
19.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?
19.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO
19.3.1 Is the operation signed off or data recorded only after completion? YES NO
19.3.2 Did the processing of the forgings conform to defined requirements? YES NO
19.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 60 -
Temperature
Check if used:
Control
Recorder
Atmosphere
19.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 61 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
20.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval
20.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
20.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
20.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 63 -
20.1.16 Does the supplier document contain all of the applicable items
described below:
20.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
20.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
20.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
20.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
20.2.5 Has the defined furnace temperature set point been used? YES NO
20.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
20.2.7 Has the defined over-temperature set point been used? YES NO NA
20.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
20.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
20.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
20.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
20.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 64 -
20.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
20.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
20.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
20.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
20.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
20.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
20.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?
20.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?
20.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO
20.3.1 Is the operation signed off or data recorded only after completion? YES NO
20.3.2 Did the processing of the forgings conform to defined requirements? YES NO
20.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 65 -
Temperature
Check if used:
Control
Recorder
Atmosphere
20.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 66 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
21.1.12 (EC) Other process requirements and test requirements specified by _______________
customer specification (e.g. fixed process approval
21.1.13 (EC) Heating for Forging requirements (orientation, spacing, stacking, _______________
loading sequence etc. etc.): See sections 7 and 8: (document reference
only required)
21.1.14 (EC) Heating for Forging requirements on the shop paper - See _______________
sections 7 and 8:
21.1.15 (EC) Heating for Forging actually performed - See sections 7 and 8: _______________
Nadcap AC7140 Revision C - 68 -
21.1.16 Does the supplier document contain all of the applicable items
described below:
21.1.16.2 Adequate description of the material (e.g. quantity, material type, YES NO
condition, form, and any required test material as applicable)?
21.1.16.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
21.2.3 Are all the required pyrometry controls and calibrations valid? YES NO
21.2.4 Is the forge furnace temperature set point defined in “shop paperwork”? YES NO
21.2.5 Has the defined furnace temperature set point been used? YES NO
21.2.6 Is the over temperature set point defined in “shop paperwork”? YES NO NA
21.2.7 Has the defined over-temperature set point been used? YES NO NA
21.2.8 Are the forge furnace loading requirements defined in “shop YES NO
paperwork”?
21.2.9 Have the pieces been loaded into the furnace in accordance with the YES NO
“shop paperwork” instructions?
21.2.10 Is the start of soak and end of soak stated in “shop paperwork”? YES NO
21.2.11 Were the pieces removed from the furnace at a time compliant with YES NO
start of soak (minimum time) and end of soak (maximum time)?
21.2.13 Were the dies used (for the Job being witnessed) in accordance with YES NO
the instructions?
Nadcap AC7140 Revision C - 69 -
21.2.14 Are the die heating, die temperature requirements, and die temperature YES NO NA
measurement requirements on the shop paperwork?
21.2.15 Was the die heated and its temperature measured in accordance with YES NO NA
the instructions?
21.2.16 Is the transfer time (for transferring parts from furnace to dies – YES NO NA
press/hammer) defined in shop paperwork?
21.2.18 Is the use and application of any in process die lubrication/ insulation YES NO NA
detailed on the shop paperwork?
21.2.19 Was the use and application of any in process die lubrication / YES NO NA
insulation in accordance with the instructions?
21.2.20 Are other key forge process parameters (see 8.2.10) defined in shop YES NO
paperwork?
21.2.22 If required, was hot inspection completed in accordance with the YES NO NA
requirements?
21.2.23 Are the requirements for cooling the pieces after forging defined in YES NO
shop paperwork?
21.2.24 Were the cooling requirements in compliance with the shop paperwork? YES NO
21.3.1 Is the operation signed off or data recorded only after completion? YES NO
21.3.2 Did the processing of the forgings conform to defined requirements? YES NO
21.4.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification and/or supplier document?
Nadcap AC7140 Revision C - 70 -
Temperature
Check if used:
Control
Recorder
Atmosphere
21.5.2 Does the furnace possess the control and recording instrumentation YES NO NA
required by the governing specification?
Nadcap AC7140 Revision C - 71 -
Temperature
Check if used:
Control
Recorder
Atmosphere
(Info) Is the part controlled under U.S. Export Control Regulations as YES NO
declared by the Auditee?
22.1.6 For all of the jobs reviewed in 22.2 thru 22.7 does the supplier
document contain all of the applicable items described below:
22.1.6.2 Identification of quantity, material type, condition, form, and any YES NO
required test material as applicable?
22.1.6.3 Adequate definition of the work statement to identify the specific YES NO
process(es) to be performed including specification number(s),
applicable equipment/cells, etc.?
22.1.6.4 Any changes, additions, and deletions are made by authorized YES NO
personnel?
22.2.1 Are the requirements for intermediate conditioning defined in “shop YES NO
paperwork”?
22.2.2 Was the flash/bore material removal completed in accordance with YES NO
shop paperwork?
22.2.3 Have the shop paperwork requirements been complied with? YES NO
22.3.1 Are the requirements for chemical and/or mechanical cleaning defined YES NO
in “shop paperwork”?
22.4.1 Are the requirements for visual inspection defined in “shop paperwork”? YES NO
22.4.2 Have the visual inspection requirements been complied with? YES NO
22.5.1 Are the requirements for dimensional inspection defined in “shop YES NO
paperwork”, including any reduced/sample inspection?
22.5.2 Have the dimensional inspection requirements been complied with? YES NO
22.5.3 Have the reduced/sample inspection requirements been complied with? YES NO
22.6.1 Are the requirements for sampling (for metallurgical and mechanical YES NO NA
testing) detailed in “shop paperwork”?
22.6.2 Are the requirements for the provision of test samples/material defined YES NO NA
in “shop paperwork”, including location and orientation of test pieces
within test sample/material?
22.6.3 Have the test samples/material requirements been complied with? YES NO NA
22.7.1 Is the operation signed off or data recorded only after completion? YES NO
22.7.2 Did the processing of the forgings conform to defined requirements? YES NO