Deliverables
i. Understanding the design process, its implementation and related complete discussion in
the report.
ii. Using of software (including excel, EES, Matlab or any other relevant software) & that file
should be submitted in soft form too.
iii. A complete comparison among simple (steam / gas) cycle, reheating, intercooling,
regeneration and combined cycle
iv. Impact of power plant on the environment
v. Proper report formatting is required.
Instructions:
• Submit printed report with complete thermal design and cost analysis.
• Every group must be comprising of two students.
• Each group will do its own work and work should not be copied / pasted.
• Evaluation will be made on the basis of report and viva.