Partial Engine Assy (1Nz Fe/2Nz Fe) : Overhaul
Partial Engine Assy (1Nz Fe/2Nz Fe) : Overhaul
Partial Engine Assy (1Nz Fe/2Nz Fe) : Overhaul
OVERHAUL
1. REMOVE SPARK PLUG
3. REMOVE THERMOSTAT
B09370
A50677
(b) Using a screwdriver with taping its tip, remove the oil
pump by prying the portions between the cylinder head
and cylinder block.
NOTICE:
Be careful not to damage the contact surfaces of the oil
Tape pump, cylinder head and cylinder block.
A50903
Wooden (c) Remove the 2 O−rings from the cylinder block and oil pan
Blocks No. 1.
(d) Using a hexagon wrench 8, remove the screw plug from
the oil pump.
A35281
(a) Using a screwdriver with taping its tip, remove the oil seal.
NOTICE:
S Never rotate the crankshaft with the chain tensioner
removed.
Plunger
S When rotating the camshaft with the timing chain re-
moved, rotate the crankshaft counterclockwise 40_
from the TDC before rotating it.
Stopper Plate A11225 (a) Using drivers or equipment, while rotating the stopper
plate of the tensioner upward, push in the plunger of the
chain tensioner as shown in the illustration.
(b) While rotating the stopper plate of the tensioner down-
ward, insert a bar of f 2.5 mm (0.098 in.) into the holes in
the stopper plate and tensioner to fix the stopper plate.
SST 10514
(c) Remove the 2 bolts and chain tensioner.
17. REMOVE CHAIN TENSIONER SLIPPER
(a) Using a spring scale, pull the timing chain with 140 N (14.3
kgf, 31.5 lb) and measure the length of it.
Maximum chain elongation: 123.2 mm (4.850 in.)
Measuring Area If the elongation is greater than maximum, replace the chain.
HINT:
0 1 2 3 4 5
Make the same measurements pulling at 3 or more places se-
16
A30412 A50062 lected at random.
TimingMark NOTICE:
When rotating the camshaft with the timing chain removed,
rotate the crankshaft counterclockwise 40_ from the TDC
and align the oil jet hole with the paint mark before rotating
it for the valves not to touch the pistons.
A50142
A37074
Close Open
Close
Open
A51761
Retard (3) Put air pressure into two broken paths (the advance
Advanced
Side Path Side Path side path and the retard side path) with about 150
kPa (1.5 kgf/cm2).
NOTICE:
Cover the paths with shop rag to avoid oil splashing.
A51762
Retard
(4) Confirm if the camshaft timing gear assembly re-
Advanced
Side Path Side Path volves in the timing advance direction when weak-
ening the air pressure of the timing retard path.
HINT:
The lock pin is released, and camshaft timing gear, revolves in
the advance direction.
(5) When the camshaft timing gear comes to the most
Decompress advanced position, take out the air pressure of the
Hold Pressure
A51763 timing retard side path, and then, take out that of
timing advance side path.
NOTICE:
Camshaft timing assembly gear occasionally shifts to the
retard side abruptly, if the air compression of the advanced
side path is released before retard side path. It often results
the breakage of the lock pin.
(c) Check smooth revolution
(1) Except the position where the lock pin meets at the
most retard angle, let the valve timing controller as-
sembly turn back and forth and check the movable
range and that there is no disturbance.
Standard: Movable smoothly in the range about 22.5_
NOTICE:
Be sure to perform this check by hand, instead of air pres-
sure.
(d) Check the lock in the most retarded position.
(1) Confirm that the camshaft timing gear assembly is
locked at the most retarded position.
(a)
Using a 8 mm bi−hexagon wrench, uniformly loosen and
remove the 10 cylinder head bolts, in several passes, in
the sequence shown. Remove the 10 cylinder head bolts
and plate washers.
NOTICE:
S Be careful not to drop washers into the cylinder head.
A35286 S Head warpage or cracking could result from remov-
ing bolts in an incorrect order.
31. REMOVE CYLINDER HEAD GASKET
SST
A38018
A51764
(c) Insert the blade of SST between oil pan No. 1 and oil pan
No. 2, and cut off applied sealer and remove the oil pan
No. 2.
SST 09032−00100
NOTICE:
Be careful not to damage the oil pan No. 2 contact surface
of the oil pan No. 1 and the oil pan No. 2 flange.
A01456
A50902
(b) Using screwdriver remove the oil pan No. 1 by prying the
portions between the cylinder block and oil pan No. 1.
NOTICE:
Be careful not to damage the contact surfaces of the oil pan
No. 1 and cylinder block.
(c) Remove the 2 O−rings from the cylinder block.
(d) Remove the 4 stud bolts.
A11272
(a) Check that the plunger moves smoothly when the ratchet
pawl is raised with your finger.
(b) Release the ratchet pawl and check that the plunger is
locked in place by the ratchet pawl and does not move
when pushed with your finger.
A11223
A37065
A37066
Overall Length (a) Using vernier calipers, measure the length of head bolts
from the seat to the end.
Standard bolt length:
142.8 − 144.2 mm (5.622 − 5.677 in.)
Maximum bolt length: 147.1 mm (5.791 in.)
If the length surpasses the maximum, replace the bolt.
A30215
A50686
(b) Remove any old packing material from the contact sur-
face.
Seal Packing (c) Apply seal packing in the shape of bead (Diameter 2 mm
9mm 4mm − 3 mm (0.0787 − 0.1181 in.)) consequently as shown in
the illustration.
Seal packing:
Part No. 08826−00080 or equivalent
NOTICE:
S Remove any oil from the contact surface.
4mm S Install the oil pan within 3 minutes after applying seal
11mm
Seal Packing A50687 packing.
S Do not put into engine oil within 2 hours after instal-
ling.
(d) Install 2 new O−rings to the cylinder block.
(a) Install a new gasket and the oil strainer with the 2 nuts and bolt.
Torque: 11 N×m (112 kgf×cm, 8 ft×lbf)
46. INSTALL OIL PAN SUB−ASSY NO.2
(a) Remove any old packing material from the contact sur-
face.
SST
A38018
HINT:
Cylinder Head The cylinder head bolts are tightened in 2 progressive steps.
(a) Apply seal packing in the shape of bead (Diameter 3.5 −
f3.5−4.5 4.5 mm (0.1378 − 0.1772 in.)) consequently as shown in
the illustration.
NOTICE:
Cylinder Head
S Remove any oil from the contact surface.
Gasket
S Install the oil pan within 3 minutes after applying seal
Cylinder Block packing.
Seal Packing (b) Apply a light coat of engine oil on the threads and under
the heads of the cylinder head bolts.
A50688
A35288
(d) Mark the front of the cylinder head bolt with paint.
90_ 90_
(e) Retighten the cylinder head bolts by 90_ and 90_ in the
numerical order shown.
Front (f) Check that the paint mark is now at a 180_ angle to the
front.
A12126
SST
A50928
3 1 2 4 A37103
30_
Timing Mark A11224
(a) Using SST and a hammer, tap in a new oil seal until its sur-
SST face is flush with the timing chain cover edge.
Wooden SST 09950−60010 (09951−00250, 09951−00380,
Block 09952−06010), 09950−70010 (09951−07100)
NOTICE:
S Be careful not to tap the oil seal slantingly.
A37153 S Keep the lip off foreign materials.
(b) Apply MP grease to the oil seal lip.
60. INSTALL OIL PUMP ASSY
A35266
FIPG
FIPG
FIPG
2.5
A51765
(d) Engage the spline teeth of the oil pump drive rotor with the
large teeth of the crankshaft, and slide the oil pump.
A35284
(e) Install the oil pump assembly with the 15 bolts and a nut.
D E Uniformly tighten the bolts and nut in several passes.
Torque:
A A
Bolt A 24 N×m (245 kgf×cm, 18 ft×lbf)
C
C
Bolt B 11 N×m (113 kgf×cm, 8 ft×lbf)
Bolt C 11 N×m (113 kgf×cm, 8 ft×lbf)
C
Nut D 24 N×m (245 kgf×cm, 18 ft×lbf)
B
Bolt E 24 N×m (245 kgf×cm, 18 ft×lbf)
C A37150 NOTICE:
S Pay attention not to wrap the chain and slipper over
the chain cover seal line.
S After installing the oil pump assembly, must install
the mounting bracket and water pump within 15 min-
utes.
HINT:
Each bolt length in indicated in the illustration.
A 30 mm (1.181 in.)
B 35 mm (1.378 in.)
C 20 mm (0.787 in.)
E 20 − 14 mm (0.787 − 0.551 in.)
61. INSTALL WATER PUMP ASSY
(a) Install the water pump and a new gasket with the 3 bolts
and 2 nuts.
Torque: 11 N×m (113 kgf×cm, 8 ft×lbf)
B09338
(a) Using SST, install the pump pulley with the 3 bolts.
SST 09960−10010 (09962−01000, 09963−01000)
SST Torque: 15 N×m (150 kgf×cm, 11 ft×lbf)
B09370
(a) Align the hole in the crankshaft damper with the pin posi-
tion and install the crankshaft damper.
(b) Using SST, install the pulley bolt.
SST 09330−00021, 09213−58012 (91111−50845)
Torque: 128 N×m (1,300 kgf×cm, 94 ft×lbf)
A11262
A50156
Timing Marks
A50135
A37101
Hexagonal Portion (d) Using drivers or equipment, while rotating the stopper
Plunger
Stopper plate of the tensioner upward, turn the exhaust camshaft
Plate right a little and push in the plunger of the chain tensioner
as shown in the illustration.
(e) Insert a bar of f 2 − 3 mm (0.08 − 0.12 in.) into the holes
in the stopper plate and tensioner to fix the stopper plate.
SST 10514
HINT:
A50158 S At this time, it is easier to fix by installing the bar while ro-
tate the camshaft right and left a little.
S Fix the bar with tape so that the bar does not come off.
SST
A50157
A35760
(h) Remove the fringe bolt with lifting up the No. 2 camshaft,
then detach the No. 2 camshaft and the camshaft timing
sprocket.
A37148
2 4 3 1
A35766
(j) Hold the timing chain with your hand, and remove the
camshaft and camshaft timing gear assembly.
A35767
(k) Tie the timing chain with a string as shown in the illustra-
tion.
NOTICE:
Be careful not to drop anything inside the timing chain cov-
er.
A35227
Painted Link (r) As shown in the illustration, install the timing chain on the
camshaft timing gear, with the painted links aligned with
the timing marks on the camshaft timing gear.
(s) Examine the front marks and numbers and tighten the
bolts in the order shown in the illustration.
Torque: 13 N×m (130 kgf×cm, 9 ft×lbf)
NOTICE:
Tighten the each bolt equally with keeping the camshaft
horizontal.
3 1 2 4 A37107
Painted Link (t) Hold the timing chain, and align the match marks on the
timing chain and camshaft timing sprocket.
(u) Align the knock pin hole in the camshaft timing sprocket
with the knock pin of the camshaft, and install the sprock-
et to the camshaft.
(v) Temporarily install the timing sprocket bolt.
A37148
5 3 1 2 4 (w) Examine the front marks and numbers and tighten the
bolts in the order shown in the illustration.
Torque: 13 N×m (130 kgf×cm, 9 ft×lbf)
NOTICE:
Tighten the each bolt equally with keeping the camshaft
horizontal.
(x) Install the bearing cap No. 1.
Torque: 23 N×m (235 kgf×cm, 17 ft×lbf)
A35763
SST
A50157
A38016
A37101
O−Ring
A50145
A50146
9
(c) Install the cylinder head cover with the 9 bolt, 2 seal wash-
11 5 7
ers and 2 nuts.
(d) Uniformly tighten the bolts and nuts, in the several
passes, in the sequence shown.
10 Torque: 10 N×m (102 kgf×cm, 7 ft×lbf)
1 2
3 6 4
8
A35756
A50133
(c)
Install the water inlet with the 2 nuts.
Torque: 9.0 N×m (92 kgf×cm, 80 in.×lbf)
72. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSY(W/ VVT−i)