Gauge Hatch Cover & Slot Dipping Device: KSGH / Ksge Type
Gauge Hatch Cover & Slot Dipping Device: KSGH / Ksge Type
Gauge Hatch Cover & Slot Dipping Device: KSGH / Ksge Type
CONTENTS
◈ General Description ◈ Installation
◈ Operation ◈ Maintenance
◈ Shop / Job Site Testing
K.S.P.C
488-1 Wolha-ro, Tongjin-eup, Gimpo-si, Gyeonggi-Do, Korea
Tel : +82-31-998-3825~7
Fax: +82-31-998-3828
Web Site : www.ikspc.com
KSPC-GH-M-001(Rev.1)
Gauge Hatch Cover
1-1 The sampling and gauging hatch cover of the model KSGH/KSGE are designed, manufactured and tested
According to the KSPC standard.
1-2 The Model KSGH/KSGE is made to take the fluid sample from the storage tank, to measure the temperature,
And to take test of the stored fluids.
1-3 The model KSGH is used under 0.05 kg/cm2 pressure of storage tank.
The model KSGE can be used Gauge Hatch as well as Pressure Relief Valve.
KSPC-GH-M-001(Rev.1)
Gauge Hatch Cover
Section 2. Installation
2-1 It should be installed in the opening nozzle of the top roof of tank.
2-3 You should handle with the proper lifting jig to prevent the damage of products.
Figure 1
KSPC-GH-M-001(Rev.1)
Gauge Hatch Cover
Section 3. Operation
3-1 The model KSGH protects the stored fluid in the tank with pad lock device which block the intake of the
Foreign substances to the tank.
3-2 In model KSGH, it is easy to examine the fluid in the tank by measuring the fluid temperature and the
Liquid level as on loosen the pad lock nut and just push the food pedal
Figure 2
KSPC-GH-M-001(Rev.1)
Gauge Hatch Cover
Section 4. Maintenance
4-1 General
4-1-1 In the model KSGH/KSGE type Gauge hatch, it is necessary to check the damage of Teflon seat face
During scaling or picking the sample from the tank without the extra checking.
4-1-2 Thereafter it need to be cleaned and checked regularly in every 6 months at least.
CAUTION.
In case of remove the GH from the tank for any reason, make sure all pressure has been
released before the flange fasteners are loosened.
4-2-1 It is necessary to use the spark free tools for the maintenance work.
4-2-2 Before the work, the inside of storage tank and pipe line should be depressurized and gas .
Freed.
CAUTION.
For the maintenance work, it is necessary to take the preventive measure against inflamm-
Ability and toxicity of liquid in the tank.
KSPC-GH-M-001(Rev.1)
Gauge Hatch Cover
KSPC-GH-M-001(Rev.1)
Gauge Hatch Cover
KSPC-GH-M-001(Rev.1)
Gauge Hatch Cover
KSPC-GH-M-001(Rev.1)