T.J.S. Engineering College: Department of Computer Science and Engineering CS8811-Project Work

This document outlines the marking scheme and evaluation process for a project work course. It allocates 50 marks for each of 4 reviews, with 10 marks for presentation, 20 for viva, 10 for handout, and 10 for progress. The 4 reviews are weighted at 20% each for an internal assessment total of 100 marks. A report is also required and earns 20 additional marks based on the supervisor's recommendation. Evaluation forms are provided for panels to record marks from each review.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
279 views2 pages

T.J.S. Engineering College: Department of Computer Science and Engineering CS8811-Project Work

This document outlines the marking scheme and evaluation process for a project work course. It allocates 50 marks for each of 4 reviews, with 10 marks for presentation, 20 for viva, 10 for handout, and 10 for progress. The 4 reviews are weighted at 20% each for an internal assessment total of 100 marks. A report is also required and earns 20 additional marks based on the supervisor's recommendation. Evaluation forms are provided for panels to record marks from each review.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

T.J.S.

ENGINEERING COLLEGE
TJS Nagar, Peruvoyal, Near Kavaraipettai, Gummidi Pundi-601206

Department of Computer Science and Engineering


CS8811-Project Work

Allocation of Marks at each Review:

Description Marks
Presentation* 10
Viva* 20
Handout 10
Guide (evaluation of the work
10
from previous review to present review)
Total Marks 50

* Presentation and Viva Marks will be average of panel members

Internal Assessment to be submitted to


University

Allocation of
Review Weightage Total
Marks
I 50 20 20

II 50 20 20

III 50 20 20

IV 50 20 20

Report Preparation* 20

Total Marks 100

*Report marks will be awarded by HoD on the basis of the recommendation of Individual
Supervisor
T.J.S. ENGINEERING COLLEGE
TJS Nagar, Peruvoyal, Near Kavaraipettai, Gummidi Pundi-601206
Department of Computer Science and Engineering
CS8811-Project Work
Project Work - Review Evaluation form
Review: _________ Date:______
Batch ID/ Title of the Project Date /Time of Review

Batch Members 1.
2.
3.
4.

Work completed

Work to be presented

Work to be completed

Remarks(by the
supervisor)

Signature of the
supervisor with date
Evaluation criteria Member 1 Member 2 Member 3 Member 4

Name of the student


Marks (evaluation of the work
from previous review to present review out of
10)
[to be filled by the supervisor]
Presentation(out of 10)

Viva voce (out of 20):

Hand out(out of 10)

Total

Remarks

Supervisor Project Coordinator