Dedi Kristiawan: Personal Detail
Dedi Kristiawan: Personal Detail
Dedi Kristiawan: Personal Detail
PERSONAL DETAIL
SKILLS
- COURSE AUTOCAD
- COURSE PIPE STRESS
ANALYSIS (CAESAR II)
PROJECT EXPERIENCE
2020 (April-August)
- Study FEED Pengembangan Fasilitas Produksi Lapangan Benuang
Position : Piping Engineer
Scope : Preparation of Specification, Data sheet, Calculation, RFQ, TBE,
Procedure Piping
Empolyer : PT. Bintang Perwira Abadi
2020 (November-April)
- Engineering And Construction For Co2 Compressor Installation
Position : Piping Engineer
Scope : Preparation of Feasibility Study line Pipe CO2
Preparation of Specification, Data sheet, Calculation, RFQ, TBE,
Procedure Piping
Empolyer : PT. Bintang Perwira Abadi
2019 (July-November)
- Jasa Penyediaan Air Dan Infrastruktur Basecamp
Position : Piping/Pipeline Engineer & Supervision
Scope : Preparation of Specification, Data sheet, Calculation, RFQ, TBE,
Procedure Piping/ Pipeline & Field supervision
Empolyer : PT. Bintang Perwira Abadi
2019 - (April-July)
- Jasa Pelaksanaan Upgrading SP-1, SP-3, SP-4, SP-5 dan Pembangunan Produced & Treated
Water Tank.
Position : Piping Engineer
Scope : Preparation of Specification, Data sheet, Calculation, RFQ, TBE,
Procedure Piping.
Empolyer : PT. Bintang Perwira Abadi
2
2019 (January-April)
- Jasa Rekayasa Teknik, Konstruksi, dan Pemasangan Stasiun Kompresi Gas LP Betung
Pendopo Field, PT. Pertamina EP Asset 2
Position : Piping Engineer & Mechanical Engineer
Scope : Preparation of Specification, Data sheet, Calculation, RFQ, TBE,
Procedure Piping & Mechanical
Empolyer : PT. Bintang Perwira Abadi
2018-2019 (Juny-January )
- Pembangunan Flowline Sumur NKT 1
Position : Piping Engineer
Scope : Preparation of Specification, Data sheet, Calculation, RFQ, TBE and
Procedure Piping
Empolyer : PT. Bintang Perwira Abadi
2017-2018 (September-june)
- Project Pembangunan Pipa Gas Duri Dumai
Position : Piping & Mechanical Engineer
Scope : Preparation of Specification, Data sheet, Calculation, RFQ, TBE
Procedure Piping& Mechanical
Empolyer : PT. Bintang Perwira Abadi
2017 (June-September)
- Muara Karang Peaker Gas Meter Project
Position : Piping Engineer
Scope : Preparation of Specification, Data sheet, Calculation, RFQ, TBE
And Procedure Piping
Empolyer : PT. Bintang Perwira Abadi
2016 (March-June)
- Proyek Pembangunan Pipa 12 inchi Metering Gas Muara Tawar ke PJB
Position : Piping Engineer
Scope : Preparation of Specification, Data sheet, Calculation, RFQ, TBE
And And Procedure Piping
Empolyer : PT. Bintang Perwira Abadi
3
2015 (July-March)
- Jasa Perancangan, Pengadaan, Dan Konstruksi Stasiun Metering Gas Muara Karang Dan
Muara Tawar
- BW Platform Modification PT Pertamina EP Asset 4
Position : Designer
Scope : Preparation of assembly & detail drawing pipe
Empolyer : PT. Bintang Perwira Abadi
2014-2015 (January-July)
- Project Design Drawing Aircraft GSE Apron Terminal 3, Bandara Soekarno Hatta
Position : Designers
Scope : Preparation of assembly & detail drawing pipe
Empolyer : PT. Pembangunan Persada
2014 (June-December)
- Project Line Conveyor Dermaga IV fase 2, PT Krakatau Bandar Samudra.
- project EPC Upgrading Conveyor terminal 1, PT.Krakatau Bandar Samudra.
Position : Designers
Scope : - Preparation of assembly & detail drawing.
- Preparation of assembly & detail drawing Belt Conveyor System
Empolyer : PT. Rubba Teknik Mandiri
2014 (February-May)
- Project Vertikal Lime Kiln #5 PT.Pec-Tech Indonesia, Pangkalan Kerinci Riau
Position : Drafter
Scope : Preparation of detail drawing, structural and detail drawing belt
conveyor, bucket elevator.
Empolyer : PT. Satya Cipta Sentosa
2013 (January-December)
- Project Integrated Steel Mill Jv Ks-Posco.
- Project Utility Piping Pabrik Kapur Pt.Krakatau Posco.
- Project Lime Calcining Plant Of Ism Jv Krakatau Posco.
Position : Drafter
Scope : - Preparation of detail drawing ducting, pipe support, pipe rack,
walkway, civil, utility piping.
- Preparation of detail drawing, piping and support.
- Preparation of detail drawing Submission of T-114 (1100m3/min) & T-
115 (590m3/min) dedusting system.
Empolyer : PT. Krakatau Engineering
4
2012 (April-December)
- PROJECT JETTY AND FACILITY MOP PP.
Position : Drafter
Scope : Preparation Of Detail Drawing Mechanical Scope Material
Handling.
Empolyer : PT. 3RAS Engineering
2012 (January-March)
- PROJECT SUGAR REFINERY PLANT PT. ANDALAN FURNINDO.
Position : Drafter
Scope : Preparation Of Detail Drawing Bucket Elevator, Transfer
Tower & Building
Empolyer : PT. Surya Cipta Sentosa