e-GP System User Manual - Organization Admin
e-GP System User Manual - Organization Admin
for
Organization Admin
(www.eprocure.gov.bd)
Contents
1. Login to e-GP Portal along with User Name & Password ................................................ 3
2. Message Box ................................................................................................................... 5
4. Manage Users (Available to Organization Admin Only) ................................................ 22
5. Reports .......................................................................................................................... 42
6. My Account .................................................................................................................... 45
Organization Admin will be created by e-GP Admin in the e-GP Portal. The moment Admin is
created on e-GP; Users will get a system generated e-Mail message in his registered e-Mail
ID which contains the necessary information pertaining to Users Login details along with
User name & Password. With the help of this User name & Password, Users can start
working on e-GP Portal (As shown in Screen – A1)
1.1. Users will login to e-GP Portal along with User Name & Password. In case of first
time login, to maintain the “Security & Integrity” on e-GP Portal, system by default
leads to “Change Password” screen will come where-in user has to give the details
which are asked.
Screen – A1
1.2. In this Change Password all fields are mandatory. Therefore, Users has to give an
input on each & every field. If any of the field skipped by Users, then, system won’t
allow Users to process further on the e-GP Portal.
1.3. Once all the inputs are given by the Users after that, Users has to click on “Submit”
button which would be available at bottom of the page. (As shown in Screen – A2)
Screen-A2
1.4. Once details are given by User and clicking on “Submit”, system will show
message on Users screen i.e. “Password Changed successfully” then User will
be redirected to home page where the Users has to enter the e-mail ID and the
changed password. (As shown in Screen-A3)
Screen-A3
2. Message Box
2.1 User will login to e-GP Portal along with User name & Password.
2.2 After login into system, User will be able to see the Message box menu (As shown in
Screen-B1)
Screen-B1
2.2.1 Left Menu will show below mentioned links (As shown in Screen-B2)
Screen-B2
2.2.2 “To Do List” Æ User can add new tasks, view existing tasks and can search for the
task details.
2.2.3 “Add Folder” Æ Folder Management of the mails can be done. Create folders and
manage the mails efficiently. By default, there will be four folders – Inbox, Sent,
Trash and Draft.
2.2.4 “Compose Message” Æ User can Compose messages using this functionality.
2.2.5 “Inbox” Æ All the mails which are received by user will be available in this folder.
2.2.6 “Sent” Æ Mails which user sent through compose message will be available in this
folder.
2.3.1 To Do List functionality, is used so that users can manage their tasks / activities on
regular basis.
2.3.2 View Task Details Æ All tasks will be listed in the grid table (S. No, Task Brief,
Priority, Start Date, Last Date, Action) (As shown in Screen - B3)
Screen-B3
2.3.3 Search Task Æ User is given Search criteria, through which user can search by
giving required parameters (i.e. From Date – To Date, Status) through which user
can get quick result. (As shown in Screen – B4)
Screen-B4
2.3.4 Add New Task Æ User can create new task by click on the link (As shown in
Screen – B5) and add in their respective To Do list. Once New Task page gets
opened, it will list down the input values (Task Brief, Task Details, Priority of Task,
Start Date and End Date) which user will fill and click on Submit button. (As shown
in Screen – B6)
Screen-B5
Screen-B6
Screen-B7
2.5.1 Compose Message Æ Users can compose message using this functionality (As
shown in Screen – B8). Lots of features like font, colour, styles are available for
better appeal. Set priority to your messages as well.
Screen – B8
2.5.2 Message can be created in “Rich Text Area” as shown. Prority of message can be
set for the message by selecting “Low, Medium, High”. After composing of
message, User can either “Send” the message or “Save as Draft”.
2.5.3 Once the message is Sent, system will prompt message “Message Sent
Successfully” and the mail will be available in “Sent Folder”.
2.6.1 Inbox basically is the storage of messages which users will receive from other
users. User will be able to View, Open and Search messages.
2.6.2 View Message Æ User can see all messages in Inbox in the grid table (From,
Subject, Priority, Date and Time). (As shown in Screen – B9)
Screen – B9
2.6.3 Open Message Æ User can select & click on the link to open message and view
the message with values (Subject, From, To, Cc, Priority, Message body) with
some more functionality mentioned in below table (As shown in Screen – B10 &
Screen - B11)
Screen – B10
Screen – B11
Trash When User View Message, on top User can click on “Trash”, to
remove the message from Inbox. Once message can then be found
in Trash Folder.
Reply When User View Message, on top User can click on “Reply”, User
can revert back to “From” e-Mail ID(s).
Reply To All When User View Message, on top User can click on “Reply”, User
can revert back to all i.e. “From” & “Cc” e-Mail ID(s).
Forward When User View Message, on top User can click on “Forward”,
User can forward the message to other users and input the values
“From” & “Cc” e-Mail ID(s).
Move To When User View Message, on top User can select from combo box
Folder folder and click on “Move To Folder”, in return message will be
moved to specific folder from Inbox.
2.6.4 Search Message Æ User can use search condition as input values (Search in
[Subject, Message], Keyword, e-Mail ID, From Date, To Date – As shown in
Screen – B12) and result will be displayed in grid table.
Screen – B12
2.7.1 Users when send messages to any other user, message will be saved in “Sent”
folder (As shown in Screen – B13). User can select any specific message to view
again message.
Screen – B13
2.8.1 Message which are deleted / removed by the Users are shown in “Trash” folder.
(As shown in Screen – B14)
2.8.2 All Trash Messages gets displayed in grid table (From, Subject, Priority, Date and
Time).
2.8.3 User can also Search in Trash folder by using input values (Search in [Subject,
Message], Keyword, e-Mail ID, From Date - To Date).
Screen – B14
2.9.1 When users save the message, Message is moved to “Draft” folder. On Click on
“Draft” link, message saved by user will be shown in the grid (As shown in Screen
- B15). If User wants to send message from Draft then User has to click on “Edit”
link > Open Message > If any update in the message, user can update and Click
on “Send” button.
Screen – B15
3. Content
3.1.1 PE admin needs to click on “Create Programme” link; Screen – C1 will appear on
screen.
Screen – C1
3.1.2 PE Admin needs to fill up the required fields of Programme Code, Programme
Name and Programme Owner – As shown in Screen – C2) PE Admin will click on
“Submit” button.
Screen – C2
3.1.3 Programme will be created and system will display message “Programme
Information added successfully”. (As shown in Screen – C3)
Screen – C3
3.2.1 Click on “View Programmes” to view all the Projects created by PE Admin. (As
shown in Screen – C4)
Screen – C4
3.2.3 If PE Admin clicks on “View”, then all programmes created information will be
displayed. (As shown in Screen – C5)
Screen – C5
3.2.4 If PE Admin clicks on “Edit”, then programmes will be displayed in edit mode and
user can do required changes and click on “Update” (As shown in Screen – C6)
Screen – C6
3.2.5 System will display message “Programme Master Modified” and system will
update the record also. (As shown in Screen – C7)
Screen – C7
3.3.1 PE admin needs to click on “Create Project” link; Screen – C8 will appear on
screen.
Screen – C8
3.3.2 PE Admin needs to fill up the required fields of Project Information (Select
Programme, Project Code, Project Name, Project Cost, Project Start Date, Project
End Date and Source of Fund – As shown in Screen – C9) PE Admin will click on
“Submit” button.
Screen – C9
3.3.4 Project Information will be created and PE Admin will then need to add users for
that Project. PE Admin needs to select Procurement Role and click on “Add Users”
Central Procurement Technical Unit (CPTU)
IME Division, Ministry of Planning
Organization Admin User Manual - Page 18 of 50
button. (As shown in Screen – C10) – User will be added in the table and on
“Submit”. Project will be added and will be shown in “View Projects > Pending
Tab”
Screen – C10
3.4.1 Click on “View Projects” to view all the Projects created by PE Admin. (As shown
in Screen – C11)
Screen – C11
3.4.2 PE Admin can view the action links - “Edit” | “View” | “Approve”. (As shown in
Screen – C11)
3.4.3 If PE Admin selects projects and clicks on “View”, then PE Admin will be able to
view the Project details. (As shown in Screen – C12)
Screen – C12
3.4.4 If PE Admin selects projects and clicks on “Edit”, then Project Key Field
Information will be displayed in edit mode and PE Admin can do required changes
in key fields (Project Cost, Project Start Date, Project End Date and Source of
Fund) and click on “Update” (As shown in Screen – C13)
Screen – C13
3.4.5 Required modification will be updated and PE Admin will be redirected to “Add
Users”, further for doing any modifications in the project users and click on
“Submit”. (As shown in Screen – C14)
Screen – C14
3.4.6 If PE Admin selects project and click on “Approve”, then Project details will be
displayed with “Approve” button and on click Project will be approved from PE
Admin. (As shown in Screen – C15)
Screen – C15
Screen – C16
4. Manage Users
4.1.1 To create Procurement entity Office, Organization Admin has to click on “Create
PE Office” link. Once click on “Create PE Office”, Screen – C1 will appear on
screen.
Screen – C1
4.1.2 Organization Admin has to fill up the required fields Office Name, Office Name In
Bangla, PE Code, Address, District, City/Town, Thana / Upazilla, Postcode, Phone
No, Fax No. Organization Admin will click on “Submit” button.
4.1.3 Organization PE Office will be created and System will display message “PE Office
created successfully” and system will display the values entered. (As shown in
Screen – C2)
Screen – C2
4.1.4 Organization Admin has to click on “OK”, for successful completion of PE Office
4.1.5 If Organization Admin wants to modify the details entered, then user has to click on
“Edit” button. Page will be displayed in editing mode so that user can do required
modification in the fields.
4.2.1 Click on “View PE Office” to view all the PE Office created by Organization Admin.
(As shown in Screen – C3)
Screen – C3
4.2.3 If Organization Admin clicks on “View”, then selected PE Office details will be
displayed. (As shown in Screen – C4)
Screen – C4
4.2.4 If Organization Admin clicks on “Edit”, then PE Office will be displayed in edit mode
and user can do required changes and click on “Update” (As shown in Screen –
C5)
Screen – C5
4.2.5 System will display message “PE Office updated successfully” and system will
update the record also. (As shown in Screen – C6)
Screen – C6
4.3.1 To create PE admin, Organization Admin has to click on “Create PE Admin” link.
Once click on “Create PE Admin”, Screen – C7 will appear on screen.
Screen – C7
4.3.2 Organization Admin has to fill up the required fields Select District, Select Office,
Office e-mail ID, Password, Confirm Password, Full Name, National ID, Phone No,
Mobile No. Organization Admin will click on “Submit” button.
4.3.3 Organization PE Admin will be created and system will display message “PE
Admin created successfully” and system will display the values entered. (As
shown in Screen – C8)
Screen – C8
4.3.4 Organization Admin has to click on “OK”, for successful completion of PE Admin.
4.3.5 If Organization Admin wants to modify the details entered, then user has to click on
“Edit” button. Page will be displayed in editing mode so that user can do required
modification in the fields.
4.4.1 Click on “View PE Admin” to view all the PE Admin created by Organization
Admin. (As shown in Screen – C9)
Screen – C9
4.4.3 If Organization Admin clicks on “View”, then selected PE Admin details will be
displayed. (As shown in Screen – C10)
Screen – C10
4.4.4 If Organization Admin clicks on “Edit”, then PE Admin details will be displayed in
edit mode and user can do required changes and click on “Update” (As shown in
Screen – C11)
Screen – C11
4.4.5 System will display message “Profile updated successfully” and system will
update the record also. (As shown in Screen – C12)
Screen – C12
Screen – C13
4.5.2 Organization Admin has to fill up the required fields Designation, select Class -
Grade. Organization Admin will click on “Submit” button.
4.5.3 Designation will be created and system will display message “Designation created
successfully” and system will display the values entered. (As shown in Screen –
C14)
Screen – C14
4.5.4 Organization Admin has to click on “OK”, for successful completion of Designation.
4.5.5 If Organization Admin wants to modify the details entered, then user has to click on
“Edit” button. Page will be displayed in editing mode so that user can do required
modification in the fields.
4.6.1 Click on “View Designations” to view all the designations created by Organization
Admin. (As shown in Screen – C15)
Screen – C15
4.6.3 If Organization Admin clicks on “View”, then selected designation details will be
displayed. (As shown in Screen – C16)
Screen – C16
4.6.4 If Organization Admin clicks on “Edit”, then designations will be displayed in edit
mode and user can do required changes and click on “Update” (As shown in
Screen – C17)
Screen – C17
4.6.5 System will display message “Designation updated successfully” and system will
update the record also. (As shown in Screen – C18)
Screen – C18
Screen – C19
4.7.2 Organization Admin has to fill up the required fields of Employee Information (e-
mail ID, Password, Confirm Password, Full Name, Name in Bangla, National ID,
and Mobile No. – As shown in Screen – C19) Organization Admin will click on
“Submit” button.
4.7.3 Organization admin has to fill up the required fields of Employee Office Information
(select office, select designation and select procurement role) and then click on
“Add Procurement Role” (As shown in Screen – C20)
Screen – C20
4.7.4 Government User will be created with assign roles. Organization admin has to click
on “Complete Registration” to activate the profile of official (As shown in Screen –
C21)
Screen – C21
4.7.5 Government User will be created and system will display message “Government
User created successfully”. (As shown in Screen – C22)
Screen – C22
4.8.1 Click on “View Users” to view all the government users created by Organization
Admin. (As shown in Screen – C23)
Screen – C23
4.8.2 Organization Admin can see Action links “Edit” | “View | Transfer | Deactivate /
Activate”.
4.8.3 If Organization Admin clicks on “View”, then selected designation details will be
displayed. (As shown in Screen – C24)
Screen – C24
4.8.4 If Organization Admin clicks on “Edit”, then required fields will be displayed in edit
mode and user can do required changes and click on “Update” (As shown in
Screen – C25). Further, if admin wants to “Edit” the Employee Office Information
then admin will click on “Next” button (As shown in Screen – C26) and click on
“Edit” link to update the office information.
Screen – C25
Screen – C26
4.8.5 If Organization Admin clicks on “Transfer”, then selected user details will be
transferred to another user profile. Organization Admin has to “Retrieve” the
information of another user through e-mail ID. (As shown in Screen – C27)
Screen – C27
Screen – C28
4.8.7 After Transfer, Organization Admin will select the profile and click on “View” to view
the details of Government User transferred (As shown in Screen – C29)
Screen – C29
4.8.8 To view transfer history of that user, click on “View Transfer History”, details of
Transfer will be shown (As shown in Screen – C30)
Screen – C30
Screen – C31
4.8.10 Admin will mention comments and click on “Deactivate” button. On click, it will ask
for confirmation and on click “Yes”. User will be deactivated from the system. (As
shown in Screen – C32)
Screen – C32
4.8.11 User will be deactivated from the system and system will display message “User’s
account Deactivated successfully”. Also in future, if Organization Admin wants to
again activate the government user then they will click on “Activate” link and follow
the same process. (As shown in Screen – C33)
Screen – C33
4.8.12 If Deactivated user again logs in to system, then system will display message
“Your account is deactivated. Please contact your Admin user”. (As shown in
Screen – C34)
Screen – C34
Screen – C35
4.9.2 Organization Admin has to fill up the required fields e-mail ID, Password, Confirm
Password, Full Name, Name in Bangla, National ID, Phone No. and Mobile No.
Organization Admin will click on “Submit” button.
4.9.3 External Evaluation committee member user will be created and system will display
message “External Committee Member created successfully” and system will
display the values entered. (As shown in Screen – C36)
Screen – C36
4.9.4 Organization Admin has to click on “OK”, for successful completion of creation of
external committee member user.
4.9.5 If Organization Admin wants to modify the details entered, then user has to click on
“Edit” button. Page will be displayed in editing mode so that user can do required
modification in the fields.
4.10.1 Click on “View Users” to view all the designations created by Organization Admin.
(As shown in Screen – C37)
Screen – C37
4.10.2 Organization Admin can view the action links - “Edit” | “View”.
Screen – C38
4.10.4 If Organization Admin clicks on “Edit”, then designations will be displayed in edit
mode and user can do required changes and click on “Update” (As shown in
Screen – C39)
Screen – C39
Screen – C40
5. Reports
5.1.1 If Organization Admin wants to see the MIS Report: Procurement Statistics then
will go to “Report Menu > Procurement Statistics sub menu” link and click on it.
(As shown in Screen – D1)
Screen – D1
5.1.2 System will display page in which Organization Admin has to select “PE Office”
and click on “Generate” to get the Report.
5.1.3 On click of “Generate”, Organization Admin will be able to see the Annual
Procurement Plan Report, Tenders Report and Awarded Contract Report.
5.1.4 System will display in “Annual Procurement Plan” tab Report Æ Total Nos. of
APP prepared, Total Nos. of APP approved. Organization Admin will find link in
count shown. On click of Total Nos. of APP prepared Æ Total Nos. of APP
prepared & Total Amount of prepared Packages (in case of Goods, Works,
Services and Total). (As shown in Screen – D2)
Screen – D2
5.1.5 Organization admin will click on count link of “Total Nos. of APP prepared”,
system will display Total Nos. of prepared packages and Total Amount of prepared
packages of (Goods, Works, Services and Total). (As shown in Screen – D3)
Screen – D3
Central Procurement Technical Unit (CPTU)
IME Division, Ministry of Planning
Organization Admin User Manual - Page 43 of 50
5.1.6 Organization admin will click on count link of “Total Nos. of APP approved”,
system will display Total Nos. of approved packages and Total Amount of approved
packages of (Goods, Works, Services and Total). (As shown in Screen – D4)
5.1.7 Organization admin click on “Tenders” tab, system will display Total Nos. of
Tenders invited, Total Nos. of Re-Tendered and Total Amount of Tenders Invited
for Goods, Works, Services and Final Total. (As shown in Screen – D5)
Screen – D5
5.1.8 Organization admin click on “Awarded Contracts” tab, system will display Total
Nos. of Contracts Awarded and Total Amount of Contracts Awarded for Goods,
Works, Services and Final Total. (As shown in Screen – D6)
Screen – D6
5.2.1 Organization Admin clicks on Annual Procurement Plan link and system will
display Consolidated Annual Procurement Plan page. (As shown in Screen – D7)
Screen – D7
5.2.2 System will show Consolidated Report on the basis of – (As shown in Screen –
D7)
5.2.2.1 All APP’s displayed are of all the PE Office listed in that Organization.
5.2.2.2 All APP’s displayed will be shown on the basis of Procurement Nature (Goods,
Works and Services) for all the Budget Type (Development, Revenue and Own
Fund)
5.2.3 System will also show the Search Parameters like (PE Office, Project Name,
Financial Year, Budget Type and Procurement Nature) and on the basis of search
parameters required result will be displayed. (As shown in Screen – D7)
5.2.4 System will also display “Print” and “Save as PDF” buttons, on click of “Print”
button, Print-out of Report can be taken into paper and on click of “Save as PDF”
button, PDF file is generated and option to Open or Save file is given in which
same report is generated. (As shown in Screen – D7)
6. My Account
6.1.1 “View Profile” sub-menu Æ System will display the profile of Organization Admin
with specified Organization, e-mail ID, Full Name, National ID, Phone No. and
Mobile No. (As shown in Screen – E1)
Screen – E1
6.2.1 “Edit Profile” sub menu Æ System will allow Organization admin to Edit Profile
Information like: Full Name, National ID, Phone No. and Mobile No.
6.2.2 After editing the required Profile Information / details, Organization Admin has to
click on ‘Update’ Button. (As shown in Screen – D3)
Screen – E2
6.2.3 On updating the profile, System will display notification, “Profile updated
successfully” (As shown in Screen – E3)
Central Procurement Technical Unit (CPTU)
IME Division, Ministry of Planning
Organization Admin User Manual - Page 46 of 50
Screen – E3
6.3.1 “Change Password” sub menu Æ System will allow Organization Admin to change
Password. User has to enter his Current Password. System will verify the Current
Password, whether the User has entered the same is correct or not. On entering
the wrong Password, system will display a message as “Invalid password”. On
entering the correct password, system will display message as “Valid Password”.
(As shown in Screen – E4)
Screen – E4
6.3.2 User then has to enter the “New Password”. If Password doesn’t contain 8
characters or alphabets & numbers then system will display a message as
“Password requires minimum 8 characters and must contain both alphabets
and numbers. You can also add special characters and space”. If user enters
password as mentioned in the tool tip, then user will be moved to “Confirm
Password” field. (As shown in Screen – E5)
Screen – E5
6.3.3 User has to confirm the Password by entering the same again in ‘Confirm
Password’ text box. User has to click on “Submit” button. On submitting the
same, System will update the New Password and System will redirect the user to
Homepage so that User will be able to Login the system with New Password and
System will display message “Password changed successfully”. (As shown in
Screen – E6)
Screen – E6
6.4.1 “Change Hint Question and Answer” sub menu Æ System will allow User to
change Hint Question and Answer. System will allow User to select Hint Question
from Drop-down list If User wants to create his own Hint Question, User has to
select “Create your own Hint Question” from options given. (As shown in Screen
– E7)
Screen – E7
6.4.2 After selecting “Create your own Hint Question”, system will allow User to create
new Own Hint Question. User will also enter Hint Answer and click on “Submit”.
(As shown in Screen – E8)
Screen – E8
6.4.3 After selecting the Hint Question from the Drop-down list, User has to enter his Hint
Answer. User then has to click on Submit Button. On submitting the same, system
will update the information. (As shown in Screen – E9)
Screen – E9
6.5.1 If User wants to change the Notification Preference, User can change the same
by selecting “Preference” option. Here user has to select, whether he wants
system to send notification by Email Alert or by SMS Alert. On selecting the same,
user has to click on Submit button. On submitting the same, system will update the
preferences and display the message “Your preference submitted successfully”.
(As shown in Screen – E10)
Screen – E10
6.6.1 If User wants to post any queries to Procurement Expert, User has to select “Ask
Procurement Expert” option from sub menu. User can also see the details of
queries in Question Table, where System will display the Category of Query, Query
description, Replied by and Action. (As shown in Screen – E11)
Screen – E11
6.6.2 To post query, User has to click on “Post Query” button. System will display the
category for which user can post the queries, User has to select Procurement
Category from the drop-down list. After selecting the category, User has to write
the Description of Query and clicks on “Submit” button. (As shown in Screen –
E12)
Screen – E12
6.6.3 On submitting the same, System will send the details to Procurement Expert and
display message “Query posted successfully”. (As shown in Screen – E3)
Screen – E13