Objectives
To provide analysis & calculations for the design of internal independent access scaffold to tank
The Purpose of this calculations is to check the structural adequacy of Scaffold tubes, couplers and other scaffolding
components as British Standards
Calculation Method
Analysis of the Scaffold Structure for Gravity Loads shall be done manually on Microsoft Excel worksheets .
Design Criteria
Scaffold boards shall be checked for permitted spans as per manufacturer's recommendation / British Standards
Transoms shall be checked for Max. Bending & Shear due to dead and Live loads
Ledgers shall be checked for Max. Bending & Shear due to Dead and Live loads
Standards shall be checked for Max. Axial forces due to Dead and Live Loads
Design Considerations
* Access Scaffold to be used for painting & Blasting ie Load Rating of scaffold = 1.5kN/m2
* Access Scaffold will be fully boarded!!
* Max. No. of working platform not to excced 3 at any given one time (Worst Case Senario)
* Scaffold will be butted into existing structure for stability.
* Scaffold shall not be sheeted.
Customer Status
Design Parameters:-
LADDER ACCESS
TOWER
0
90
13
00
90 DENOTES TRANSOMS
0
@ Max. 1.25m C/C
250
0
00
TYPICAL BAY = 3.8m 25
130 900
0
2500 1300
DENOTES
MAKE - UP BAY
RDS
BOA
4.0m BOARDS 1.8m
Timber Board
1.25 m
1.30 m
APPLIED LOADING
Distributed Loads
Beam influence width 1.00 m
2.20 kN/m² @ 0.000 m --> 2.20 kN/m² @ 1.300 m
RESULTS SUMMARY
Max. Reaction 1.43 kN @ 0.000m
Max. Sag BM 0.46 kNm @ 0.650m Allowable Bending = 1.0kNm ………Ok
Max. Shear Force 1.43 kN @ 0.000m Allowable Shear Force = 36.4kN …..…Ok
Customer Status
1.80 m
APPLIED LOADING
Distributed Loads
Beam influence width 1.00 m
0.86 kN/m² @ 0.000 m --> 0.86 kN/m² @ 2.500 m
RESULTS SUMMARY
Max. Reaction 1.07 kN @ 2.500m
Max. Sag BM 0.67 kNm @ 1.250m Allowable Bending = 1.0kNm ………Ok
Max. Shear Force 1.08 kN @ 2.500m Allowable Shear Force = 36.4kN …..…Ok
Customer Status
1.4kN
1250 1250
2500
APPLIED LOADING
Point Loads
1.40 kN @ 1.25 m
RESULTS SUMMARY
Max. Reaction 0.70 kN @ 0.000m
Max. Sag BM 0.88 kNm @ 1.250m Allowable Bending = 1.0kNm ………Ok
Max. Shear Force 0.70 kN @ 0.000m Allowable Shear Force = 36.4kN …..…Ok
B
2500
WORST LOADED STANDARD
TYPICAL TRAPEZIUM
BAY (INTERNAL)
2500
900
900
1800 2500
2500 1300 1245
DENOTES
MAKE - UP BAY 4.0m Boards TYPICAL TRAPEZIUM
BAY (EXTERNAL)
B
Customer Status
2
Effective Area of Standard (Boards) = 2.8 m
As per Harsco Datasheets axial load on 2.0m effective length of Cuplok Standard = 33.0kN
1300
0 check that we have correctly interpreted his requirements and that all loadings, dimensions, details, erection,
250 pouring and striking sequences etc. are as required and practicable.
6.0m
4.0m
13 The following documents have been used to prepare this scheme:-
0
130 00
6.0m
Customer Drawings: 5638-E1-1500-MEQ-DWG-501Rev 0
....................................................................................
Customer Drawings: .
....................................................................................
2.0m
2500
25 Design Brief: .
....................................................................................
00
6.0m
Customer Method Statement: .
....................................................................................
4.0m
TUBE LACING Other Information: .
....................................................................................
6.0m
00
25 This drawing has been prepared in accordance with Harsco Infrastructure Equipment Datasheets, Formwork,
2.0m
A Guide to Good Practice (Concrete Society) 2nd Edition, CIRIA Report 108 Concrete Pressure on
6.0m
Formwork, as well as the relevant statutory provisions and Codes of Practice.
2500
4.5m
4.5m
00 To enable us to complete this drawing, we have allowed for the following:-
13
13 Foot Tie .Information as per Action request sheet
.......................................................................................................................................
00
No Sheeting
.......................................................................................................................................
.
.......................................................................................................................................
.
.......................................................................................................................................
6.0m Tie Pattern The Customer is to check and confirm that we have correctly interpreted his requirements.
25
The Customer is directed to the Members Area of our website where all the latest Product Datasheets, CAD
0
n
blocks, Animations, and other useful technical information is available to download. Please visit
0
Tie tubes must be connected to both inside and outside standard or ledger
13 and within 300mm of a node point. Right angle couplers must be used for this www.harsco-i.com and follow the links for details.
00 TYPICAL connection. On the end verticals the tie pattern must be doubled unless a
00
i
SCAFFOLD 3. Applied Loads
25
13
ACCESS BRACING between braced ties is 7.5m horizontally and 12m vertically for an 8m tie
13
00
TOWER pattern, 7.5m horiz. and 10m vert. for a 6m tie pattern, and 7.5m horiz. and Formwork Maximum Concrete Pressure allowed .
8m vert. for a 4m tie pattern. Assume load from missing tie is evenly .
d
Concrete Type (CIRIA 108) ...............
distributed to adjacent ties.
w
Concrete Temperature .
00 Rate of Rise .
...............m/hr
BRACING 13 Ties must not be removed on sheeted/netted scaffolds unless plan and
00
2000 Standard
2000 Standard
ledger bracing is used and tie loads are checked. The maximum distance
25
25
DENOTES TIE POSITION between braced ties is 5m horizontally and 6m vertically for a 2m and 4m tie
Level 9 Level 9 Level 9 (6m TIE PATTERN) .
00 Additional Lifts
00
pattern.
25 Hop-Up Brackets . .
e
For a 4m tie pattern, if the pattern is NOT staggered the leg load capacity
2000
2000
b
0
Tu Tu
Wind .
250
00 00
35 35
1500 Standard
1500 Standard
General Rules for Ties to Cuplok
r ir
4. Timber
Level 8 Level 8 Level 8 No timber is supplied by Harsco Infrastructure unless specifically stated. Where Harsco Infrastructure does not
TABLE SHOWING LENGTH OF BRACING TUBES (mm) supply, the design & supply of timber is the responsibility of the Customer. To enable us to complete this
25
drawing the following properties (based on Formwork, A Guide to Good Practice), have been allowed for as
00
Bay Length (mm)
the Customers
0
1300
130
2000
2000
2000
00 00
Tu Tu Timber(s):
be b e 2000 3500 3000 3000 2500 2500 2500 2500
.......................................
3000 Standard
3000 Standard
3000 Standard
1500 3500 2500 2500 2500 2500 2000 2000 Main bearers .
...................................... Secondary bearers
.......................................
D u
1000 3000 2500 2000 2000 2000 2000 1500 Walings .
...................................... Other(s)
Level 7 Level 7 Level 7 Timber Grade allowed .
......................................
Jack Bracing
(Full extension) 3000 2500 2000 2000 2000 1500 1500 Plywood .
......................................with face grain orientated parallel to span.
BRACING Bay Length
2500
Lacing to Internal Beam Brackets 1500 1500 1500
5. Formwork
2000
2000
2000
be be
0 Tu 0 Tu
350 350 THE CUSTOMER IS RESPONSIBLE FOR ENSURING THAT ALL HARSCO INFRASTRUCTURE
COMPONENTS THAT COME INTO CONTACT WITH CONCRETE ARE TREATED WITH CHEMICAL
RELEASE AGENT PRIOR TO EACH USE.
q
Level 6 Level 6 Level 6
3000 Standard
3000 Standard
3000 Standard
2500
y
6. Foundations/Support
BUTTRESS
Unless otherwise noted, no soleplates or other means of spreading the imposed loads are supplied by Harsco
35 35 Infrastructure. Where Harsco Infrastructure equipment is supported, suspended, anchored or tied to an
2000
2000
2000
00 00
Tu Tu existing structure or the ground, the Customer must ensure that the structure or ground is adequate to safely
r
support the additional imposed loads.
SCAFFOLD HEIGHT = 17.8m
e
TANK HEIGHT = 22m
Level 5 Level 5 Level 5 This drawing has been prepared using the Safe Working Loads of the Harsco Infrastructure components
1300
specified. No alteration to components, assembly, loading or any other aspect must be made without the
expressed written authority from Harsco Infrastructure.
2000
2000
2000
be be
3000 Standard
3000 Standard
3000 Standard
a
Tu Tu
00 00 Can only be used to Connect 8. Tying & Bracing
35 35 FACE BRACE
Perpendicular Tubes The Customer is responsible for ensuring all structures remain adequately tied and/or braced to carry the load
R
Used to Connect
and ensure stability. No ties or braces are to be removed or altered in any way without the expressed written
Angular Tubes
Level 4 Level 4 Level 4 authority from Harsco Infrastructure. Where Harsco Infrastructure is supplying equipment only, the supply &
2500
fixing of all necessary ties is the responsibility of the Customer.
Tube Fittings Tube Fittings
Double Coupler
n
35 35 Swivel Coupler 9. Temporary Working Platforms
2000
2000
2000
00 00
Tu Tu Unless specifically stated it is considered that any other working platforms (for erection or dismantling
i al
be be
purposes), will be designed, supplied and fitted by the Customer.
2500
3000 Standard
3000 Standard
.
................................................................................................................................................................................
2000
2000
2000
be be
Tu Tu
00 00
Unless indicated otherwise, all loads shown are not factored.
1300
1300
(6m TIE PATTERN) 23.2
Maximum calculated Leg Load =...............kN
0
250
A
m
Cuplok Std. .
Maximum calculated Tie Load =...............kN
v
250
.
Tie Type :-................................
0
2000
2000
00 00 PONTOON
3000 Standard
i
Tu Tu
be b
Ledger
2500
e
Note, method of assessment of loads in tie rods allows for elongation of ties and not continuity. Ref. Formwork,
A Guide to Good Practice 2nd Edition 3.8.2.
l
Level 1 Level 1 Level 1 Cuplok
o
PONTOON PONTOON Unless a specification for tolerance has been provided, deflection has been limited to 1/270th of the maximum
Ledger
span of each member.
250
1000
1000
1000
25
00 Cuplok Node Point Base & Head Plate
0
.
A
r
DECK DECK DECK Maximum weight of table unit = .
................kg
BACK
e
PROPPING 13 12. Eccentricity
00
BACK BACK All legs are to be erected plumb and loaded concentrically to the general tolerances given in BS5975:2008
130
00
0
13
ACCESS
r
2000
2000
2000
p
This drawing constitutes Harsco Infrastructures Risk Assessment in accordance with Regulation 11 of the
current CDM Regulations 2007. The elimination of general risk in the use of temporary works is by use of good
practice. Guidance can be found within relevant Codes, HSE publications and Guides. Wherever possible, risk
is designed out of this proposal during the design process.
00
25
2500 1300 300 2500 1300 300 1300 300 ************DO NOT TAKE RISK ! - IF IN DOUBT, ASK************
P Ap
Section A-A Section B-B Section C-C
25
00
B By : By :
INTERMEDIATE Date : 04/01/2015 Date :
TRANSOMS 00
2500 25
25 C RESIDUAL RISK ASSESSMENT
Wherever possible, risk is designed-out of this proposal during the design process. Where this is not
00
possible, the risk will be minimised and any residual risk will be noted and indicated by the symbol.
TYPICAL TRAPEZIUM
BAY (INTERNAL) DRAWING STATUS
2500
13
900 Preliminary drawing
FOR DISCUSSION AND PRICING PURPOSES ONLY - SUBJECT TO CUSTOMERS APPROVAL
00
25
250 Scale: As shown Client:
0
Date Name SINOPEC
130
0 1300 Drawn: 04/01/2015 EMK
2500
C Checked: 04/01/2015 MWR Project:
1800
2500 1300 1245 Remark: Internal Independed Access Scaffold Jet A-1 Tank
DENOTES
MAKE - UP BAY 4.0m Boards TYPICAL TRAPEZIUM at Oil Terminal at Hamriyah
BAY (EXTERNAL)
Cuplok and Tube & fittings
Abu Dhabi Design Office A part of Harsco Infrastructure
B P.O. Box 7574 Harsco House, Regent Park
Abu Dhabi, United Arab Emirates Leatherhead, Surrey KT22 7SG
Tel: +971 (0) 2 5824835 Tel: +44 (0) 844 3358860
INTERNAL ACCESS PLAN LAYOUT - Jet A-1 Tank Fax: +971 (0) 2 5827974 Fax: +44 (0) 1372 381399
E-Mail: [email protected]
www.harsco-i.com
SCALE 1:80 CAD-File: Drawing-No.:
6060-26 A-UAE-6060-26 Quebeisi SGB LLC
The following pages are Data Sheets that are referred to in
these calculations being submitted.
Loadings
Issue A
Date 12/03/98 Page 600
Bracing satisfies 2 conditions. It provides nodal restraint and resists external forces. Providing the
worst condition is catered for both conditions, satisfied.
This bracing can be provided externally, i.e. by the permanent works, or internally by the Cuplok
bracing system. In any event the bracing system must be capable of restraining 2.5% of the vertical
loads appied horizontally or all the known loads + 1% whichever is greater. Base and top jacks must
be effectively braced in both directions. The direction of the braces must be alternated. A diagonal
brace may be used to support a number of base/top jacks provided the base plate/fork heads are
effectively linked by the ground/formwork.
Guidance Note
For this heavier duty and in particular when new equipment is supplied, it will greatly assist in the
striking of the falsework if the top screw jacks are lubricated. A release tool is also available.
© SGB cup147a.doc
Loadings
Issue A
Date 12/03/98 Page 10 of 10
Vertical Top
Vertical Top
Values are given for the case of the horizontal in the first
cup from the top or bottom of the vertical and for the
horizontal in the second cup. The horizontal in the first cup
is to be preferred. The permissible loads per vertical are
shown on pages to .
The tables below show the permissible loads per vertical for
all main lifts. The values apply regardless of the type of
formwork to be supported and where the maximum length
of bay does not exceed 2.7m.
Permissible Loads per Vertical for Main Lifts in kN
Internal Verticals
Main Lift (m) Vertical Load (kN)
1.00 57.0
1.50 45.0
2.00 33.0
2.50 23.0
External Verticals
Bay Length (mm)
Lift (m) 600 900 1200 1800 2500
1.0 57.0 57.0 57.0 57.0 57.0
1.5 45.0 44.5 43.5 43.0 42.5
2.0 33.0 31.5 30.5 29.0 28.5
Vertical Base
© SGB cup120a.doc
CALCULATION INFORMATION SHEET Job No: A-UAE-6060-26
Title: Internal Independent Access Scaffold for Jet A-1 Tank Sheet No: 1 of 2
Prepared by: Date:
EMK 1/04/2015
Properties of Steel tube Standard scaffold tube in accordance with EN39 / TG20 / BS EN 12811-2
3
Outside diameter = 48.3 (±0.5) mm Zp (S in TG20) = 7.87 cm
3
Wall thickness = 4.0 (+0.47/-0.4) mm Ze = 5.70 cm
Cross sectional area = 5.57 cm2 Allowable BM. = 1.12 kNm
Mass = 4.37 kg/m Allowable shear = 29.85 kN
4 2
I = 13.8 cm Min yield strength = 235 N/mm
r = 1.57 cm Modulus of Elasticity = 210000 N/mm2
Note: All tube will be galvanised therefore take as new.
Properties of Aluminium tube Standard scaffold tube in accordance with BS 1139-1.2 / TG20
Outside diameter = 48.3 (±0.5) mm Zp (S in TG20) = 8.61 cm3
3
Wall thickness = 4.47 (±0.56) mm Ze = 6.18 cm
2
Cross sectional area = 6.15 cm Allowable BM. = 1.33 kNm
Mass = 1.67 (-7.5%) kg/m Allowable shear = 25.52 kN
I = 14.9 cm4 Min yield strength = 255 N/mm2
r = 1.56 cm Modulus of Elasticity = 70000 N/mm2
Scaffold Coupler Safe Working Loads Couplers in accordance with EN 74 / TG20 / BS 1139-2.2 / Independent Tests
P08/083/E1
CALCULATION INFORMATION SHEET Job No: A-UAE-6060-26
Title: Internal Independent Access Scaffold for Jet A-1 Tank Sheet No: 1 of 2
Prepared by: Date:
EMK 1/04/2015
Note: In accordance with permissible stress design (BS 5975) the allowable working stresses for steel can be increased by
25% when the over load is solely due to wind (e.g. for steel components as indicated above in red).
Allowable
Aluminium Chord Maximum Allowable Bending Moment at Various Compression Chord Shear /
Beams Centres Bracing Centres Reaction Harsco Code Numbers
1.0m 1.2m 1.5m 1.8m 2.0m 2.25m 2.4m
068313, 068314,
Harsco (SGB) 068315, 068316,
400 (Coverspan) 400mm 18.6kNm - 11.2kNm - 7.0kNm - - 17.4kN 068318
068604, 068606,
S450 400mm 18.5kNm - 11.2kNm - 7.0kNm - - 12.0kN 068608
Note: When combining Harsco (SGB) 400 (Coverspan) and S450 aluminium beams the lower of values above should be
used.
068402, 068403,
Coverspan 610 610mm - 24.0kNm - 13.0kNm - - 7.9kNm 17.1kN 068404, 068405
068472, 068473,
068474, 068475,
Coverspan 750 750mm - 43.8kNm - - - - 38.4kNm 31.5kN 068476, 068477
4032125, 4032225,
Haki Super 75 702mm - - - - 41.3kNm 41.3kNm - 30.6kN 4032325, 4032625
068621, 068622,
068623, 068624,
DAX 750 Beam 702mm 40.3kNm - - - 27.7kNm - - 38.2kN 068626
P08/083/E1
Regional Head Office
Quebeisi SGB LLC
P.O. Box 37656,
Dubai,
United Arab Emirates.
Tel: +971 (0)4 813 2000
Fax: +971 (0)4 813 2001
www.beis.com