GBI Design Reference Guide - Non-Residential Existing Building (NREB) V1.01
GBI Design Reference Guide - Non-Residential Existing Building (NREB) V1.01
GBI Design Reference Guide - Non-Residential Existing Building (NREB) V1.01
EXISTING BUILDING
(NREB)
Design Reference Guide
& SUBMISSION FORMAT
www.greenbuildingindex.org | [email protected]
GREENBUILDINGINDEX SDN BHD (845666-V) 4 & 6 Jalan Tangsi, 50480 Kuala Lumpur, Malaysia Tel 603 2694 4182 Fax 603 2697 4182
GREEN BUILDING INDEX DESIGN REFERENCE GUIDE & SUBMISSION FORMAT
Copyright
The Green Building Index (GBI) is developed by Greenbuildingindex Sdn Bhd (in short “GSB”) for the
purposes as mentioned herein and may be subject to updating and/or modification in future.
While every care has been taken by in the development of the GBI to establish and acknowledge copyright
of the information and materials used, and contact the copyright owners known to GSB, GSB tender their
apologies for any accidental omissions.
Green Building Index and GBI is a copyright of Greenbuildingindex Sdn Bhd (in short “GSB”) in which GSB
reserves all rights. GSB is the custodian of all rights for GBI. No part of the GBI may be used, modified,
reproduced, stored in a retrieval system or transmitted in any form, or by any means, electronic, mechanical,
photocopying, recording or otherwise, without the prior written permission of GSB.
DISCLAIMERS
GSB shall not be held liable for any improper or incorrect use of the GBI (inclusive of the materials and/or
information contained therein) and assume no responsibility for any user’s use of it. In no event shall GSB be
liable for any damages whatsoever, whether direct, indirect, incidental, special, exemplary or consequential
(including, but not limited to business interruption or loss of use, data or profits) regardless of cause, and
on any basis of liability, whether in contract, strict liability or tort (including negligence, misrepresentation or
otherwise) arising in any way out of the use of the GBI or the information and materials contained therein.
The information and materials in the GBI are provided “as is” and without warranties of any kind expressed
or implied. GSB do not warrant or make representations as to the accuracy and completeness of any
information and/or materials contained therein. While every effort has been made to check the accuracy
and completeness of the information and materials given, the users should always make their own
relevant checks. Accordingly, GSB do not accept responsibility and liability for misstatements made in it or
misunderstanding from it.
The GBI is no substitute for professional advice. Users are advised to consult with appropriate and accredited
professional advisors for advice concerning specific matters pertaining to the GBI before adopting or
using it. GSB disclaim any responsibility for positions taken by users in their individual cases or for any
misunderstandings and losses, direct or indirectly, on the part of the users.
GSB do not endorse or otherwise acknowledge the GBI rating achieved by the use of the GBI. GSB offer a
formal certification process for ratings; which service provides for independent third party review of points
claimed to ensure that all credits can be demonstrated to be achieved by the provision of the necessary
documentary evidence. Use of the GBI without formal certification by GSB does not entitle the user or any
other party to promote the achieved GBI rating.
INDEMNIFICATION
To the extent permitted by applicable law, by using GSB’s GBI, the user agrees to defend, indemnify, and
hold harmless, GSB, their officers, employees, members, representatives and agents from and against all
claims and expenses of whatsoever kind and amount, arising out of the user’s use of the GBI or materials
and information contained therein and not to pursue any cause of action whatsoever against GSB under
any conceivable circumstances.
CONTENTS
2 Copyright
4 Introduction
6 PROCEDURES
17 ASSESSMENT CRITERIA
18 ENERGY EFFICIENCY (EE)
29 INDOOR ENVIRONMENTAL QUALITY (EQ)
45 SUSTAINABLE SITE PLANNING & MANAGEMENT (SM)
53 MATERIALS & RESOURCES (MR)
60 WATER EFFICIENCY (WE)
66 INNOVATION (IN)
70 ACKNOWLEDGEMENTS
INTRODUCTION
The purpose of the Green Building Index Design Reference Guide is to establish a guidance document
to assist project teams in understanding the criteria for each of the main components of the Green
Building Index Rating Tool. The project team can use the document as a guide when submitting for the
Green Building Index as it clearly identifies examples of how and what is required for completing the
submission. Each of the main six criteria’s are further divided into the corresponding sub-sections in
obtaining the necessary credit points. This guide is indicative and not an exhaustive/definitive reference
to the Green Building Index rating tool.
The basic framework of this document sets out for each subsection the intent, description, requirements,
approach & implementation and in some occasions calculations to achieve the credit point for each sub-
section. The Green Building Index Design Reference Guide further becomes the base curriculum for the
training of facilitators on the Green Building Index Rating Tools.
To attain the Green Building Index classification, the procedures are as follows:
GBI verifies within 12 months of CPC (or CCC/OC/OP whichever is the later); or earlier, if occupancy
is not less than 50%, on the project classification. The verification process involves verifying the actual
measured energy and water use, sustainable site measures, indoor comfort survey results and action
plan, Building Manual and Sustainable Maintenance program. A full Certification is given at this stage. A
summary Completion & Verification Assessment (CVA) checklist is provided to determine target scoring.
APPEAL PROCEDURES
Appeal can be submitted (with fee paid) after receiving the Design Assessment result or after receiving
the Completion & Verification Assessment results.
VALIDITY OF CERTIFICATION
The validity of the certification is limited for three years. This is to encourage sustainable building
maintenance management throughout the life of the building.
GBI Facilitators provide services to enable building projects to achieve GBI Accreditation. A GBI Facilitator
is a registered person with GSB having completed the training and examinations conducted by GSB.
NON-RESIDENTIAL EXISTING
BUILDING (NREB)
PROCEDURES
STAGE 1
APPLICATION & REGISTRATION
COMPLETE
APPLICATION
REGISTRATION
Applicant to make the necessary
Registration Fee payment to GSB
and submit any other additional
required information
STAGE 2
DESIGN ASSESSMENT (DA)
DA Assessment by Certifier
Applicant to resubmit DA
Is the DA
Submission
NO
Accepted by Additional information/documents received
Certifier?
2nd Review
To submit YES
appeal form
& fees Certifier to finalise DA
GBIAP
Review
STAGE 3
COMPLETION & VERIFICATION ASSESSMENT (CVA)
Appeal
GSB notifies Applicant of CVA result
• Fail
• Request Review for a
Higher Rating
APPEAL
Appeal by
Applicant?
NO APPEAL
NON-RESIDENTIAL
EXISTING BUILDING (NREB)
CRITERIA CHECKLIST
& SUBMISSION FORMAT
PROJECT NAME
PROJECT ADDRESS
POSTCODE
STATE
APPLICANT
CONTACT PERSON
ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
QUANTITY SURVEYOR
LAND SURVEYOR
LANDSCAPE CONSULTANT
MAIN CONTRACTOR
LOCAL AUTHORITY
BUILDING DESCRIPTION
ASSESSMENT CRITERIA
Overall points score
6 Innovation (IN) 10
76 to 85 points Gold
66 to 75 points Silver
50 to 65 points Certified
NON-RESIDENTIAL
EXISTING BUILDING (NREB)
ASSESSMENT CRITERIA
SCORE SUMMARY
PART criteria item points SUBMITTER GBI
EE Energy Efficiency
Design
EE1 Minimum EE Performance 2
EE2 Lighting Zoning 3
EE3 Electrical Sub-metering 2
EE4 Renewable Energy 5
1
EE5 Advanced or Improved EE Performance - BEI 15
Commissioning
EE6 Enhanced or Re-commissioning 4
EE7 On-going Post Occupancy Commissioning 2
Verification & Maintenance
EE8 EE Monitoring & Improvement 2
EE9 Sustainable Maintenance 3
EQ Indoor Environmental Quality
Air Quality
EQ1 Minimum IAQ Performance 1
EQ2 Environmental Tobacco Smoke (ETS) Control 1
EQ3 Carbon Dioxide Monitoring and Control 1
EQ4 Indoor Air Pollutants 2
EQ5 Mould Prevention 1
Thermal Comfort
EQ6 Thermal Comfort: Design & Controllability of Systems 2
EQ7 Air Change Effectiveness 1
2
Lighting, Visual & Acoustic Comfort
EQ8 Daylighting 2
EQ9 Daylight Glare Control 1
EQ10 Electric Lighting Levels 1
EQ11 High Frequency Ballasts 1
EQ12 External Views 2
EQ13 Internal Noise Levels 1
Verification
EQ14 IAQ Before & During Occupancy 2
EQ15 Post Occupancy Comfort Survey: Verification 2
The Non-Residential Existing Building (NREB) Reference Guide is formatted in reference to the Non-
Residential Existing Building Tool. It is envisaged that this reference guide is a live document that from time
to time will be updated for the benefit of the end users.
The Reference guide has been formatted to form part of the basic criteria checklist for all documentation
submissions for both the Design Assessment (DA) and Completion & Verification Assessment (CVA). The
front cover sheet of the individual criteria is to be attached with documentation drawings, project narratives
and technical submissions. The criteria checklist is to be signed by the Principal Submitting Person (in short
“PSP”) , Submitting Person ( in short “SP”) or Specialist (in short “S”) together with the client’s (in short “C”).
Where the retrofitting works do not require appointment of the full compliment of consultants, the sole or
lead consultant will sign in lieu.
Enclosed the summary checklist together with the corresponding signatories required for each criteria.
PSP is defined as Architect or Engineer (similar to the definition in Certificate of Completion & Compliance, CCC)
SP is defined as Engineer, Landscape Architect, Planner and Quantity Surveyor (QS).
S is defined as Specialist which includes Facilitator, Project Manager, Facilities Manager, Energy or
Sustainable Consultant and Commissioning Specialist.
C is defined as Client or client’s assigned representative.
For NREB project without the full complement of the identified professionals, then the sole or lead
professional may sign in lieu.
The following is the recommended format of all documents that will form the Design Assessment (DA) &
Completion & Verification Assessment (CVA) submission;
1. All Drawings, Plans, Sections and Elevations to be formatted on A3 size paper, with respective scale
or scales clearly indicated. Should drawings be too small for legibility, provide a key plan with part
plans for full clarity of building information.
2. All Perspectives to fit A3 size paper.
3. All Reports to be A4 format. Signature of Qualified submitting professional should form part of the
submission.
4. Clearly mark the Design Assessment Checklist or Completion & Verification Checklist on submission
of documentations together with a Design Submission form.
All submissions to be saved into CD in PDF format. Two hard copies and three copies of CDs are to be
submitted to GSB.
NON-RESIDENTIAL EXISTING
BUILDING (NREB)
ASSESSMENT CRITERIA
energy efficiency
(EE)
INTENT
To create energy efficiency (EE) awareness and promote the use of MS 1525.
DESCRIPTION
Establish minimum energy efficiency (EE) performance to reduce energy consumption in buildings, thus reducing CO2
emission to the atmosphere. Meet the following minimum EE requirements as stipulated in MS 1525.
REQUIREMENTS
1 point: Awarded for Overall Thermal Transfer Value (OTTV) ≤ 50 W/m2, and where applicable, Roof Thermal Transfer
Value (RTTV) ≤ 25 W/m2. Submit calculations for OTTV and RTTV. Use of the BEIT software or other GBI approved
software is acceptable.
1. Plans and elevations marking out walls & apertures used for the calculation coloured blue;
and walls & apertures not used for calculation coloured red. Recommended scale 1: 200.
2. OTTV calculations for each facing wall and roof.
3. Description of wall & aperture materials specified.
4. Calculations of U-values for roof and walls.
5. Proposed Glazing specifications on Shading Coefficient, U-values and Visible Light
Transmission.
6. Confirm provision of Energy Management System where air conditioned space ≥ 4000m2.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As Built plans and elevations marking out walls & apertures used for the calculation coloured
blue; and walls & apertures not used for calculation coloured red.
2. OTTV calculations for each facing wall and roof.
3. Description of built wall & aperture materials with U-value calculation
4. Manufacturer issued glazing specification on shading coefficient, U-values and Visible Light
Transmission.
5. Description of as-installed Energy Management System and I/O schedule.
6. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To provide flexible lighting controls so as to optimise energy savings.
DESCRIPTION
Encourage and recognise lighting design practices that offer greater flexibility for light switching, making it easier to light
only occupied areas.
REQUIREMENTS
1 point: Awarded for all individual or enclosed spaces to be individually switched; and the size of individually switched
lighting zones shall not exceed 100m² for 90% of the NLA; with switching clearly labelled and easily accessible by
building occupants.
1 point: Awarded for provision of auto-sensor controlled lighting in conjunction with daylighting strategy for all perimeter
zones and daylit areas, if any.
1 point: Awarded for provision of motion sensors or equivalent to complement lighting zoning for at least 25% NLA.
1. Drawings of floor plans clearly showing every proposed individually switched lighting zone
and its coverage area.
2. Electrical schematic drawings showing the locations and extent of switching, the area
controlled by the switch and automated control sensing system detailed.
3. Report to include the areas of all switched zones and confirmation that the total areas meet
the percentage NLA requirements.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built Drawings of floor plans clearly showing each individually switched lighting zone
and its coverage area.
2. As-Built Electrical schematic drawings showing the locations and extent of switching, the
area controlled by the switch and automated control sensing system detailed.
3. Report to include the exact areas of all switched zones and confirmation that the total area
meets the percentage NLA requirements.
4. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To monitor energy consumption of key building services as well as all tenancy areas.
DESCRIPTION
Encourage and recognise the provision of energy sub-metering to facilitate energy monitoring of base building services
by tenants or end users.
REQUIREMENTS
1 point: Provide separate sub-metering for all energy use ≥ 100kVA.
1 point: Provide separate sub-metering for
1) Lighting, AND
2) Power
at each floor or tenancy.
For existing buildings with tentative space planning layouts, compliance is by demonstrating commitment and provision
to install meters for separate tenancy areas. As a minimum this is to be provided on each floor and to each wing or other
clearly separable tenancy area or zone.
Where Energy Management System (EMS) is provided, all meters should be linked to the EMS for monitoring and
recording, and control where appropriate.
1. An extract from the specification detailing the installation requirements for electrical sub-
meters that meets the credit criteria.
2. Clearly marked electrical schematic drawings showing the proposed locations of meters
and the usage served by those meters.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built Electrical schematic drawings showing the exact locations of meters and the
building usage served by those meters.
2. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To promote use of all forms of renewable energy to reduce environmental impact and emission of CO2.
DESCRIPTION
The use of renewable energy systems will help to defer the need for power plant-up and promote green energy use.
Calculate the project performance by expressing the energy produced by the renewable energy systems as a percentage
of the building annual energy use. In the context of the built environment in Malaysia, the most likely form of renewable
energy would be derived from BIPV. Other forms of renewable energy are also applicable with their appropriate
conversion into equivalent electrical energy for calculation purposes.
REQUIREMENTS
1 point : Awarded where 0.25 % of the Maximum [electricity] Demand (MD) is supplied by Renewable Energy (RE) or 2
kWp RE is installed, whichever is the greater, OR
2 points : Awarded where 0.5 % or 5 kWp whichever is the greater, OR
3 points : Awarded where 1.0 % or 10 kWp whichever is the greater, OR
4 points : Awarded where 1.5 % or 20 kWp whichever is the greater, OR
5 points : Awarded where 2.0 % or 40 kWp whichever is the greater.
1. Plans and elevations marking out areas allocated to house renewable energy equipment.
2. Describe proposed technology to be used, including documenting total kWp or equivalent
to be installed.
3. Predicted reduced MD/total electricity consumption by the building and percentage of
renewable energy to be generated.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built plans and elevations marking out installation and location of renewable energy
equipment.
2. Manufacturer’s technical specification of the renewable energy equipment.
3. As-Measured kWp or equivalent renewable energy generated.
4. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
Advanced or Improved
EE5 EE Performance - BEI
15 Points
INTENT
To encourage enhancement of building EE performance thereby reducing CO2 emission.
REQUIREMENTS
Up to 15 points are awarded where it is demonstrated that Energy Efficiency (EE) performance exceeds the baseline
minimum to reduce energy consumption in the building. Achieve Building Energy Intensity (BEI) as defined by GBI [use
of BEIT Software (limited to GBI Certified or Silver rating only) or other GBI approved softwares is acceptable], for award
of points as follows:
Demonstrate Energy savings over the last 3 years from Existing Building historical BEI baseline, to be improved, for award
of points as follows:
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
Enhanced Commissioning /
EE6 Re-commissioning of Building 4 Points
Energy Systems
INTENT
To ensure building’s energy related system are installed to achieve proper commissioning so as to realise their full
potential and intent. This will serve to eliminate the bad practice of not fully commissioning the installed systems.
REQUIREMENTS
Appoint an independent GBI recognised Commissioning Specialist (CxS) to ensure a comprehensive commissioning /
re-commissioning / retro commissioning is performed for all the building’s energy related systems in accordance with
ASHRAE Commissioning Guideline or other GBI approved equivalent standard/s by:
• Implementing improvements to ensure the building’s major energy using systems are repaired, operated and
maintained effectively to optimize energy performance.
• Developing a commissioning or ongoing commissioning plan for the building’s major energy-using systems.
• Providing training for management staff to build awareness and skills in a broad range of sustainable building
operation topics, including energy efficiency and building, equipment and systems operations and maintenance.
• Updating the building operating plan as necessary to reflect any changes in occupancy schedule, equipment
runtime schedule, design set points and lighting levels.
1. Confirmation letter from the CxS of his appointment and scope of works in accordance with
the GBI CxS requirements.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Documentary evidence that the full scope of CxS works have been carried out during the
contract administration phase.
2. The final commissioning report including recommendations to the client regarding the
performance of the commissioned building energy related systems.
3. A copy of the systems manual as described in the CxS scope of works.
4. Documented evidence of training of building management staff.
5. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To ensure up-to-date on-going post occupancy commissioning are carried out for all tenancy areas after fit-out changes
are completed, if any, so that the intended EE and IEQ are fully sustained.
REQUIREMENTS
1 point: Awarded where professional engineer reviews all tenancy fit-out plans to ensure original design intent is not
compromised and upon completion of the fit-out works, verify and fine-tune the installations to suit.
1 point: Awarded where the CxS carries out a full re-commissioning of the building’s energy related systems for affected
tenancy areas to verify that their performance is sustained in conjunction with the completed tenancy fit-out changes.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Document what has been approved and constructed for post-occupancy fit-out’s.
2. CxS to verify re-commissioning of post occupancy fit-out, if applicable.
3. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To provide for ongoing accountability of the building energy consumption over time.
REQUIREMENTS
1 point: Awarded for the use of Energy Management System to monitor and trend log building system performance
for system efficiency including parameters for plant sequencing, etc, AND
Monitor sub-metering of building systems to track energy consumption of major building uses and other end use
applications e.g. by categorising into building systems or floors.
1 point: Fully commission EMS and activate Maximum Demand Limiting programme, AND
Compile, summarise and submit BEI, Fuel and Water Consumption of the building to GSB on an annual basis during
the 3-years validity period or earlier whenever requested by GSB. Submissions shall include monthly energy and water
bills.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Actual verified BEI achieved, Renewable Energy generated and Water consumption for
completed building.
2. Where EMS is installed, comprehensive printouts of EMS results including Maximum
Demand Limiting program setting.
3. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To ensure the building’s energy related systems will continue to perform as intended with proper and sustainable
maintenance.
REQUIREMENTS
1 point : Awarded where at least 75% of permanent building maintenance team participate in the commissioning of all
building energy services.
1 point : Awarded for providing a designated building maintenance office that is fully equipped with facilities (including
tools and instrumentation) and inventory storage
1 point : Provision of evidence of documented plan for at least 3-year facility maintenance and preventive maintenance
budget (inclusive of staffing and outsourced contracts).
1. Identify building maintenance room and facilities in the design floor plan.
2. Commitment to deploy at least 75% of permanent building maintenance team to participate
in commissioning of all building energy services with organisation chart and staff positions
identified.
3. Commitment to provide evidence of documented plan for at least 3-year facility maintenance
and preventive maintenance budget (inclusive of staffing and outsourced contracts).
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Documentary evidence that 75% of the maintenance team were involved in the full testing
& commissioning of the building energy related systems.
2. Comprehensive list of maintenance tools and instrumentation, and inventory storage
items.
3. Provide evidence of documented plan for at least 3-year facility maintenance and preventive
maintenance budget for facility maintenance (inclusive of staffing and outsourced
contracts).
4. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INDOOR ENVIRONMENTAL
QUALITY (EQ)
INTENT
To provide for minimum IAQ performance in buildings to ensure comfort and well-being of building occupants.
DESCRIPTION
Meet the minimum requirements of ventilation rate in ASHRAE 62.1 or local building code, whichever is the more
stringent.
REQUIREMENTS
Meet the minimum requirements specified in ASHRAE 62.1 or local building code whichever is stricter.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To minimize exposure of building occupants to Environmental Tobacco Smoke.
DESCRIPTION
Avoid health problems associated with tobacco smoke by preventing possible contamination in the building, thereby
reducing health risks to occupants linked to “second-hand smoke”.
REQUIREMENTS
Prohibit smoking in the building and locate any exterior designated smoking areas away from entries, outdoor air intakes
and operable windows, OR
Prohibit smoking in the building except in designated smoking rooms and establish negative pressure in the smoking
rooms together with provision of effective air filtration system.
1. Description of strategies to be employed in the building to achieve this credit (by means of
management policy or signage proposal).
2. Plans showing the location of exterior and/or interior designated smoking areas, if any.
3. Ventilation design schematics and description illustrating provision of effective air filtration
system and maintenance of negative pressure for the smoking room (where designated
smoking room in the building is provided)
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built drawings identifying location of exterior and/or interior designated smoking areas
2. Summary report describing strategies undertaken to ensure prohibition of smoking indoors
can be enforced and strategies implemented to ensure that tobacco smoke will not enter
the building or ventilation system where exterior and/or interior smoking area is provided.
3. Photographic evidence of strategies adopted.
4. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To provide capacity for effective ventilation system monitoring and control so as to ensure comfort and well-being of
building occupants.
DESCRIPTION
Use carbon dioxide monitoring and control system to deliver the required outdoor air to the occupants to suit variation
in occupancy.
REQUIREMENTS
Install carbon dioxide (CO2) monitoring and control system with at least one (1) CO2 sensor at main return air points on
each floor to facilitate continuous monitoring and adjustment of outside air ventilation rates to each floor, and ensure
independent control of ventilation rates to maintain CO2 level < 1,000 ppm.
1. Submission of ventilation and control schematics together with description of how CO2
monitoring and controls are integrated into the ventilation design.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To minimize detrimental impact on occupant health through the use of materials with minimal volatile organic compounds
(VOC) and formaldehyde content.
DESCRIPTION
Encourage the use and specification of healthy materials and finishes which contain low volatile organic compounds
(VOC) and formaldehyde.
REQUIREMENTS
1 point : Use low VOC paint and coating throughout the building. Paints and Coatings to comply with requirements
specified in international labelling schemes recognized by GBI, AND
Use low VOC carpet or flooring throughout the building. Carpets to comply with requirements specified in international
labelling schemes recognized by GBI. Other types of flooring to comply with requirements under FloorScore developed
by Science Certification System or equivalent, AND
Use low VOC adhesive and sealant or no adhesive or sealant used. Adhesives and sealants to comply with requirements
specified in international labelling schemes recognized by GBI.
1. Summary report identifying areas where the low VOC materials will be installed and how the
credit compliance is to be met.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As built drawings showing where low VOC materials or products are used.
2. List of products installed that meet the credit requirements, and their specifications.
3. Manufacturer’s information including data sheets, certificates, test reports etc to demonstrate
credit compliance.
4. Photographic evidence of each typical low VOC installation.
5. Describe any deviations or additions to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To prevent microbial contamination in the building to ensure the health and well-being of building occupants.
DESCRIPTION
Design system(s) which reduce the risk of mould growth and its associated detrimental impact on occupant health.
REQUIREMENTS
Demonstrate that the air-conditioning and mechanical ventilation system will maintain a positive indoor air pressure
relative to the exterior, and can actively control indoor air humidity to be no more than 70% RH without the use of primary
active reheat system (which consumes additional energy).
Ensure that excessive moisture in building is taken into consideration during the retrofitting exercise, and be controlled
and monitored during construction and operation stages by control of the following:
• Rainwater leakage through roof and walls
• Infiltration of moist air
• Diffusion of moisture through walls, roof and floors
• Groundwater intrusion into basements and crawl spaces through walls and floors
• Leaking or burst pipes
• Indoor moisture sources
• Construction moisture
OR
The above mentioned measures are not necessary or applicable if the building is fully naturally ventilated.
1. Summary report outlining the strategies adopted to meet the credit requirements.
2. A copy of specifications for the strategies to be carried out.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built drawings or As-Built specifications confirming that the building has been retrofitted
in accordance with the strategies adopted.
2. Manufacturer’s information on all relevant materials specified for mould prevention and/or
resistance, to verify credit compliance.
3. Documentation evidence during construction of the precautions taken for mould prevention,
e.g. photographs of material storage and protection for items that are susceptible to mould
growth as identified in the DA submission stage.
4. Provide 24-hour record (during full occupancy) of Temperature-Relative Humidity
measurements for at least two (2) areas acceptable to the GBI Certifier.
5. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To provide a thermal environment that is comfortable and supports the productivity and well-being of building
occupants.
DESCRIPTION
Provide a high level of thermal comfort system control by individual occupants or by specific groups in multi-occupant
spaces to promote the productivity, comfort and well-being of building occupants.
REQUIREMENTS
1 point : Provide individual comfort control for ≥ 50% of the building occupants to enable adjustments to suit individual
task needs and preferences, AND
Provide comfort system control for all shared multi-occupant spaces to enable adjustments to suit group needs and
preferences.
1. Describe how the project will fulfil the requirements on provision of individual control for
at least 50% of building occupants and also provision of controls for shared multi-occupant
spaces.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Summary report that includes information on the methods used to establish thermal
conditions for the project and how the system design addresses the design criteria.
2. Provide 72-hour record (during full occupancy) of temperature measurement for at least
two (2) areas acceptable to the GBI Certifier, to verify the specified close thermal comfort
condition.
3. Summary report on the individual types of control and the controls for multi-occupant
spaces that are provided to achieve the credit compliance.
4. Photographic evidence of each typical type of sensor and control installed.
5. Describe any deviation or addition to the DA submission
DATE
PROJECT NAME
CLIENT
INTENT
To ensure effective delivery of clean air through reduced mixing with indoor pollutants in order to promote
a healthy indoor environment.
DESCRIPTION
Prevent or minimize short-circuiting of outdoor ventilation air through recirculation of supply and return air.
REQUIREMENTS
Demonstrate that the Air Change Effectiveness (ACE) meets the following criteria for at least 90% of the NLA:
The ventilation system is designed to achieve an ACE ≥ 0.95 when measured in accordance with ASHRAE 129. Measure
air change effectiveness, where ACE is to be measured within the breathing zone (nominally 1.0 m from finished floor
level).
1. Summary report detailing the design criteria that has been adopted for each type of space
in the development.
2. Describe how the ventilation system meets the credit compliance.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To ensure provision of good levels of daylighting for building occupants.
DESCRIPTION
Design and implement good level of diffused daylight into interior of building.
REQUIREMENTS
1 point: Demonstrate that ≥ 30% of the NLA has a Daylight Factor in the range of 1.0 – 3.5% as measured at the working
plane, 800mm from floor level, OR
2 points: Demonstrate that ≥ 50% of the NLA has a Daylight Factor in the range of 1.0 – 3.5% as measured at the working
plane, 800mm from floor level.
Note:
a) Refer to MS1525 for the description and calculation of Daylight Factor.
b) Refer to GBI for non office applications.
1. Summary report with diagrams, of the design daylight strategies including for glare control
that will be undertaken to meet the credit requirements.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built drawings and specifications demonstrating that the daylighting system has been
constructed according to design drawings/specifications.
2. Typical floor plans with Daylight Factor measurement results.
3. Site plan incorporating height of existing buildings or planned buildings surrounding the
building together with solar diagrams & sun path.
4. Summary of Daylight Factor results.
5. Manufacturer’s Information on the daylighting system used, if custom-made.
6. Furnish photographs of each type of typical device installed.
7. Describe any deviations or additions to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To reduce discomfort of glare from natural light.
DESCRIPTION
Ensure daylighting system is designed with adequate and proper glare control in order not to negate the benefits of
daylighting.
REQUIREMENTS
Where blinds or screens are fitted on glazing and atrium as a base building, incorporate provisions to meet the following
criteria;
1. Eliminate glare from all direct sun penetration and keep horizontal workspace luminance level below 2000 lux;
AND
2. Eliminate glare from diffused sky radiation for occupant workspace at viewing angles of 15° to 60° from the horizontal
at eye level (typically 1.2m from floor level); AND
3. Control with an automatic monitoring system (for atrium and windows with incident direct sun light only - not
applicable for fixed blinds/screens); AND
4. Equip with a manual override function accessible by occupants (not applicable for fixed blinds/screens).
1. Typical floor plans and sections showing variable position of glare control system.
2. Brief description of proposed control mechanism to be provided.
3. Summary report to describe how view and daylight is assured when glare control system
is engaged.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To ensure lighting level is not over-designed.
DESCRIPTION
Ensure lighting level is designed in accordance to MS1525 for different types of spaces.
REQUIREMENTS
Demonstrate that (office) lighting design maintains a luminance level of no more than specified in MS1525 for 90% of
NLA as measured at the working plane (800 mm above the floor level).
Note: For non office applications, refer to GBI for working plane height.
1. Summary report of lighting design brief to illustrate how the credit will be met.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To provide for comfortable visual working environment for occupants.
DESCRIPTION
Increase workplace amenity by avoiding low frequency flickers that may be associated with fluorescent light fittings.
REQUIREMENTS
Install high frequency ballasts in fluorescent luminaires over a minimum of 90% of NLA.
1. Description of design strategy to achieve installation of high frequency ballasts for minimum
90% of NLA
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built lighting plans to identify location of the 90% NLA of fluorescent luminaries installed
with high frequency ballasts.
2. Manufacturer’s information confirming the specifications of high frequency ballasts
installed.
3. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To reduce eyestrain for building occupants by providing long distance views and visual connection to the outdoor.
DESCRIPTION
Provision of view to the outside for building occupants to achieve benefits of connectivity with the outdoor
environment.
REQUIREMENTS
1 point: Demonstrating that ≥ 60% of the NLA has a direct line of sight through vision glazing at a height of 1.2m from
floor level. OR
2 points: Demonstrating that ≥ 75% of the NLA has a direct line of sight through vision glazing at a height of 1.2m from
floor level.
1. Typical floor plans to identify how external view for the spaces is maintained.
2. Design strategy of the interior layout that will be designed or recommended to maintain
view to the outside.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built plans including interior layout confirming that there is direct line of sight to outside
through vision glazing between 0.8 and 2.2m above the finish floor level for the required
spaces.
2. For buildings where fit-out is not done, recommended interior layout shall be provided to
tenants.
3. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To ensure building is designed to maintain a comfortable acoustic environment for occupants.
DESCRIPTION
Maintain internal noise level at an acceptable and tolerable level.
REQUIREMENTS
Demonstrate that 90% of the NLA do not exceed the following ambient internal noise level:
• Within the entire building general office, space noise does not exceed 40 dBAeq, OR
• Within the baseline building office space, the sound level does not exceed 45 dBAeq for open plan and does not
exceed 40 dBAeq for closed offices.
1. Design report on strategies to ensure internal noise level is maintained at the prescribed
levels.
2. Floor plans showing location of Core, M&E, and equipment rooms.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Report describing the measured internal and external noise sources and features installed
to achieve required noise level.
2. As built drawings showing noise control features.
3. Manufacturer’s data sheets of the acoustic materials used in building.
4. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To maintain good Indoor Air Quality condition both before building occupancy and during building occupancy.
DESCRIPTION
Reduce indoor air quality problems resulting from the construction process in order to help sustain the comfort and well-
being of building occupants.
REQUIREMENTS
1 Point: Develop and implement an Indoor Air Quality (IAQ) Management Plan to effect this requirement as follows:
Option 1: Perform a building flush-out by supplying outdoor air to provide not less than 10 air changes/hour (ACH) for
at least 30 minutes operation before occupancy and continuous minimum 1 ACH during the initial 14 days occupancy of
the completed building, OR
Option 2: If low VOC materials and low formaldehyde composite wood are used (EQ4 is achieved), then building flush-
out can be performed by supplying outdoor air to provide not less than 10 ACH for at least 15 minutes operation, OR
Option 3: Conduct IAQ testing to demonstrate maximum concentrations of pollutants do not exceed that listed in the
Indoor Air Quality Code of Malaysia.
Where a permanent air flushing system of at least 10 airchanges/hour operation is installed and operated
at least once a year during occupancy stage
Option 3, IAQ testing procedure to confirm major contaminants are below recognized acceptable levels. This will help
to ensure good indoor air quality for occupants.
1. Summary report outlining the strategies and procedures to be taken to meet the credit
requirements.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Report on building flush-out procedure including the actual dates of the flush-out.
2. If IAQ testing is carried out, a report to outline the procedures undertaken and the results
of the testing to verify if the credit requirements are met or not. If not, corrective measures
must be taken.
3. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To provide for assessment of comfort of the building occupants.
DESCRIPTION
Conduct post occupancy comfort survey of building occupants and to undertake measures to rectify the problems
identified during the survey.
REQUIREMENTS
Conduct an occupancy comfort survey of building occupants. This survey should collect anonymous responses about
thermal comfort, visual comfort and acoustic comfort in a building. It should include an assessment of overall satisfaction
with thermal, visual and acoustic performance and identification of thermal-related, visual-related and acoustic-related
problems, AND
Develop a plan for corrective action if the survey results indicate that more than 20% of occupants are dissatisfied
with the overall comfort in the building. This plan should include measurement of relevant environmental variables in
problem areas. The relevant environmental variables include 1) temperature, relative humidity, air speed and mean
radiant temperature, 2) lighting level and glare problem, 3) background noise level, 4) odour problem, CO2 level, VOCs,
and particulate concentration.
1. Summary report of the strategies that will be undertaken to meet the credit compliance.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To give due recognition to a building with previous green rating or with energy efficiency audit report which is still
valid.
DESCRIPTION
Encourage building to subscribe to continuous improvements and maintaining its green rating and energy efficiency
effort.
REQUIREMENTS
Awarded if the building has been previously GBI (or other GBI approved Green Rating system) rated under any category,
OR within the last 12 months a comprehensive Energy Efficiency Audit has been conducted.
1. Furnish past GBI certificate or other GBI approved Green Building Certificate OR valid
Energy Efficiency Audit report (not more than 12 months old).
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Furnish past GBI certificate or other GBI approved Green Building Certificate OR valid
Energy Efficiency Audit report (not more than 12 months old).
DATE
PROJECT NAME
CLIENT
INTENT
To mitigate pollution to the environment when carrying out maintenance of building exterior.
DESCRIPTION
Promote conscious use of environmentally friendly products to carry out building management works.
REQUIREMENTS
Employ environmentally sensitive building exterior management plan to reduce pollution.
Use environmentally non-polluting methods and chemicals for cleaning of building exterior including maintenance
equipment, chemicals, paint and sealants.
1. Submit building exterior management plan and intended list of non-polluting cleaning
agents / products.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To preserve the natural environment of the building exterior through adopting environmentally sensitive management
measures.
DESCRIPTION
Promote the awareness and need to use least toxic chemicals for exterior maintenance as well as effect erosion and
sedimentation controls.
REQUIREMENTS
Employ environmentally sensitive management to preserve the site’s natural components. Minimise harmful chemical
use, energy waste, water waste, air pollution, solid waste and/or chemical runoff such as gasoline and oil. The following
operational elements must be addressed:
1. Use of least toxic chemical pesticides, minimum use of chemicals and use only in targeted locations and only for
targeted species. Conduct routine inspection and monitoring AND
2. Erosion and sedimentation control for ongoing landscape operations including measures that prevent erosion and
sedimentation, prevent air pollution from dust or particulate matter and restore eroded areas.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To reduce pollution and land development impacts from automobile use.
DESCRIPTION
Provide preferred parking areas for green vehicles, thereby encouraging the use of such vehicles (e.g. hybrid or electric
vehicles).
REQUIREMENTS
Encourage use of green vehicles:
• Provide preferred parking for low-emitting and fuel-efficient vehicles by allocating 5% of the total car parks of the
building.
• “Preferred parking” refers to the parking spots that are closest to the main entrance of the project (exclusive of
spaces designated for handicapped or parking passes provided at a discounted price).
1. Submit calculations for provision of 5% required car park bays for green vehicles.
2. Plans showing the locations and numbers of car park bays reserved for green vehicles.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Submit As-Built plans showing locations and the allocated 5% car park bays for green
vehicles.
2. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To reduce pollution and land development impacts from single occupancy vehicle use.
DESCRIPTION
Reward for not over-providing parking capacity. This is to encourage the use of public transport and carpools and reduce
single occupancy private vehicle use. The environmental benefits of travelling by public transport include the reduction
in the emission of greenhouse gases by private cars, thereby reducing urban pollution and traffic congestion.
REQUIREMENTS
Discourage over-provision of car parking capacity:
• Size parking capacity not exceeding the minimum local zoning requirements, AND
• Provide preferred parking for carpools or vanpools for 5% of the total provided parking spaces.
1. Submit detailed calculation showing the minimum number of car park bays required by the
local authorities, and the number of bays provided.
2. Submit plans showing location for preferred parking for carpools or vanpools.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To reduce heat island effect (thermal gradient difference between developed and undeveloped areas) so as to minimize
impact on microclimate and human and wildlife habitat.
DESCRIPTION
• Minimize impact on microclimate and human wildlife habitat.
• Reward for achieving any option. Roof application includes roofs over individual parking lots and roofs over parking
structures.
• The use of greenery on rooftops can help alleviate urban heat island effects through shading and evaporative
cooling. It also enhances aesthetics to the surrounding and provides a more pleasant working environment, which
is also discussed in Indoor Environment Quality.
REQUIREMENTS
2 Points: Hardscape & Greenery Application
1. Provide any combination of the following strategies for 50% of the site hardscape (including sidewalks,
courtyards, plazas and parking lots):
• Shade (within 5 years of occupancy);
• Paving materials with a Solar Reflectance Index (SRI) of at least 29;
• Open grid pavement system;
1. Submit Site plan and Roof Plan showing the extent of proposed hardscape and greenery
(softscape) (To scale).
2. Section drawing of the rooftop showing details of built-up roof greenery (To scale)
3. List of names of native or adaptive vegetation and their characteristics.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-Built plans and sections of roof (to scale). Submit list of materials used and their SRI
values
2. Submit photographs of roof and materials.
3. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To document Green building design features and strategies for user information and guide to sustain performance
during occupation.
DESCRIPTION
A Building User Manual is intended to inform occupants about the active and passive design features that should be
maintained throughout the lifespan of the building.
REQUIREMENTS
Provide a Building User Manual which documents all the passive and active features that are part of the building, and
highlight all passive and active features that should not be downgraded.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To encourage designers to specify the usage of reused building materials when retrofitting buildings.
DESCRIPTION
Reuse building materials and products to reduce demand for virgin materials and reduce creation of waste. This serves
to reduce environmental impact associated with extraction and processing of virgin resources. Integrate building design
and its buildability with selection of reused building materials, taking into account their embodied energy, durability,
carbon content and life cycle costs.
REQUIREMENTS
1 point: Where reused products/materials constitute ≥ 20% of the project’s total retrofit material cost value.
Reused Materials found on site: Fixed components such as doors, cabinetries, posts etc. that no longer serve their
original function are refurbished, reconditioned and installed for a different use or in a different location.
Reused Materials found off site: Use of salvaged materials found off site. They must be previously used or they may
be relocated from another facility.
Temporary structures: Temporary formwork, framing and structures etc that can be reused many times before disposal
(5-10 cycles of usage) can also be included. If the temporary structures are not new procurement for this project but have
been used previously in other project/s, state the number of re-use that are remaining (e.g. use of system formwork is
encouraged).
1. Provide a narrative describing the materials reuse strategy for the project
2. List of anticipated reused or salvaged materials for the project.
3. Cost of each proposed reused or salvaged materials.
4. Establish the estimated Total Cost of the materials for the project excluding MEP items (or
use the 45% default value for materials costs; i.e. Total Materials Cost may be derived by
multiplying the total construction cost by 0.45) for the project.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To encourage designers to specify the usage of recycled content materials when retrofitting buildings.
DESCRIPTION
Increase demand for building products that incorporate recycled content materials in their production. (Recycled content
shall be defined in accordance with the ISO 14021 document).
REQUIREMENTS
1 point: Where use of materials with recycled content is such that the sum of post-consumer recycled plus one half
of the pre-consumer content constitutes ≥ 20% (based on cost) of project’s total retrofit material cost value.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Documentation during the construction stage including photographs of the installed reused
materials.
2. Calculation of the recycled content value of each material must be provided.
3. Information on the sources/suppliers on the materials with recycled content must be provided.
4. Calculate the total percentage (based on cost) value of the materials with recycled content
against the actual total value of the materials for the project. The percentage of post-consumer
and/or pre-consumer recycled content must be established by cost.
5. Establish the estimated Total Cost of the materials excluding MEP items (or use the 45%
default value for materials costs; i.e. Total Materials Cost may be derived by multiplying the
total construction cost by 0.45) for the project
6. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To promote responsible forest management.
DESCRIPTION
Encourage environmentally responsible forest management.
REQUIREMENTS
Where ≥ 75% of wood-based materials and products used in the retrofit works are certified. These components include,
but are not limited to, structural framing and general dimensional framing, flooring, sub-flooring, wood doors and
finishes. To include wood materials permanently installed and also temporarily purchased for the project. Compliance
with Forest Stewardship Council and Malaysian Timber Certification Council requirements.
Provide a list of certified vendors, suppliers and manufacturers to the contract bidders.
1. List all new wood products specified in the project and identify which components are FSC and
MTCC certified.
2. Indicate the estimated volume of each wood product.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. List all new wood products used in the project and identify which components are FSC and
MTCC certified.
2. The volume of each wood product must be shown.
3. The vendor’s chain-of-custody (COC) number must be shown in the invoice to verify FSC and
MTCC certifications.
4. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To promote the use of sustainable consumer products apart from building maintenance and operational needs, through
the adoption of a sustainable purchasing policy.
DESCRIPTION
It is essential to extend environmental protection to cover the day to day operation of a building through the
implementation of a sustainable purchasing policy by the owners and tenancies.
REQUIREMENTS
Develop a Sustainable Purchasing policy that must cover product purchases within the building and management’s
control.
1. Submit an outline of the Sustainable Purchasing Policy with its objective, scope and
responsibilities, best practices and procurement strategies, etc.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To provide dedicated areas and storage bins for non-hazardous materials for recycling during BOTH construction and
building occupancy.
DESCRIPTION
Facilitate reduction of waste generated during retrofit construction and during building occupancy that is hauled and
disposed off in landfills.
REQUIREMENTS
1 point: Provide recycling facilities/infrastructure for sorting and separate collection of recyclable waste for recycling
during construction (consumables - glass, paper, metal, equipment, addition & alteration construction wastes)
1 point: Promote and encourage waste minimization and recycling among occupants, tenants and visitors through
various avenues
1 point: Promote waste sorting, collecting, quantifying, monitoring and recycling of a large range of waste generated
in-house.
1. Floor plans showing the proposed locations of the storage areas for recyclables and their
proximity to the building entrance and vehicular access point/s.
2. Ensure that the space provided for recyclables is in addition to the storage space allocated
for general waste.
3. Describe proposed promotional activities to encourage recycling within the building.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As-built plans showing the locations of the storage area for recyclables. The plans should
indicate the proximity of the storage from the building entrance.
2. Photographs showing the location, size, storage provision and labelling of dedicated
facilities during construction.
3. Write up of promotional activities to encourage recycling within the building including
evidence of such promotional activities carried out.
4. A waste recycling strategy and plan that identifies types of recyclable materials diverted
from landfills as well as recycling facilities that have been signed up to handle the
recyclable waste
5. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To demonstrate leadership in accelerating phase-out of all Ozone Depleting Substances. Recognise and promote use of
low Global Warming Substances.
DESCRIPTION
Use environmentally-friendly Refrigerants and Clean Agents exceeding Malaysia’s commitment to the Montreal & Kyoto
protocols.
REQUIREMENTS
1 point: Use zero Ozone Depleting Potential (ODP) products: non-CFC and non-HCFC refrigerants AND clean agents,
1 point: Use non-synthetic (natural) refrigerants AND clean agents with zero ODP and negligible Global Warming
Potential.
Use non-synthetic (natural) refrigerants (for HVAC) and clean agents (for fire fighting) with zero ODP and negligible Global
Warming Potential (GWP) such as water, hydrocarbon, carbon dioxide, ammonia and etc (for HVAC); and nitrogen, argon,
water mist and etc (for fire fighting).
1. Submit proposed types of refrigerants and clean agents to be used and/or if no refrigerants
or clean agents will be used.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
WATER EFFICIENCY
(WE)
INTENT
To encourage rainwater harvesting that will lead to reduction in potable water consumption.
DESCRIPTION
Maximise rainwater collection from rooftop or runoff rainwater systems for building consumption and/or irrigation.
REQUIREMENTS
Rainwater harvesting that achieves the following percentage in reduction of potable water consumption:
1 point: For ≥ 5% or more reduction, OR
2 points: For ≥ 15% or more reduction, OR
3 points: For ≥ 30% or more reduction.
Submit calculation demonstrating reduction in water consumption compared to the existing building’s water usage which
includes potable water used for cooling towers, fountains, pools, etc.
Water purifying system may be necessary depending on the application and methodology of harvesting the rainwater.
Where rainwater filtration/purification is required, use of ozone or activated oxygen in lieu of chlorine or other GHG
chemicals, is preferred to obviate negative environmental impact.
Rainwater harvesting calculation method and parameters adopted using GBI recognized Standards, Codes or Guides
are acceptable.
1. A technical report describing the concept and details of rainwater collection, conveyance
system (gutters/downpipes or equivalent), filtration system (if any), storage facility and
distribution system.
2. The technical report shall include schematics showing how the rainwater is to be harvested
and utilised, including calculation of annual water consumption and reduction achievable
from using harvested rainwater based on historical rainfall data.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Final as-installed calculation of rainwater harvested, storage tank capacity and building
usage distribution system.
2. As Built drawings for rainwater harvesting system and storage tank location (Recommended
scale 1:200).
3. Furnish photographs of as installed main equipment and components.
4. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To encourage water recycling that will lead to reduction in potable water consumption.
DESCRIPTION
Encourage recycling of greywater and/or blackwater for building and irrigation use to reduce discharge to external sewer,
thereby reducing the overall building potable water consumption.
Encourage and recognise building design that reduces water flow to sewerage treatment plants.
REQUIREMENTS
Treat and recycle the following percentage of wastewater leading to reduction in potable water consumption:
1 point: For ≥ 10% or more wastewater being treated and recycled, OR
2 points: For ≥ 30% or more wastewater being treated and recycled.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Final as-installed calculation of the recycled and treated wastewater, storage tank capacity
and distribution system.
2. As Built drawings for wastewater recycling and treatment system, and storage tank location
(to scale).
3. Describe any deviation or addition to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To encourage and recognise the design of landscaping system that minimises or does not require the use of potable
water supply from the local water authority.
DESCRIPTION
The main aim is to reduce the consumption of potable water for landscape irrigation. This may be achieved through the
use of native or adaptive plants to reduce potable water consumption.
REQUIREMENTS
1 point: For reducing potable water consumption for landscape irrigation by 50% or more, OR
2 points: For not using potable water at all for landscape irrigation.
1. A brief description of the system with references to Guidelines used, calculations, and an
explanation of how the system meets the requirement for the credit.
2. A brief report by a landscape architect detailing the selection of native adaptive vegetation
and the water efficient irrigation system and demonstrating that it will meet all the
requirements for the credit.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. As built plans showing the detail location of the planted native adaptive vegetation and
installed water efficient irrigation system (to scale).
2. Calculation of the reduction of potable water for landscape irrigation.
3. Furnish photographs of the vegetation installed.
4. Describe any deviations or additions to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To encourage reduction in potable water consumption through use of efficient devices.
REQUIREMENTS
1) With reference to Utility calculations:
1 point: For reduction of ≥ 20% or more annual potable water consumption, OR
2 points: For reduction of ≥ 30% or more annual potable water consumption, OR
3 points: For reduction of ≥ 50% or more annual potable water consumption.
OR
2) From existing 3-year average water consumption record, reduce annual potable water use by:
1 point: For reduction of ≥ 20% or more annual potable water consumption, OR
2 points: For reduction of ≥ 30% or more annual potable water consumption, OR
3 points: For reduction of ≥ 50% or more annual potable water consumption.
Submit with reference to Utility calculations or from existing 3-year average water consumption record to demonstrate
that the fittings selected will reduce the potable water consumption compared to the building base conditions.
Specify the use of automatic self-closing faucets, electronic or otherwise, to eliminate wastage through faucets left
running unnecessarily.
1. A brief description of the system and an explanation of how the system meets the
requirement for the credit.
2. Submit proposed makes of the intended fittings.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INTENT
To encourage the design of systems that allows monitoring and management of water consumption.
REQUIREMENTS
1 point: For incorporation of sub-meters to monitor and manage major water usage for cooling towers, irrigation,
kitchens and tenancy use.
1 point: For linking sub-meters to EMS to facilitate early detection of water leakage.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
INNOVATION
(IN)
INTENT
To provide opportunity for the project to be awarded points for exceptional performance above the requirements set
by GBI rating system.
DESCRIPTION
Reward innovation and initiatives.
REQUIREMENTS
Encourage project team to score points for exceptional performance above the requirements set by GBI rating system:
1 point for each approved innovation and environmental design initiative up to a maximum of 9 points, for innovative
ideas such as, but not limited to:
• Use of Industrialized Building System (IBS) for the retrofit component (minimum CIDB IBS score of 30);
• Condensate water recovery (accounting for at least 50% of total AHUs/FCUs) for use as cooling tower make-up
water or other suitable application;
• Co-generation / Tri-generation system;
• Thermal / PCM / Thermal Mass storage system (accounting for at least 25% of total required cooling capacity);
• Solar thermal technology / Solar Air conditioners (generating at least 10% of total required cooling capacity);
• Heat recovery system (contributing to at least 10% of total required capacity);
• Heat pipe technology (contributing to at least 50% of relevant applications);
• Light pipes (generating at least 1% of the total lighting capacity);
• Auto-condenser tube cleaning system (fitted to plant equipment serving at least 50% of total capacity);
• Non-chemical water treatment system (serving at least 50% of total capacity);
• Air and dirt separator system for chilled water system
• Vacuum degasser cleaning system for chilled water piping system
• Dynamic balancing control valve system (for entire chilled water system)
• Mixed mode / low energy ventilation system;
• Advanced air filtration technology (serving at least 50% of the GFA);
• Waterless urinals (fitted to at least 75% male toilets);
• Central vacuum system (serving at least 50% of NLA);
• Central Pneumatic Waste Collection system (serving at least 50% of NLA);
• Self-cleaning façade (for at least 10% of facade);
• Electrochromic glazed façade (for at least 10% of facade);
• Refrigerant leakage detection and recycling facilities (for at least 90% of HVAC plant);
• Car park mechanical ventilation fans provided with VSD and controlled by CO2/CO sensors;
• Recycling of all fire systems (sprinkler and wet riser) water during regular testing;
Project team may submit any innovation not listed above to GBI for consideration and approval of credit point.
1. Report on each innovation, how it is derived, and how it would assist in reducing energy
and/or improving sustainable design.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
1. Full documentation and photographic evidence of each innovation, and the process from
commencement to commissioning, complete with drawings, manuals and maintenance
write-up.
2. Describe any deviations or additions to the DA submission.
DATE
PROJECT NAME
CLIENT
INTENT
To support and encourage the design integration required for Green Building Index rated buildings and to streamline
the application and certification process.
DESCRIPTION
Encourage and promote green technology service providers.
REQUIREMENTS
Support and encourage the design integration required for Green Building Index rated buildings and to streamline the
application and certification process, where:
At least one principal participant of the project team shall be a Green Building Index Facilitator who is engaged at the
onset of the design process until completion of construction and Green Building Index certification is obtained. Name of
the GBI Facilitator shall be inserted in GBI Application & Registration Form.
REQUIRED SUBMISSION FOR COMPLETION & VERIFICATION ASSESSMENT (CVA) SUBMITTER GBI
DATE
PROJECT NAME
CLIENT
ACKNOWLEDGEMENTS
GSB would like to thank all contributors for efforts in preparing the Non-Residential Existing Building
(NREB) Design Reference Guide Version 1.0. The following are the main contributors to the formation of
this document: