Exercise:1

Prepare Frequency table, plot histogram.Calculate mean and standard


deviation

Given below are observations taken in microns of the surface finish of machined tubes.
24 33 19 19 21
24 24 12 20 27
28 15 23 23 21
23 27 27 27 25
24 27 31 16 20
23 27 24 27 30
27 15 16 17 22
27 24 19 31 23
29 31 24 21 22
24 32 20 27 20
19 15 19 22 29
19 27 27 19 27
31 17 21 20 20
12 23 27 24 25
29 19 23 21 31
15 23 27 24 24
23 16 27 20 21
15 32 23 27 24
34 23 19 22 30
25 24 20 16 27

Exercise-2: Develop a Pareto Diagram for the Data Given Below


Down time Details of the Machine due to various reasons during the month of
July’12

Sl.No Machine Down Description Hours of Down Time


1 Power Failure 25Hrs
2 Electrical Problems 50Hrs
a3 Mechanical Problems 100hrs
4 Non Availability of Raw material 10Hrs
5 Operator Non Availability 12Hrs
Exercise: 3 Develop a Cause and Effect Diagram including Why-Why Analysis for
the Problem_________

4.Exercise: Compute the correlations coefficient from the data given in the First Two
Columns of the Table
Data

X Y X2 XY Y2
10 2 100 20 4

15 3 225 45 9

20 5 400 100 25

15 4 225 60 16

Total 60 14 950 225 54