COMSATS University Islamabad, Wah Campus: Date: 28-12-2020 Day: Monday Class Section: BS (ME) 5A&B Quiz: 4

This document contains information about an engineering quiz being administered at COMSATS University Islamabad's Wah Campus. The quiz is for a class section of 5A&B in the subject of Engineering Management & Economics. The quiz contains questions about calculating the net present value and profitability index of two mutually exclusive projects with different projected cash flows at various discount rates.

Uploaded by

Usman Ali
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

COMSATS University Islamabad, Wah Campus: Date: 28-12-2020 Day: Monday Class Section: BS (ME) 5A&B Quiz: 4

This document contains information about an engineering quiz being administered at COMSATS University Islamabad's Wah Campus. The quiz is for a class section of 5A&B in the subject of Engineering Management & Economics. The quiz contains questions about calculating the net present value and profitability index of two mutually exclusive projects with different projected cash flows at various discount rates.

Uploaded by

Usman Ali
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

COMSATS University Islamabad, Wah Campus

Fall-2020
Department of Mechanical Engineering

Program/Class: BME
Subject: Engineering Management & Economics
Date: 28-12-2020
Day: Monday
Class Section: BS (ME) 5A&B
Quiz: 4

Two mutually exclusive projects have projected cash flows as follows:

Determine the net present value for each project at discount rates of 15, 10, 20, and 35 percent.
Find the profitability index of each project