110Kv Vinh Tuong Substation Extension (Transformer No. 2)
110Kv Vinh Tuong Substation Extension (Transformer No. 2)
Project No.
EDHP
P09-006
Material
Title
35
066-066
0
1 2 3 4 5 6 7 8
REVISION REVISION
SHEET DESCRIPTION SHEET DESCRIPTION
00 01 02 03 04 05 00 01 02 03 04 05
00 Sheet index - -
C-03 Control CB - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
EDHp
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110kv vinh tuong substation control PANEL + CP3
02 02-04-2009 CHECKER Do Minh Viet for 110/22KV TRANSFORMER T2 Dwg number Page 1
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 drawing's List A-066-066-1 2 pages
1 2 3 4 5 6 7 8
BILL OF MATERIALS
F101 DC MCB power supply for tripping 1 & closing circuits 01 5SY5 206 SIEMENS
F102 DC MCB power supply for tripping 2 circuit 01 5SY5 206 SIEMENS
F104 DC MCB power supply for measuring & signalling 01 5SY5 206 SIEMENS
E Lighting 01 - VIETNAM
R Heater 01 - -
X Socket 01 - CLIPSAL
EDHp
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION control PANEL + CP3
02 02-04-2009 CHECKER Do Minh Viet for 110/22kv TRANSFORMER T2 Dwg number Page 2
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 DEVICE's List A-066-066-2 2 pages
1 2 3 4 5 6 7 8
QE52-1
QF50
M Trip circuit 1
Trip circuit 2
200-400-600-800/1-1-1-1A
P2
CL 0.5 MULTI.FUN MULTI.FUN
(U,I,P,Q...) (U,I,P,Q...)
PM750 PM750
CL 5P20
E05-P1 J15-P1
CT
CL 5P20
CONTROL PANEL
CL 5P20 +CP3
P1
QE51-1
RECEIVE 50BF
QL51 MARS. KIOSK
M =E05+MK3
86
QE51-2
7PA22
200-400-600/1/1/1A
F861
PROTECTION PANEL
CL 0.5
86
CL 5P20 7PA22
CL 5P20
F862
+PP3
BCT CL 5P20
INTERNAL
TRANSF.
T2 PROT. 87T / 49 / 64N
7UT613
600-800/1/1A
F87T1
CL 0.5
BCT 74
67/67N, 50/51, 50/51N 74
CL 5P20
50BF 7PA30 7PA30
Q8
F671 - 7SJ622 F741 F742
P2 CL 1.0
600-800-1200/1-1-1A
CL 5P10
CT
CL 5P20
SEND 50BF
P1
Q0
M
TO +PP4
K1J-22kV
J15
Nguyen Xuan Quynh Project
APPROVER Drawing name Date = T2
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung RELAY PROT. & MEASURING DIAGRAM 06-02-2009
+ BASIC
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
02 02-04-2009 CHECKER Do Minh Viet
FOR 110/22KV TRANSFORMER T2 Dwg number Page 1
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 B-066-069- 1 16 pages
54
53
BASIC
1 2 3 4 5 6 7 8
2200 LEGEND:
+CP3 2150
2100
SYMBOL NAME DESCRIPTION
A01 2050 A01 - ANNUNCIATOR
H1
RELAY RESET
1400
1350
1300
COLOR:
1250
- PANEL: RAL 7032
H01 1200
- 110kV MIMIC: RED
QE52-1
1150
110kV - 6kV MIMIC: YELLOW
1100 - 22kV MIMIC: BLUE
QE51-1
QF50 QL52
1050 MATERIAL:
1000 - SHEET STEEL 2mm
QE51-2 QL51
950 DEGREE:
- IP41
900
850
T2
800
Q8 750
700
Q0 650
H02
22kV
600
PE
550 LK LK
500
450
400
∅13
A
∅13
350
∅13
∅13
300
LK LK
800
250
470
470
744
692
XA1 XV1 XA2 XV2 200
LK LK
150
100
50
00
120 120
LK LK
00
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
696
800 800
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 10-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110kV VINH TUONG SUBSTATION control panel + CP3
02 02-04-2009 CHECKER Do Minh Viet for 110/22 KV TRANSFORMER T2 Dwg number Page 1
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Panel layout d-066-066-1 2 pages
1 2 3 4 5 6 7 8
AC DISTRIBUTION PANEL
PROTECTION PANEL
+(EXISTING)
220 VAC SUPPLY
=AC+EXISTING
=E05+PP3 =PP3+E05
2
1
1 122 1
4
3
2 3
1 3
2 4
/9.3
132
131
7
8
X010 X010
21 21 11
S B0 F104
/2.6
22 22 12
133
151
161
X1 L
1
X
E R
PE
X1
2 N
X2
H1
X2
5
6
X010 X010
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 1
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 AC power supply C-066-066- 1 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
DC DISTRIBUTION BOARD
+DC =DC+EXISTING
& VT-DCDB/S06-2
220 VDC SUPPLY
2
1
1
XDC6 224
4
3
2
XDC13 225
6
1
XDC13 226
8
2
1 3 1 3 1 3 1 3
2 4 2 4 2 4 2 4
/9.4
/9.4
/9.5
/1.6
271 /
10L+/5.1
272 /
10L-/5.1
222 /
252 /
221 /
212 /
251 /
211 /
X121
4
4
2
6
1
X131
-
=MK3+E05
=PP3+E05
MARSHALLING KIOSK
PROTECTION PANEL
3L1+/3.1
3L1-/3.1
2L1+/8.1
2L1-/8.4
2L2-/8.7
E05.1L1+/4.1
E05.1L1-/4.1
E05.1L2+/4.1
E05.1L2-/4.1
E05.1L3+/7.1
E05.1L3-/7.1
2L2+/8.5
=E05+MK3
=E05+PP3
PM750 PM750
E05-P1 J15-P1
CONTROL CB
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 2
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 DC power supply C-066-066- 2 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
211 /
3L1+/2.1
REMOTE
SCADA
2 4
12 14 22 24 32 34
S100
K101 K101
/14.1
.1 11 .1 21 31
1 3
361 /
311 /
331
321
X131
9
MARSHALLING KIOSK
=MK3+E05
E05.QF50+/6.6
E05.QF50-/6.7
1
=E05+MK3
X911
6 8
OFF
ON
QF50
/14.1
SCADA ON OFF
6
5 7 X121 X121
MARSHALLING KIOSK
protection panel
2
3
=MK3+E05 =PP3+E05
10
X131 X911
E05.CB.CL/12.3
E05.Q0.OPEN/5.3
=E05+MK3
=E05+PP3
341 /
312 /
X131
8
A1
K101
A2
212 /
3L1-/2.1
14 11
.1
12
24 21
.6
22
34 31
.6
32
44 41
42
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110KV LINE FEEDER = E08 Dwg number Page 3
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Control CB C-934-934- 3 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
REMOTE
REMOTE
REMOTE
SCADA
SCADA
SCADA
6 8 10 12 14 16
5 7 9 11 13 15
444
422
472
443
471
413
10
X911 X911
7
X911
6 8 6 8 6 8
OFF
OFF
OFF
ON
ON
ON
QL52 SCADA ON OFF QL51 SCADA ON OFF J15-Q0 SCADA ON OFF
/14.1 /14.1
/14.1
5 7 5 7 5 7
12
11
X911 X911
9
5
8
X911
442 /
441 /
411 /
412/
421 /
474
713 /
473
461
14
12
13
15
16
11
X131 X131
3
1
X401
X3 X3 X3
=MK3+E05 =22KV_INCOMING+J15
MARSHALLING KIOSK
31 24 27
X3
INCOMING 22kv
E05.QL51.RM/7.4
E05.QL52.RM/7.2
E05.QL51.ON/7.4
E05.QL51.OFF/7.5
E05.QL52.ON/7.2
E05.QL52.OFF/7.2
=E05+MK3
30
DWG: AMS24-0295-SI1
=J15
Nguyen Xuan Quynh Project
APPROVER Drawing name Date = E05
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 4
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Control E05-DS; incoming CB - Q0 C-066-066- 4 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
LAMP TEST LOCAL CONTROL QF50 OFF/ON QL52 OFF/ON QL51 OFF/ON QE52-1 OFF/ON QE51-1 OFF/ON QE51-2 OFF/ON
271 /
10L+/2.7 10L+/6.1
17
X131
13
=MK3+E05
S11
marshalling kiosk
14
E05.1L+/9.1
=E05+MK3
E05.QF50.LOCAL/9.1
E05.QE52-1.OFF/9.5
E05.QE51-2.OFF/9.8
E05.QE51-1.OFF/9.7
E05.QE52-1.ON/9.6
E05.QE51-2.ON/9.8
E05.QE51-1.ON/9.7
E05.QF50.OFF/9.2
E05.QL52.OFF/9.3
E05.QL51.OFF/9.4
E05.QF50.ON/9.2
E05.QL52.ON/9.3
E05.QL51.ON/9.5
20
30
24
29
22
23
25
26
27
28
19
18
21
X131
933 /
952 /
962 /
982 /
941 /
932/
972/
971 /
911 /
921/
961/
981/
921/
1 3 1 3 1 3
OFF
ON
OFF
ON
OFF
/14.1 /14.1 /14.1
2 4 2 4 2 4
3 2 3 2 3 2
554
543
533
1 1 1
553 /
TES/6.1
H01
/14.1 /14.1
272 /
10L-/2.7 10L-/6.1
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 5
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Discrepancy indication C-066-066- 5 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
271 /
10L+/5.8 10L+/8.3
4
X401
=MK3+E05
=22KV_INCOMING+J15
marshalling kiosk
X5 X5 X5 X5 X5
INCOMING 22kv
38 11 5 23 21
=E05+MK3
=j15
QL51.INT+/13.7
QL51.INT-/13.8
QB QB QE QE
X5 X5 X5 X5 X5
39 12 6 24 22
32
31
X401 X401 X131 X131
9
5
8
X401
672 /
671 /
632
631
621
641
651
22 24
ES J15-Q8 OFF
12 14
K102
K102 .4 21
.4 11
1 3
642
J15-Q0
ON
OFF
/14.1
2 4
A1 3 2
K102 J05-Q8
633
A2 1
553 /
TES/5.5
H02
272 /
10L-/5.8 10L-/8.3
41
21
31
11
44
24
34
42
22
32
14
12
.4
.7
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 6
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Discrepancy indication C-066-066- 6 14 pages
54
53
CP3
53
54
CP3
=MK3+E05
Rev
X912
SCADA 711
E05.SCADA/10.0
1
Date
1
04 30-06-2009
Final 17-07-2009
03 17-04-2009
QF50 OPEN 712
E05.2QF50.OFF/10.1
2
CHECKER
DESIGNER
APPROVER
QF50 CLOSE 713
E05.2QF50.ON/10.1
DEP.MANAGER
PRO.MANAGER
3
2
Do Minh Viet
722
Ho Xuan Tung
QL52 CLOSE
E05.2QL52.ON/10.2
5
E05.2QL51.ON/10.4
7
Project
QE52-1 CLOSE 733
E05.2QE52-1.ON/10.5
9
4
E05.2QE51-2.ON/10.7
13
marshalling kiosk
=E05+MK3
EDHP
6
Drawing name
Dwg number
06-02-2009
C-066-066- 7
14
8
Page
= E05
+ CP3
7
pages
=SCADA
scada
1 2 3 4 5 6 7 8
271 /
10L+/6.6
12 14 12 14
LOCKOUT ACCEPT RESET TEST
KH KB
RESET
.3 11 .4 11
841
842
881 /
B+/9.2
HORN BELL
X1 X1
X2 X2
272 / 882 /
10L-/6.6 A+/10.1
861
13 13 23
S12 S13 S11
14 14 24
863
862
871
843
831
A1 A1
KH KB
13
A2 A2
S14
14
231 /
812 /
X121 X121
7
=PP3+E05
A1 H1 H2 B1 B2 P N AC RE TE LP FP LN
PROTECTION PANEL
E05.RESET+/5.6
E05.RESET-/5.6
=E05+PP3
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 8
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Power Supply for annuciator C-066-066- 8 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
881 /
B+/8.8 B+/10.1
11 11 11 11
931 /
ACDC.TR/11.3
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 9
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Signalling trip MCB C-066-066- 9 14 pages
54
53
CP3
53
54
CP3
Rev
B+/9.6
A+/8.8
A1
A1
A1
1
Date
X910
1017
X100
1014 TRANSF. DIFFERENTIAL 1011 /
33 F87T/13.2
L01
F01
04 30-06-2009
Final 17-07-2009
03 17-04-2009
1
X1
F87T
X2
RC R1
1018
1
1015 HIGH SENSITIVITY O/C TIME- 110KV SIDE 1012 /
F64/13.3
L02
F02
2
X1
F64
X2
R2
1019
CHECKER
DESIGNER
2
APPROVER
1016 DIRECT-OVERCURRENT 110KV SIDE 1013 /
F67/13.4
L03
F03
DEP.MANAGER
3
PRO.MANAGER
X1
F67/67N HV
X2
R3
10110
3
1024 OVERCURRENT 110KV SIDE 1021 /
F51/13.4
L04
F04
4
X1
F50/51 HV
2
X2
R4
1027
C1
R1
4
1025 OVERLOAD ALARM 1022 /
Do Minh Viet
F49/13.5
L05
F05
5
X1
F49
Ho Xuan Tung
X2
R5
1028
L06
F06
6
X1
X2
X100
R6
1029 881 /
2B1+/13.1
6 33
1034 SEND 50BF 1033
SE.50BF/13.7
L07
F07
7
X1
F50BF
X2
R7
1037
3
7
1035 RELAY FAULT 1031 /
RF/14.2
L08
F08
8
X1
X2
R8
1038
L09
F09
Project
9
X1
F86
X2
RC R9
1039
9
1045 TRIP CIRCUIT SUPERVISION 1041
F74/14.5
L10
F10
10
X1
F74
X2
1049
R10
10
4
X1 11
X2
11
1047 SPARE 1043
L12
F12
12
X1
X2
10411
R12
C2
R2
12
1048 SPARE 1044
L13
F13
13
X1
X2
FOR SCADA
1057
R13
13
1054 SPARE 1051
14
X1
X2
5
1058
R14
14
1055 SPARE 1052
L15
F15
15
X1
X2
1059
R15
=E05+PP3
15 =PP3+E05
1056 SPARE 1053
L16
F16
16
X1
X2
PROTECTION PANEL
EDHP
10510
R16
16
=MK3+E05
17
X1
X2
X100
1067
RC R17
E05.1B1+/11.1
6
17 34
1065 CB LOCKOUT OF SF6 1062
E05.CB.LOCKSF6/11.4
L18
F18
18
X1
X2
1068
R18
Drawing name
18
Signalling to annuciator
19
X1
X2
1069
R19
19
1075 MCB TRIP ON MARSHALLING KIOSK 1072
E05.MCB.TR/11.2
L20
F20
20
X1
X2
CONTROL PANEL
1078
R20
C3
R3
20
1076 SPARE 1073
L21
F21
7
21
X1
X2
1079
R21
=E05+MK3
21
1077 SPARE 1074
MARSHALLING KIOSK
L22
F22
22
X1
X2
10710
R22
=RCC+W1
Date
22
X9
X9
X9
X9
L23
F23
2
18
17
23
X1
X2
1084
R23
Dwg number
06-02-2009
6
5
19
23
20
C-066-066- 10
X100
21
24
X1
22
10
35
X2
14
1085
R24
8
882 /
31
13
Page
14
32
24
= E05
+ CP3
16
15
33
34
10
A+/11.1
RCC + W1
1 2 3 4 5 6 7 8
40
39
36
37
38
X100
B+/10.8
=22KV_INCOMING+J15
INCOMING 22KV
X5 X5 X2 =J15
28 25 2
ACDC.TR/9.3
X5 X5 X2
29 27 5
30
29
25
26
27
28
32
31
X100
931 /
1122
1124
1123
1131
1121
1112
1111
SPARE
SPARE
SPARE
1128
1125
1133
1126
1132
1114
1113
X1 X1 X1 X1 X1 X1 X1 X1
A1
X2 X2 X2 X2 X2 X2 X2 X2
882 /
A+/10.8
R4
11211
1134
1135
1136
1129
1115
1116
30
29
25
26
27
28
32
31
X910
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 11
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Signalling to annuciator C-066-066- 11 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
=INCOMING+J15
marshalling kiosk
marshalling kiosk
CORE 2 VT4 CORE 1 - 600/1A
PROTECTION PANEL
incoming 22KV
CL 0.5 CL 0.5
=E05+MK3
=E05+MK3
=E03+PP4
1.VT4.UL2/17.5
1.VT4.UL3/17.6
1.VT4.UL1/17.5
1.VT4.UN/17.6
=j15
E05.1IL2/16.2
E05.1IL3/16.2
E05.1IL1/16.2
E05.UL2/18.1
E05.UL3/18.1
E05.UL1/18.1
E05.1IN/16.2
E05.UN/18.2
X4 X4 X4 X4 X6 X6 X6 X6
3 7 11 13 2 5 8 14
1242 /
1243 /
1244 /
1241 /
1625/
1626/
1627/
1263
1273
1262
1272
1251
1261
1271
1281
XA1 1 2 3 4 XV1 1 2 3 4 XA2 1 2 3 4 XV2 1 2 3 4
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
1252
1264
1265
1215
1217
1266
1216
1274
1218
1275
1276
1222
1232
1282
1221
1231
V1 V2 V3 VN V1 V2 V3 VN
I1+ I1- I1+ I1-
E05-P1 J15-P1
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 12
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Measuring circuit C-066-066- 12 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
01 05 09 13 17 21 25 29
02 06 10 14 18 22 26 30
03 07 11 15 19 23 27 31
04 08 12 16 20 24 28 32
OVERCURRENT MCB TRIP TRANSFORMER AC & DC MCB TRIP AC & DC MCB TRIP
110kV RELAY FAULT SPARE SPARE MARSHALLING KIOSK ALARM 22kV SWITCHGEAR CONTROL PANEL
- F50/51 -
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 13
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 annuciator window C-066-066- 13 14 pages
54
53
CP3
1 2 3 4 5 6 7 8
REMOTE
SCADA
2 4 6 8 10 12
5 7 9 11
3
1
OFF
OFF
OFF
ON
ON
ON
2 4 6 8 10 12
5 7 9 11
3
1
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung CONTROL PANEL 06-02-2009
+ CP3
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
FOR 110/22kV TRANSFORMER T2 Dwg number Page 14
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Connection terminal switch C-066-066- 14 14 pages
54
53
CP3
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X010
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
1.3 5 -E X2
1.5 6 -R 2
1.3 7 -S 21
1.5 8 -B0 21
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 1
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X010 1 16 pages
=CP3+E05-X010
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X011
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
2.8 8
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 2
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X011 2 16 pages
=CP3+E05-X011
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X5
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
30.5 1-2-3
30.6 4-5-6
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 3
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X5 3 16 pages
=CP3+E05-X5
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X100
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 4
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X100 4 16 pages
=CP3+E05-X100
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X100
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
11.2 38 39
11.2 40
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 4.1
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X100 4.1 16 pages
=CP3+E05-X100
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X121
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
3.6 6
-S14 13 231 8.1 7
=PP3 -X211 6 231 8.1
-S14 14 812 8.1 8
=PP3 -X211 7 812 8.1
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 5
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X121 5 16 pages
=CP3+E05-X121
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X131
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 6
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X131 6 16 pages
=CP3+E05-X131
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X131
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 6.1
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X131 6.1 16 pages
=CP3+E05-X131
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X401
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
4.6 1 -S100 14
6.2 5 -H02
6.3 6 -J15-Q0 1
6.3 7 -J15-Q0 3
-K102 A1 6.4 8
-J05-Q8 2 6.5 9
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 7
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X401 7 16 pages
=CP3+E05-X401
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X601
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
12.1 1
12.1 2
12.1 3
12.1 4
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 8
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X601 8 16 pages
=CP3+E05-X601
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X602
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
12.5 1
12.6 2
12.6 3
12.6 4
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 9
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X602 9 16 pages
=CP3+E05-X602
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X701
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
12.2 1 -XV1 1
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 10
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X701 10 16 pages
=CP3+E05-X701
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X702
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
12.7 1 -XV2 1
12.7 2
12.7 3 -XV2 2
12.7 4
12.7 5 -XV2 3
12.7 6
12.8 7 -XV2 4
12.8 8
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 11
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X702 11 16 pages
=CP3+E05-X702
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X910
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 12
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X910 12 16 pages
=CP3+E05-X910
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X911
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 13
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X911 13 16 pages
=CP3+E05-X911
54
53
INSTALLATION : =CP3
TERMINAL STRIP LOCATION : +E05
STRIP : X912
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
7.1 1
7.1 2
7.1 3
7.2 4
7.2 5
7.2 6
7.3 7
7.3 8
7.3 9
E05.2QE51-1.OFF 741 7.4 10
E05.2QE51-1.ON 742 7.4 11
E05.2QE51-2.OFF 7.5 12
E05.2QE51-2.ON 7.5 13
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +CP3 + TERM.CP3
Dwg number Page 14
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =CP3+E05-X912 14 16 pages
=CP3+E05-X912
54
53