This document lists 40 IACS PRs (Procedural Requirements) along with their titles and the panel responsible for each. The PRs cover various areas related to ship classification including surveys, plan approval, statutory certification, crew certification, and quality control. The panels responsible include Survey, Hull, Quality Control (QC), Environmental Guidelines and Marine Systems (EG/MS), and General Policy Group (GPG).
This document lists 40 IACS PRs (Procedural Requirements) along with their titles and the panel responsible for each. The PRs cover various areas related to ship classification including surveys, plan approval, statutory certification, crew certification, and quality control. The panels responsible include Survey, Hull, Quality Control (QC), Environmental Guidelines and Marine Systems (EG/MS), and General Policy Group (GPG).
This document lists 40 IACS PRs (Procedural Requirements) along with their titles and the panel responsible for each. The PRs cover various areas related to ship classification including surveys, plan approval, statutory certification, crew certification, and quality control. The panels responsible include Survey, Hull, Quality Control (QC), Environmental Guidelines and Marine Systems (EG/MS), and General Policy Group (GPG).
This document lists 40 IACS PRs (Procedural Requirements) along with their titles and the panel responsible for each. The PRs cover various areas related to ship classification including surveys, plan approval, statutory certification, crew certification, and quality control. The panels responsible include Survey, Hull, Quality Control (QC), Environmental Guidelines and Marine Systems (EG/MS), and General Policy Group (GPG).
1 Deleted January 2000 1A Procedures for Transfer of Class Survey 1B Procedure for Adding, Maintaining or Withdrawing Survey Double or Dual Class 1C Procedure for Suspension and Reinstatement or Survey Withdrawal of Class in Case of Surveys, Conditions of Class or Recommendations Going Overdue 1D Procedure for Class Entry of Ships not subject to Survey PR1A or PR1B 1 Annexes to PR1A, PR1B and PR1C Survey ANNEX 2 Procedure for Failure Incident Reporting and Early Survey Warning of Serious Failure Incidents - Early Warning Scheme – EWS – Del Jan2017 2A Procedure for Hull Failure Reporting Hull/Survey 2B Procedure for Early Warning of Serious Hull Hull/Survey Failure Incidents – “Early Warning Scheme – EWS” 3 Transparency of Classification and Statutory GPG Information 4 Deleted January 2000 5 Definition of Exclusive Surveyor and Survey Non-Exclusive Surveyor and Procedure for Employment and Control of Non-Exclusive Surveyors 6 Procedure for Activity Monitoring of Surveyors, QC Plan Approval Staff and Auditors 7 Procedure for the Training and Qualification of QC Survey and Plan Approval Staff 8 Procedure for Responding to Port State Control Survey 9 Procedural Requirements for ISM Code EG/MS Certification 10 Procedure for the Selection, Training, Qualification EG/MS and Authorisation of Marine Management Systems Auditors 10A Deleted March 2009 10B Procedure for the Selection, Training, Qualification EG/MS and Authorisation of Maritime Labour Inspectors 11 IACS Procedure for Assigning Date of Build Survey
12 Procedure for Statutory Certification at Change of Survey
Class without Change of Flag 13 Cancelled December 1998 14 Deleted July 2009 15 Deleted March 2009 16 Procedure for providing lists of classed ships EG/DATA to Equasis
Page 1 of 2 IACS PR’s and Panel Responsible
PR Title Panel Responsible
17 Reporting on deficiencies possibly affecting the EG/MS implementation of the ISM Code on board during surveys 18 Transfer of Safety and Security Management EG/MS Systems Certification 19 Procedural Requirement for Thickness Survey Measurements 20 Procedural Requirement for certain ESP Surveys Survey 21 Procedural Requirement for Statutory Surveys Survey by Exclusive Surveyors 22 Deleted July 2009 23 Procedure for Reporting Cancellation of Approval Survey of a Thickness Measurement Firm 24 Procedural Requirements for ISPS Code EG/MS Certification 25 Deleted March 2009 26 Deleted March 2009 27 Deleted Jan 2008, and incorporated in PR 18 (Rev.2 Jan 2008) Complete Revision 28 Procedure for Change of Flag Survey 29 Definition of date of “contract for construction” GPG 30 Deleted June 2006 31 Additional measures to ensure mandatory GPG application of IACS Unified Interpretations 32 Procedure for handling technical questions Hull regarding the IACS CSRs 33 Owner’s Hull Inspection and Maintenance Survey Schemes 34 Procedural Requirement on Application of the IMO Performance Standard for Protective Coatings (PSPC), Resolution MSC.215(82), under IACS Common Structural Rules for Bulk Carriers and Oil Tankers (Deleted July 2012) 35 Procedure for Imposing and Clearing Survey Recommendations/Conditions of Class 36 Transfer of Maritime Labour Convention, 2006 EG/MS Certification 37 Procedural Requirement for Confined Space Safe Survey Entry 38 Procedure for Calculation and Verification of the Environmental Energy Efficiency Design Index (EEDI) 39 Procedure for Fleet Quality Monitoring QC 40 Procedural Requirements for MLC, 2006 EG/MS Certification